Bulletin board for constructional engineering management
By designing lifting mechanisms and expansion mechanisms, the expansion and height adjustment of the construction project management bulletin board is solved, and the existing bulletin boards cannot effectively display a large amount of information is improved, and the comprehensiveness and readability of information display are improved.
Patent Information
- Application Number
- CN202422053661.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2034-08-23
AI Technical Summary
When the project scale is expanded or the construction links increase, the existing construction project management bulletin board cannot effectively display all necessary information, resulting in incomplete or confusing information display.
A construction project management bulletin board including a lifting mechanism and an expansion mechanism is designed. Through the driving motor and gear system, the smooth expansion of the secondary bulletin board and the height adjustment of the main bulletin board are realized, thereby expanding the display area of the bulletin board.
It significantly improves the information display capabilities of the bulletin board, ensures the comprehensiveness and readability of the information, adapts to the display needs of different occasions, and avoids the problems of incomplete or confusing information display.
Smart Images

Figure CN222838561U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bulletin boards, in particular to a construction engineering management bulletin board. Background Art
[0002] With the acceleration of urbanization and the rapid development of the construction industry, the requirements for standardization and transparency of the construction process are increasing. Bulletin boards, as a carrier of information disclosure, can intuitively display information such as project progress, safety regulations, and responsible parties. This not only facilitates site personnel to obtain the latest information in a timely manner, but also facilitates supervision by regulatory authorities and the public. Therefore, the establishment of a construction project management bulletin board not only helps to improve the level of project management, but also effectively ensures construction safety and project quality. It is an inevitable trend in the modernization of the construction industry.
[0003] Existing construction project management bulletin boards are usually designed and installed according to fixed sizes and layouts, and are mainly used to display key information such as project progress, safety regulations, quality requirements, and responsible parties. However, when a construction project needs to display a large amount of relevant information due to expansion in scale, an increase in construction links, or the need to pay special attention to certain matters, the fixed size and layout of the bulletin board will become insufficient. In this case, the bulletin board may not be able to accommodate all the necessary information, resulting in incomplete or confusing information display. Utility Model Content
[0004] The purpose of the utility model is to solve the problem that when the above-mentioned equipment is in use, due to the expansion of the project scale and other factors, the information that needs to be displayed on the bulletin board increases, and the bulletin board cannot display all the necessary information at the same time, resulting in incomplete or confusing information display, thereby proposing a construction project management bulletin board.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical solution: a construction project management notice board, including a lifting mechanism, and an expansion mechanism is fixedly connected to one side of the outer wall of the lifting mechanism;
[0006] The expansion mechanism includes three connecting plates, a main fixing frame is fixedly connected between the inner surface walls of the three connecting plates, a main bulletin board is fixedly installed on the inner surface wall of the main fixing frame, two second sliding grooves are arranged on the top of the main fixing frame, a second sliding block is slidably embedded in the inner surface walls of the two second sliding grooves, a rack is fixedly connected to the top of the two second sliding blocks, a gear is meshed and connected between the outer surfaces of the two racks, a rotating shaft is fixedly inserted into the inner surface wall of the gear, a second bearing is fixedly sleeved on the outer surface wall of the rotating shaft, a driving motor is fixedly connected to one side of the outer wall of the rotating shaft, two groups of third sliding grooves are arranged on one side of the outer wall of the main fixing frame, a third sliding block is slidably embedded in the inner surface walls of the two groups of the third sliding grooves, a secondary fixing frame is fixedly connected between one side of the outer wall of the two groups of the third sliding blocks, and the tops of the two racks are fixedly connected to the bottoms of the two secondary fixing frames, a group of fourth sliding grooves are arranged on the inner surface walls of the two groups of the fourth sliding grooves, a sliding frame is slidably embedded in the inner surface walls of the two groups of the fourth sliding grooves, and a secondary bulletin board is fixedly installed between one side of the outer walls of the two groups of the sliding frames.
[0007] Preferably, a second mounting hole is opened on one side of the outer wall of the two auxiliary bulletin boards, a third bearing is fixedly inserted into the inner wall of the two second mounting holes, a fixing screw is fixedly inserted into the inner wall of the two third bearings, a thread groove is opened on one side of the outer wall of the two auxiliary fixing frames, and the outer walls of the two fixing screws are threadedly connected to the inner walls of the two thread grooves.
[0008] Preferably, the lifting mechanism comprises a support frame, and two first sliding grooves are provided on one side of an outer wall of the support frame, and first sliding blocks are slidably embedded in the inner surface walls of the two first sliding grooves.
[0009] Preferably, the inner surface wall of the support frame is provided with two first mounting holes, and the inner surface walls of the two first mounting holes are both fixedly inserted with first bearings.
[0010] Preferably, a threaded rod is fixedly inserted between the interiors of the two first bearings, and a threaded block is threadedly connected to the outer wall of the threaded rod.
[0011] Preferably, a lifting motor is fixedly connected to one side of the outer wall of the threaded rod.
[0012] Preferably, one side of the outer wall of the two first sliding blocks is fixedly connected to one side of the outer wall of two of the three connecting plates, and one side of the outer wall of the threaded block is fixedly connected to one side of the outer wall of one of the three connecting plates.
[0013] Compared with the prior art, the advantages and positive effects of the utility model are:
[0014] 1. In the utility model, by the interaction of the components of the expansion mechanism and the drive of the drive motor, the two auxiliary bulletin boards are smoothly unfolded on both sides of the main bulletin board and stably maintained on a horizontal plane. This method significantly improves the display capacity of the bulletin board, allowing more information to be displayed at the same time, ensuring the comprehensiveness and readability of the information.
[0015] 2. In the present invention, the height of the bulletin board can be flexibly adjusted by driving the lifting motor under the cooperation of the lifting mechanism and the expansion mechanism, so as to adapt to the display needs of different occasions, so that the bulletin board can effectively display information in a variety of environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The utility model proposes a main structural stereogram in a construction project management notice board;
[0017] Figure 2 A three-dimensional disassembled diagram of a lifting mechanism in a construction engineering management notice board is proposed for the utility model;
[0018] Figure 3 A three-dimensional split diagram of an expansion mechanism in a construction engineering management bulletin board is proposed for the utility model;
[0019] Figure 4 The utility model proposes a three-dimensional disassembled diagram of the expansion mechanism part structure in a construction project management bulletin board;
[0020] Figure 5 The utility model provides a side-view stereoscopic split diagram of the expansion mechanism part structure in a construction engineering management bulletin board.
[0021] Legend:
[0022] 1. Lifting mechanism; 101. Support frame; 102. First slide slot; 103. First slide block; 104. First mounting hole; 105. First bearing; 106. Threaded rod; 107. Threaded block; 108. Lifting motor;
[0023] 2. Expansion mechanism; 201. Connecting plate; 202. Main fixed frame; 203. Main bulletin board; 204. Second slide groove; 205. Second slider; 206. Rack; 207. Gear; 208. Rotating shaft; 209. Second bearing; 210. Driving motor; 211. Third slide groove; 212. Third slider; 213. Second fixed frame; 214. Fourth slide groove; 215. Sliding frame; 216. Second bulletin board; 217. Second mounting hole; 218. Third bearing; 219. Fixing screw; 220. Thread groove. DETAILED DESCRIPTION
[0024] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0025] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0026] Embodiment 1, as Figure 1-Figure 5 As shown, the utility model provides a construction project management notice board, including a lifting mechanism 1, and an expansion mechanism 2 is fixedly connected to one side of the outer wall of the lifting mechanism 1;
[0027] The expansion mechanism 2 includes three connecting plates 201, and a main fixing frame 202 is fixedly connected between the inner surface walls of the three connecting plates 201, and a main bulletin board 203 is fixedly installed on the inner surface wall of the main fixing frame 202. Two second sliding grooves 204 are provided on the top of the main fixing frame 202, and the inner surface walls of the two second sliding grooves 204 are slidably embedded with second sliders 205. The tops of the two second sliders 205 are fixedly connected with racks 206, and the outer surface walls of the two racks 206 are meshedly connected with a gear 207. A rotating shaft 208 is fixedly inserted into the inner surface wall of the gear 207, and a second bearing 209 is fixedly sleeved on the outer wall of the rotating shaft 208. A driving motor 210 is fixedly connected to one side of the outer wall of the rotating shaft 208. Two sets of third sliding grooves 211 are provided on one side of the outer wall of the main fixing frame 202, and the inner surface walls of the two sets of third sliding grooves 211 are slidably embedded with third sliders 21 2. A secondary fixing frame 213 is fixedly connected between one side of the outer wall of the two groups of third sliding blocks 212, and the tops of the two racks 206 are fixedly connected to the bottoms of the two secondary fixing frames 213. A group of fourth sliding grooves 214 are opened on the inner surface walls of the two groups of fourth sliding grooves 214, and sliding frames 215 are slidably embedded in the inner surface walls of the two groups of fourth sliding grooves 214. A secondary notice board 216 is fixedly installed between one side of the outer wall of the two groups of sliding frames 215. A second mounting hole 217 is opened on one side of the outer wall of the two secondary notice boards 216. A third bearing 218 is fixedly inserted into the inner surface walls of the two second mounting holes 217. A fixing screw 219 is fixedly inserted into the inner surface walls of the two third bearings 218. A threaded groove 220 is opened on one side of the outer wall of the two secondary fixing frames 213, and the outer wall of the two fixing screws 219 is threadedly connected to the inner wall of the two threaded grooves 220.
[0028] The effect achieved by the entire embodiment 1 is that when more management information needs to be displayed due to the expansion of the project scale or the increase of construction links, the drive motor 210 is first started, and the output end of the drive motor 210 drives the shaft 208 to rotate, and the rotation of the shaft 208 drives the gear 207 to rotate. Since the outer wall of the gear 207 is meshed and connected with two racks 206, the rotation of the gear 207 will cause the two racks 206 to move in opposite directions. Since the tops of the two racks 206 are fixedly connected to the auxiliary fixing frame 213, the movement of the two racks 206 will The two auxiliary fixing frames 213 are respectively driven to be synchronously unfolded on both sides of the main fixing frame 202. Then, by rotating the two fixing screws 219, the two fixing screws 219 can respectively push the two auxiliary bulletin boards 216 to move, so that the two auxiliary bulletin boards 216 are flush with the main bulletin board 203, thereby better expanding the display area of the bulletin board. By adding two auxiliary bulletin boards 216, the information display capability of the construction project management bulletin board can be significantly improved, so that it can display more management information at the same time, avoiding the problem of incomplete or confusing display due to excessive information.
[0029] Embodiment 2, as Figure 2-Figure 5 As shown, the lifting mechanism 1 includes a support frame 101, and two first sliding grooves 102 are provided on one side of the outer wall of the support frame 101, and the inner walls of the two first sliding grooves 102 are slidably embedded with first sliders 103, and the inner wall of the support frame 101 is provided with two first mounting holes 104, and the inner walls of the two first mounting holes 104 are fixedly inserted with first bearings 105, and a threaded rod 106 is fixedly inserted between the insides of the two first bearings 105, and the outer wall of the threaded rod 106 is threadedly connected with a threaded block 107, and the outer wall side of the threaded rod 106 is fixedly connected with a lifting motor 108, one side of the outer wall of the two first sliders 103 is fixedly connected to one side of the outer wall of two of the three connecting plates 201, and one side of the outer wall of the threaded block 107 is fixedly connected to one side of the outer wall of one of the three connecting plates 201.
[0030] The effect achieved by the entire embodiment 2 is that when the display height of the bulletin board does not meet the requirements, the lifting motor 108 is first started, and the output end of the lifting motor 108 drives the threaded rod 106 to rotate. Through the threaded transmission mechanism, the rotation of the threaded rod 106 will drive the threaded block 107 to move up and down in the vertical direction. The movement of the threaded block 107 will then drive the main fixed frame 202 and the main bulletin board 203 to move up and down synchronously, thereby realizing the adjustment of the display height of the main bulletin board 203. Through this adjustment method, the main bulletin board 203 can flexibly adjust its display height according to actual usage scenarios and needs, ensuring that the information can be displayed to the viewer more clearly, thereby improving the readability and dissemination efficiency of the information.
[0031] Working principle: When in use, first start the lifting motor 108 according to the height to be displayed, and the output end of the lifting motor 108 drives the threaded rod 106 to rotate. Since the outer wall of the threaded rod 106 is threadedly connected to the inner wall of the threaded block 107, the rotational movement of the threaded rod 106 is converted into linear movement of the threaded block 107 in the vertical direction, and the threaded block 107 is connected to the main fixed frame 202 through a connecting plate 201, so that the movement of the threaded block 107 drives the main fixed frame 202 and the main bulletin board 203 to move up and down synchronously, so as to achieve precise adjustment of the display height of the main bulletin board 203. In addition, through the cooperation of the two first slide grooves 102 and the two first sliders 103, the stability and smoothness of the main fixed frame 202 in the process of moving up and down are ensured. When more content needs to be displayed due to the expansion of the project scale or the increase of information content, the drive motor 210 is started first, and the output end of the drive motor 210 drives the rotating shaft 208 to rotate, thereby driving the gear 207 rotates, and the outer wall of the gear 207 is meshed with the outer walls of the two racks 206, so the rotation of the gear 207 will drive the two racks 206 to move in opposite directions. Since the tops of the two racks 206 are fixedly connected with the auxiliary fixing frames 213, the movement of the two racks 206 will respectively drive the two auxiliary fixing frames 213 to be synchronously unfolded on both sides of the main fixing frame 202, and the cooperation of the two groups of third sliding grooves 211 and the two groups of third sliding blocks 212 ensures the stability and smoothness of the auxiliary fixing frames 213 during the movement. When the two auxiliary fixing frames 213 move to the extreme position, the staff can rotate the two fixing screws 219 to push the two auxiliary bulletin boards 216 to move, so that the two auxiliary bulletin boards 216 are flush with the main bulletin board 203, thereby displaying more information content. In addition, the close cooperation of the two fixing screws 219 and the two threaded grooves 220 ensures that the auxiliary bulletin boards 216 can remain stable after unfolding and are not easy to shake.
[0032] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A construction project management notice board, comprising a lifting mechanism (1), characterized in that: An expansion mechanism (2) is fixedly connected to one side of the outer wall of the lifting mechanism (1); The expansion mechanism (2) comprises three connecting plates (201), the inner surfaces of the three connecting plates (201) are fixedly connected with a main fixing frame (202), the inner surface of the main fixing frame (202) is fixedly installed with a main bulletin board (203), the top of the main fixing frame (202) is provided with two second sliding grooves (204), the inner surfaces of the two second sliding grooves (204) are slidably embedded with second sliders (205), the tops of the two second sliders (205) are fixedly connected with racks (206), the outer surfaces of the two racks (206) are meshedly connected with a gear (207), the inner surface of the gear (207) is fixedly inserted with a rotating shaft (208), and the outer surface of the rotating shaft (208) is fixedly sleeved with a second bearing (209), A driving motor (210) is fixedly connected to one side of the outer wall of the rotating shaft (208); two groups of third sliding grooves (211) are opened on one side of the outer wall of the main fixed frame (202); third sliding blocks (212) are slidably embedded in the inner walls of the two groups of third sliding grooves (211); a secondary fixed frame (213) is fixedly connected between one side of the outer walls of the two groups of third sliding blocks (212); the tops of the two racks (206) are fixedly connected to the bottoms of the two secondary fixed frames (213); a group of fourth sliding grooves (214) are opened on the inner walls of the two groups of fourth sliding grooves (214); sliding frames (215) are slidably embedded in the inner walls of the two groups of fourth sliding grooves (214); and a secondary bulletin board (216) is fixedly installed between one side of the outer walls of the two groups of sliding frames (215).
2. A construction project management bulletin board according to claim 1, characterized in that: A second mounting hole (217) is provided on one side of the outer wall of the two auxiliary bulletin boards (216); a third bearing (218) is fixedly inserted into the inner wall of the two second mounting holes (217); a fixing screw (219) is fixedly inserted into the inner wall of the two third bearings (218); a thread groove (220) is provided on one side of the outer wall of the two auxiliary fixing frames (213); and the outer walls of the two fixing screws (219) are threadedly connected to the inner walls of the two thread grooves (220).
3. A construction project management bulletin board according to claim 2, characterized in that: The lifting mechanism (1) comprises a support frame (101), two first sliding grooves (102) are provided on one side of an outer wall of the support frame (101), and first sliding blocks (103) are slidably embedded in the inner surface walls of the two first sliding grooves (102).
4. A construction project management bulletin board according to claim 3, characterized in that: The inner surface wall of the support frame (101) is provided with two first mounting holes (104), and the inner surface walls of the two first mounting holes (104) are both fixedly provided with first bearings (105).
5. A construction project management bulletin board according to claim 4, characterized in that: A threaded rod (106) is fixedly inserted between the interiors of the two first bearings (105), and a threaded block (107) is threadedly connected to the outer wall of the threaded rod (106).
6. A construction project management notice board according to claim 5, characterized in that: A lifting motor (108) is fixedly connected to one side of the outer wall of the threaded rod (106).
7. A construction project management notice board according to claim 6, characterized in that: One side of the outer wall of the two first sliding blocks (103) is fixedly connected to one side of the outer wall of two of the three connecting plates (201), and one side of the outer wall of the threaded block (107) is fixedly connected to one side of the outer wall of one of the three connecting plates (201).