Pile head sealing waterproof structure
By setting a combination method of waterproof mortar, waterproof coating layer and protective plate at the connection between the pile head and the ground, the problem of waterproof mortar being easily damaged during use in the prior art is solved, and better waterproofing effect and service life are achieved.
Patent Information
- Application Number
- CN202422166995.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2025-06-06
- Estimated Expiration
- 2034-09-04
AI Technical Summary
In the prior art, cement-based permeable crystalline waterproof coatings and waterproof mortars are mostly used for waterproofing at pile heads, but the waterproof mortar may be damaged due to the lack of protective structure during use.
Waterproof mortar is installed at the connection between the pile head and the ground, and a waterproof coating layer is installed on the outside, and a protective plate is installed on the outside of the waterproof coating layer to protect the waterproof mortar and waterproof coating layer.
By setting up protective panels to protect the waterproof mortar and waterproof coating layer, it significantly improves its service life and effectively improves the waterproof performance.
Smart Images

Figure CN222949068U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a waterproof structure, in particular to a pile head sealing waterproof structure. Background Art
[0002] A deep foundation consisting of a pile and a pile cap connected to the top of the pile, or a single pile foundation connected by a column and a pile foundation, is referred to as a pile foundation. If the pile body is completely buried in the soil and the bottom of the cap is in contact with the soil, it is called a low cap pile foundation; if the upper part of the pile body is exposed to the ground and the bottom of the cap is above the ground, it is called a high cap pile foundation. Building pile foundations are usually low cap pile foundations. In high-rise buildings, pile foundations are widely used. The pile head is generally composed of concrete or reinforced concrete, which is the part that is in closest contact with groundwater. When carrying out construction, the bottom of the building usually uses a pile foundation as the deep foundation structure of the entire building. The pile foundation has the characteristics of high bearing capacity and a wide range of applications. It is widely used in high-rise buildings, ports, bridges and other projects. In the pile foundation, multiple piles driven into the ground are used as the main load-bearing components to carry the subsequent structure cast on the pile foundation, and the pile head refers to the upper part of the pile, usually the top of the pile. Pile heads play an important role in construction, especially in pile foundation construction. If the pile heads are not waterproofed, they will face the risk of erosion and leakage by groundwater, which will cause corrosion and deformation of the pile heads and even affect the stability of the entire civil engineering structure. For this reason, the pile heads need to be waterproofed.
[0003] At present, in the prior art, cement-based penetrating crystalline waterproof coatings and waterproof mortars are mostly used to construct the waterproofing of the pile heads. However, the waterproof mortar may be damaged during use due to the lack of a protective structure. Therefore, the present application proposes a pile head sealing waterproof structure to solve this problem. Utility Model Content
[0004] The purpose of the utility model is to provide a pile head sealing waterproof structure to solve the problem that in the prior art proposed in the above background technology, the waterproofing of the pile head is mostly constructed by using cement-based penetrating crystalline waterproof coating and waterproof mortar, but the waterproof mortar may be damaged during use due to the lack of a protective structure.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A pile head sealing waterproof structure comprises a ground, wherein a pile foundation body is fixedly installed inside the ground, one end of the pile foundation body passes through the ground, a waterproof mortar is arranged at the connection between the ground and the pile foundation body, a waterproof coating layer is arranged on the outside of the waterproof mortar, and a protective plate is arranged between the ground and the pile foundation body and on the outside of the waterproof coating layer.
[0007] As a further solution of the utility model: first bolts are symmetrically arranged on both sides of the protective plate, and the protective plate is fixed to the ground through the first bolts.
[0008] As a further solution of the utility model: second bolts are symmetrically arranged on both sides of the protective plate and above the first bolts, and the protective plate is fixed to the pile foundation body through the second bolts.
[0009] As a further solution of the utility model: a first baffle is fixedly installed on the outer side of the protective plate and above the first bolt.
[0010] As a further solution of the utility model: a second baffle is fixedly installed on the outer side of the protective plate and above the second bolt.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] The utility model provides a good waterproof effect by arranging waterproof mortar at the connection between the pile head and the ground, and arranging a waterproof coating on the outside of the waterproof mortar. At the same time, in order to protect the waterproof mortar and the waterproof coating layer, a protective plate is also provided on the outside of the waterproof mortar and the waterproof coating layer. The protective plate provides protection for the waterproof mortar and the waterproof coating layer, thereby effectively improving the service life of the waterproof mortar and the waterproof coating layer. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a structural schematic diagram of the utility model.
[0014] Figure 2 For this utility model Figure 1 Enlarged view of point A in the middle.
[0015] Figure 3 It is the front view in the utility model.
[0016] 1. Protective plate; 2. First baffle; 3. First bolt; 4. Pile foundation body; 5. Waterproof mortar; 6. Waterproof coating layer; 7. Second baffle; 8. Second bolt; 9. Ground. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] See also Figures 1 to 3In an embodiment of the utility model, a pile head sealing waterproof structure includes a ground 9, a pile foundation body 4 is fixedly installed inside the ground 9, one end of the pile foundation body 4 passes through the ground 9, a waterproof mortar 5 is arranged at the connection between the ground 9 and the pile foundation body 4, a waterproof coating layer 6 is arranged on the outside of the waterproof mortar 5, and a protective plate 1 is arranged between the ground 9 and the pile foundation body 4 and on the outside of the waterproof coating layer 6.
[0019] First bolts 3 are symmetrically arranged on both sides of the protective plate 1 , and the protective plate 1 is fixed to the ground 9 through the first bolts 3 , which are used to fix the protective plate 1 to the ground end.
[0020] Second bolts 8 are symmetrically arranged on both sides of the protective plate 1 and above the first bolts 3 . The protective plate 1 is fixed to the pile foundation body 4 through the second bolts 8 , which are used to fix the protective plate 1 to the pile foundation body 4 .
[0021] A first baffle plate 2 is fixedly installed on the outer side of the protective plate 1 and above the first bolt 3, so as to prevent rainwater from directly corroding the connection of the first bolt 3 and causing the bolt to rust.
[0022] A second baffle plate 7 is fixedly installed on the outer side of the protective plate 1 and above the second bolt 8, so as to prevent rainwater from directly corroding the connection of the second bolt and causing the bolt to rust.
[0023] The working principle of the utility model is:
[0024] When the utility model is used, a waterproof mortar 5 is arranged at the connection between the pile head and the ground 9, and the waterproof mortar 5 has an effective waterproof effect. Furthermore, a waterproof coating layer 6 is coated on the outside of the waterproof mortar 5, and the waterproof coating layer 6 cooperates with the waterproof mortar 5 to further improve the waterproof performance. A protective plate 1 is also arranged on the outside of the waterproof coating layer 6, and the waterproof mortar 5 and the waterproof coating layer 6 are protected by the protective plate 1, thereby improving the service life of the waterproof mortar 5 and the waterproof coating layer 6. The protective plate 1 is fixed to the ground 9 and the pile foundation body 4 by the first bolt 3 and the second bolt 8, and the first baffle plate 2 and the second baffle plate 7 are respectively arranged at the positions corresponding to the first bolt 3 and the second bolt 8, so as to avoid the phenomenon that rainwater directly erodes the threaded connection and causes rust on the bolts, and facilitates the later maintenance or removal.
[0025] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A pile head sealing and waterproof structure, comprising a ground surface (9), characterized in that: A pile foundation body (4) is fixedly installed inside the ground (9), one end of the pile foundation body (4) passes through the ground (9), a waterproof mortar (5) is provided at the connection between the ground (9) and the pile foundation body (4), a waterproof coating layer (6) is provided on the outside of the waterproof mortar (5), and a protective plate (1) is provided between the ground (9) and the pile foundation body (4) and on the outside of the waterproof coating layer (6).
2. A pile head sealing and waterproof structure according to claim 1, characterized in that: First bolts (3) are symmetrically arranged on both sides of the protection plate (1), and the protection plate (1) is fixed to the ground (9) via the first bolts (3).
3. A pile head sealing and waterproof structure according to claim 1, characterized in that: Second bolts (8) are symmetrically arranged on both sides of the protection plate (1) and above the first bolts (3); the protection plate (1) is fixed to the pile foundation body (4) via the second bolts (8).
4. A pile head sealing and waterproof structure according to claim 1, characterized in that: A first baffle (2) is fixedly mounted on the outer side of the protective plate (1) and above the first bolt (3).
5. The pile head sealing and waterproof structure according to claim 1, characterized in that: A second baffle (7) is fixedly mounted on the outer side of the protective plate (1) and above the second bolt (8).