Shaped temporary cover plate for water-collecting well and elevator shaft on building construction site

By designing temporary covers of water collection wells and elevator shafts with adjustable height and size, the problems of insufficient applicability and safety of existing protection methods are solved, and efficient and safe protection effects are achieved.

CN223017682UActive Publication Date: 2025-06-24THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422048592.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2025-06-24
Estimated Expiration
2034-08-22

AI Technical Summary

Technical Problem

At the construction site, the existing water collection wells and elevator shaft protection methods have problems such as the risk of personnel falling, the material is prone to corrosion, and the inability to adjust according to the size of the wellhead, resulting in insufficient applicability and safety.

Method used

A fixed temporary cover plate including adjustable height legs and adjustable size cover plate is designed, using 2mm thick steel plate and 50mm×100mm×2mm square steel pipe material, and adjusting the leg height and cover plate size through bolted connections is achieved.

Benefits of technology

The adaptability of adjusting the cover plate and legs according to on-site needs is achieved, which improves safety and corrosion resistance, reduces the risk of falling people, and has good economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223017682U_ABST
    Figure CN223017682U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction site water-collecting well and elevator shaft finalization temporary cover plate, which relates to the technical field of building construction site water-collecting well and elevator shaft protection, and adopts the technical scheme that the building construction site water-collecting well and elevator shaft finalization temporary cover plate comprises a cover plate and supporting legs arranged at the bottom of the cover plate, a reserved hole is formed in the cover plate, and a reserved hole cover plate is arranged at the reserved hole; the cover plate comprises a fixed cover plate and movable cover plates arranged at the two ends of the fixed cover plate, and the supporting legs comprise the upper movable supporting leg and the lower movable supporting leg. The utility model has the beneficial effects that the utility model provides a turnover and adjustable water-collecting well and elevator well cover plate, and the size of the well cover plate can be adjusted through the bolts, so that the requirements of various sizes of well mouths on site can be met. The steel structure has high structural strength and high safety coefficient, meets the requirement for on-site safety management, adopts steel as a main body material, solves the risk that vertical face protection is possibly detached, has a high corrosion-resistant effect, can be turned over, and has good economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of the protection of catch wells and lift wells at the construction site of buildings, and particularly relates to a standardized temporary cover plate for catch wells and lift wells at the construction site of buildings. Background Technique

[0002] In the field of building construction, when the construction stage is after the basement raft slab is poured and before the basement floor is poured, the foundation pits such as catch wells and lift wells are usually protected by setting up vertical protection and covering with wooden formwork. The basement is below the plus-minus zero, and the basements of some high-rise buildings are buried very deep. The basement floors of many high-rise buildings are generally below the groundwater level. Therefore, some catch wells with large diameters are set up in the basement to collect the rainwater in the basement or flowing into the basement, which also causes the basement to be in a humid state all year round before the decoration stage.

[0003] At present, the protection of catch wells and lift wells at the building construction site is usually carried out by setting up vertical protection or covering with wooden square timbers and formwork. Setting up vertical protection can provide an obvious sign at the construction site, but when plastering and whitewashing the wall before pouring the basement floor, the vertical protection usually needs to be removed, which also increases the risk of personnel falling into the well and is not conducive to on-site safety management. The method of covering with wooden square timbers and formwork can solve the risk of personnel falling, but due to the humid environment characteristics of the basement, the wooden square timbers and formwork are easy to be corroded, and their own strength becomes weak after a long time, which is difficult to meet the on-site requirements and safety management requirements. Moreover, there are various sizes of wellheads on the site, and the existing protection methods cannot be adjusted according to the size of the wellhead, resulting in poor applicability.

[0004] How to solve the above problems is the research topic of this solution. Content of the Utility Model

[0005] In order to achieve the above-mentioned utility model purpose and solve the above-mentioned technical problems, the utility model provides a standardized temporary cover plate for catch wells and lift wells at the building construction site.

[0006] The technical solution is that it includes a cover plate and legs arranged at the bottom of the cover plate. A reserved hole is opened on the cover plate, and a reserved hole cover plate is arranged at the reserved hole;

[0007] The cover plate includes a fixed cover plate and movable cover plates arranged at both ends of the fixed cover plate, and the legs include upper movable legs and lower movable legs.

[0008] The upper movable legs are provided with inner cavities, and the lower movable legs are sleeved in the inner cavities of the upper movable legs;

[0009] Threaded holes are provided on the side wall of the upper movable leg, and a number of evenly distributed threaded holes matching the threaded holes of the upper movable leg are provided on the lower movable leg. The threaded holes of the upper movable leg and the lower movable leg are fixedly connected by bolts to realize the adjustment of the leg height.

[0010] A fixed hinge is fixedly arranged on the lower surface of the fixed cover plate, and a threaded hole is provided on the fixed hinge. A corresponding threaded hole is provided at the top of the upper movable leg. The top of the upper movable leg and the fixed hinge are fixedly connected by bolts.

[0011] The movable cover plate includes a top plate, side plates provided at the bottoms of both ends of the top plate, and a bottom plate provided at the bottom of the side plates;

[0012] A number of evenly distributed threaded holes are provided on the side plates, and a number of evenly distributed threaded holes are provided on the side wall of the fixed cover plate. The threaded holes on the side plates and the side wall of the fixed cover plate are fixedly connected by bolts to realize the connection between the fixed cover plate and the movable cover plate, thereby realizing the adjustment of the cover plate size.

[0013] The top plate is in a concave shape, and the recessed parts of the concave shapes of the two movable cover plates are arranged oppositely, and the middle of the recessed part corresponds to the reserved hole;

[0014] The bottom plate is arranged towards the top plate, and a sliding groove is formed between the top plate and the bottom plate. The sliding groove is slidably matched with the side wall of the fixed cover plate.

[0015] One end of the reserved hole cover plate is hinged to the upper surface of the fixed cover plate.

[0016] The cover plate is made of a 2-mm-thick steel plate and used after being painted with anti-rust paint. The legs are made of a square steel pipe of 50mm×100mm×2mm, and the steel pipe is painted with anti-rust paint.

[0017] This solution is provided with legs with adjustable height, cover plates with adjustable size, reserved pumping holes, pumping hole cover plates, and fixed hinges. The size of the cover plate and the height of the legs can be adjusted according to the actual needs on site, with strong adaptability. At the same time, because the cover plate itself is made of steel, it has strong turnover ability and good economic benefits.

[0018] The movable cover plate and the fixed cover plate are made of 2-mm-thick steel plates and used after being painted with anti-rust paint. The legs themselves are made of a square steel pipe of 50mm×100mm×2mm, and the steel pipe is painted with anti-rust paint. It has strong turnover ability and high safety factor.

[0019] The technical solution provided by the embodiment of the utility model has the following beneficial effects: the solution provides a traversable and adjustable water collection well and elevator well cover, which can meet the requirements of wellheads of various sizes on site by adjusting the size through bolts. The steel structure has a strong structural strength and a high safety factor, which meets the needs of on-site safety management. The use of steel as the main material solves the risk of possible disassembly of the facade protection while having a high corrosion resistance effect, and is traversable and has good economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model.

[0021] Figure 2 for Figure 1 A partial enlarged view of .

[0022] Figure 3 It is a side view of an embodiment of the utility model.

[0023] Among them, the figures are marked as: 1. fixed cover plate; 2. movable cover plate; 3. upper movable leg; 4. lower movable leg; 5. reserved hole; 6. reserved hole cover plate; 7. fixed hinge; 201. top plate; 202. side plate; 203. bottom plate. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. Of course, the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0025] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0026] In the description of the creation of the present utility model, it should be understood that the orientation or positional relationship indicated by terms such as "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the creation of the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be construed as a limitation to the creation of the present utility model. In addition, terms such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, features defined with "first", "second", etc. may explicitly or implicitly include one or more of such features. In the description of the creation of the present utility model, unless otherwise stated, the meaning of "a plurality" is two or more.

[0027] In the description of the creation of the present utility model, it should be noted that unless otherwise clearly specified and defined, the terms "installation", "connection", "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, and it can be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the creation of the present utility model can be understood through specific circumstances.

[0028] Embodiment 1

[0029] See Figures 1 to 3 , the present utility model provides a standardized temporary cover for sump pits and elevator shafts at a building construction site, including a cover plate and legs provided at the bottom of the cover plate. A reserved hole 5 is provided on the cover plate, and a reserved hole cover plate 6 is provided at the reserved hole 5;

[0030] The cover plate includes a fixed cover plate 1 and movable cover plates 2 provided at both ends of the fixed cover plate 1. The legs include upper movable legs 3 and lower movable legs 4.

[0031] The upper movable leg 3 is provided with an inner cavity, and the lower movable leg 4 is sleeved in the inner cavity of the upper movable leg 3;

[0032] Threaded holes are provided on the side wall of the upper movable leg 3, and a number of uniformly distributed threaded holes matching the threaded holes of the upper movable leg 3 are provided on the lower movable leg 4. The threaded holes of the upper movable leg 3 and the lower movable leg 4 are fixedly connected by bolts to realize the adjustment of the height of the legs.

[0033] A fixed hinge 7 is fixedly arranged on the lower surface of the fixed cover plate 1. Threaded holes are provided in the fixed hinge 7, and corresponding threaded holes are provided at the top of the upper movable leg 3. The top of the upper movable leg 3 is fixedly connected to the fixed hinge 7 by bolts.

[0034] The movable cover plate 2 includes a top plate 201, side plates 202 provided at the bottoms of both ends of the top plate 201, and a bottom plate 203 provided at the bottoms of the side plates 202;

[0035] A number of uniformly distributed threaded holes are provided in the side plates 202, and a number of uniformly distributed threaded holes are provided in the side walls of the fixed cover plate 1. The threaded holes in the side plates 202 and the side walls of the fixed cover plate 1 are fixedly connected by bolts, realizing the connection between the fixed cover plate 1 and the movable cover plate 2, thereby realizing the adjustment of the size of the cover plate.

[0036] The top plate 201 is in a concave shape, and the recessed parts of the concave shapes of the two movable cover plates 2 are arranged opposite to each other, and a reserved hole 5 is correspondingly provided in the middle of the recessed parts;

[0037] The bottom plate 203 is arranged on the side facing the top plate 201. A sliding groove is formed between the top plate 201 and the bottom plate 203, and the sliding groove is slidably matched with the side wall of the fixed cover plate 1.

[0038] One end of the reserved hole cover plate 6 is hingedly arranged on the upper surface of the fixed cover plate 1.

[0039] The cover plate is made of a 2-mm-thick steel plate and is used after being painted with anti-rust paint. The legs are made of square steel pipes of 50 mm×100 mm×2 mm, and the steel pipes are painted with anti-rust paint.

[0040] This solution is provided with legs with adjustable height, a cover plate with adjustable size, a reserved pumping hole, a pumping hole cover plate, and a fixed hinge. The size of the cover plate and the height of the legs can be adjusted according to the actual needs on site, and the adaptability is strong. At the same time, because the cover plate itself is made of steel, it has strong turnover ability and good economic benefits.

[0041] The movable cover plate and the fixed cover plate are made of 2-mm-thick steel plates and are used after being painted with anti-rust paint. The legs themselves are made of square steel pipes of 50 mm×100 mm×2 mm, and the steel pipes are painted with anti-rust paint. They have strong turnover ability and high safety factor.

[0042] Specific implementation method:

[0043] (1) Measure the sizes of the sump and elevator shaft openings on site, and adjust the movable cover plate 2 to cover the openings.

[0044] (2) Use bolts to fixedly connect the movable cover plate 2 and the fixed cover plate 1.

[0045] (3) Install the upper movable leg 3.

[0046] (4) Measure the depths of the on-site sump and elevator shaft, and adjust the lower movable leg 4 to meet the depth requirements.

[0047] (5) Use bolts to connect and fix the upper movable leg 3 and the lower movable leg 4.

[0048] (6) Place it into the well.

[0049] Daily pumping process:

[0050] (1) Open the cover plate 6 of the reserved hole.

[0051] (2) Place the water pump.

[0052] (3) Power on the water pump and pump water.

[0053] (4) After pumping is completed, take out the water pump and cover the cover plate 6 of the reserved hole.

[0054] Disassembly process:

[0055] (1) Remove the bolts fixing the fixed cover plate 1 and the movable cover plate 2.

[0056] (2) Take out the cover plate, remove the bolts of the lower movable leg 4 and the upper movable leg 3, and take out the lower movable leg 4.

[0057] (3) Remove the bolts of the upper movable leg 3 and the fixed hinge 7, and take out the upper movable leg 3.

[0058] (4) Pack for turnover.

[0059] The above are only the preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present utility model shall be included within the protection scope of the present utility model.

Claims

1. A standardized temporary cover for water collection wells and elevator shafts at construction sites, characterized in that: It comprises a cover plate and a support leg arranged at the bottom of the cover plate, the cover plate is provided with a reserved hole (5), and a reserved hole cover plate (6) is arranged at the reserved hole (5); The cover plate comprises a fixed cover plate (1) and movable cover plates (2) arranged at two ends of the fixed cover plate (1), and the supporting legs comprise an upper movable supporting leg (3) and a lower movable supporting leg (4).

2. The temporary cover plate for water collection wells and elevator shafts at construction sites according to claim 1 is characterized in that: The upper movable leg (3) is provided with an inner cavity, and the lower movable leg (4) is sleeved in the inner cavity of the upper movable leg (3); The side wall of the upper movable leg (3) is provided with a threaded hole, and the lower movable leg (4) is provided with a plurality of evenly distributed threaded holes that match the threaded holes of the upper movable leg (3). The threaded holes of the upper movable leg (3) and the lower movable leg (4) are fixedly connected by bolts to achieve adjustment of the height of the legs.

3. The temporary cover plate for water collection wells and elevator shafts at construction sites according to claim 2 is characterized in that: A fixed hinge (7) is fixedly arranged on the lower surface of the fixed cover plate (1), a threaded hole is provided on the fixed hinge (7), a corresponding threaded hole is provided on the top of the upper movable leg (3), and the top of the upper movable leg (3) is fixedly connected to the fixed hinge (7) by bolts.

4. The temporary cover plate for water collection wells and elevator shafts at construction sites according to claim 3 is characterized in that: The movable cover plate (2) comprises a top plate (201), side plates (202) arranged at the bottom of both ends of the top plate (201), and a bottom plate (203) arranged at the bottom of the side plates (202); The side plate (202) is provided with a plurality of evenly distributed threaded holes, and the side wall of the fixed cover plate (1) is provided with a plurality of evenly distributed threaded holes. The side plate (202) and the threaded holes on the side wall of the fixed cover plate (1) are fixedly connected by bolts, thereby realizing the connection between the fixed cover plate (1) and the movable cover plate (2), thereby realizing the adjustment of the size of the cover plate.

5. The temporary cover plate for water collection wells and elevator shafts at construction sites according to claim 4 is characterized in that: The top plate (201) is in a concave shape, and the concave indented parts of the two movable cover plates (2) are arranged opposite to each other, and the middle of the indented parts corresponds to the reserved hole (5); The bottom plate (203) is arranged toward one side of the top plate (201), and a sliding groove is formed between the top plate (201) and the bottom plate (203), and the sliding groove is slidably matched with the side wall of the fixed cover plate (1).

6. The temporary cover plate for water collection wells and elevator shafts at construction sites according to claim 1 is characterized in that: One end of the reserved hole cover plate (6) is hingedly connected to the upper surface of the fixed cover plate (1).

7. The temporary cover plate for water collection wells and elevator shafts at construction sites according to claim 1 is characterized in that: The cover plate is made of 2mm thick steel plate, which is painted with anti-rust paint, and the legs are made of 50mm×100mm×2mm square steel pipes, which are painted with anti-rust paint.