Intelligent construction equipment for building decoration engineering
By designing an intelligent construction equipment for building decoration projects, using technical means such as mobile mechanisms, lifting mechanisms and electric telescopic poles, the labor intensity and efficiency problems of staff when painting at high places are solved, and the large-area wall painting and corner gap filling are automated, which significantly improves work efficiency.
Patent Information
- Application Number
- CN202421745505.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2025-05-27
- Estimated Expiration
- 2034-07-23
AI Technical Summary
When painting walls at high places, staff need to frequently go up and down the ladder, resulting in long-term stress damage to the arms and hands, and it is difficult to complete large-area painting and fill corner gaps at the same time, which consumes a lot of time and energy, affecting work efficiency.
Design an intelligent construction equipment for building decoration engineering, including base, moving mechanism, lifting mechanism, electric telescopic rod and electric push rod. Through the coordinated work of these mechanisms, the automatic movement and lifting of roller brushes and wool brushes can be realized, and large-scale painting of the wall and filling of corner gaps can be carried out.
This equipment can complete the large-area wall painting and fill the corner gap without the need for staff to frequently go up and down the ladder, which significantly improves work efficiency, reduces the labor intensity of staff, and prevents the pollution of paint.
Smart Images

Figure CN222909345U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to an intelligent construction equipment for building decoration engineering. Background Technique
[0002] Building decoration is a process of various treatments on the inner and outer surfaces and spaces of buildings using decorative materials or ornaments to protect the main structure of the building, improve the physical properties, use functions and beautify the building. Building decoration is an indispensable part of people's lives.
[0003] When painting high walls, workers need to stand on ladders to carry out painting work. At the same time, workers need to hold the roller brush for a long time, and the arms and hands are prone to injury due to long-term stress. Facing different positions of the wall, the position of the ladder needs to be continuously adjusted, and workers frequently climb up and down the ladder, which is very inconvenient to work. When painting on the ladder, due to the limited working position of the workers, large-area painting of the wall and filling of corners such as wall corners cannot be carried out simultaneously, and multiple paintings are required, consuming a lot of time and energy, which is not conducive to improving work efficiency.
[0004] Therefore, an intelligent construction equipment for building decoration engineering is proposed. Content of the Utility Model
[0005] The purpose of the utility model is to provide an intelligent construction equipment for building decoration engineering to solve the problems mentioned in the above background technique.
[0006] The utility model specifically adopts the following technical solutions to achieve the above purpose:
[0007] An intelligent construction equipment for building decoration engineering, including a base, a moving mechanism is provided on the surface of the base, a support column is fixedly installed on the surface of the moving mechanism, a lifting mechanism is provided on the surface of the support column, a fixing plate is fixedly installed on the surface of the lifting mechanism, an electric telescopic rod and an electric push rod are fixedly installed on the surface of the fixing plate, the number of the electric telescopic rod and the electric push rod is two and they are symmetrically installed on the front and rear sides of the support column, a roller brush is fixedly installed at the telescopic end of the electric telescopic rod, a wool brush is fixedly installed at the telescopic end of the electric push rod, and a baffle is fixedly installed at the bottom of the roller brush.
[0008] Further, the moving mechanism includes a chute, the chute is opened on the top surface of the base, a first motor is fixedly installed on the front surface of the base, the output end of the first motor is fixedly connected with a first threaded rod, the first threaded rod is rotatably installed on the inner surface of the chute, a first slider is threadedly sleeved on the surface of the first threaded rod, the first slider is slidably installed on the inner surface of the chute, and the support column is fixedly installed on the top surface of the first slider.
[0009] Further, the lifting mechanism includes a lifting groove opened on the surface of the support column. A second motor is fixedly installed on the top surface of the support column. The output end of the second motor is fixedly connected to a second threaded rod, which is rotatably installed on the inner wall surface of the lifting groove. A second slider is threadedly sleeved on the surface of the second threaded rod and is slidably installed on the inner wall surface of the lifting groove. The fixing plate is fixedly installed on the surface of the second slider.
[0010] Further, the drum brush includes connecting rods. The number of the connecting rods is two and they are arranged front and back. The front and back connecting rods are respectively fixedly connected to the telescopic ends of the front and back electric telescopic rods. A drum brush body is rotatably installed between the opposite surfaces of the two connecting rods.
[0011] Further, the baffle includes connecting plates. The number of the connecting plates is two and they are arranged front and back. The front and back connecting plates are respectively fixedly sleeved on the surfaces of the two connecting rods. A baffle body is fixedly installed on the bottom surface of the connecting plates.
[0012] Further, the baffle body is located below the drum brush body, and the rightmost end of the baffle body does not extend beyond the rightmost end of the drum brush body.
[0013] The beneficial effects of the present utility model are as follows: Move the construction equipment to the vicinity of the wall to be painted. Drive the fixing plate, the drum brush and the wool brush to lift through the lifting mechanism. Drive the drum brush to move until it contacts the wall through the electric telescopic rod. At this time, drive the drum brush to paint the wall up and down through the lifting mechanism. After one cycle of up and down painting, drive the support column to move horizontally through the moving mechanism to adjust the horizontal positions of the drum brush and the wool brush. Then drive the drum brush to move up and down again through the lifting mechanism to paint other parts of the wall. When painting to the corner position, drive the wool brush to move towards the wall through the electric push rod and drive the wool brush to move up and down through the lifting mechanism to fill and paint the corner. The large-area painting of the wall and the filling of the corner gaps can be completed at one time without multiple painting, which is beneficial to improving the work efficiency and the smooth progress of the decoration work. Description of the Drawings
[0014] Figure 1 is a schematic side view of the three-dimensional structure of the present utility model;
[0015] Figure 2 is a top cross-sectional view of the moving mechanism of the present utility model;
[0016] Figure 3 is a side view of the drum brush of the present utility model;
[0017] Reference numerals: 1, base; 2, moving mechanism; 201, chute; 202, first motor; 203, first threaded rod; 204, first slider; 3, support column; 4, lifting mechanism; 401, lifting groove; 402, second motor; 403, second threaded rod; 404, second slider; 5, fixing plate; 6, electric telescopic rod; 7, roller brush; 701, connecting rod; 702, roller brush body; 8, wool brush; 9, baffle; 901, connecting plate; 902, baffle body; 10, electric push rod. Detailed implementation manners
[0018] To make the objectives, technical solutions and advantages of the embodiments of the present utility model clearer, the technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Apparently, the described embodiments are some but not all of the embodiments of the present utility model. The components of the embodiments of the present utility model usually described and illustrated in the accompanying drawings here can be arranged and designed in various different configurations.
[0019] Therefore, the following detailed description of the embodiments of the present utility model provided in the accompanying drawings is not intended to limit the scope of the claimed present utility model, but merely represents the selected embodiments of the present utility model. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present utility model without creative efforts fall within the scope of protection of the present utility model.
[0020] It should be noted that: Similar reference numerals and letters denote similar items in the following drawings. Therefore, once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. In addition, the terms "first", "second", etc. are only used for descriptive distinction and cannot be construed as indicating or implying relative importance.
[0021] The electrical components appearing in this article are all electrically connected to an external main controller and 220V mains power, and the main controller can be a conventional known device such as a computer for control.
[0022] In the description of the embodiments of the present utility model, it should be noted that the orientation or positional relationship indicated by the terms "inner", "outer", "upper", etc. is based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship when the product of the present utility model is normally placed. It is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be construed as a limitation of the present utility model.
[0023] Such as Figures 1 to 3As shown in the figure, an intelligent construction equipment for building decoration projects includes a base 1. A moving mechanism 2 is provided on the surface of the base 1. A support column 3 is fixedly installed on the surface of the moving mechanism 2. A lifting mechanism 4 is provided on the surface of the support column 3. A fixing plate 5 is fixedly installed on the surface of the lifting mechanism 4. An electric telescopic rod 6 and an electric push rod 10 are fixedly installed on the surface of the fixing plate 5. The numbers of the electric telescopic rod 6 and the electric push rod 10 are both two and they are symmetrically installed on the front and rear sides of the support column 3. A roller brush 7 is fixedly installed at the telescopic end of the electric telescopic rod 6. A wool brush 8 is fixedly installed at the telescopic end of the electric push rod 10. A baffle 9 is fixedly installed at the bottom of the roller brush 7.
[0024] Specifically, move the construction equipment to the vicinity of the wall to be painted. The right side of the equipment faces the wall. Drive the fixing plate 5 to lift through the lifting mechanism 4 on the surface of the support column 3, and then drive the roller brush 7 and the wool brush 8 on the surface of the fixing plate 5 to lift. After adjusting the roller brush 7 and the wool brush 8 to the appropriate height, drive the roller brush 7 to move slowly towards the wall through the electric telescopic rod 6 until the roller brush 7 contacts the wall. At this time, drive the roller brush 7 to paint the wall up and down through the lifting mechanism 4. After painting up and down for one cycle, drive the support column 3 to move horizontally through the moving mechanism 2 to adjust the horizontal positions of the roller brush 7 and the wool brush 8. Then drive the roller brush 7 to move up and down again through the lifting mechanism 4 to paint other parts of the wall. The construction equipment realizes the automatic painting function, eliminating the need for workers to frequently climb up and down the ladder to change positions, saving a lot of time and energy. When painting to the corner position, drive the wool brush 8 to move towards the wall until it contacts the wall through the electric push rod 10. At this time, drive the wool brush 8 to move up and down through the lifting mechanism 4 to fill and paint the corner. The large-area painting of the wall and the filling of the corner gaps can be completed at one time without multiple painting operations, which is beneficial to improving work efficiency. The setting of the baffle 9 at the bottom of the roller brush 7 prevents paint and other coatings from dripping and polluting the wall during the painting process, thus damaging the painting effect and facilitating the smooth progress of the decoration work.
[0025] As Figures 1 to 3 As shown in the figure, the moving mechanism 2 includes a chute 201. The chute 201 is opened on the top surface of the base 1. A first motor 202 is fixedly installed on the front of the base 1. The output end of the first motor 202 is fixedly connected to a first threaded rod 203. The first threaded rod 203 is rotatably installed on the inner wall surface of the chute 201. A first slider 204 is threadedly sleeved on the surface of the first threaded rod 203. The first slider 204 is slidably installed on the inner wall surface of the chute 201. The support column 3 is fixedly installed on the top surface of the first slider 204.
[0026] Specifically, the rotation of the output end of the first motor 202 can drive the rotation of the first threaded rod 203, thereby driving the first slider 204 that is threadedly sleeved on the surface of the first threaded rod 203 and slidably installed on the inner wall surface of the chute 201 to slide back and forth, and then driving the support column 3 fixedly installed on the top surface of the first slider 204 to move back and forth, facilitating the movement of the roller brush 7 and the wool brush 8 to different positions on the wall for painting. Without frequently moving the device, the wall can be painted more comprehensively, saving a lot of time and effort and being conducive to improving work efficiency.
[0027] As Figures 1 to 3 shown, the lifting mechanism 4 includes a lifting groove 401, which is opened on the surface of the support column 3. A second motor 402 is fixedly installed on the top surface of the support column 3. The output end of the second motor 402 is fixedly connected to a second threaded rod 403. The second threaded rod 403 is rotatably installed on the inner wall surface of the lifting groove 401. A second slider 404 is threadedly sleeved on the surface of the second threaded rod 403. The second slider 404 is slidably installed on the inner wall surface of the lifting groove 401. A fixing plate 5 is fixedly installed on the surface of the second slider 404.
[0028] Specifically, the rotation of the output end of the second motor 402 can drive the rotation of the second threaded rod 403, thereby driving the second slider 404 that is threadedly sleeved on the surface of the second threaded rod 403 and slidably installed on the inner wall surface of the lifting groove 401 to slide up and down, and then driving the fixing plate 5 to lift, facilitating the adjustment of the height position of the roller brush 7 and the wool brush 8 on the surface of the fixing plate 5, enabling the painting of walls at different heights. There is no need for workers to stand on a ladder and hold the roller brush 7 for painting, ensuring the work safety of the workers while improving work efficiency.
[0029] As Figures 1 to 3 shown, the roller brush 7 includes a connecting rod 701. The number of connecting rods 701 is two and they are arranged front and back. The front and back connecting rods 701 are respectively fixedly connected to the telescopic ends of the front and back two electric telescopic rods 6. A roller brush body 702 is rotatably installed between the opposite surfaces of the two connecting rods 701.
[0030] Specifically, a connecting plate 901 is fixedly installed on the surface of the connecting rod 701, such that when the lifting mechanism 4 drives the roller brush 7 to move, the baffle 9 can move accordingly. When the roller brush 7 is painting at any position, the baffle body 902 can block the paint and other coating materials that may drip on the surface of the roller brush 7, preventing the paint and coating materials from polluting the wall surface and affecting the overall painting effect.
[0031] As Figures 1 to 3 shown, the baffle 9 includes a connecting plate 901. The number of connecting plates 901 is two and they are arranged front and back. The front and back connecting plates 901 are respectively fixedly sleeved on the surfaces of the two connecting rods 701. The bottom surface of the connecting plate 901 is fixedly installed with a baffle body 902.
[0032] Specifically, the electric telescopic rod 6 drives the connecting rod 701 to move, and then drives the roller brush body 702 rotatably installed on the surface of the connecting rod 701 to move towards the wall until the roller brush body 702 contacts the wall. When the lifting mechanism 4 drives the roller brush 7 to lift and lower, due to the wall exerting a force on the roller brush body 702, the roller brush body 702 can roll along the wall, thus successfully completing the painting work.
[0033] As Figures 1 to 3 shown, the baffle body 902 is located below the roller brush body 702, and the rightmost end of the baffle body 902 does not extend beyond the rightmost end of the roller brush body 702.
[0034] Specifically, the rightmost end of the baffle body 902 does not extend beyond the rightmost end of the roller brush body 702, which facilitates the roller brush body 702 to smoothly contact the wall and perform painting, and is not easily affected by the baffle body 902.
[0035] In summary: Move the construction equipment to the vicinity of the wall to be painted. The lifting mechanism 4 drives the fixing plate 5, the roller brush 7 and the wool brush 8 to lift and lower. The electric telescopic rod 6 drives the roller brush 7 to move until it contacts the wall. At this time, the lifting mechanism 4 can drive the roller brush 7 to paint the wall up and down. After one cycle of up and down painting, the moving mechanism 2 drives the support column 3 to move horizontally to adjust the horizontal positions of the roller brush 7 and the wool brush 8. Then, the lifting mechanism 4 drives the roller brush 7 to move up and down again to paint other parts of the wall. When painting to the corner position, the electric push rod 10 can be used to drive the wool brush 8 to move towards the wall, and the lifting mechanism 4 drives the wool brush 8 to move up and down to fill and paint the corner. The large-area painting of the wall and the filling of the corner gaps can be completed at one time without multiple painting operations, which is beneficial to improving work efficiency and smoothly promoting the decoration work.
[0036] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. What is described in the above embodiments and the specification is only the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will have various changes and improvements, and these changes and improvements all fall within the scope of the present invention claimed. The scope of protection claimed by the present invention is defined by the appended claims and their equivalents.
Claims
1. An intelligent construction equipment for building decoration engineering, characterized in that: The invention comprises a base (1), wherein a moving mechanism (2) is provided on the surface of the base (1), a support column (3) is fixedly installed on the surface of the moving mechanism (2), a lifting mechanism (4) is provided on the surface of the support column (3), a fixing plate (5) is fixedly installed on the surface of the lifting mechanism (4), an electric telescopic rod (6) and an electric push rod (10) are fixedly installed on the surface of the fixing plate (5), the number of the electric telescopic rod (6) and the electric push rod (10) are both two and they are symmetrically installed on the front and rear sides of the support column (3), a roller brush (7) is fixedly installed on the telescopic end of the electric telescopic rod (6), a wool brush (8) is fixedly installed on the telescopic end of the electric push rod (10), and a baffle (9) is fixedly installed on the bottom of the roller brush (7).
2. The intelligent construction equipment for building decoration engineering according to claim 1 is characterized in that: The moving mechanism (2) comprises a slide groove (201), the slide groove (201) is opened on the top surface of the base (1), a first motor (202) is fixedly installed on the front surface of the base (1), an output end of the first motor (202) is fixedly connected to a first threaded rod (203), the first threaded rod (203) is rotatably installed on the inner wall surface of the slide groove (201), a first slider (204) is threadedly mounted on the surface of the first threaded rod (203), the first slider (204) is slidably installed on the inner wall surface of the slide groove (201), and the support column (3) is fixedly installed on the top surface of the first slider (204).
3. The intelligent construction equipment for building decoration engineering according to claim 1 is characterized in that: The lifting mechanism (4) comprises a lifting groove (401), the lifting groove (401) is provided on the surface of the support column (3), a second motor (402) is fixedly mounted on the top surface of the support column (3), an output end of the second motor (402) is fixedly connected to a second threaded rod (403), the second threaded rod (403) is rotatably mounted on the inner wall surface of the lifting groove (401), a second slider (404) is threadedly mounted on the surface of the second threaded rod (403), the second slider (404) is slidably mounted on the inner wall surface of the lifting groove (401), and the fixing plate (5) is fixedly mounted on the surface of the second slider (404).
4. The intelligent construction equipment for building decoration engineering according to claim 1 is characterized in that: The roller brush (7) comprises a connecting rod (701), wherein the connecting rods (701) are two in number and arranged front and rear, the connecting rods (701) on the front and rear sides are respectively fixedly connected to the telescopic ends of the two front and rear electric telescopic rods (6), and a roller brush body (702) is rotatably mounted between the opposite surfaces of the two connecting rods (701).
5. The intelligent construction equipment for building decoration engineering according to claim 4 is characterized in that: The baffle (9) comprises a connecting plate (901), the number of the connecting plates (901) is two and they are arranged front and back, the connecting plates (901) on the front and back sides are respectively fixedly sleeved on the surfaces of two connecting rods (701), and the bottom surface of the connecting plate (901) is fixedly mounted with a baffle body (902).
6. The intelligent construction equipment for building decoration engineering according to claim 5 is characterized in that: The baffle body (902) is located below the roller brush body (702), and the rightmost end of the baffle body (902) does not exceed the rightmost end of the roller brush body (702).