A steel pipe column casting and installation structure

By designing the steel cage structure, installation bracket and steel pipe column mounting frame, and using concrete pouring to achieve stable installation of steel pipe columns, the existing installation process is solved, the installation process is simplified and efficiency is improved.

CN222716026UActive Publication Date: 2025-04-04CHINA RAILWAY EIGHTH BUREAU GROUP SECOND ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421496632.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-04-04
Estimated Expiration
2034-06-27

AI Technical Summary

Technical Problem

The installation process of existing steel pipe columns is cumbersome and requires two grouting operations, which is time-consuming and complicated.

Method used

A steel pipe column casting installation structure was designed, including a steel cage structure, installation bracket and steel pipe column mounting frame. The stable installation was achieved through concrete pouring, eliminating the grouting material leveling step.

Benefits of technology

The stable installation of steel pipe strings is achieved, the installation process is simplified, the installation time is reduced, and the height adjustment of the steel pipe string is achieved through the nut and bolt structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222716026U_ABST
    Figure CN222716026U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel pipe column casting installation structure, including a steel cage structure, an installation bracket, and a steel pipe column installation frame; the lower end of the installation bracket passes through the steel cage structure and is placed at the bottom of a strip foundation trough; the steel pipe column installation frame includes a steel pipe column flange and a plurality of steel pipe column screw assemblies, the steel pipe column flange is installed at the bottom of the steel pipe column, the steel pipe column is placed on the top of the installation bracket, and the steel pipe column screw passes downward through the steel cage structure and is placed at the bottom of the strip foundation trough, and the poured concrete is set above the top of the installation bracket. In the present application, a strip foundation trough is provided in the foundation layer and a steel cage structure is placed therein for structural reinforcement, and then the steel pipe column installation frame is placed on the installation bracket, and the installation bracket and the steel pipe column screw are also extended into the steel cage, and finally, by pouring concrete on the installation bracket and the steel cage structure, a stable installation of the steel pipe column is achieved, thereby eliminating the step of leveling the grouting material during the installation process, and the installation operation can be completed by pouring once.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building materials, in particular to a steel pipe column casting and installation structure. Background Art

[0002] A steel pipe column refers to a column made of steel pipes, which is usually used to support and fix structures. It has good ductility and energy absorption performance, and can effectively improve the seismic performance of the structure.

[0003] In the prior art, during the installation of steel pipe columns, it is necessary to first dig a foundation trench on the ground, then lay steel bars and steel plates for support, and then pour concrete for fixation. After fixation, the steel pipe columns are installed on the steel plates and welded to fix them. During installation, a certain gap needs to be left between the supporting steel plates and the foundation layer, and finally slurry is poured into the gap for leveling. A total of two grouting operations are required during the whole process, which is relatively cumbersome and time-consuming.

[0004] Therefore, it is necessary to develop a steel pipe column casting and installation structure to solve the above problems. Utility Model Content

[0005] The purpose of the utility model is to design a steel pipe column casting and installation structure in order to solve the above problems.

[0006] The utility model achieves the above-mentioned purpose through the following technical solutions:

[0007] A steel pipe column casting and installation structure, comprising:

[0008] Steel cage structure; a strip foundation groove is provided in the foundation layer, and the steel cage structure is installed in the strip foundation groove;

[0009] The mounting bracket is formed into a rectangular parallelepiped, and the lower end of the mounting bracket passes through the steel cage structure and is placed at the bottom of the strip foundation groove;

[0010] Steel pipe column mounting frame; the steel pipe column mounting frame includes a steel pipe column flange and multiple steel pipe column screw assemblies. The steel pipe column flange is installed at the bottom end of the steel pipe column. Multiple mounting holes are evenly arranged on the steel pipe column flange around the axis of the steel pipe column. The steel pipe column screw assembly includes a steel pipe column screw, a first nut, and a second nut. The steel pipe column screw is arranged through the mounting hole. The first nut and the second nut are both matched with the steel pipe column screw thread. The first nut is placed on the lower surface of the steel pipe column flange, and the second nut is placed on the upper surface of the steel pipe column flange; the steel pipe column is placed on the top of the mounting bracket, and the steel pipe column screw is placed at the bottom of the strip foundation groove after passing downward through the steel cage structure, and the poured concrete is set to cover the top of the mounting bracket.

[0011] The steel cage structure is formed into a rectangular parallelepiped shape, and includes a plurality of stirrups and a plurality of horizontally arranged main bars. The plurality of main bars are surrounded into a rectangular parallelepiped shape, and the plurality of stirrups are sheathed on the sides of the plurality of main bars. The stirrups and the main bars are fixed by welding or binding with wires.

[0012] The steel pipe column casting and installation structure also includes two baffles, which are installed on the two side walls of the strip foundation groove and are located on both sides of the steel cage structure.

[0013] The mounting bracket includes four parallel supporting legs, two parallel supporting rods, two parallel connecting strips, four U-shaped frames, four first bolts, and four second bolts. The positioning groove of the U-shaped frame is arranged upward, and the lower end of the U-shaped frame is connected to the top of the supporting leg. Two second threaded holes at the same height are provided on the two side walls of the U-shaped frame, two first threaded holes are provided at both ends of the supporting rod along its length direction, a plurality of through holes are evenly provided on the side wall of the supporting rod along its length direction, an adjustment hole is provided in the middle part of the connecting strip along its length direction, and the two ends of the supporting rod are mounted in the positioning grooves of the two U-shaped frames and can slide along the positioning grooves, the rod of the first bolt is screwed into the first second threaded hole, the through hole, and the second second threaded hole in sequence, and the rod of the second bolt passes through the adjustment hole and is screwed into the first threaded hole.

[0014] The steel pipe column casting and installation structure also includes a plurality of reinforcement plates, which are evenly arranged around the axis of the steel pipe column, one side of the reinforcement plate is connected to the side wall of the steel pipe column, and the lower end of the reinforcement plate is connected to the top of the steel pipe column flange.

[0015] The beneficial effects of the utility model are:

[0016] In the present application, a strip foundation groove is provided in the foundation layer and a steel cage structure is placed therein for structural reinforcement, and then the steel pipe column mounting frame is placed on the mounting bracket, and the mounting bracket and the steel pipe column screws are also extended into the steel cage, and finally, the mounting bracket and the steel cage structure are poured with concrete to achieve stable installation of the steel pipe column, thereby eliminating the step of leveling the grouting material during the installation process, and the installation operation can be completed by pouring once;

[0017] The installation height of the steel pipe column can be adjusted by the first nut and the second nut;

[0018] By setting structures such as support legs and second bolts, the position of the support legs can be adjusted according to the position of the gap formed by the intersection of the stirrups and the main reinforcement, and by rotating the second bolt, the connecting strip and the support rod can be put in a movable state, thereby adjusting the distance between the two support rods, so that the two support rods can be adjusted according to the position of the support legs for installation operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a structural schematic diagram of a steel pipe column casting and installation structure proposed by the utility model;

[0020] Figure 2 This is a partial structural schematic diagram of a steel pipe column casting and installation structure proposed by the utility model;

[0021] Figure 3 This is a structural schematic diagram of a first threaded hole portion of a steel pipe column casting installation structure proposed by the utility model;

[0022] Figure 4 The utility model provides a structural schematic diagram of the support rod part of the steel pipe column casting installation structure.

[0023] In the figure: 100, foundation layer; 101, strip foundation groove; 200, baffle; 201, stirrups; 202, main reinforcement; 300, support leg; 301, U-shaped frame; 302, support rod; 303, first bolt; 304, connecting strip; 305, second bolt; 306, adjustment hole; 307, first threaded hole; 308, positioning groove; 309, second threaded hole; 400, steel pipe column flange; 401, steel pipe column; 402, reinforcement plate; 403, steel pipe column screw; 404, first nut; 405, second nut; 406, bolt assembly; 407, mounting hole. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0025] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0027] In the description of the present utility model, it should be understood that the terms "upper", "lower", "inside", "outside", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the utility model product is usually placed when in use, or are directions or positional relationships that are usually understood by those skilled in the art. These directions or positional relationships are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or component referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present utility model.

[0028] Furthermore, the terms “first”, “second”, etc. are merely used for distinguishing descriptions and should not be understood as indicating or implying relative importance.

[0029] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms such as "setting" and "connection" should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0030] The specific implementation of the utility model is described in detail below in conjunction with the accompanying drawings.

[0031] like Figure 1-3 As shown, a steel pipe column casting and installation structure comprises:

[0032] A steel cage structure; a strip foundation groove 101 is provided in the foundation layer 100, and the steel cage structure is installed in the strip foundation groove 101;

[0033] The mounting bracket is formed into a rectangular parallelepiped, and the lower end of the mounting bracket passes through the steel cage structure and is placed at the bottom of the strip foundation groove 101;

[0034] Steel pipe column mounting frame; the steel pipe column mounting frame includes a steel pipe column flange 400 and multiple steel pipe column screw 403 assemblies. The steel pipe column flange 400 is installed at the bottom end of the steel pipe column 401. Multiple mounting holes 407 are evenly arranged on the steel pipe column flange 400 around the axis of the steel pipe column 401. The steel pipe column screw 403 assembly includes a steel pipe column screw 403, a first nut 404, and a second nut 405. The steel pipe column screw 403 is arranged through the mounting hole 407. The first nut 404 and the second nut 405 are both threadedly matched with the steel pipe column screw 403. The first nut 404 is placed on the lower surface of the steel pipe column flange 400, and the second nut 405 is placed on the upper surface of the steel pipe column flange 400; the steel pipe column 401 is placed on the top of the mounting bracket, and the steel pipe column screw 403 is placed on the bottom of the strip foundation groove 101 after passing through the steel cage structure downward, and the poured concrete is set to cover the top of the mounting bracket. The steel pipe column screw 403 , the first nut 404 , and the second nut 405 constitute a bolt assembly 406 , which is used to adjust the steel pipe column 401 .

[0035] like Figure 1 As shown, the steel cage structure is formed into a rectangular parallelepiped, and the steel cage structure includes multiple stirrups 201 and multiple horizontally arranged main bars 202. The multiple main bars 202 are surrounded by a rectangular parallelepiped, and the multiple stirrups 201 are mounted on the sides of the multiple main bars 202. The stirrups 201 and the main bars 202 are fixed by welding or wire binding.

[0036] like Figure 1 As shown, the casting and installation structure of the steel pipe column 401 also includes two baffles 200. The two baffles 200 are installed on the two side walls of the strip foundation trench 101 and are located on both sides of the steel cage structure.

[0037] like Figure 4 As shown, the mounting bracket includes four parallel supporting legs 300, two parallel supporting rods 302, two parallel connecting strips 304, four U-shaped frames 301, four first bolts 303, and four second bolts 305. The positioning grooves 308 of the U-shaped frames 301 are arranged upward, and the lower ends of the U-shaped frames 301 are connected to the tops of the supporting legs 300. Two second threaded holes 309 arranged at the same height are provided on the two side walls of the U-shaped frames 301. Two first threaded holes 309 are provided at both ends of the supporting rods 302 along their length direction. Threaded hole 307, a plurality of through holes are evenly opened on the side wall of the support rod 302 along its length direction, an adjustment hole 306 is set in the middle part of the connecting strip 304 along its length direction, both ends of the support rod 302 are mounted in the positioning grooves 308 of the two U-shaped frames 301, and can slide along the positioning grooves 308, the rod of the first bolt 303 is screwed into the first second threaded hole 309, the through hole, and the second second threaded hole 309 in sequence, and the rod of the second bolt 305 passes through the adjustment hole 306 and is screwed into the first threaded hole 307.

[0038] like Figure 3 As shown, the casting and installation structure of the steel pipe column 401 also includes a plurality of reinforcing plates 402, which are evenly arranged around the axis of the steel pipe column 401, one side of the reinforcing plate 402 is connected to the side wall of the steel pipe column 401, and the lower end of the reinforcing plate 402 is connected to the top of the steel pipe column flange 400.

[0039] Working principle of this utility model:

[0040] During installation, baffles 200 are first laid on the inner walls of both sides of the strip foundation groove 101, and then a plurality of stirrups 201 are laid in parallel in the strip foundation groove 101. The plurality of stirrups 201 are connected by a plurality of main bars 202. The stirrups 201 and the main bars 202 can be connected and fixed by welding or wire binding. Then, the support legs 300 are inserted according to the positions of the holes generated by the staggered holes between the stirrups 201 and the main bars 202, so that the bottom ends of the support legs 300 are in contact with the bottom of the strip foundation groove 101 for support. The second bolts 305 on both sides of the rotating support rod 302 will rotate and move in the first threaded holes 307 when the second bolts 305 rotate, and the moved second bolts 305 will be away from the contact with the connecting strip 304, so that The connection between the connecting strip 304 and the support rod 302 is loosened, and then the position of the support rod 302 on the connecting strip 304 can be adjusted. During the adjustment process, the second bolt 305 will be driven to slide in the adjustment hole 306, so that the two support rods 302 can face the four positioning grooves 308, and the two support rods 302 are respectively placed in the positioning grooves 308 on the two U-shaped frames 301 at the corresponding positions for positioning to prevent deviation, and then the second bolt 305 is rotated in the opposite direction and tightened. Under the action of the second bolt 305, the connecting strip 304 will be close to the support rod 302 again to prevent the support rod 302 from loosening, and the position of the support rod 302 can be adjusted according to the position of the second threaded hole 309, so that the second threaded hole 309 on the support rod 302 can be aligned with the second threaded hole 309 on the support rod 302. The second threaded holes 309 on the U-shaped frame 301 are aligned and connected, and the first bolts 303 are screwed into the two second threaded holes 309 at the corresponding positions to connect and fix the U-shaped frame 301 and the support rod 302, so that the support rod 302 can be adjusted in the horizontal or vertical position to adapt to the positions of the stirrups 201 and the main reinforcement 202. After completion, the steel pipe column flange 400 can be placed on the two support rods 302 for support. By setting a reinforcement plate 402 on the steel pipe column flange 400 and the steel pipe column 401, its stability can be improved. After placement, the first nut 404 can be taken and placed on the bottom side of the steel pipe column flange 400, and the steel pipe column screw 403 is inserted into the mounting hole 407 at the corresponding position and the first nut 4 04 is rotated and screwed on the steel pipe column screw 403, and the installation hole 407 will extend into the strip foundation groove 101. Then take the second nut 405 and screw it on the top side of the steel pipe column screw 403, so that the first nut 404 and the steel pipe column screw 403 can sandwich the steel pipe column flange 400 in the middle. Continuous rotation can make the first nut 404 contact with the bottom side of the steel pipe column flange 400, and the steel pipe column screw 403 contacts with the top side of the steel pipe column flange 400. By rotating the first nut 404 and the steel pipe column screw 403, the length of the steel pipe column screw 403 extending into the strip foundation groove 101 can be adjusted. After all the steel pipe column screws 403 are installed, concrete can be poured into the foundation layer 100 so that the concrete can cover the stirrups 201 and the support rods 302.The poured concrete layer can be reinforced by laying the baffle plate 200, the stirrups 201 and the main reinforcement 202, and the solidified concrete can fix the steel pipe column screw 403, thereby completing the installation of the steel pipe column 401.

[0041] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. A steel pipe column casting and installation structure, characterized in that: include: Steel cage structure; A strip foundation groove is provided in the foundation layer, and a steel cage structure is installed in the strip foundation groove; Mounting bracket; The mounting bracket is formed into a rectangular parallelepiped shape, and the lower end of the mounting bracket passes through the steel cage structure and is placed at the bottom of the strip foundation groove; Steel pipe column mounting frame; the steel pipe column mounting frame includes a steel pipe column flange and multiple steel pipe column screw assemblies. The steel pipe column flange is installed at the bottom end of the steel pipe column. Multiple mounting holes are evenly arranged on the steel pipe column flange around the axis of the steel pipe column. The steel pipe column screw assembly includes a steel pipe column screw, a first nut, and a second nut. The steel pipe column screw is arranged through the mounting hole. The first nut and the second nut are both matched with the steel pipe column screw thread. The first nut is placed on the lower surface of the steel pipe column flange, and the second nut is placed on the upper surface of the steel pipe column flange; the steel pipe column is placed on the top of the mounting bracket, and the steel pipe column screw is placed at the bottom of the strip foundation groove after passing downward through the steel cage structure, and the poured concrete is set to cover the top of the mounting bracket.

2. A steel pipe column casting and installation structure according to claim 1, characterized in that: The steel cage structure is formed into a rectangular parallelepiped shape, and includes a plurality of stirrups and a plurality of horizontally arranged main bars. The plurality of main bars are surrounded into a rectangular parallelepiped shape, and the plurality of stirrups are sheathed on the sides of the plurality of main bars. The stirrups and the main bars are fixed by welding or binding with wires.

3. A steel pipe column casting and installation structure according to claim 1, characterized in that: The steel pipe column casting and installation structure also includes two baffles, which are installed on the two side walls of the strip foundation groove and are located on both sides of the steel cage structure.

4. A steel pipe column casting and installation structure according to claim 1, characterized in that: The mounting bracket includes four parallel supporting legs, two parallel supporting rods, two parallel connecting strips, four U-shaped frames, four first bolts, and four second bolts. The positioning groove of the U-shaped frame is arranged upward, and the lower end of the U-shaped frame is connected to the top of the supporting leg. Two second threaded holes at the same height are provided on the two side walls of the U-shaped frame, two first threaded holes are provided at both ends of the supporting rod along its length direction, a plurality of through holes are evenly provided on the side wall of the supporting rod along its length direction, an adjustment hole is provided in the middle part of the connecting strip along its length direction, and the two ends of the supporting rod are mounted in the positioning grooves of the two U-shaped frames and can slide along the positioning grooves, the rod of the first bolt is screwed into the first second threaded hole, the through hole, and the second second threaded hole in sequence, and the rod of the second bolt passes through the adjustment hole and is screwed into the first threaded hole.

5. The steel pipe column casting and installation structure according to claim 1, characterized in that: The steel pipe column casting and installation structure also includes a plurality of reinforcement plates, which are evenly arranged around the axis of the steel pipe column, one side of the reinforcement plate is connected to the side wall of the steel pipe column, and the lower end of the reinforcement plate is connected to the top of the steel pipe column flange.