Building waterproof construction leaking stoppage device

By designing a waterproof construction leak-blocking device for building including rubber storage frame, scraper base plate, threaded rod, hose outlet, hose coating and rubber coating head, the problems of uneven coating of asphalt liquid and difficulty in removing the inner wall of the rubber storage frame in the prior art are solved, and the precise coverage of asphalt liquid and the convenient cleaning of the inner wall of the rubber storage frame are achieved.

CN222976480UActive Publication Date: 2025-06-13GUANGZHOU JINGXING CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422190522.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2025-06-13
Estimated Expiration
2034-09-06

AI Technical Summary

Technical Problem

During the waterproofing construction of existing buildings, it is difficult to accurately coat the heated asphalt liquid on the cracks on the floor, resulting in uneven coating and difficult to remove the residue on the inner wall of the rubber storage frame.

Method used

A building waterproof construction leak plugging device is designed, including a rubber storage frame, scraping base plate, threaded rod, hose outlet, hose coating and rubber coating head. Through the movement of the rubber storage frame and the adjustment of the threaded rod, the precise coating of the bitumen liquid is achieved; the inclined surface of the scraper base plate and the design of the internal threaded plate is convenient for cleaning the residues on the inner wall of the rubber storage frame.

Benefits of technology

It realizes accurate coverage of asphalt liquid, avoids uneven coatings, and simplifies the cleaning process of residues on the inner wall of the rubber storage frame, improving construction efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222976480U_ABST
    Figure CN222976480U_ABST
Patent Text Reader

Abstract

The utility model discloses a building waterproof construction leaking stoppage device which comprises a glue storage frame, a scraping bottom plate is connected to the bottom side in the glue storage frame in an attached and sleeved mode, a threaded rod is fixedly connected to the middle of the top end of the scraping bottom plate, a glue outlet pipe opening is formed in the lower portion of the outer side of the glue storage frame, one end of the glue outlet pipe opening is connected with a gluing pipe, and a gluing head is movably connected to the bottom end of the gluing pipe in a sleeved mode. The device has the following advantages that asphalt liquid needing to be poured can be conveniently moved in real time only through the glue storage frame, the asphalt liquid can accurately cover cracks through the glue coating head, the situation of uneven coating is effectively avoided, when the inner wall of the glue storage frame needs to be cleaned, the inner wall of the glue storage frame needs to be cleaned, the inner wall of the glue storage frame does not need to be cleaned, and the glue storage frame is convenient to clean. And the residual materials on the inner wall of the glue storage frame can be scraped only by rotating the internal thread disc to control the scraping bottom plate to move upwards, and convenience and rapidness are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building waterproof and plugging devices, and specifically relates to a building waterproof construction plugging device. Background Art

[0002] Building waterproof and plugging is regarded as an important project. In order to prevent the influence of rain and snow weather from causing water leakage in the house and affecting the living, waterproof materials are applied to the cracks on the ground surface of the building roof. However, when applying asphalt waterproof materials to the cracks on the floor surface at present, the asphalt needs to be heated and liquefied before being poured onto the cracks on the roof. This method is not only difficult to control the amount of asphalt poured into the cracks, resulting in uneven pouring and coating, but also difficult to remove the residual materials on the inner wall of the device for storing asphalt after use. Therefore, a building waterproof construction plugging device is provided to solve the above problems. Content of the Utility Model

[0003] To solve the problems in the above background art, the technical solution adopted by the utility model to solve the technical problems is: a building waterproof construction plugging device, which includes: a glue storage frame, a scraping bottom plate is fitted and sleeved on the bottom side inside the glue storage frame, a threaded rod is fixedly connected to the middle of the top end of the scraping bottom plate, a glue outlet pipe is arranged below the outside of the glue storage frame, one end of the glue outlet pipe is connected to a glue coating pipe, the bottom end of the glue coating pipe is movably sleeved with a glue coating head, and a notch is opened at one end of the glue coating head away from the glue coating pipe.

[0004] As a preferred technical solution of the utility model, an adjusting rod is threadedly connected inside the upper end of the glue coating pipe, a cylindrical plug is fixedly connected to one end of the adjusting rod located inside the glue coating pipe, and the glue outlet pipe communicates the glue storage frame and the glue coating pipe.

[0005] As a preferred technical solution of the utility model, a limiting ring is fixedly connected to one side of the glue coating pipe below the glue outlet pipe, and a spring is sleeved on the outer circumference of the glue coating pipe between the limiting ring and the glue coating head.

[0006] As a preferred technical solution of the utility model, the top end of the scraping bottom plate is an inclined surface, and the inclined surface at the top end of the scraping bottom plate at one end of the glue outlet pipe is an inclined end.

[0007] As a preferred technical solution of the utility model, a support plate is fixedly connected to one side of the top end of the glue storage frame, the number of the support plates is two, and a limiting plate is fixedly connected to the top end of the support plate by screws.

[0008] As a preferred technical solution of the utility model, the threaded rod slidably penetrates through the middle of the limiting plate, an internal threaded disk is threadedly connected to one end of the threaded rod above the limiting plate, and a grip rod is fixedly connected to the outer circumference of the internal threaded disk.

[0009] As a preferred technical solution of the present utility model, a limit cap is fixedly connected to the top end of the adjusting rod, and a circular torsion rod is arranged on the top end of the limit cap.

[0010] As a preferred technical solution of the present utility model, a pull rod is connected to the upper side of one end of the glue storage frame and the glue application pipe. The pull rod is of a U-shaped structure, and the end of the pull rod away from the glue storage frame is inclined upward.

[0011] As a preferred technical solution of the present utility model, rollers are arranged at the bottom end of the glue storage frame. The number of the rollers is four, and the rollers are universal wheels.

[0012] The present utility model has the following advantages: The present utility model only needs a glue storage frame to facilitate the real-time movement of the asphalt liquid to be poured. Through the glue application head, the asphalt liquid can be accurately covered at the crack, effectively avoiding the situation of uneven coating. When it is necessary to clean the inner wall of the glue storage frame, only need to rotate the internal thread disc to control the scraping bottom plate to move upward, and then the residual materials on the inner wall of the glue storage frame can be scraped off, which is convenient and fast. Description of the Drawings

[0013] Figure 1 is the overall structural schematic diagram of the preferred embodiment of the present utility model;

[0014] Figure 2 is the sectional structural schematic diagram of the glue storage frame of the preferred embodiment of the present utility model;

[0015] Figure 3 is the sectional structural schematic diagram of the glue application pipe of the preferred embodiment of the present utility model.

[0016] Description of the reference numerals: 1. Glue storage frame; 2. Scraping bottom plate; 3. Threaded rod; 4. Glue outlet; 5. Glue application pipe; 6. Cylindrical plug; 7. Adjusting rod; 8. Limit cap; 9. Limit ring; 10. Spring; 11. Glue application head; 12. Notch; 13. Support plate; 14. Limit plate; 15. Internal thread disc; 16. Holding rod; 17. Pull rod; 18. Roller. Detailed Embodiment

[0017] Next, the technical solutions of the present utility model will be clearly and completely described in conjunction with the drawings. In the description of the present utility model, it should be noted that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0018] In the description of the present utility model, it should be noted that unless otherwise clearly specified and defined, the terms "installation", "connection", and "coupling" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the communication inside two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0019] The present utility model will be further described below with reference to the accompanying drawings.

[0020] Please refer to Figures 1 - 3 , a building waterproof construction leak plugging device of the present utility model includes: a glue storage frame 1, a scraping bottom plate 2 is fitted and sleeved on the bottom side inside the glue storage frame 1, a threaded rod 3 is fixedly connected to the middle of the top end of the scraping bottom plate 2, a glue outlet pipe orifice 4 is arranged below the outside of the glue storage frame 1, one end of the glue outlet pipe orifice 4 is connected to a glue application pipe 5, the bottom end of the glue application pipe 5 is movably sleeved with a glue application head 11, and a notch 12 is opened at one end of the glue application head 11 away from the glue application pipe 5.

[0021] Combined with Figure 3 as shown, an adjusting rod 7 is threadedly connected to the inside of the upper end of the glue application pipe 5, a cylindrical plug 6 is fixedly connected to one end of the adjusting rod 7 located inside the glue application pipe 5, the glue outlet pipe orifice 4 of the glue outlet pipe orifice 4 communicates with the glue storage frame 1 and the glue application pipe 5 through the cylindrical plug 6, a limiting ring 9 is fixedly connected to one side of the glue application pipe 5 below the glue outlet pipe orifice 4, a spring 10 is sleeved on the outer circumference of the glue application pipe 5 between the limiting ring 9 and the glue application head 11, and due to the elastic force of the spring 10, the glue application head 11 can always contact the crack, so that asphalt glue can enter the cracked gap more easily. The top end of the scraping bottom plate 2 is an inclined surface, and the inclined surface at the top end of the scraping bottom plate 2 at one end of the glue outlet pipe orifice 4 is an inclined end.

[0022] Combined with Figure 1 and Figure 2As shown in the figure, one side of the top end of the glue storage frame 1 is fixedly connected with a support plate 13. The number of the support plates 13 is set to two. The top end of the support plate 13 is fixedly connected with a limit plate 14 by screws. The threaded rod 3 slides through the middle of the limit plate 14. One end of the threaded rod 3 above the limit plate 14 is threadedly connected with an internal thread disc 15. By rotating the internal thread disc 15, the lifting of the threaded rod 3 can be adjusted threadedly. A grip rod 16 is fixedly connected to the outer circumference of the internal thread disc 15. The top end of the adjusting rod 7 is fixedly connected with a limit cap 8. A circular ring-shaped torsion rod is arranged at the top end of the limit cap 8, which is convenient for screwing the adjusting rod 7 to rotate. One end of the glue storage frame 1 above the upper side of one end of the glue coating pipe 5 is connected with a pull rod 17. The pull rod 17 is of a U-shaped structure. One end of the pull rod 17 away from the glue storage frame 1 is inclined upward. The pull rod 17 is convenient for personnel to move the glue storage frame 1. The bottom end of the glue storage frame 1 is provided with rollers 18. The number of the rollers 18 is set to four, and the rollers 18 are universal wheels.

[0023] Specifically, when the present utility model is used, the heated asphalt is poured into the glue storage frame 1. Personnel move the glue storage frame 1 to the crack on the building floor surface through the pull rod 17, and make the glue coating head 11 align with the crack. Then, the limit cap 8 is screwed to drive the adjusting rod 7 to rotate, so that the adjusting rod 7 drives the cylindrical plug 6 to move upward. Then, the cylindrical plug 6 stops blocking the glue outlet pipe orifice 4. Thus, the asphalt in the glue storage frame 1 flows out from the glue coating head 11, and then is coated on the crack for plugging. When the plugging is completed, the internal thread disc 15 can be rotated to threadedly drive the threaded rod 3 upward. Then, the threaded rod 3 drives the scraping bottom plate 2 to move upward. Then, the scraping bottom plate 2 can scrape the residual materials on the inner wall of the glue storage frame 1.

[0024] The above is only the preferred embodiment of the present utility model. It should be noted that for those of ordinary skill in the art, without departing from the principle of the present utility model, several improvements and retouches can be made, and these improvements and retouches should also be regarded as the protection scope of the present utility model.

[0025] Other parts not detailed in the present utility model belong to the prior art, so they will not be elaborated here.

[0026] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present utility model, rather than to limit them; although the present utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that they can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements on some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present utility model.

Claims

1. A leak-proofing device for building waterproofing construction, comprising: A glue storage frame (1) is characterized in that a scraper base plate (2) is fitted and sleeved on the bottom inner side of the glue storage frame (1), a threaded rod (3) is fixedly connected to the middle of the top of the scraper base plate (2), a glue outlet (4) is arranged at the lower outer side of the glue storage frame (1), one end of the glue outlet (4) is connected to a glue coating tube (5), a glue coating head (11) is movably sleeved on the bottom end of the glue coating tube (5), and a notch (12) is provided at one end of the glue coating head (11) away from the glue coating tube (5).

2. A leak-proofing device for building waterproofing construction as claimed in claim 1, characterized in that: The upper end of the glue coating tube (5) is internally threadedly connected to an adjusting rod (7), one end of the adjusting rod (7) located inside the glue coating tube (5) is fixedly connected to a cylindrical plug (6), and the glue outlet (4) is connected to the glue storage frame (1) and the glue coating tube (5).

3. A leak-proofing device for building waterproofing construction as claimed in claim 1, characterized in that: The glue coating tube (5) is fixedly connected to a limiting ring (9) at one side below the glue outlet (4), and a spring (10) is sleeved on the outer side of the circumference of the glue coating tube (5) between the limiting ring (9) and the glue coating head (11).

4. A leak-proofing device for building waterproofing construction as claimed in claim 1, characterized in that: The top end of the scraper bottom plate (2) is an inclined surface, and the inclined surface at the top end of the scraper bottom plate (2) is located at the end of the rubber outlet (4) and is an inclined end.

5. A leak-proofing device for building waterproofing construction as claimed in claim 1, characterized in that: A support plate (13) is fixedly connected to one side of the top end of the glue storage frame (1), two support plates (13) are provided, and the top end of the support plate (13) is fixedly connected to a limiting plate (14) via screws.

6. A leak-proofing device for building waterproofing construction as claimed in claim 1, characterized in that: The threaded rod (3) slides through the middle of the limiting plate (14); one end of the threaded rod (3) located above the limiting plate (14) is threadedly connected to an internal threaded disc (15); and a gripping rod (16) is fixedly connected to the outer circumference of the internal threaded disc (15).

7. A leak-proofing device for building waterproofing construction as claimed in claim 2, characterized in that: The top end of the regulating rod (7) is fixedly connected to a limiting cap (8), and the top end of the limiting cap (8) is provided with a circular torsion bar.

8. A leak-proofing device for building waterproofing construction as claimed in claim 1, characterized in that: The glue storage frame (1) is located on the upper side of one end of the glue coating tube (5) and is connected to a pull rod (17). The pull rod (17) is a U-shaped structure, and the pull rod (17) is tilted upward away from one end of the glue storage frame (1).

9. A leak-proofing device for building waterproofing construction as claimed in claim 1, characterized in that: The bottom end of the glue storage frame (1) is provided with a roller (18), the number of the rollers (18) is four, and the rollers (18) are universal wheels.