Roadbed slope construction device

By designing a device for roadbed slope construction, the overall lifting of steel bars is achieved by using fixed frames, movable frames and sliding wheels, the problems of insufficient straightness guarantee and high construction risks in the prior art are solved, and construction efficiency and cost reduction are achieved.

CN222861038UActive Publication Date: 2025-05-13GUIZHOU ROAD & BRIDGE GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421529238.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2025-05-13
Estimated Expiration
2034-07-01

AI Technical Summary

Technical Problem

In the existing roadbed slope construction technology, the construction of anchor cable frame beams has problems such as insufficient straightness guarantee, unstable construction risks, long construction period, high labor costs and high construction costs.

Method used

A roadbed slope construction device is designed, including a fixing frame, a connecting plate, a movable frame, a sliding wheel, a hoist and a fixing assembly. The fixing frame is installed on the slope through a fixing assembly, and the movable frame and sliding wheels are used to achieve the overall lifting of vertical beam steel bars and cross beam steel bars, reducing manual operation.

Benefits of technology

The device ensures the integrity and perpendicularity of the steel bars, reduces the risk of personnel working on the slope surface, shortens the construction period, reduces labor and cost, and the device can be repeatedly disassembled and used.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222861038U_ABST
    Figure CN222861038U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of side slope construction, in particular to a roadbed side slope construction device which comprises fixing frames, connecting plates are arranged on the fixing frames, grooves are formed in the two sides in the fixing frames, a movable frame is arranged between the fixing frames, sliding wheels are arranged at the two ends of the movable frame, the sliding wheels are arranged in the grooves in a sliding mode, and the connecting plates are arranged on the fixing frames. A connecting frame is arranged at the top end of the fixing frame, the fixing frame is installed on a construction slope through the fixing assembly, then a vertical beam reinforcing steel bar or a cross beam reinforcing steel bar needing to be hoisted is placed on the movable frame, the movable frame is hoisted under the driving of the winch, and the movable frame slides in the groove through the sliding wheels, so that the vertical beam reinforcing steel bar or the cross beam reinforcing steel bar is hoisted. The movable frame can easily slide between the fixing frames, vertical beam reinforcing steel bars and cross beam reinforcing steel bars can be conveniently and integrally hoisted, the integrity and perpendicularity of the whole reinforcing steel bars are ensured, workers are not required to stand on a free slope for construction operation for a long time, the labor cost is reduced, the manufacturing cost is low, and the movable frame can be repeatedly used after being disassembled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of slope construction, in particular to a roadbed slope construction device. Background Art

[0002] For roadbed slope construction, anchor frame beam construction is a common form of slope protection. In conventional construction methods, steel bars are tied on the slope surface, and the straightness of the steel bars cannot be guaranteed. In addition, the risk factors are unstable during the construction process, resulting in a long construction period, high labor costs, and high construction costs. Utility Model Content

[0003] 1. Technical issues to be solved

[0004] In view of the deficiencies in the prior art, the utility model provides a roadbed slope construction device.

[0005] (II) Technical solution

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a roadbed slope construction device, comprising a fixed frame, a connecting plate is provided on the fixed frame, grooves are provided on both sides of the fixed frame, a movable frame is provided between the fixed frames, sliding wheels are provided at both ends of the movable frame, and the sliding wheels are slidably arranged inside the grooves, a connecting frame is provided at the top of the fixed frame, a fixed pulley is provided at the top of the connecting frame, a lifting ring is provided in the middle of the top of the movable frame, a rope is provided on the lifting ring, a winch is provided on one side of the bottom end of the fixed frame, one end of the rope passes through the fixed pulley and is connected to the winch, and fixing components are provided at both ends of the side surfaces of the fixed frame.

[0007] Furthermore, the utility model is improved in that the fixing assembly includes a fixing tube, an adjustment hole is provided in one side of the fixing tube, and the adjusting holes are provided in plurality, a connecting bolt is provided in one side of the adjusting hole, an insertion rod is provided inside one end of the fixing tube, one end of the insertion rod is slidably provided inside the fixing tube, a connecting hole is provided in one side of the insertion rod, and the connecting hole is provided in plurality, the plurality of connecting holes are opposite to the adjusting hole, and one end of the connecting bolt passes through the adjusting hole and is connected to the connecting hole.

[0008] Furthermore, the utility model is improved in that a plurality of the fixing components are provided and symmetrically arranged on the fixing frame.

[0009] Furthermore, the utility model is improved in that a slide rail is provided on the side of the fixing frame, and sliders are provided at both ends of the movable frame, and one end of the slider is slidably provided on the slide rail.

[0010] Furthermore, the utility model is improved in that two groups of fixed pulleys are provided.

[0011] Furthermore, the utility model is improved in that a plurality of connecting plates are provided and are evenly arranged on the fixing frame, and the connecting plates and the fixing frame are connected by welding.

[0012] Furthermore, the utility model is improved in that the connecting plate, the fixing frame and the movable frame are all made of stainless steel metal.

[0013] (III) Beneficial effects

[0014] Compared with the prior art, the utility model provides a roadbed slope construction device having the following

[0015] Beneficial effects:

[0016] The roadbed slope construction device installs a fixed frame on the construction slope through a fixing component, then places the vertical beam steel bars or the horizontal beam steel bars that need to be lifted on the movable frame, and then lifts the movable frame driven by a winch. The movable frame slides in a groove through a sliding wheel, so that the movable frame can easily slide between the fixed frames, which is convenient for lifting the vertical beam steel bars and the horizontal beam steel bars as a whole, ensuring the integrity and verticality of the whole steel bars, eliminating the need for personnel to stand on the open slope for a long time during construction work, reducing labor costs, low cost, and can be repeatedly used after disassembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 For this utility model Figure 1 A side view structural schematic diagram of;

[0019] Figure 3 For this utility model Figure 2 A side view structural schematic diagram of;

[0020] Figure 4 For this utility model Figure 1 Schematic diagram of the disassembled and expanded structure of the fixed components;

[0021] In the figure: 1. fixed frame; 2. connecting plate; 3. movable frame; 4. lifting ring; 5. connecting frame; 6. fixed pulley; 7. rope; 8. winch; 9. fixed assembly; 10. sliding wheel; 11. slider; 12. slide rail; 13. groove; 14. fixing pipe; 15. plug rod; 16. connecting hole; 17. adjustment hole; 18. connecting bolt; 19. limit ring. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-4 A roadbed slope construction device comprises a fixed frame 1, a connecting plate 2 is provided on the fixed frame 1, grooves 13 are provided on both sides of the fixed frame 1, a movable frame 3 is provided between the fixed frames 1, sliding wheels 10 are provided at both ends of the movable frame 3, and the sliding wheels 10 are slidably arranged inside the groove 13, a connecting frame 5 is provided at the top of the fixed frame 1, a fixed pulley 6 is provided at the top of the connecting frame 5, a lifting ring 4 is provided in the middle of the top of the movable frame 3, a rope 7 is provided on the lifting ring 4, a winch 8 is provided on one side of the bottom end of the fixed frame 1, one end of the rope 7 passes through the fixed pulley 6 and is connected to the winch 8, and fixing components 9 are provided at both ends of the side of the fixed frame 1.

[0024] During the actual use of the above structure, the fixed frame 1 is first installed on the construction slope through the fixing assembly 9, and then one end of the rope 7 is connected to the lifting ring 4, and then one end of the lifting ring 4 passes through the fixed pulley 6, and finally the rope 7 is connected to the winch 8. At this time, the vertical beam steel bars or the horizontal beam steel bars that need to be lifted are fixed on the movable frame 3, and then the winch 8 is turned on. The winch 8 reels the rope 7, and the rope 7 slides on the fixed pulley 6 and drives the movable frame 3 to rise through the lifting ring 4, so that the movable frame 3 is lifted and lowered and slid between the fixed frame 1 through the sliding wheel 10, and then the vertical beam steel bars or the horizontal beam steel bars are lifted to the specified height, which is convenient for construction, simple to operate, and highly practical.

[0025] In this embodiment, the fixing component 9 includes a fixing tube 14, one side of which is provided with an adjustment hole 17, and the adjusting hole 17 is provided with a plurality of holes. A connecting bolt 18 is provided on one side of the adjusting hole 17, and an insert rod 15 is provided inside one end of the fixing tube 14, and one end of the insert rod 15 is slidably provided inside the fixing tube 14, and one side of the insert rod 15 is provided with a connecting hole 16, and the connecting hole 16 is provided with a plurality of holes. The plurality of connecting holes 16 are opposite to the adjusting hole 17, and one end of the connecting bolt 18 passes through the adjusting hole 17 and is connected to the connecting hole 16. The fixing component 9 includes the insert rod 15, and the fixing frame 1 is fixedly inserted on the slope surface by the insert rod 15. The insert rod 15 passes through the adjusting hole 17 and the connecting bolt 18 on the fixing tube 14, and cooperates with the connecting hole 16 of the insert rod 15 itself, so that the length of the insert rod 15 can be adjusted in real time, thereby ensuring the fixing effect of the fixing component 9.

[0026] In this embodiment, a plurality of fixing components 9 are provided and symmetrically arranged on the fixing frame 1, thereby improving the firmness of the fixing frame 1 after installation.

[0027] In this embodiment, a slide rail 12 is provided on the side of the fixing frame 1, and sliders 11 are provided at both ends of the movable frame 3. One end of the slider 11 is slidably provided on the slide rail 12, thereby improving the stability of the movable frame 3 when sliding up and down.

[0028] In this embodiment, two groups of fixed pulleys 6 are provided, thereby improving the stability of the rope 7 .

[0029] In this embodiment, a plurality of connecting plates 2 are provided and are evenly arranged on the fixing frame 1 . The connecting plates 2 and the fixing frame 1 are connected by welding, thereby improving the firmness between the connecting plates 2 of the fixing frame 1 .

[0030] In this embodiment, the connecting plate 2, the fixing frame 1 and the movable frame 3 are all made of stainless steel metal, which improves the durability of the device itself.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A roadbed slope construction device, characterized in that: The invention comprises a fixed frame (1), a connecting plate (2) is arranged on the fixed frame (1), grooves (13) are arranged on both sides of the fixed frame (1), a movable frame (3) is arranged between the fixed frames (1), sliding wheels (10) are arranged at both ends of the movable frame (3), and the sliding wheels (10) are slidably arranged inside the grooves (13), a connecting frame (5) is arranged at the top of the fixed frame (1), a fixed pulley (6) is arranged at the top of the connecting frame (5), a lifting ring (4) is arranged in the middle of the top of the movable frame (3), a rope (7) is arranged on the lifting ring (4), a winch (8) is arranged on one side of the bottom end of the fixed frame (1), one end of the rope (7) passes through the fixed pulley (6) and is connected to the winch (8), and fixing components (9) are arranged at both ends of the side of the fixed frame (1).

2. A roadbed slope construction device according to claim 1, characterized in that: The fixing assembly (9) comprises a fixing tube (14), one side of the fixing tube (14) is provided with an adjustment hole (17), the number of the adjustment holes (17) is multiple, one side of the adjustment hole (17) is provided with a connecting bolt (18), one end of the fixing tube (14) is provided with an insertion rod (15), one end of the insertion rod (15) is slidably arranged inside the fixing tube (14), one side of the insertion rod (15) is provided with a connecting hole (16), the number of the connecting holes (16) is multiple, the multiple connecting holes (16) are opposite to the adjustment holes (17), and one end of the connecting bolt (18) passes through the adjustment hole (17) and is connected to the connecting hole (16).

3. A roadbed slope construction device according to claim 2, characterized in that: The fixing components (9) are provided in plurality and are symmetrically arranged on the fixing frame (1).

4. A roadbed slope construction device according to claim 3, characterized in that: A slide rail (12) is arranged on the side of the fixed frame (1), and sliders (11) are arranged at both ends of the movable frame (3), and one end of the slider (11) is slidably arranged on the slide rail (12).

5. A roadbed slope construction device according to claim 4, characterized in that: The fixed pulley (6) is provided in two groups.

6. A roadbed slope construction device according to claim 5, characterized in that: A plurality of connecting plates (2) are provided and are evenly arranged on the fixing frame (1); the connecting plates (2) and the fixing frame (1) are connected by welding.

7. A roadbed slope construction device according to claim 6, characterized in that: The connecting plate (2), the fixing frame (1) and the movable frame (3) are all made of stainless steel.