Prefabricated concrete pipe pile retaining device
By installing steel rings, rubber gaskets and retaining casings on the top of the precast concrete pipe piles and connecting them through high-strength bolts, the problem of insufficient sealing at the ends of the precast concrete pipe piles is solved, achieving a more efficient construction process and a better sealing effect.
Patent Information
- Application Number
- CN202421510367.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-06-28
AI Technical Summary
During the construction process of existing precast concrete pipe piles, due to the poor sealing of their ends, underground earth and mud enter the inside of the pipe pile, affecting the construction efficiency.
A precast concrete pipe pile retaining device is designed, including installing steel ring sheets and rubber gaskets on the top of the pipe pile, and a retaining sleeve is installed thereon, connecting the retaining sleeves and pipe piles through multiple high-strength bolts to improve sealing and connection stability.
Effectively prevent underground earthwork and mud from entering the pipe piles, improve construction efficiency, and improve the sealing and convenience of the device through rubber gaskets and connecting rods.
Smart Images

Figure CN222745038U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a prefabricated concrete pipe pile retaining device. Background Art
[0002] Concrete pipe piles are widely used in our current construction, bridge erection and other fields. The protective sealing of the ends of concrete pipe piles is particularly important.
[0003] After searching, a Chinese patent with announcement number CN216108473U discloses a prestressed concrete pipe pile end sealing device, including a pile head end plate, a steel pad, and an annular sealing pad; the pile head end plate is placed on the end of the prestressed concrete pipe pile; the steel pad is placed on the pile head end plate; an annular inner edge seal and an annular outer edge seal are provided on the steel pad, and the distance between the annular inner edge seal and the annular outer edge seal is slightly greater than the wall thickness of the prestressed pipe pile body; the annular sealing pad is placed between the pile head end plate and the steel pad; an annular inner sealing ring and an annular outer sealing ring are provided on the annular sealing pad, the annular inner sealing ring is placed between the inner wall of the prestressed concrete pipe pile and the annular inner edge seal, and the annular outer sealing ring is placed between the outer wall of the prestressed concrete pipe pile and the annular outer edge seal.
[0004] Based on the above search combined with the existing technology, we found that;
[0005] During the construction process of existing precast concrete pipe piles, due to the poor sealing of their ends, underground earth and mud will enter the interior of the precast concrete pipe piles during construction, resulting in the need to clean the interior when the precast concrete pipe piles are poured in the later stage, affecting the construction efficiency, so there are certain limitations. Utility Model Content
[0006] In order to solve the above technical problems, the utility model proposes a precast concrete pipe pile retaining device, which can effectively seal and protect the end of the precast concrete pipe pile, prevent underground earth and mud from entering the pipe pile through the middle hole of the precast concrete pipe pile, avoid the need to clean the earth in the pipe pile before the later precast concrete pipe pile core pouring process, and improve construction efficiency.
[0007] The technical solution for achieving the purpose of the utility model is: a precast concrete pipe pile earth retaining device, comprising a precast concrete pipe pile, a steel ring piece is fixedly installed on the top of the precast concrete pipe pile, a threaded hole is reserved on the steel ring piece, a rubber gasket is fixedly installed on the top of the steel ring piece, and an earth retaining sleeve is arranged on the top of the rubber gasket.
[0008] In some embodiments, the retaining sleeve is threadedly connected to the steel ring piece and the precast concrete pipe pile by a plurality of high-strength bolts.
[0009] In some embodiments, a pair of vertically staggered connecting rods are disposed inside the soil retaining sleeve, and a plurality of annular grooves are formed on the pair of connecting rods.
[0010] In some embodiments, the end of each high-strength bolt is sleeved with a bolt protection sleeve, and the end of each bolt protection sleeve is commonly fixedly mounted with a connecting ring.
[0011] Compared with the prior art, the present invention has the following significant advantages:
[0012] First, the utility model utilizes the earth retaining sleeve to seal the end of the precast concrete pipe pile, and utilizes multiple bolts to make the connection between the earth retaining sleeve and the precast concrete pipe pile more firmly. At the same time, a rubber gasket is provided between the two to further improve the sealing performance of the device. In addition, a pair of connecting rods are provided inside the earth retaining sleeve, and an annular groove is provided on the connecting rod, which is convenient for the lifting device to lift the precast concrete pipe pile, and also convenient for removing the earth retaining sleeve for recycling.
[0013] Secondly, the utility model adds a bolt protection cover on the top of the bolt, and the bolt protection cover can be easily taken and placed through the connecting ring. The construction site capability is strong, the construction can be completed with simple operation, and the construction is convenient.
[0014] The invention solves the problem that during the construction of the existing precast concrete pipe piles, due to the poor sealing of the ends thereof, underground earth and mud will enter the interior of the precast concrete pipe piles during construction, resulting in the need to clean the interior during the later core pouring of the precast concrete pipe piles, thus affecting the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:
[0016] Figure 1 It is a schematic diagram of the overall first-view structure provided by the utility model in one embodiment;
[0017] Figure 2 It is a schematic diagram of an overall half-section structure provided by the utility model in one embodiment;
[0018] Figure 3 It is a schematic diagram of the overall second viewing angle structure provided in the second embodiment of the utility model;
[0019] Figure 4 It is a schematic diagram of the overall partial half-section structure provided in the second embodiment of the utility model.
[0020] Description of reference numerals:
[0021] 1. Precast concrete pipe piles; 2. Rubber gaskets; 3. Retaining sleeves; 4. High-strength bolts; 5. Steel rings; 6. Annular grooves; 7. Connecting rods; 8. Connecting rings; 9. Bolt protection sleeves. DETAILED DESCRIPTION
[0022] The utility model is described in detail below, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] The utility model provides a prefabricated concrete pipe pile retaining device through improvement. The technical solution of the utility model is:
[0024] Embodiment 1
[0025] like Figure 1-2 As shown, a precast concrete pipe pile retaining device comprises a precast concrete pipe pile 1, a steel ring piece 5 is fixedly installed on the top of the precast concrete pipe pile 1, a threaded hole is reserved on the steel ring piece 5, a rubber gasket 2 is fixedly installed on the top of the steel ring piece 5, and a retaining sleeve 3 is arranged on the top of the rubber gasket 2. The steel ring piece 5 can be used to improve the connection stability between the retaining sleeve 3 and the precast concrete pipe pile 1, and the rubber gasket 2 can be used to further improve the sealing performance of the device, so that the sealing effect is better.
[0026] like Figure 1-2 As shown, a plurality of high-strength bolts 4 are threadedly connected between the retaining sleeve 3, the steel ring piece 5 and the precast concrete pipe pile 1. The retaining sleeve 3, the steel ring piece 5 and the precast concrete pipe pile 1 are tightly connected together by the high-strength bolts 4 to improve the sealing effect of the device.
[0027] Embodiment 2:
[0028] Based on the precast concrete pipe pile retaining device provided in the first embodiment of the present application, the second embodiment of the present application provides another precast concrete pipe pile retaining device. The second embodiment is only a preferred mode of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.
[0029] The second embodiment of the utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0030] like Figure 3-4As shown, a pair of vertically staggered connecting rods 7 are arranged inside the retaining sleeve 3, and a plurality of annular grooves 6 are opened on the pair of connecting rods 7. The arranged connecting rods 7 can play an auxiliary role in lifting or transporting the precast concrete pipe piles 1. At the same time, the arranged annular grooves 6 can prevent the occurrence of unstable lifting or transporting caused by slipping, thereby improving the safety of the construction process.
[0031] like Figure 3-4 As shown, the end of each high-strength bolt 4 is sleeved with a bolt protection sleeve 9, and the end of each bolt protection sleeve 9 is fixedly installed with a connecting ring 8. The provided bolt protection sleeve 9 can well protect the high-strength bolt 4 to prevent rust of the high-strength bolt 4 during storage, which affects the later use. In addition, the provided connecting ring 8 can be used to uniformly install and disassemble multiple bolt protection sleeves 9, thereby improving convenience and construction efficiency.
[0032] The technical means disclosed in the utility model are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the utility model belong to the common knowledge of those skilled in the art.
Claims
1. A precast concrete pipe pile retaining device, comprising a precast concrete pipe pile (1), a steel ring sheet (5) being fixedly mounted on the top of the precast concrete pipe pile (1), characterized in that: A threaded hole is reserved on the steel ring piece (5), a rubber gasket (2) is fixedly installed on the top of the steel ring piece (5), and a soil retaining sleeve (3) is arranged on the top of the rubber gasket (2).
2. A precast concrete pipe pile retaining device according to claim 1, characterized in that: The retaining sleeve (3), the steel ring piece (5) and the precast concrete pipe pile (1) are connected by a plurality of high-strength bolts (4) through threads.
3. A precast concrete pipe pile retaining device according to claim 1, characterized in that: A pair of vertically staggered connecting rods (7) are arranged inside the soil retaining sleeve (3), and a plurality of annular grooves (6) are formed on the pair of connecting rods (7).
4. A precast concrete pipe pile retaining device according to claim 2, characterized in that: The end of each high-strength bolt (4) is sleeved with a bolt protection sleeve (9), and the end of each bolt protection sleeve (9) is commonly fixedly mounted with a connecting ring (8).
Citation Information
Patent Citations
Prestressed concrete pipe pile end sealing device
CN216108473U