Assembly type shear wall vertical seam joint connecting structure

By setting up embedded parts in the prefabrication stage of the shear wall and using a combined structure of hooks and screw bolts, the rapid positioning and fixed connection of the shear wall are achieved, solving the problems of failure and high construction costs of shear wall connections in the prior art, and improving construction efficiency and structural stability.

CN222810248UActive Publication Date: 2025-04-29ZHEJIANG HONGTU TRANSPORTATION CONSTR CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421564349.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2025-04-29
Estimated Expiration
2034-07-04

AI Technical Summary

Technical Problem

The existing shear wall connection structure has vertical joints, which leads to failure of connections, increasing construction costs and time-consuming, and requires a large amount of cast formwork and cumbersome steel bar binding work.

Method used

The prefabricated shear wall vertical joint node connection structure is adopted. By setting the first and second embedded parts in the prefabricated stage of the shear wall, and using a combined structure of hooks and screw bolts, the shear wall is quickly positioned and fixed connection.

Benefits of technology

It reduces the use of formwork and steel bar binding during construction, improves construction efficiency and structural stability, and reduces construction cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222810248U_ABST
    Figure CN222810248U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building structures, and provides an assembly type shear wall vertical seam joint connecting structure which comprises a first prefabricated shear wall, a second prefabricated shear wall, a first embedded part and a second embedded part. A shear wall steel reinforcement framework is arranged in the second prefabricated shear wall. In the prefabrication stage of the shear wall, according to the layout of a structural engineering wall body, a certain number of first embedded parts or second embedded parts obtained through calculation are fixed with a shear wall steel reinforcement framework under the action of the hooks when the steel reinforcement meshes are bound, then concrete is poured and cured, and the formwork is removed after the concrete is cured in place. And the shear wall in which the first embedded part and the second embedded part are embedded is transported to a site, and the first prefabricated shear wall and the second prefabricated shear wall are positioned. According to the technical scheme, the problem of connection of T-shaped or cross-shaped wall bodies in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building structures, and in particular to an assembled shear wall vertical seam node connection structure. Background Art

[0002] With the continuous development of materials and structural design technology, shear walls are widely used in high-rise buildings and houses with high requirements for lateral resistance. However, there are usually vertical through-slits between adjacent prefabricated shear walls, which can easily lead to failure of the shear wall connection, thereby greatly reducing the stability of the structure. The existing technology mostly adopts the method of fixing horizontal stirrups to each other, by tying the vertical longitudinal reinforcements on both sides of the shear wall in situ and supporting the concrete formwork for pouring, but this method requires the use of a large number of casting formworks, and the tying of steel bars is cumbersome, which will increase the construction cost while consuming a lot of manpower and time, seriously affecting the construction progress.

[0003] After searching, the publication number CN113898092A, a prefabricated shear wall vertical joint structure and its construction method, discloses a prefabricated shear wall vertical joint structure and its construction method, which relates to the technical field of prefabricated concrete shear wall vertical joint connection structure in civil engineering. Its main structure includes: shear wall, embedded steel and connector; the embedded steel is partially embedded in the shear wall, and the embedded steel on the two shear walls are butt-jointed by tongue and groove, and the joint is covered with connectors.

[0004] The existing shear walls have the following problems:

[0005] The current shear wall requires complex prefabricated template construction and high-precision manufacturing requirements. It is inevitable that certain errors will occur during the production and assembly process, which makes it difficult to assemble the plug-in fixing parts. Trimming is required to complete the assembly of the shear wall. At the same time, this solution also has the problem of high steel consumption. Considering the huge amount of shear walls used in general high-rise buildings, this will increase the construction cost. Therefore, the widespread promotion and use of this solution in the construction industry still faces certain difficulties.

[0006] In view of the above problems, we propose a prefabricated shear wall vertical seam node connection structure. Utility Model Content

[0007] The utility model provides an assembled shear wall vertical seam node connection structure, which solves the problems raised by an assembled shear wall vertical seam node connection structure in the related art.

[0008] The technical solution of the utility model is as follows:

[0009] A prefabricated shear wall vertical joint node connection structure comprises a first prefabricated shear wall, a second prefabricated shear wall, a first embedded part and a second embedded part, wherein a shear wall steel bar skeleton is arranged inside the first prefabricated shear wall, a shear wall steel bar skeleton is arranged inside the second prefabricated shear wall, a plurality of first embedded parts are arranged on both sides of the first prefabricated shear wall, a side of the first embedded part away from the shear wall steel bar skeleton is an asymmetric "C-shaped" steel plate, and a side of the first embedded part close to the shear wall steel bar skeleton is provided with a hook.

[0010] Preferably, the first embedded parts are fixedly connected to the shear wall reinforcement skeleton via hooks, and the first embedded parts are engaged with each other.

[0011] Preferably, a plurality of second embedded parts are provided on both sides of the second prefabricated shear wall, the side of the second embedded part away from the shear wall steel frame is a straight plate, mounting screw holes are provided on the upper and lower sides inside the second embedded part, mounting bolts are passed through the inside of the two second embedded parts, and a bent hook is provided on the side of the second embedded part close to the shear wall steel frame.

[0012] Preferably, the mounting screw hole is threadably matched with a mounting bolt, and the two second embedded parts are fixedly connected by the mounting bolt.

[0013] The working principle and beneficial effects of the utility model are:

[0014] 1. In the utility model, during the prefabrication stage of the shear wall, according to the wall layout of the structural engineering, when the steel mesh is tied, a certain number of the first embedded parts or the second embedded parts calculated are fixed to the shear wall steel skeleton under the action of the hook, and then the concrete is poured and cured. After the curing is in place, the formwork is removed, the shear wall with the first embedded parts and the second embedded parts embedded is transported to the site, and the positions of the first prefabricated shear wall and the second prefabricated shear wall are located.

[0015] 2. In the utility model, for the position where the wall is partially structured in a T-shape or a cross-shape, the first prefabricated shear wall with the first embedded parts pre-embedded is hoisted into place and the exposed parts of the first embedded parts are interlocked with each other, and the second prefabricated shear wall with the second embedded parts pre-embedded is hoisted into place and the mounting screw holes of the exposed parts of the second embedded parts are aligned and fastened with mounting bolts.

[0016] 3. In the utility model, for the positions where the partial wall structure is in the shape of a straight line or a T, the formwork is set up on the side where the wall is not set up. For the cross-shaped position, since the wall can bear the role of the formwork, there is no need to set up the formwork. Then, the operations of pouring concrete, curing, and removing the formwork can be completed according to the construction requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0018] Figure 1 This is a schematic diagram of the structure of the shear wall reinforcement skeleton of the utility model;

[0019] Figure 2 This is a structural schematic diagram of the first prefabricated shear wall of the utility model;

[0020] Figure 3 This is a structural schematic diagram of the second prefabricated shear wall of the utility model;

[0021] Figure 4 This is a schematic diagram of the structure of the first embedded part and the second embedded part of the utility model

[0022] Figure 5 This is a structural schematic diagram of a straight-line wall node connection of the utility model;

[0023] Figure 6 This is a schematic diagram of the structure of the T-shaped wall node connection of the utility model;

[0024] Figure 7 It is a structural schematic diagram of the cross-shaped wall node connection of the utility model.

[0025] In the figure:

[0026] 1. First prefabricated shear wall; 2. Second prefabricated shear wall; 3. Shear wall reinforcement skeleton; 4. First embedded part; 5. Second embedded part; 6. Mounting screw hole; 7. Mounting bolt. DETAILED DESCRIPTION

[0027] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] Example 1

[0029] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 6 and Figure 7As shown, this embodiment proposes an assembled shear wall vertical seam node connection structure, including a first prefabricated shear wall 1, a second prefabricated shear wall 2, a first embedded part 4 and a second embedded part 5. A shear wall steel frame 3 is arranged inside the first prefabricated shear wall 1, and a shear wall steel frame 3 is arranged inside the second prefabricated shear wall 2. Several first embedded parts 4 are arranged on both sides of the first prefabricated shear wall 1. The side of the first embedded part 4 away from the shear wall steel frame 3 is an asymmetric "C-shaped" steel plate. The side of the first embedded part 4 close to the shear wall steel frame 3 is provided with a hook. The first embedded part 4 is fixedly connected to the shear wall steel frame 3 through the hook, and the first embedded parts 4 are engaged with each other.

[0030] In this embodiment, during the prefabrication stage of the shear wall, according to the wall layout of the structural engineering, when the steel mesh is tied, a certain number of the first embedded parts 4 or the second embedded parts 5 calculated are fixed to the shear wall steel skeleton 3 under the action of the hook, and then the concrete is poured and cured. After curing, the formwork is removed, and the shear wall with the first embedded parts 4 and the second embedded parts 5 embedded is transported to the site, and the positions of the first prefabricated shear wall 1 and the second prefabricated shear wall 2 are located. For the position where the local wall structure is T-shaped or cross-shaped, the first prefabricated shear wall 1 with the first embedded parts 4 embedded is hoisted into place and the exposed parts of the first embedded parts 4 are interlocked.

[0031] Example 2

[0032] like Figure 1 , Figure 3 , Figure 4 and Figure 5 As shown, based on the same concept as the above-mentioned embodiment 1, this embodiment further proposes that a plurality of second embedded parts 5 are provided on both sides of the second prefabricated shear wall 2, the side of the second embedded part 5 away from the shear wall steel frame 3 is a straight plate, and mounting screw holes 6 are provided on the upper and lower sides inside the second embedded part 5, and mounting bolts 7 are penetrated inside the two second embedded parts 5. A bent hook is provided on the side of the second embedded part 5 close to the shear wall steel frame 3, and the mounting screw hole 6 is threadedly matched with the mounting bolt 7, and the two second embedded parts 5 are fixedly connected by the mounting bolts 7.

[0033] In this embodiment, the second prefabricated shear wall 2 with the second embedded part 5 is hoisted into place, the mounting screw holes 6 of the exposed part of the second embedded part 5 are aligned, and the mounting bolts 7 are used to tighten. For the positions where the wall is partially structured in a straight line and a T shape, the formwork is erected on the side where the wall is not set. For the cross-shaped position, since the wall can serve as the formwork, there is no need to support the formwork. Subsequently, the operations of pouring concrete, curing, and removing the formwork can be completed according to the construction requirements.

[0034] In summary, the working steps are:

[0035] First, in the shear wall prefabrication stage, according to the wall layout of the structural engineering, when the steel mesh is tied, a certain number of the first embedded parts 4 or the second embedded parts 5 calculated are fixed to the shear wall steel skeleton 3 under the action of the hook, and then the concrete is poured and cured. After the curing is in place, the formwork is removed, the shear wall with the first embedded parts 4 and the second embedded parts 5 embedded is transported to the site, and the positions of the first prefabricated shear wall 1 and the second prefabricated shear wall 2 are located.

[0036] Secondly, for the position where the local wall structure is T-shaped or cross-shaped, the first prefabricated shear wall 1 with the first embedded part 4 is hoisted into place and the exposed parts of the first embedded part 4 are interlocked with each other, and the second prefabricated shear wall 2 with the second embedded part 5 is hoisted into place and the exposed part of the second embedded part 5 is installed with the screw hole 6 centered and fastened with the installation bolts 7.

[0037] Finally, for the positions where the partial wall structure is in the shape of a straight line or a T, the formwork is set up on the side where the wall is not set up. For the cross-shaped position, there is no need to set up the formwork because the wall can serve as the formwork. Then, the operations of pouring concrete, curing, and removing the formwork can be completed according to the construction requirements.

[0038] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A prefabricated shear wall vertical joint node connection structure, characterized in that: The invention comprises a first prefabricated shear wall (1), a second prefabricated shear wall (2), a first embedded part (4) and a second embedded part (5); a shear wall steel frame (3) is arranged inside the first prefabricated shear wall (1); a shear wall steel frame (3) is arranged inside the second prefabricated shear wall (2); a plurality of first embedded parts (4) are arranged on both sides of the first prefabricated shear wall (1); a side of the first embedded part (4) away from the shear wall steel frame (3) is a steel plate with an asymmetric "C-shaped" structure; and a side of the first embedded part (4) close to the shear wall steel frame (3) is provided with a hook.

2. The assembled shear wall vertical joint node connection structure according to claim 1 is characterized in that: The first embedded parts (4) are fixedly connected to the shear wall reinforcement skeleton (3) via hooks, and the first embedded parts (4) are engaged with each other.

3. The assembled shear wall vertical joint node connection structure according to claim 1 is characterized in that: A plurality of second embedded parts (5) are provided on both sides of the second prefabricated shear wall (2); the side of the second embedded part (5) away from the shear wall reinforcement frame (3) is a straight plate; the upper and lower sides of the second embedded part (5) are provided with mounting screw holes (6); mounting bolts (7) are passed through the inside of the two second embedded parts (5); and a bent hook is provided on the side of the second embedded part (5) close to the shear wall reinforcement frame (3).

4. The assembled shear wall vertical joint node connection structure according to claim 3 is characterized in that: The mounting screw hole (6) is threadably matched with the mounting bolt (7), and the two second embedded parts (5) are fixedly connected by the mounting bolt (7).