Drilling pipe frame for building drilling

By designing a building drilling pipe frame containing mounting plates, support components and collection boxes, the problem of oil waste in the drilling pipe during oil drilling and development is solved, and the support of drilling pipes and the cleaning and collection of oil is achieved, which improves the efficiency of oil extraction.

CN222909964UActive Publication Date: 2025-05-27FUJIAN BANGU CONSTR ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421773632.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2025-05-27
Estimated Expiration
2034-07-25

AI Technical Summary

Technical Problem

During oil drilling and production, oil is attached to the outer wall of the drill pipe. When the drill pipe is removed from the drill pipe rack, the oil may drip on the drill pipe rack, resulting in waste of oil.

Method used

A building drilling pipe frame is designed, including mounting plates, support components and collection boxes. The drill pipe can be supported and the drill pipe is cleaned and oil is collected on the drill pipe by the mutual cooperation of the fixing ring, support hole, fixing plate, extrusion rod, movable hole, restriction ring and connection port.

Benefits of technology

It effectively avoids the waste of oil, and improves the efficiency of oil extraction by supporting drill pipes and cleaning and collecting oil.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222909964U_ABST
    Figure CN222909964U_ABST
Patent Text Reader

Abstract

According to the technical scheme, the building drilling pipe frame is characterized in that the building drilling pipe frame comprises an installation plate, a first supporting plate is fixedly installed on one side of the installation plate, a second supporting plate is fixedly installed on the other side of the installation plate, and bottom plates are fixedly installed on one side of the first supporting plate and one side of the second supporting plate respectively; the supporting assembly is arranged on the top face of the mounting plate and used for supporting a drill pipe, the supporting assembly comprises a supporting hole, the supporting hole is formed in the top face of the mounting plate, a movable hole is formed in one side of the first supporting plate, and the movable hole is communicated with the first supporting plate. Through mutual cooperative use of the fixing ring, the supporting hole, the fixing plate, an extrusion rod, a movable hole, a second limiting ring, a first limiting ring, a connecting opening and a collecting box, the drill pipe can be supported when the drill pipe exploits petroleum, the petroleum on the drill pipe can be cleaned and collected after the petroleum is exploited, and petroleum waste is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of drill pipe racks, and particularly relates to a drill pipe rack for building drilling. Background Art

[0002] There are two theories about the oil formation mechanism of petroleum: the biogenic sedimentary transformation theory and the petrochemical oil theory. The former is more widely accepted and believes that petroleum is formed by the long-term evolution of organisms in ancient oceans or lakes, belonging to biogenic sedimentary transformation oil and being non-renewable; the latter believes that petroleum is generated by the carbon within the earth's crust itself, has nothing to do with organisms, and is renewable. Petroleum is mainly used as fuel and gasoline, and is also the raw material for many chemical industrial products such as solvents, fertilizers, pesticides, and plastics. Before using petroleum, it needs to be mined. Drill pipes are used during petroleum drilling. During drilling, due to the excessive length of the drill pipe, a drill pipe rack is needed to support the drill pipe.

[0003] For example, the Chinese patent with the publication number CN219528953U proposes a drill pipe rack for petroleum drilling. This patent facilitates the connection of the stabilizing mechanism and the linkage mechanism by installing a rotating block and a fixing rod. When placing the drill pipe, the fixing buckle and the fixing frame are opened, and by rotating the linkage mechanism, it is convenient to place the drill pipe. After the drill pipe is placed, under the action of an external force, the linkage mechanism is pressed, and the fixing buckle is buckled on the fixing frame, so that the stabilizing mechanism and the linkage mechanism clamp the drill pipe, thus facilitating the stable use of the drill pipe and improving the efficiency of petroleum extraction. However, in this solution, since a layer of petroleum will adhere to the outer wall surface of the drill pipe during petroleum extraction, during the process of removing the drill pipe from the drill pipe rack, the petroleum on the drill pipe may drip onto the drill pipe rack, resulting in waste of petroleum. Content of the Utility Model

[0004] Aiming at the deficiencies of the prior art, the utility model provides a drill pipe rack for building drilling, which solves the problem that during petroleum extraction, a layer of petroleum adheres to the outer wall surface of the drill pipe, and during the process of removing the drill pipe from the drill pipe rack, the petroleum on the drill pipe may drip onto the drill pipe rack, resulting in waste of petroleum.

[0005] The above technical purpose of the utility model is achieved through the following technical solutions:

[0006] A building drilling pipe support frame, comprising: a mounting plate, a first support plate is fixedly mounted on one side of the mounting plate, a second support plate is fixedly mounted on the other side of the mounting plate, and bottom plates are fixedly mounted on one side of the first support plate and one side of the second support plate respectively; a support assembly, the support assembly is arranged on the top surface of the mounting plate and is used for supporting the drill pipe, the support assembly includes: a support hole, the support hole is opened on the top surface of the mounting plate, a movable hole is opened on one side of the first support plate, a pressing rod is movably sleeved on the inner circumferential wall of the movable hole, one end of the pressing rod is fixedly mounted with a fixing plate, fixing rings are fixedly mounted on the top surface of the mounting plate and one end of the pressing rod respectively, a fixing hole is opened on one side of the first support plate, a fixing rod is fixedly sleeved on the inner circumferential wall of the fixing hole, a first limiting ring is fixedly mounted at one end of the fixing rod, a second limiting ring is arranged on one side of the first limiting ring, a hinge is fixedly mounted on one side of the second limiting ring, the first limiting ring and the second limiting ring are connected by the hinge, a connection port is opened on one side of the first support plate, and a collection box is movably sleeved inside the connection port.

[0007] In order to scrape oil from the drill pipe, as a building drilling pipe support frame of the present utility model, preferably, a limiting groove is opened on one side of the second limiting ring, a connection block is fixedly mounted on one side of the first limiting ring, a threaded groove is opened on one side of the connection block, a threaded hole is opened on the outer circumferential wall of the second limiting ring, the threaded hole is internally communicated with the limiting groove, and a threaded rod is threadedly connected to the inner circumferential wall of the threaded hole, and the threaded rod is threadedly connected to the threaded groove.

[0008] In order to limit the collection box, as a building drilling pipe support frame of the present utility model, preferably, a limiting hole is opened on one side of the first support plate, mounting blocks are fixedly mounted on both sides of the collection box, and a connecting rod is fixedly mounted on one side of the mounting block, and the connecting rod is movably sleeved in the limiting hole.

[0009] In order to draw out the collection box from the inside of the connection port, as a building drilling pipe support frame of the present utility model, preferably, the outer circumferential wall of the connecting rod is threadedly connected, and a threaded ring is threadedly connected to the outer circumferential wall of the connecting rod.

[0010] In order to facilitate the fixing ring to limit the drill pipe, as a building drilling pipe support frame of the present utility model, preferably, a fixing groove is opened on one side of the first support plate, an electric push rod is fixedly sleeved on the inner circumferential wall of the fixing groove, a PLC controller is fixedly mounted on one side of the first support plate, the electric push rod is electrically connected to the PLC controller, and one end of the telescopic shaft of the electric push rod is fixedly mounted on one side of the fixing plate.

[0011] In order to scrape oil from the drill pipe, as a drill pipe rack for building drilling in the present utility model, preferably, rubber strips are respectively fixedly sleeved on the inner circular wall surfaces of the first limiting ring and the second limiting ring.

[0012] In summary, the present utility model mainly has the following beneficial effects:

[0013] Through the mutual cooperation of the fixing ring, the support hole, the fixing plate, the extrusion rod, the movable hole, the second limiting ring, the first limiting ring, the connection port and the collection box, the drill pipe can be supported when the drill pipe is used for oil extraction, and the oil on the drill pipe can be cleaned and collected after the oil extraction, so as to avoid waste of oil. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 is a three-dimensional structural schematic diagram of the present utility model;

[0015] Figure 2 is a structural schematic diagram of the collection box of the present utility model;

[0016] Figure 3 is a structural schematic diagram of the fixing plate of the present utility model;

[0017] Figure 4 is a structural schematic diagram of the first limiting ring of the present utility model;

[0018] Figure 5 is Figure 4 a partial structural schematic diagram of A in

[0019] Reference numerals: 1, mounting plate; 2, first support plate; 3, second support plate; 4, bottom plate; 5, connection port; 6, collection box; 7, mounting block; 8, connecting rod; 9, threaded ring; 10, limiting hole; 11, fixing hole; 12, fixing rod; 13, first limiting ring; 14, connecting block; 15, threaded groove; 16, second limiting ring; 17, limiting groove; 18, threaded hole; 19, threaded rod; 20, rubber strip; 21, movable hole; 22, extrusion rod; 23, fixing plate; 24, fixing groove; 25, electric push rod; 26, support hole; 27, fixing ring. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0020] The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present utility model without creative efforts shall fall within the protection scope of the present utility model.

[0021] Embodiment 1

[0022] Reference Figure 1 、 Figure 2 、 Figure 3 、 Figure 4 and Figure 5 ,a building drilling pipe support, comprising a mounting plate 1. One side of the mounting plate 1 is fixedly installed with a first support plate 2, and the other side of the mounting plate 1 is fixedly installed with a second support plate 3. Bottom plates 4 are respectively fixedly installed on one side of the first support plate 2 and one side of the second support plate 3. A support assembly is arranged on the top surface of the mounting plate 1 for supporting the drill pipe. The support assembly includes a support hole 26 opened on the top surface of the mounting plate 1. An activity hole 21 is opened on one side of the first support plate 2. A pressing rod 22 is movably sleeved on the inner circular wall surface of the activity hole 21. One end of the pressing rod 22 is fixedly installed with a fixing plate 23. Fixing rings 27 are respectively fixedly installed on the top surface of the mounting plate 1 and one end of the pressing rod 22. A fixing hole 11 is opened on one side of the first support plate 2. A fixing rod 12 is fixedly sleeved on the inner circular wall surface of the fixing hole 11. One end of the fixing rod 12 is fixedly installed with a first limiting ring 13. A second limiting ring 16 is arranged on one side of the first limiting ring 13. A hinge is fixedly installed on one side of the second limiting ring 16. The first limiting ring 13 and the second limiting ring 16 are connected by the hinge. A connection port 5 is opened on one side of the first support plate 2. A collection box 6 is movably sleeved inside the connection port 5. By setting the fixing ring 27, when drilling and extracting oil through the drill pipe, the staff can place the drill pipe inside the support hole 26. After placing the drill pipe inside the support hole 26, the staff can push the fixing plate 23, so that the pressing rod 22 moves inside the activity hole 21, thereby pressing the left fixing ring 27 against the drill pipe, restricting the drill pipe inside the support hole 26 by the two fixing rings 27, and enabling the drill pipe to extract oil. After extracting the oil, the staff can flip the second limiting ring 16 through the hinge, so that the second limiting ring 16 and the first limiting ring 13 are combined to restrict the drill pipe inside the first limiting ring 13 and the second limiting ring 16. After restricting the drill pipe inside the first limiting ring 13 and the second limiting ring 16, the staff can move the drill pipe upward. While the drill pipe is moving upward, the staff can push the collection box 6 inside the connection port 5, so that the collection box 6 is pushed below the drill pipe. When the drill pipe moves upward inside the first limiting ring 13 and the second limiting ring 16, the first limiting ring 13 and the second limiting ring 16 can scrape the oil on the drill pipe, so that the scraped oil falls inside the collection box 6, and the collection box 6 collects the oil on the drill pipe. It can support the drill pipe when drilling and extracting oil, and can clean and collect the oil on the drill pipe after extracting the oil, avoiding waste of oil.

[0023] Embodiment 2

[0024] Based on the above Embodiment 1, reference Figure 1 、Figure 4 and Figure 5 , a limiting groove 17 is formed on one side of the second limiting ring 16. A connecting block 14 is fixedly installed on one side of the first limiting ring 13. A threaded groove 15 is formed on one side of the connecting block 14. A threaded hole 18 is formed on the outer circumferential wall surface of the second limiting ring 16. The threaded hole 18 communicates with the inside of the limiting groove 17. A threaded rod 19 is threadedly connected to the inner circumferential wall surface of the threaded hole 18. The threaded rod 19 is threadedly connected to the threaded groove 15. By providing the threaded rod 19, after the staff flips the second limiting ring 16 through the hinge and abuts it against the first limiting ring 13, the connecting block 14 on the first limiting ring 13 is engaged with the limiting groove 17 on the second limiting ring 16. After the connecting block 14 is stuck inside the limiting groove 17, the staff can screw the threaded rod 19 into the threaded hole 18 and the threaded groove 15 on the connecting block 14 through the thread, so as to fix the first limiting ring 13 and the second limiting ring 16 together, and the first limiting ring 13 and the second limiting ring 16 are fixed together to scrape the oil from the drill pipe.

[0025] Embodiment 3

[0026] Based on the above Embodiment 1 or 2, referring to Figure 1 、 Figure 2 、 Figure 3 and Figure 4 , a limiting hole 10 is formed on one side of the first support plate 2. Mounting blocks 7 are respectively fixedly installed on both sides of the collection box 6. A connecting rod 8 is fixedly installed on one side of the mounting block 7. The connecting rod 8 is movably sleeved in the limiting hole 10. By providing the connecting rod 8, when the staff moves the collection box 6 inside the connection port 5, the connecting rod 8 can move inside the limiting hole 10, so that the connecting rod 8 restricts the collection box 6. A threaded connection is formed on the outer circumferential wall surface of the connecting rod 8. A threaded ring 9 is threadedly connected to the outer circumferential wall surface of the connecting rod 8. By providing the threaded ring 9, after the staff unscrews the threaded ring 9 from the connecting rod 8 through the thread, the collection box 6 can be pulled out from the inside of the connection port 5. A fixed groove 24 is formed on one side of the first support plate 2. An electric push rod 25 is fixedly sleeved on the inner circumferential wall surface of the fixed groove 24. A PLC controller is fixedly installed on one side of the first support plate 2. The electric push rod 25 is electrically connected to the PLC controller. One end of the telescopic shaft of the electric push rod 25 is fixedly installed on one side of the fixed plate 23. By providing the electric push rod 25, the staff can start the electric push rod 25 through the PLC controller, so that the telescopic shaft of the electric push rod 25 drives the fixed plate 23 to move, thereby moving the fixed ring 27, which is convenient for the fixed ring 27 to restrict the drill pipe. Rubber strips 20 are respectively fixedly sleeved on the inner circumferential wall surfaces of the first limiting ring 13 and the second limiting ring 16.

[0027] Working principle: Please refer to Figures 1 - 5As shown in the figure, by setting the fixed ring 27, when drilling for oil through the drill pipe, the staff can place the drill pipe inside the support hole 26. After placing the drill pipe inside the support hole 26, the staff can push the fixed plate 23, causing the extrusion rod 22 to move inside the movable hole 21, so that the left fixed ring 27 can be abutted against the drill pipe, and the two fixed rings 27 can limit the drill pipe inside the support hole 26, enabling the drill pipe to extract oil. After the oil extraction, the staff can flip the second limiting ring 16 through the hinge, so that the second limiting ring 16 and the first limiting ring 13 are combined to limit the drill pipe inside the first limiting ring 13 and the second limiting ring 16. After limiting the drill pipe inside the first limiting ring 13 and the second limiting ring 16, the staff can move the drill pipe upward. While the drill pipe is moving upward, the staff can push the collection box 6 inside the connection port 5, causing the collection box 6 to be pushed below the drill pipe. When the drill pipe moves upward inside the first limiting ring 13 and the second limiting ring 16, the first limiting ring 13 and the second limiting ring 16 can scrape the oil on the drill pipe, causing the scraped oil to fall inside the collection box 6, enabling the collection box 6 to collect the oil on the drill pipe. It can support the drill pipe during oil extraction and clean and collect the oil on the drill pipe after oil extraction, avoiding waste of oil.

[0028] By setting the threaded rod 19, after the staff flips the second limiting ring 16 through the hinge and abuts it against the first limiting ring 13, the connecting block 14 on the first limiting ring 13 will be stuck with the limiting groove 17 on the second limiting ring 16. After the connecting block 14 is stuck inside the limiting groove 17, the staff can screw the threaded rod 19 into the threaded hole 18 and the threaded groove 15 on the connecting block 14 through the thread, so as to fix the first limiting ring 13 and the second limiting ring 16 together, enabling the first limiting ring 13 and the second limiting ring 16 to be fixed together to scrape the oil on the drill pipe. By setting the connecting rod 8, when the staff moves the collection box 6 inside the connection port 5, the connecting rod 8 can move inside the limiting hole 10, causing the connecting rod 8 to limit the collection box 6. By setting the threaded ring 9, after the staff unscrews the threaded ring 9 from the connecting rod 8 through the thread, the collection box 6 can be pulled out from inside the connection port 5. By setting the electric push rod 25, the staff can start the electric push rod 25 through the PLC controller, causing the telescopic shaft of the electric push rod 25 to drive the fixed plate 23 to move, so as to move the fixed ring 27, facilitating the fixed ring 27 to limit the drill pipe. By setting the rubber strip 20, the rubber strip 20 can scrape the oil on the drill pipe.

[0029] Although embodiments of the present utility model have been shown and described, those of ordinary skill in the art can understand that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principle and spirit of the present utility model. The scope of the present utility model is defined by the appended claims and their equivalents.

Claims

1. A construction drilling pipe rack, characterized in that: include: A mounting plate (1), a first support plate (2) being fixedly mounted on one side of the mounting plate (1), a second support plate (3) being fixedly mounted on the other side of the mounting plate (1), and a bottom plate (4) being fixedly mounted on one side of the first support plate (2) and one side of the second support plate (3); A support assembly, wherein the support assembly is arranged on the top surface of the mounting plate (1) and is used to support the drill pipe, and the support assembly comprises: a support hole (26), wherein the support hole (26) is opened on the top surface of the mounting plate (1), a movable hole (21) is opened on one side of the first support plate (2), an extrusion rod (22) is movably sleeved on the inner circular wall surface of the movable hole (21), a fixing plate (23) is fixedly installed on one end of the extrusion rod (22), a fixing ring (27) is fixedly installed on the top surface of the mounting plate (1) and one end of the extrusion rod (22), and the first support A fixing hole (11) is provided on one side of the plate (2), a fixing rod (12) is fixedly sleeved on the inner circular wall of the fixing hole (11), a first limiting ring (13) is fixedly installed on one end of the fixing rod (12), a second limiting ring (16) is provided on one side of the first limiting ring (13), a hinge is fixedly installed on one side of the second limiting ring (16), the first limiting ring (13) and the second limiting ring (16) are connected via the hinge, a connecting port (5) is provided on one side of the first support plate (2), and a collecting box (6) is movably sleeved inside the connecting port (5).

2. A construction drilling pipe stand according to claim 1, characterized in that: A limiting groove (17) is provided on one side of the second limiting ring (16); a connecting block (14) is fixedly installed on one side of the first limiting ring (13); a threaded groove (15) is provided on one side of the connecting block (14); a threaded hole (18) is provided on the outer circumferential wall surface of the second limiting ring (16); the threaded hole (18) is communicated with the inside of the limiting groove (17); a threaded rod (19) is threadedly connected to the inner circumferential wall surface of the threaded hole (18); and the threaded rod (19) is connected to the threaded groove (15) by threads.

3. A construction drilling pipe stand according to claim 1, characterized in that: A limiting hole (10) is provided on one side of the first support plate (2), mounting blocks (7) are fixedly mounted on both sides of the collection box (6), a connecting rod (8) is fixedly mounted on one side of the mounting block (7), and the connecting rod (8) is movably sleeved with the limiting hole (10).

4. A construction drilling pipe stand according to claim 3, characterized in that: The outer circumferential wall surface of the connecting rod (8) is provided with a threaded connection, and the outer circumferential wall surface of the connecting rod (8) is threadedly connected with a threaded ring (9).

5. A construction drilling pipe stand according to claim 1, characterized in that: A fixing groove (24) is provided on one side of the first support plate (2), an electric push rod (25) is fixedly sleeved on the inner circular wall surface of the fixing groove (24), a PLC controller is fixedly installed on one side of the first support plate (2), the electric push rod (25) is electrically connected to the PLC controller, and one end of the telescopic shaft of the electric push rod (25) is fixedly installed on one side of the fixing plate (23).

6. A construction drilling pipe stand according to claim 1, characterized in that: The inner circular wall surfaces of the first limiting ring (13) and the second limiting ring (16) are respectively fixedly sleeved with rubber strips (20).

Citation Information

Patent Citations

  • Drilling pipe frame for petroleum drilling and production

    CN219528953U