Auxiliary point fixing device for building survey lofting

By designing a building measurement and stake assisted fixed point device including prisms, support frames and embedded nail components, the problem of large errors in the plug-in and unplugging process of level nails in the prior art is solved, and a high-precision stake and fixed point and convenient operation process are realized.

CN222798610UActive Publication Date: 2025-04-25HEFEI KENUO ARCHITECTURAL DESIGN CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421782793.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2025-04-25
Estimated Expiration
2034-07-25

AI Technical Summary

Technical Problem

Existing building measurement and staking fixed-point tools are prone to large errors in the process of plugging and unplugging the level nails, which affects the accuracy of the fixed-point.

Method used

A building measurement and lofting auxiliary fixed point device is designed, including prisms, support frames, embedded nail assembly, hollow telescopic rods, bases and nail holding assembly. Through the articulation structure of the prisms and support frames and the movement mechanism of the press rod, the level nails are pre-embedded and final fixed.

Benefits of technology

After determining the stake point, the device can pre-built and fix the level nails with high accuracy to reduce errors, improve the accuracy of fixed points and facilitate operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222798610U_ABST
    Figure CN222798610U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building survey, and discloses a building survey lofting auxiliary point fixing device which comprises a prism, a supporting frame, a pre-buried nail assembly, a hollow telescopic rod and a nail holding assembly, the supporting frame comprises a support fixedly arranged at the top of the hollow telescopic rod, a connecting piece is hinged to the support, the prism is arranged on the connecting piece, and the hollow telescopic rod is fixedly connected with the prism. The pre-embedded nail assembly comprises a pressing rod arranged in the hollow telescopic rod, a base is arranged at the bottom of the hollow telescopic rod and comprises a sleeve arranged at the lower end of the hollow telescopic rod, and the nail holding assembly comprises a nail pressing piece arranged in the sleeve in a sliding mode; through cooperative use of the prism, the supporting frame, the nail pre-burying assembly, the hollow telescopic rod, the base, the nail holding assembly and the level nail, the level nail can be pre-buried while the position of the prism is maintained through a hinge and the hollow telescopic rod, the level nail can be accurately pushed out only by treading the fixed base and pressing the pressing plate, and the effects of high positioning precision and convenient operation are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building measurement, and in particular to an auxiliary point-fixing device for building measurement and setting out. Background Art

[0002] The existing engineering surveying and staking out tools are mainly used in combination with a centering rod and a prism. After the total station locates the direction and distance, the staking out point is finally determined. After the staking out point is determined, the centering rod and prism are lifted, and the leveling nail is driven into the staking out point to complete the staking out work.

[0003] When the above method is used to determine the layout point, the centering rod and the prism need to be continuously adjusted and leveled until the layout point is determined. After the layout point is determined, the prism and the centering rod need to be lifted to bury the leveling nails. Large errors are likely to occur during the insertion and removal process.

[0004] The above information disclosed in the background technology is only used to increase the understanding of the background technology of the present application, and therefore, it may include information that does not constitute the prior art known to ordinary technicians in the field. Utility Model Content

[0005] In order to solve the problem that after determining the layout point, the prism and the centering rod need to be lifted up to bury the leveling nails through the combined use of the centering rod and the prism, and large errors are likely to occur during the insertion and removal process, the present application provides an auxiliary positioning device for building measurement and layout.

[0006] The present application provides a building measurement and setting out auxiliary positioning device that adopts the following technical solutions:

[0007] An auxiliary fixed-point device for building measurement and setting out, comprising a prism, a support frame, a pre-embedded nail assembly, a hollow telescopic rod and a nail holding assembly;

[0008] Wherein, the support frame comprises a bracket fixedly arranged on the top of the hollow telescopic rod, a connecting piece is hinged on the bracket, and a prism is arranged on the connecting piece;

[0009] The embedded nail assembly includes a pressure rod arranged in the hollow telescopic rod, and the pressure rod can move along the Z axis. The bottom of the hollow telescopic rod is provided with a base, and the base includes a sleeve arranged at the lower end of the hollow telescopic rod;

[0010] The nail holding assembly comprises a nail pressing member slidably arranged in a sleeve, a connecting tube is slidably sleeved on the outer side of the nail pressing member, and a level nail is arranged in the connecting tube.

[0011] Preferably, the connecting member comprises a connecting seat hingedly arranged on the bracket, and a rotating shaft is rotatably arranged between the connecting seat and the prism.

[0012] Preferably, the bracket is symmetrically provided with two connection holes with the hinge point as the center, and a pin is provided in one of the connection holes. The pin passes through the connection seat and is slidably connected with the connection seat.

[0013] Preferably, a guide sleeve is provided on the fixing sleeve of the pressure rod, and the guide sleeve is slidably connected to the inner wall of the hollow telescopic rod. The upper end of the pressure rod slides through the bracket and is connected to the pressure plate.

[0014] Preferably, pedals are provided on both sides of the sleeve, and an elastic element is also provided between the connecting tube and the nail pressing member in the sleeve for driving the nail pressing member to reset.

[0015] Preferably, the nail pressing member comprises a push rod slidably arranged in the connecting tube, and a guide ring is sleeved on the upper end of the push rod.

[0016] In summary, this application includes the following beneficial technical effects:

[0017] Through the coordinated use of prism, support frame, embedded nail assembly, hollow telescopic rod, base, nail holding assembly and level nail, the prism is hinged to the bracket through a connecting piece. After the layout point is determined, the position of the prism relative to the bracket can be adjusted so that there is no obstruction above the pressure plate. The position of the base is fixed by stepping on the pedal with both feet, and then the pressure plate is pressed down to make the pressure rod move down and hit the push rod. The push rod is used to push the level nail downward, and the level nail is pushed out of the connecting tube for preliminary embedding. There is no need to lift the prism and the centering rod before burying the level nail. Compared with the existing technology, it has the effects of high positioning accuracy and convenient operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 is a schematic diagram of a three-dimensional structure from a first-view perspective of an embodiment of the application;

[0019] Figure 2 is a schematic diagram of a second perspective stereoscopic structure of an embodiment of the application;

[0020] Figure 3 It is a schematic diagram of the three-dimensional structure from a third perspective of an embodiment of the application.

[0021] Explanation of the reference numerals: 1. prism; 2. support frame; 201. bracket; 202. connecting seat; 203. rotating shaft; 204. pin; 3. embedded nail assembly; 301. pressure rod; 302. guide sleeve; 303. pressure plate; 4. hollow telescopic rod; 5. base; 501. sleeve; 502. pedal; 6. nail holding assembly; 601. spring; 602. connecting tube; 603. nail pressing piece; 6031. push rod; 6032. guide ring; 7. level nail. DETAILED DESCRIPTION

[0022] The following is combined with Figure 1-3This application is described in further detail.

[0023] The present application embodiment discloses a building measurement and setting out auxiliary fixed-point device. Figure 1-3 A construction surveying and setting out auxiliary fixed-point device comprises a base 5, the base 5 comprises a sleeve 501, a nail holding assembly 6 is installed on the inner side of the sleeve 501, the nail holding assembly 6 comprises a connecting tube 602 fixedly installed on the sleeve 501, a leveling nail 7 is installed in the connecting tube 602, a hollow telescopic rod 4 is installed on the upper end of the sleeve 501, a support frame 2 is fixedly installed on the upper end of the hollow telescopic rod 4, the support frame 2 comprises a bracket 201 fixedly installed on the hollow telescopic rod 4, a connecting piece is hinged at the upper end of the bracket 201, a prism 1 is installed on the connecting piece, an embedded nail assembly 3 is installed inside the hollow telescopic rod 4, the embedded nail assembly 3 comprises a pressure rod 301 movably installed inside the hollow telescopic rod 4, the pressure rod 301 can move along the Z axis and is coaxial with the leveling nail 7;

[0024] By adopting the above technical solution, using the prism 1 hinged to the bracket 201 through a connecting piece, after the layout point is determined, the position of the prism 1 relative to the bracket 201 can be adjusted so that there is no obstruction above the pressure rod 301, and then the pressure plate 303 is pressed down to move the pressure rod 301 downward to push the leveling nail 7, and the leveling nail 7 is pushed out of the connecting tube 602 to preliminarily embed the layout point, without lifting the prism and the centering rod, and then burying the leveling nail.

[0025] Reference Figure 2 The connecting member includes a connecting seat 202 hinged on the bracket 201, and a rotating shaft 203 is rotatably installed on the connecting seat 202. The end of the rotating shaft 203 is connected to the prism 1. The bracket 201 is symmetrically provided with two connecting holes with the hinge point as the center. A positioning hole is provided on the connecting seat 202, and a pin 204 is installed in the positioning hole. The positioning is performed by the pin 204 to improve the accuracy of the flip adjustment. The pin 204 slides through the corresponding connecting hole. The bracket 201 and the connecting seat 202 are hinged to realize that the prism 1 can be flipped left and right relative to the bracket 201 to avoid affecting the push-down operation of the pressure rod 301. At the same time, it can also rotate around the axis of the rotating shaft 203 to adjust the angle.

[0026] Reference Figure 2 The hollow telescopic rod 4 includes a plurality of sleeves that are connected to each other. Damping is installed on the inner sides of two adjacent sleeves to increase friction and achieve stopping at any position. A guide sleeve 302 is fixed on the pressure rod 301. The guide sleeve 302 is slidably connected to the inner wall of the innermost sleeve. The upper end of the pressure rod 301 slides through the bracket 201 and is connected to a pressure plate 303. The guide sleeve 302 and the sleeve are used for guidance to prevent the pressure rod 301 from deflecting when it moves downward.

[0027] Reference Figure 3, foot pedals 502 are installed on both sides of the sleeve 501 to facilitate the staff to step on them and prevent the pressure rod 301 from deflecting when it is pressed down. An elastic element is also provided between the connecting tube 602 and the pressure nail piece 603 in the sleeve 501. The pressure nail piece 603 includes a push rod 6031 slidably installed in the connecting tube 602. A guide ring 6032 is also sleeved on the upper end of the push rod 6031. The elastic element is a spring 601. The spring 601 is slidably sleeved on the spring 601 and is located between the guide ring 6032 and the connecting tube 602. The push rod 6031, the connecting tube 602, and the pressure rod 301 are on the same axis. A damping is installed on the inner side of the connecting tube 602 to increase the friction with the level nail 7 and prevent the level nail 7 from sliding off under the action of gravity.

[0028] The implementation principle of the auxiliary fixed-point device for building measurement and layout in the embodiment of the present application is as follows: the device is transported to the vicinity of the measurement point, and the base 5 is placed steadily on the ground. The hollow telescopic rod 4 is unfolded and adjusted to a suitable height. The prism 1 is rotated to the top of the pressure rod 301, and is initially fixed by the pin 204. By adjusting the angle and position of the prism 1, it is ensured that there is no obstruction above the prism, and the surveying instrument is used to perform preliminary positioning of the layout point, according to the positioning result. The staff steps on the pedals 502 on both sides of the base to ensure that the device is stable. Then remove the pin 204, turn the prism 1 to the other side, press down the pressure plate 303 or tap it with a hammer, so that the pressure rod 301 slides along the inside of the hollow telescopic rod 4, and pushes the pressure nail piece 603 to extend outward. The leveling nail 7 moves out of the connecting tube 602 under the push of the pressure nail piece 603, and the preliminary embedding of the layout point is completed. Release the pressure plate 303, and the pressure rod 301 is reset under the action of the elastic element 601, but the leveling nail 7 remains in the embedded position. The level nail 7 is finally fixed, such as by tapping with a hammer.

[0029] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0030] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0031] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

[0032] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A building surveying and setting out auxiliary positioning device, comprising a prism (1), a support frame (2), a pre-embedded nail assembly (3), a hollow telescopic rod (4) and a nail holding assembly (6); in, The support frame (2) comprises a bracket (201) fixedly arranged on the top of the hollow telescopic rod (4), a connecting piece is hinged on the bracket (201), and a prism (1) is arranged on the connecting piece; The embedded nail assembly (3) comprises a pressure rod (301) arranged in a hollow telescopic rod (4), and the pressure rod (301) can move along the Z axis. A base (5) is arranged at the bottom of the hollow telescopic rod (4), and the base (5) comprises a sleeve (501) arranged at the lower end of the hollow telescopic rod (4); The nail holding assembly (6) comprises a nail pressing member (603) slidably arranged in a sleeve (501), a connecting tube (602) is slidably sleeved on the outer side of the nail pressing member (603), and a leveling nail (7) is arranged in the connecting tube (602).

2. The auxiliary point-fixing device for building surveying and setting out according to claim 1, characterized in that: The connecting member comprises a connecting seat (202) hingedly arranged on a bracket (201), and a rotating shaft (203) is rotatably arranged between the connecting seat (202) and the prism (1).

3. The auxiliary point-fixing device for building surveying and setting out according to claim 2, characterized in that: The bracket (201) is symmetrically provided with two connection holes with the hinge point as the center, and a pin shaft (204) is provided in one of the connection holes. The pin shaft (204) passes through the connection seat (202) and is slidably connected to the connection seat (202).

4. The auxiliary point-fixing device for building surveying and setting out according to claim 1, characterized in that: A guide sleeve (302) is fixed on the pressure rod (301), and the guide sleeve (302) is slidably connected to the inner wall of the hollow telescopic rod (4). The upper end of the pressure rod (301) slides through the bracket (201) and is connected to a pressure plate (303).

5. The auxiliary point-fixing device for building surveying and setting out according to claim 1, characterized in that: Foot pedals (502) are provided on both sides of the sleeve (501), and an elastic element is also provided between the connecting tube (602) and the nail pressing member (603) in the sleeve (501) for driving the nail pressing member (603) to reset.

6. The auxiliary point-fixing device for building surveying and setting out according to claim 1, characterized in that: The nail pressing member (603) comprises a push rod (6031) slidably arranged in the connecting tube (602), and a guide ring (6032) is sleeved on the upper end of the push rod (6031).