Inorganic silicon crystal terrazzo construction terrace

By adopting a combination technology of multi-layer structure and inorganic nano-silicon materials in floor construction, multiple problems in existing floor coatings during construction are solved, and the tensile, flexural performance and overall stability of the floor are improved.

CN222782335UActive Publication Date: 2025-04-22四川百年成诺新材料科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421497186.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-04-22
Estimated Expiration
2034-06-27

AI Technical Summary

Technical Problem

During construction, existing floor coatings have problems such as large solvent volatility, large odor, easy foaming and falling off in humid environments, poor safety, long drying time, and insufficient mechanical performance after film formation.

Method used

Using the technology of inorganic silicon tertile construction floor, a multi-layer structure is provided on the base layer, including a mortar layer, reinforcement layer, primer layer, silicon crystal layer, fill layer, hardening layer and protective layer, and a stainless steel partition strip is installed on the top, and the stainless steel mesh structure and inorganic nano-silicon materials are used to improve the stability and mechanical properties of the floor.

Benefits of technology

It improves the tensile and flexural properties of the floor, enhances the stability of the overall structure, avoids the problem of uneven filling, and ensures the wear resistance and waterproof performance of the floor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222782335U_ABST
    Figure CN222782335U_ABST
Patent Text Reader

Abstract

The utility model discloses an inorganic silicon crystal millstone construction terrace which comprises a base layer. A mortar layer is arranged on the base layer; a first reinforcing layer is arranged at the upper part of the mortar layer; a primer layer is arranged at the upper part of the first reinforcing layer; a silicon crystal layer is arranged at the upper part of the primer layer; a filling layer is arranged at the upper part of the silicon crystal layer; a hardened layer is arranged at the upper part of the filling layer; a protective layer is arranged on the upper part of the hardened layer; and a dividing strip is arranged outside the base layer. Through the arrangement of the first reinforcing layer located at the bottom of the silicon crystal layer and the stainless steel net structure of the first reinforcing layer, the silicon crystal layer is mixed with the stainless steel net after being solidified, the stability of the whole structure is improved, meanwhile, the filling layer located on the upper portion of the silicon crystal layer fills gaps in the silicon crystal layer, the stability of the structure is improved, and meanwhile, the separation strips on the outer side improve the separation efficiency. And a plurality of floor structures are separated, so that uneven filling caused by the flowability of materials is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of floor construction, in particular to an inorganic silicon crystal grinding stone construction floor. Background Art

[0002] The floor is the surface layer of the building floor that directly bears various physical and chemical effects. It is mainly used for industrial plants, parking lots, commercial stores and other floors. It is required to have certain strength, hardness and wear resistance, as well as good dustproof, moisture-proof and waterproof properties. Common floor coatings are mainly epoxy resin floor coatings. Among them, oil-based epoxy floor coatings have large solvent volatilization and strong odor; after coating in a humid environment, they are prone to blistering and falling off; poor safety, especially easy to slip on rainy days. Conventional water-based epoxy floor coatings need to be diluted during construction, which makes the solid content of the water-based epoxy system low. Thick coatings will have problems such as long drying time and insufficient mechanical properties after film formation. Utility Model Content

[0003] The utility model aims to improve the tensile and flexural properties of a floor and provides an inorganic silicon crystal grindstone construction floor.

[0004] An inorganic silicon crystal grinding stone construction floor, comprising

[0005] A base layer; a mortar layer is arranged on the base layer; a first reinforcement layer is arranged on the mortar layer; a primer layer is arranged on the first reinforcement layer; a silicon crystal layer is arranged on the primer layer; a filling layer is arranged on the silicon crystal layer; a hardening layer is arranged on the filling layer; a protective layer is arranged on the hardening layer;

[0006] A separation strip is arranged outside the base layer.

[0007] Furthermore, the first reinforcement layer is configured as a double-layer mesh structure, and the mesh spacing is configured as 40 mm*40 mm.

[0008] Furthermore, the first reinforcement layer is configured as a stainless steel mesh structure, and the diameter of the steel wire is 3 mm.

[0009] Furthermore, the top height of the dividing strip is flush with the protective layer; the length and width of the dividing strip are set to 4000mm*4000mm.

[0010] Furthermore, the partition bar is set to a stainless steel structure; the thickness of the partition bar is set to 3mm.

[0011] Furthermore, the primer layer is set to be a water-based interface agent material; the thickness ratio of the primer layer, the filling layer and the hardening layer is 1:1:1.

[0012] Furthermore, the silicon crystal layer is configured as an inorganic nano-silicon material.

[0013] The beneficial effects of the utility model are:

[0014] By setting a first reinforcement layer at the bottom of the silicon crystal layer, through the stainless steel mesh structure of the first reinforcement layer, the silicon crystal layer is mixed with the stainless steel mesh after solidification to increase the stability of the overall structure. At the same time, the filling layer located on the upper part of the silicon crystal layer fills the gaps in the silicon crystal layer to increase the stability of the structure. At the same time, the outer dividing strips separate multiple floor structures to avoid uneven filling due to the fluidity of the material. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model.

[0016] In the figure, 1, base layer; 2, mortar layer; 3, first reinforcement layer; 4, primer layer; 5, silicon crystal layer; 6, filling layer; 7, hardening layer; 8, protective layer; 9, separator. DETAILED DESCRIPTION

[0017] The following describes the implementation of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0018] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed at will, and the component layout may also be more complicated.

[0019] Example 1

[0020] like Figure 1 As shown:

[0021] An inorganic silicon crystal grinding stone construction floor, comprising

[0022] Base layer 1; a mortar layer 2 is arranged on the top of the base layer 1; a first reinforcement layer 3 is arranged on the top of the mortar layer 2; a primer layer 4 is arranged on the top of the first reinforcement layer 3; the specific primer layer is set as a water-based interface agent; the water-based interface agent is a floor material, which is mainly used to improve the wettability and permeability of the coating to the substrate and improve the adhesion. It has many forms, including liquid and powder. In water-based two-component polyurethane floor coatings, water-based interface agents are an indispensable component, which can effectively reduce the surface tension of the system, improve the wettability and permeability of the coating to the substrate, and improve the adhesion.

[0023] The silicon crystal layer 5 is arranged on the top of the primer layer 4; specifically, the silicon crystal layer 5 is arranged as an inorganic nano-silicon monolithic floor material; the inorganic nano-silicon monolithic floor material is a floor material made of inorganic nano-silicon material, which has excellent mechanical properties, thermal properties and gas barrier properties, and has obvious anti-melting droplet effect and carbonization effect. Its main application fields include electronic functional materials, sensitive functional materials, optical functional materials, artificial crystals, functional glass, catalysts and catalyst carriers for environmental protection, etc.

[0024] A filling layer 6 is arranged on the upper part of the silicon crystal layer 5; the filling layer 6 is specifically arranged as a microporous repair material; the microporous repair material in the floor is mainly used to fill and repair the tiny holes on the floor surface. This type of material has good adhesion, wear resistance and pressure resistance, and can effectively improve the flatness and durability of the floor surface. Common microporous repair materials on the market include epoxy resin, polyurethane coating, etc.

[0025] A hardening layer 7 is arranged on the top of the filling layer 6; specifically, the hardening layer 7 is arranged as a penetrating liquid hardener, which is a material used to improve the hardness and wear resistance of the ground, which can make the ground have higher strength and density while reducing dust generation.

[0026] The protective layer 8 is arranged on the upper part of the hardening layer 7; the specific protective layer 8 is arranged as a special anti-fouling and anti-seepage protective agent; the special anti-fouling and anti-seepage protective agent is a chemical agent specially designed to improve the anti-fouling and anti-seepage performance of the material surface. It is widely used in the fields of construction, home furnishing, automobile, etc., effectively preventing moisture, oil stains, dirt and other substances from penetrating into the material, thereby extending the product life. Its main components include organic silicon, fluoride, etc., and have good wear resistance, weather resistance, and environmental protection performance. The method of use is simple, and it can be directly applied or sprayed on the surface of the material.

[0027] The first reinforcement layer 3 is configured as a double-layer mesh structure, and the mesh spacing is configured as 40mm*40mm. The first reinforcement layer 3 is configured as a stainless steel mesh structure, and the diameter of the steel wire is 3mm.

[0028] The base layer 1 is provided with a separator 9 on the outside. The top height of the separator 9 is flush with the protective layer 8; the length and width of the separator 9 are set to 4000mm*4000mm. The separator 9 is set to a stainless steel structure; the thickness of the separator 9 is set to 3mm.

[0029] The primer layer 4 is made of a water-based interface material; the thickness ratio of the primer layer 4, the filling layer 6 and the hardening layer 7 is 1:1:1. The silicon crystal layer 5 is made of an inorganic nano-silicon material.

[0030] In this plan, the existing base floor is milled; after milling, the base is cleaned, and the ground is checked after cleaning. Only when there are no hollows and floating dust can the next step of construction be carried out; after the base is shot blasted, the impurities, floating dust, oil stains, etc. on the surface of the base are cleaned, and a multifunctional water-based interface agent is applied. The application needs to be repeated vertically and horizontally. After the interface agent is completely dry, the surface of the base becomes shiny and forms a film, which is the basis for acceptance; the position of the separator is designed according to the on-site column and shear structure design, and the seam is cut according to the designed position of the separator; infrared equipment is used to check whether the seam is cut crooked; the top position of the separator is determined according to the finished surface elevation line, the top of the separator is aligned and fixed with the elevation line, and then one end of the two side brackets is welded to the separator, and the other end is fixed to the floor; after the fixing is completed, the infrared equipment is used again to check whether the top of the separator is flush with the elevation line. After the multifunctional water-based interface agent is accepted, the stainless steel mesh is laid, and attention is paid to the joint position to avoid missing paving; after the silicon crystal material is mixed evenly according to the standard water-adding ratio, it is spread to the designed construction area and leveled with special construction tools; after the silicon crystal is completely dry, use a low-mesh diamond grinding wheel to perform rough grinding on the surface until the aggregate is evenly exposed. After the surface is opened, use a vacuum cleaner to clean the surface dust; after the special matching micropore repair powder is mixed with water and evenly, it is evenly scraped on the surface of the silicon crystal after the surface is opened. After the pore-filling material is dry, use a grinder to add a small amount of water to grind and knead the slurry until the surface micropores are completely filled with the pore-filling material; use a vacuum cleaner to clean up the waste slurry produced by kneading; after cleaning, check whether the surface micropores are repaired in place. If there are inadequate repairs, arrange a secondary pore repair in time until all micropores are repaired.

[0031] After the implementation of this plan, the following effects can be achieved:

[0032]

[0033]

[0034] The above-mentioned embodiments only express the specific implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.

Claims

1. An inorganic silicon crystal grinding stone construction floor, characterized by: include A base layer (1); a mortar layer (2) is arranged on the top of the base layer (1); a first reinforcement layer (3) is arranged on the top of the mortar layer (2); a primer layer (4) is arranged on the top of the first reinforcement layer (3); a silicon crystal layer (5) is arranged on the top of the primer layer (4); a filling layer (6) is arranged on the top of the silicon crystal layer (5); a hardening layer (7) is arranged on the top of the filling layer (6); a protective layer (8) is arranged on the top of the hardening layer (7); A separation strip (9) is arranged outside the base layer (1).

2. The inorganic silicon crystal grinding stone construction floor according to claim 1, characterized in that: The first reinforcement layer (3) is configured as a double-layer mesh structure, and the mesh spacing is configured as 40 mm*40 mm.

3. The inorganic silicon crystal grinding stone construction floor according to claim 2, characterized in that: The first reinforcement layer (3) is configured as a stainless steel mesh structure, and the diameter of the steel wire is 3 mm.

4. The inorganic silicon crystal grinding stone construction floor according to claim 1, characterized in that: The top height of the partition bar (9) is flush with the protective layer (8); the length and width of the partition bar (9) are set to 4000mm*4000mm.

5. The inorganic silicon crystal grinding stone construction floor according to claim 4, characterized in that: The partition bar (9) is configured as a stainless steel structure; the thickness of the partition bar (9) is configured to be 3 mm.

6. The inorganic silicon crystal grinding stone construction floor according to claim 1, characterized in that: The primer layer (4) is configured as a water-based interface agent material; the thickness ratio of the primer layer (4), the filling layer (6) and the hardening layer (7) is 1:1:

1.

7. The inorganic silicon crystal grinding stone construction floor according to claim 1, characterized in that: The silicon crystal layer (5) is configured as an inorganic nano-silicon material.