Beam bottom hanging bracket construction platform
By designing a beam bottom hanging frame construction platform for bridge maintenance, the problem of increased costs and inconvenience of long-term use of bridge inspection vehicles is solved, and efficient and economical construction platform installation and bridge deck traffic are alleviated.
Patent Information
- Application Number
- CN202420721948.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2025-06-06
- Estimated Expiration
- 2034-04-09
AI Technical Summary
During the bridge maintenance and reinforcement process, long-term use of bridge inspection vehicles as construction platforms will increase construction costs and cause inconvenience to bridge deck traffic.
A beam bottom hanging frame construction platform is designed, including a bridge deck stable structure, a vertical connecting structure and a bottom load bearing structure. Through the combination and fixation of these structures, a detachable construction platform is set up.
The platform provides a long-term construction platform for the bottom of the bridge. Multiple hanging frames can combine to build larger platforms, which improves construction efficiency, reduces costs, and reduces pressure on bridge deck traffic.
Smart Images

Figure CN222948852U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a beam bottom hanger construction platform. Background Art
[0002] A construction platform is a temporary platform that provides workspace and safety protection for construction workers on construction sites. It is usually constructed of steel pipes, steel plates and other materials, and can be cantilevered outside a building or in a high-altitude area to provide a stable working platform for construction workers.
[0003] During the process of bridge maintenance and reinforcement, it is often necessary to carry out construction work at the bottom of the beam. The project often uses a bridge inspection vehicle or sets up a support at the bottom of the beam as a construction platform for construction work at the bottom of the bridge. Bridge inspection vehicles are often used when the bridge clearance is high, it is not convenient to set up a support under the bridge, and the operation time is relatively short. In other cases, the support under the bridge is generally used for construction work; bridges often cross rivers and canyons, etc., and it is not convenient to set up a support under the bridge, so only a bridge inspection vehicle can be used to provide a construction work platform. However, since the construction time of bridge maintenance work is relatively long, using a bridge inspection vehicle as a construction platform for a long time will increase the construction cost. At the same time, the long-term occupation of the bridge deck by the bridge inspection vehicle brings great inconvenience to the bridge deck traffic. Utility Model Content
[0004] The purpose of the utility model is to solve the problems of the above-mentioned background technology and to provide a beam bottom hanger construction platform.
[0005] The purpose of the utility model can be achieved through the following technical solutions:
[0006] A beam bottom hanger construction platform, comprising a bridge deck stabilizing structure, a vertical connecting structure and a bottom bearing structure, wherein two vertical connecting structures are detachably mounted at both ends of the bottom bearing structure, and the bridge deck stabilizing structure is detachably mounted on one side of the top of the vertical connecting structure;
[0007] The ends of the bridge deck stabilizing structure are welded with fixing pieces, and the bridge deck stabilizing structure is fixed on the beam through the fixing pieces.
[0008] As a further solution of the utility model: transverse supporting legs are arranged on the inner sides of the two vertical connecting structures.
[0009] As a further solution of the utility model: a bearing plate is laid on the bottom bearing structure.
[0010] As a further solution of the utility model: a second platform is detachably installed between at least two beam bottom hangers, and the second platform is composed of multiple steel pipes, and the multiple steel pipes are arranged in a straight line. Both ends of the steel pipes can be detachably installed on the bottom bearing structure on the two beam bottom hangers.
[0011] As a further solution of the utility model: bearing plates are laid on the second platform and the bottom bearing structure.
[0012] Beneficial effects of the utility model: the utility model can provide a long-term construction platform for the bottom of the bridge, and a plurality of hangers can be combined to build a larger construction platform, which is convenient for operators to carry out construction work on the bottom of the bridge, improves construction efficiency, reduces construction costs, and reduces traffic pressure on the bridge surface. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The utility model is further described below in conjunction with the accompanying drawings.
[0014] Figure 1 This is a structural schematic diagram of a beam bottom hanger construction platform of the utility model;
[0015] Figure 2 yes Figure 1 The enlarged structural diagram at A in the middle;
[0016] Figure 3 This is a schematic diagram of the placement structure of a beam bottom hanger construction platform of the utility model;
[0017] Figure 4 This is a schematic diagram of the combined structure of a beam bottom hanger construction platform of the utility model;
[0018] Figure 5 The utility model is a schematic diagram of a combined placement structure of a beam bottom hanger construction platform.
[0019] In the figure: 1. Bridge deck stabilizing structure; 2. Vertical connecting structure; 3. Bottom bearing structure; 4. Horizontal supporting legs; 5. Bearing plate; 6. Bolts; 7. Steel pipe. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] For example, see Figure 1-3 As shown, the utility model is a beam bottom hanger construction platform, comprising a bridge deck stabilizing structure 1, a vertical connecting structure 2 and a bottom bearing structure 3, wherein the two vertical connecting structures 2 are detachably installed at both ends of the bottom bearing structure 3, and the bridge deck stabilizing structure 1 is detachably installed on one side of the top of the vertical connecting structure 2;
[0022] The ends of the bridge deck stabilizing structure 1 are welded with fixing parts, and the bridge deck stabilizing structure 1 is fixed on the beam through the fixing parts.
[0023] The inner sides of the two vertical connecting structures 2 are both provided with transverse supporting legs 4 .
[0024] A bearing plate 5 is laid on the bottom bearing structure 3 .
[0025] For example 2, please refer to Figure 1-5 As shown, the utility model is a beam bottom hanger construction platform, comprising a bridge deck stabilizing structure 1, a vertical connecting structure 2 and a bottom bearing structure 3, wherein the two vertical connecting structures 2 are detachably installed at both ends of the bottom bearing structure 3, and the bridge deck stabilizing structure 1 is detachably installed on one side of the top of the vertical connecting structure 2;
[0026] The ends of the bridge deck stabilizing structure 1 are welded with fixing parts, and the bridge deck stabilizing structure 1 is fixed on the beam through the fixing parts.
[0027] The inner sides of the two vertical connecting structures 2 are both provided with transverse supporting legs 4 .
[0028] A second platform is detachably installed between at least two beam bottom hangers. The second platform is composed of multiple steel pipes 7. The multiple steel pipes 7 are arranged in a straight line. Both ends of the steel pipes 7 are detachably installed on the bottom bearing structure 3 on the two beam bottom hangers.
[0029] The second platform and the bottom bearing structure 3 are both provided with bearing plates 5 .
[0030] The bridge deck stabilizing structure 1 is welded entirely with lightweight steel materials to reduce the deadweight of the structure, and is fixed with high-strength bolts 6 to the bridge deck.
[0031] The vertical connecting structure 2 is welded as a whole with lightweight steel materials to reduce the deadweight of the structure. Its upper part is welded and fixed to the bridge deck stabilizing structure 1, and its lower part is fixed to the bottom bearing structure 3 with high-strength bolts 6.
[0032] The bottom bearing structure 3 is welded with lightweight steel materials as a whole to reduce the deadweight of the structure. The left and right sides of the structure are connected and fixed with the vertical connecting structure 2 by high-strength bolts 6, and a simple paving layer 5 is laid on the surface to facilitate the movement of construction workers during construction work.
[0033] The transverse support legs 4 act on the bridge web to provide transverse support for the hanger.
[0034] A plurality of hangers can be combined, and by using steel pipes 7, high-strength bolts 6 and laying a paving layer 5, a larger construction platform can be set up at the bottom of the beam.
[0035] The construction platform of the beam bottom hanger is placed. First, the bridge deck stabilizing structure 1 is welded and assembled. After welding is completed, the vertical connecting structure 2 is welded and assembled. After welding is completed, the two are welded again. After welding is completed, the bridge deck stabilizing structure 1 is placed on the bridge deck by a crane. At this time, the vertical connecting structure 2 is already outside the bridge, and the transverse support legs 4 have also acted on the bridge web;
[0036] The bridge deck stabilizing structure 1 is fixed to the bridge deck by high-strength bolts 6 to prevent the integral hanger from falling from the bridge;
[0037] Then, using a crane and manual labor, the bottom bearing structure 3 and the vertical connecting structure 2 are connected and fixed by high-strength bolts 6. After the fixation is completed, the construction workers lay a bearing plate 5, that is, a thickened and encrypted wooden board, on the bottom of the bottom bearing structure 3. Finally, the beam bottom hanger construction platform is stabilized on the bridge.
[0038] The construction workers cooperate with the crane to overlap the bottom bearing structure 3 of the two hangers through the steel pipe 7, and then drill holes to fix them with high-strength bolts 6 or tie them together with ropes, and then lay thickened and dense wooden boards on the surface of the steel pipe 7 to complete the assembly and fixation of the expanded platform at the bottom of the beam.
[0039] The above is a detailed description of an embodiment of the utility model, but the content is only a preferred embodiment of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the claims of the utility model.
Claims
1. A beam bottom hanger construction platform, characterized in that: It comprises a bridge deck stabilizing structure (1), a vertical connecting structure (2) and a bottom bearing structure (3), wherein the two vertical connecting structures (2) are detachably mounted at both ends of the bottom bearing structure (3), and the bridge deck stabilizing structure (1) is detachably mounted on one side of the top of the vertical connecting structure (2); A fixing piece is welded to the end of the bridge deck stabilizing structure (1), and the bridge deck stabilizing structure (1) is fixed to the beam via the fixing piece; The inner sides of the two vertical connecting structures (2) are both provided with transverse supporting legs (4); A bearing plate (5) is laid on the bottom bearing structure (3); A second platform is detachably mounted between at least two beam bottom hangers, the second platform being composed of a plurality of steel pipes (7), the plurality of steel pipes (7) being arranged in a straight line, and both ends of the steel pipes (7) being detachably mounted on the bottom bearing structure (3) on the two beam bottom hangers.
2. A beam bottom hanger construction platform according to claim 1, characterized in that: A bearing plate (5) is laid on the second platform and the bottom bearing structure (3).