Die for anchoring and integrally forming concrete sleeper and spikes
By setting up a lane fixing device and an isolation cylinder on the lane mold, the simultaneous forming of concrete lane and lane anchoring is achieved, solving the problems of cumbersome construction and unqualified insulation performance in the prior art, and improving the construction efficiency and insulation performance of the lane sleepers.
Patent Information
- Application Number
- CN202421776458.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2025-05-13
- Estimated Expiration
- 2034-07-25
AI Technical Summary
In the prior art, concrete sleepers are formed first and then nailed to anchor, resulting in cumbersome construction process and a lot of manpower. Moreover, the insulation performance of the sleepers is unqualified due to direct contact between the nails and concrete.
A mold is designed to form a concrete rail sleeper and rail nail anchoring integrated mold. By setting up a rail nail fixing device and an isolation cylinder on the rail sleeper mold, the rail nail is pre-anchored and isolated by insulating anchoring agent when the rail sleeper is formed to avoid direct contact between the rail nail and concrete.
The simultaneous molding of the sleeper and the nail anchor is realized, the construction process is simplified, the anchoring efficiency is improved, and the insulation performance of the sleeper is improved through insulating anchoring agent.
Smart Images

Figure CN222858335U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of sleeper moulds, and in particular relates to a mould for integrally forming a concrete sleeper and a spike anchor. Background Art
[0002] Concrete sleepers need to be anchored with spikes before fasteners can be installed and rails can be fixed. At present, the method of anchoring spikes on sleepers usually involves first forming the sleepers, reserving anchor holes when forming the sleepers, and then using insulating anchors to install and fix the spikes in the anchor holes. The disadvantages of this method of anchoring spikes on sleepers are: 1) It involves operations such as installing anchor frames, grouting, inserting spikes, removing anchor frames, and cleaning anchor surfaces. The procedures are extremely cumbersome and consume a lot of manpower; 2) During online construction, due to the complex construction environment, the anchoring quality is often not up to standard due to unequal objective conditions for sleeper placement and insufficient injection of insulating anchors, thereby affecting the insulation of the sleepers;
[0003] Although pre-anchoring the spikes on the concrete sleepers can solve the above-mentioned problems caused by forming the sleepers first and then anchoring the spikes, the traditional pre-anchoring mold usually only installs the spikes on the mold. The spikes produced by the pre-anchored sleepers are in direct contact with the concrete, and the insulation of the concrete is poor. Therefore, the insulation performance of the concrete sleepers produced with pre-anchored spikes is unqualified; and when insulating concrete is used to produce pre-anchored spike sleepers, it not only increases the production cost, but also causes changes in its mechanical properties due to the addition of a large amount of insulating agent to the concrete, thereby affecting its normal use. Therefore, a mold for integrally forming the concrete sleeper and the spike anchor is developed, so that the spikes can be pre-anchored in the concrete sleeper through the insulating anchoring agent when the concrete sleeper is formed. It not only realizes the simultaneous forming of the sleeper and the spike anchoring, so as to solve a series of problems caused by the need to form the sleeper first and then anchor the spikes in the prior art, but also avoids direct contact between the spikes and the concrete, and solves the defect of decreased insulation performance of the sleeper caused by direct contact between the spikes and the concrete. Utility Model Content
[0004] The utility model aims to overcome the defects in the prior art and provides a mold for integrally forming a concrete sleeper and a spike anchor, which can pre-anchor the spike in the sleeper when the concrete sleeper is formed and can avoid direct contact between the spike and the concrete.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0006] A mold for integrally forming a concrete sleeper and a spike anchor comprises: a sleeper mold enclosed by a bottom plate and a plurality of side plates and used to contain concrete, a spike fixing device arranged below the bottom plate, a spike insertion hole arranged on the spike fixing device, and an isolation cylinder arranged in the sleeper mold for accommodating an insulating anchoring agent, wherein the isolation cylinder corresponds to the position of the spike insertion hole.
[0007] As a further technical solution, the spike insertion hole and the isolation cylinder are coaxially arranged.
[0008] As a further technical solution, the isolation cylinder is detachably connected to the sleeper mold or the spike fixing device.
[0009] As a further technical solution, the insulating anchoring agent adopts a cement mortar insulating anchoring agent.
[0010] As a further technical solution, the road spike fixing device is made of rubber, silicone or polyurethane material.
[0011] As a further technical solution, the road spike fixing device includes a road spike mounting seat, an annular boss arranged outside the road spike mounting seat, a limiting plate arranged on the annular boss, and the road spike insertion hole is opened at the center of the road spike mounting seat; the limiting plate is connected to the base plate by bolts.
[0012] As a further technical solution, the road spike mounting seat, the annular boss and the limiting plate are integrally connected.
[0013] As a further technical solution, the upper surface of the spike mounting seat is flush with the upper surface of the annular boss.
[0014] As a further technical solution, the bottom plate is provided with an opening, the annular boss is inserted into the opening and matched with the opening, the upper surface of the annular boss is flush with the upper surface of the bottom plate, and the upper surface of the limit plate abuts against the lower surface of the bottom plate;
[0015] As a further technical solution, the opening is a conical opening with a small diameter at the upper part and a large diameter at the lower part.
[0016] As a further technical solution, the limiting plate is annular.
[0017] As a further technical solution, the isolation cylinder is an isolation cylinder made of magnetic material;
[0018] The road spike fixing device further comprises an annular electromagnet, and the annular electromagnet is magnetically connected to the isolation cylinder.
[0019] As a further technical solution, an annular groove is provided at the bottom of the annular boss, and the annular electromagnet is arranged in the annular groove.
[0020] Compared with the prior art, the beneficial effects of the utility model are:
[0021] The utility model arranges a spike fixing device on a sleeper mould, and arranges an isolation cylinder in the sleeper mould, and before the sleeper is formed, the spike is fixed to the mould by the spike fixing device, so that the sleeper forming and the anchoring of the spike are formed in one piece, and a series of problems caused by the sleeper being formed first and the spike being anchored later in the prior art are solved; and the arrangement of the isolation cylinder isolates the concrete of the formed sleeper from the insulating anchoring agent during the sleeper forming process, so that the insulating anchoring agent with insulating performance is coated on the outside of the spike, thereby providing insulation for the sleeper, and avoiding direct contact between the concrete and the spike, which causes unqualified insulation performance of the sleeper.
[0022] The utility model adopts magnetic material to prepare the isolation cylinder, and connects it with the electromagnet by magnetic attraction. When power is on, the two attract each other to fix the isolation cylinder. When power is off, the electromagnetic attraction disappears, which facilitates the removal of the isolation cylinder, thereby making it easy to fix and disassemble. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the structure of an embodiment of the utility model (with road spikes);
[0024] Figure 2 A three-dimensional diagram of a road spike fixing device in one embodiment of the utility model;
[0025] Figure 3 A three-dimensional diagram of a road spike fixing device in one embodiment of the utility model from another angle;
[0026] In the figure: 1. bottom plate, 2. side plate, 3. concrete, 4. sleeper mold, 5. spike insertion hole, 6. insulating anchor, 7. isolation cylinder, 8. spike mounting seat, 9. annular boss, 10. limit plate, 11. bolt, 12. annular electromagnet, 13. annular groove, 14. spike. DETAILED DESCRIPTION
[0027] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0029] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] The present invention will be described in further detail below with reference to the accompanying drawings.
[0031] Figure 1-3 An embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model is shown, comprising: a sleeper mold 4 formed by a bottom plate 1 and a plurality of side plates 2 and used to contain concrete 3, a spike insertion hole 5 arranged on the spike fixing device, and an isolation cylinder 7 arranged in the sleeper mold 4 for accommodating an insulating anchor 6, wherein the isolation cylinder 7 corresponds to the position of the spike insertion hole 5. The utility model provides a spike fixing device on the sleeper mold 4, and provides an isolation cylinder 7 in the sleeper mold 4. Before the sleeper is formed, the spike 14 is fixed to the mold by the spike fixing device, so that the sleeper forming and the anchoring of the spike 14 are carried out simultaneously, which solves a series of problems caused by the sleeper being formed first and the spike 14 being anchored later in the prior art. In addition, the isolation cylinder 7 is provided to isolate the concrete 3 of the formed sleeper from the insulating anchor 6 during the sleeper forming process, so that the insulating anchor with insulating performance is coated on the outside of the spike 14, thereby providing insulation for the sleeper and avoiding direct contact between the concrete 3 and the spike 14, which may result in unqualified insulation performance of the sleeper.
[0032] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the spike insertion hole 5 and the isolation cylinder 7 are coaxially arranged.
[0033] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the isolation cylinder 7 is detachably connected to the sleeper mold 4 or the spike fixing device.
[0034] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the insulating anchor 6 is a cement mortar insulating anchor. The cement mortar insulating anchor of the utility model is an anchor prepared by adding an insulating agent to cement mortar, which is a prior art and can also be purchased commercially, and the specific formula is not repeated here.
[0035] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the spike fixing device is made of rubber, silicone or polyurethane material. These materials are conducive to the tight sealing between the spike fixing device and the sleeper mold 4, and between the spike 14 and the spike fixing device, so as to avoid leakage.
[0036] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the spike fixing device includes a spike mounting seat 8, an annular boss 9 arranged outside the spike mounting seat 8, a limiting plate 10 arranged on the annular boss 9, and the spike insertion hole 5 is opened at the center of the spike mounting seat 8.
[0037] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the limiting plate 10 is connected to the bottom plate 1 by bolts 11 .
[0038] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor,
[0039] The spike mounting seat 8, the annular boss 9 and the limiting plate 10 are integrally connected.
[0040] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the upper surface of the spike mounting seat 8 is flush with the upper surface of the annular boss 9 .
[0041] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, an opening is provided on the bottom plate 1, the annular boss 9 is inserted into the opening and matched with the opening, the upper surface of the annular boss 9 is flush with the upper surface of the bottom plate 1, and the upper surface of the limiting plate 10 is in contact with the lower surface of the bottom plate 1;
[0042] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the opening is conical, with a small diameter at the top and a large diameter at the bottom.
[0043] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the limiting plate 10 is annular.
[0044] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the isolation cylinder 7 is an isolation cylinder 7 made of magnetic material;
[0045] The spike fixing device further comprises an annular electromagnet 12, which is magnetically connected to the isolation tube 7. The utility model adopts magnetic material to prepare the isolation tube 7, and connects it to the electromagnet by magnetic attraction. When the power is on, the two attract each other to fix the isolation tube 7. When the power is off, the electromagnetic attraction disappears, which facilitates the removal of the isolation tube 7.
[0046] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, an annular groove 13 is formed at the bottom of the annular boss 9 , and the annular electromagnet 12 is arranged in the annular groove 13 .
[0047] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, a spike 14 is inserted into the spike insertion hole 5 , and the other end of the spike 14 extends into the isolation cylinder 7 .
[0048] As an embodiment of a mold for integrally forming a concrete sleeper and a spike anchor of the utility model, the upper surface of the isolation cylinder 7 is flush with or higher than the upper surface of the side plate 2 .
[0049] The use of the utility model:
[0050] When the utility model is used, firstly, the spike 14 is inserted into the spike insertion hole 5 of the spike fixing device at one end of the spike 14, and then the spike fixing device is inserted into the opening of the sleeper mold 4 and fixed by the bolt 11;
[0051] Then, the annular electromagnet 12 is energized, and the isolation cylinder 7 is placed in the sleeper mold 4 and is attracted and fixed to the annular electromagnet 12 .
[0052] Then, the premixed concrete 3 is loaded into the sleeper mold 4, and the mixed insulating anchor 6 is loaded into the isolation tube 7;
[0053] Then, the power supply of the annular electromagnet 12 is disconnected, and the isolation tube 7 is pulled out in the vertical direction, and the insulating anchor 6 is automatically leveled and combined with the concrete 3;
[0054] Finally, after the insulating anchor 6 and the concrete 3 are cured to reach a preset strength, the bolts 11 are removed, the spike fixing device is removed, and then the sleeper mold 4 is removed to obtain a concrete sleeper with pre-anchored spikes 14.
[0055] The above-mentioned embodiments are only preferred embodiments of the present invention, and are not exhaustive of the feasible implementations of the present invention. For those skilled in the art, any obvious changes made to the present invention without departing from the principle and spirit of the present invention should be considered to be included in the scope of protection of the claims of the present invention.
Claims
1. A mold for integrally forming a concrete sleeper and a spike anchor, characterized in that: include: A rail sleeper mould (4) formed by a bottom plate (1) and a plurality of side plates (2) and used for containing concrete (3), a spike fixing device arranged below the bottom plate (1), a spike insertion hole (5) arranged on the spike fixing device, and an isolation cylinder (7) arranged in the rail sleeper mould (4) for containing an insulating anchor (6), wherein the isolation cylinder (7) corresponds to the position of the spike insertion hole (5).
2. A mold for integrally forming a concrete sleeper and a spike anchor according to claim 1, characterized in that: The spike insertion hole (5) and the isolation cylinder (7) are arranged coaxially.
3. A mold for integrally forming a concrete sleeper and a spike anchor according to claim 2, characterized in that: The isolation cylinder (7) is detachably connected to the sleeper mould (4) or the spike fixing device.
4. A mold for integrally forming a concrete sleeper and a spike anchor according to claim 2, characterized in that: The insulating anchor (6) is a cement mortar insulating anchor (6).
5. The mold for integrally forming a concrete sleeper and a spike anchor according to claim 1, characterized in that: The road spike fixing device is made of rubber, silicone or polyurethane material.
6. A mold for integrally forming a concrete sleeper and a spike anchor according to any one of claims 1 to 5, characterized in that: The road spike fixing device comprises a road spike mounting seat (8), an annular boss (9) arranged outside the road spike mounting seat (8), and a limiting plate (10) arranged on the annular boss (9); the road spike insertion hole (5) is opened at the center of the road spike mounting seat (8); and the limiting plate (10) is connected to the base plate (1) by bolts (11).
7. A mold for integrally forming a concrete sleeper and a spike anchor according to claim 6, characterized in that: The road spike mounting seat (8), the annular boss (9) and the limiting plate (10) are integrally connected.
8. The mold for integrally forming a concrete sleeper and a spike anchor according to claim 6, characterized in that: The bottom plate (1) is provided with an opening, the annular boss (9) is inserted into the opening and matched with the opening, the upper surface of the annular boss (9) is flush with the upper surface of the bottom plate (1), and the upper surface of the limiting plate (10) is in contact with the lower surface of the bottom plate (1).
9. The mold for integrally forming a concrete sleeper and a spike anchor according to claim 6, characterized in that: The isolation cylinder (7) is an isolation cylinder (7) made of magnetic material; The road spike fixing device also includes an annular electromagnet (12), and the annular electromagnet (12) is magnetically connected to the isolation cylinder (7).
10. A mold for integrally forming a concrete sleeper and a spike anchor according to claim 9, characterized in that: An annular groove (13) is provided at the bottom of the annular boss (9), and the annular electromagnet (12) is arranged in the annular groove (13).