Fabricated wallboard quick-assembly structure
By setting up connection blocks and plug-in slots on prefabricated wall panels and equipped with fixed components, the rapid installation and efficient connection of prefabricated wall panels are achieved, which solves the problem of complex and inefficient assembly of prefabricated wall panels in the prior art, and improves construction efficiency and cost-effectiveness.
Patent Information
- Application Number
- CN202422247748.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2025-06-27
- Estimated Expiration
- 2034-09-13
AI Technical Summary
During the installation process of existing prefabricated wall panels, the assembly is complex and inefficient, and the fixed structure is difficult to disassemble, resulting in the inability to reuse the materials and causing high material consumption.
The prefabricated wall panel quick-loading structure is adopted. By setting connecting blocks and plugging grooves on the prefabricated wall panels, and equipped with fixing components, including the first baffle, the second baffle, the sleeve, the screw and the nut, the rapid fixing connection between the prefabricated wall panels and the rapid pouring of concrete are achieved.
It realizes rapid installation and efficient connection of prefabricated wall panels, simplifies the construction process, reduces material waste, and improves construction efficiency and cost-effectiveness.
Smart Images

Figure CN223034256U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wall panel installation, in particular to a quick installation structure for assembled wall panels. Background Art
[0002] Reinforced concrete slab-type components for building assembly are processed in prefabrication factories or construction sites, simply referred to as wall panels or wall slabs. Using precast concrete wall panels to build prefabricated large-panel buildings can improve the degree of factory and mechanized construction, reduce on-site wet operations, save on-site labor, overcome seasonal influences, and shorten the building construction period. The precast wall panels need to be transported to the site, then installed together with the building main structure, and then concrete is poured to form the wall. When installing the precast wall panels, it is necessary to first fix the precast wall panels, and then pour concrete between the precast panels for connection. It is very difficult to remove the fixed steel bars later. In addition, the existing fixing structure of precast wall panels is complex, the on-site assembly efficiency is low, and the materials cannot be reused, resulting in a large consumption of materials. Summary of the Utility Model
[0003] The purpose of this application is to provide a quick installation structure for assembled wall panels to solve the problems of complex assembly and low efficiency of precast wall panels in the prior art.
[0004] To achieve this purpose, this application adopts the following technical solutions:
[0005] This application provides a quick installation structure for assembled wall panels, which includes precast wall panels and fixing components, where:
[0006] At least one connecting block is fixedly arranged horizontally on one side of the precast wall panel, and at least one insertion slot is horizontally opened on the other side of the precast wall panel. The connecting block corresponds to and fits with the insertion slot, and adjacent two precast wall panels are fixedly connected through the connecting block and the insertion slot;
[0007] The fixing component is installed at the splicing joint of the precast wall panels, and the fixing component is configured to assist in pouring concrete at the splicing joint of the precast wall panels to further fix and connect adjacent two precast wall panels.
[0008] Optionally, the fixing component includes a first baffle, a second baffle, a sleeve, a screw rod and a nut. The first baffle and the second baffle are respectively arranged on both sides of the precast wall panel. The sleeve is connected to the connecting block. The screw rod is arranged in the sleeve, and both ends of the screw rod respectively extend out of the corresponding first baffle and second baffle, and nuts are respectively arranged at both ends of the screw rod.
[0009] Optionally, a through hole is arranged on the connecting block, and the sleeve is arranged in the through hole.
[0010] Optionally, the length of the connecting block is greater than the depth of the insertion slot.
[0011] Optionally, both ends of the sleeve abut against the corresponding first baffle and second baffle respectively.
[0012] Optionally, mounting grooves are provided on both the first baffle and the second baffle, and elastic sealing gaskets are provided in the mounting grooves.
[0013] Compared with the prior art, the present application has the following advantages:
[0014] 1) Place the first baffle and the second baffle on both sides of the splicing joint of the precast wall panels respectively. The first baffle and the second baffle can enclose the gap of the precast wall panels. The sleeve is pre-installed on the connecting block. When using the screw to penetrate the first baffle and the second baffle, the screw is arranged in the sleeve, and then fixed with a nut to complete the preliminary fixation between the precast wall panels. Finally, pour concrete to fill the gap between the precast wall panels to realize the installation of the precast wall panels, and the operation is simple and convenient.
[0015] 2) After the concrete is fixed, the sleeve is fixed in the concrete. When disassembling the first baffle and the second baffle, the nut can be loosened, and then the screw is rotated to remove the screw, realizing the reuse of the screw; the screw is screwed inside the sleeve, and the first baffle and the second baffle can be shrink-fixed through the nut on the screw, and the operation process is simple and convenient.
[0016] 3) Through the cooperation of the connecting block, the insertion slot and the fixing component, the rapid fixed connection between two adjacent precast wall panels is realized, and through the fixing component, the rapid and accurate pouring work of the concrete is realized, improving the assembly efficiency between the precast wall panels. Description of the Drawings
[0017] In order to more clearly illustrate and understand the technical solutions in the embodiments of the present application, the following will briefly introduce the drawings required for the background technology and the description of the embodiments of the present application. Obviously, the drawings described below are only some embodiments of the present application. For those of ordinary skill in the art, other drawings can be obtained according to the content of the embodiments of the present application and these drawings without creative efforts.
[0018] Figure 1 is a sectional view of the quick-installation structure of the precast wall panel provided by the embodiment of the present application;
[0019] Figure 2 is Figure 1 the enlarged schematic view of part A in
[0020] Figure 3 is a side view of the quick-installation structure of the precast wall panel provided by the embodiment of the present application;
[0021] Figure 4 is a side view of the precast wall panel of the quick-installation structure of the precast wall panel provided by the embodiment of the present application. Detailed implementation mode
[0022] To facilitate the understanding of this application, the following will describe this application more comprehensively with reference to the relevant attached drawings. The preferred embodiments of this application are shown in the attached drawings. However, this application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of this application more thorough and comprehensive. It should be noted that when a component is referred to as "fixed to" another component, it can be directly on the other component or there may also be an intermediate component. When a component is considered to be "connected" to another component, it can be directly connected to the other component or there may be an intermediate component at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are only for the purpose of illustration and do not represent the only implementation mode. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field to which this application belongs. The terms used in the specification of this application herein are only for the purpose of describing specific embodiments and are not intended to limit this application. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.
[0023] Please refer to Figures 1 to 4 As shown, a quick installation structure for prefabricated wall panels provided by an embodiment of this application includes a prefabricated wall panel 1 and a fixing component 4. At least one connecting block 2 is provided on one side of the prefabricated wall panel 1, and at least one insertion slot 3 is provided on the other side of the prefabricated wall panel 1. The connecting block 2 is inserted into the insertion slot 3 on the adjacent prefabricated wall panel 1;
[0024] The fixing component 4 is arranged at the splicing position of the prefabricated wall panel 1. The fixing component 4 includes a first baffle 41, a second baffle 42, a sleeve 43, a screw 44 and a nut 45. The first baffle 41 and the second baffle 42 are respectively arranged on both sides of the prefabricated wall panel 1. The sleeve 43 is connected to the connecting block 2. The screw 44 is installed in the sleeve 43. The two ends of the screw 44 respectively extend out of the corresponding first baffle 41 and second baffle 42, and nuts 45 are respectively arranged at the two ends of the screw 44.
[0025] A through hole 5 is provided on the connecting block 2, and the sleeve 43 is passed through the through hole 5, which is convenient for pre-installing the sleeve 43 on the connecting block 2 and positioning the sleeve 43.
[0026] The length of the connecting block 2 is greater than the depth of the insertion slot 3, and the extra part of the connecting block 2 is used to fix the sleeve 43.
[0027] Both ends of the sleeve 43 respectively abut against the corresponding first baffle 41 and second baffle 42, which can prevent the concrete from contacting the screw 44 when pouring the concrete.
[0028] Installation grooves 6 are provided on both the first baffle 41 and the second baffle 42, and elastic sealing gaskets 7 are arranged in the installation grooves 6 to facilitate improving the sealing effect and preventing slurry leakage during the construction of building concrete.
[0029] A concrete layer 8 is poured at the joint of the precast wall panels 1.
[0030] Working principle: When installing the precast wall panel 1, first pass the sleeve 43 through the through hole 5 of the connecting block 2, and then insert the connecting block 2 into the insertion slot 3 to complete the preliminary fixation of the precast wall panel 1, which can also improve the connection strength between the precast wall panels 1. Then, install the first baffle 41 and the second baffle 42 on both sides of the joint of the precast wall panel 1 respectively, pass the screw rod 44 through the first baffle 41, the second baffle 42 and the sleeve 43, and after tightening the nut 45 for tightening and fixing, the two precast wall panels 1 can be connected and fixed together. Then, pour the concrete into the gap between the precast wall panels 1; after the concrete solidifies, the nut 45 can be loosened, the screw rod 44 can be taken out, and then the first baffle 41 and the second baffle 42 can be removed for reuse, which greatly reduces the cost during the construction process and is very convenient to operate.
[0031] The above embodiments only illustrate the basic principles and characteristics of the present application. The present application is not limited by the above examples. Without departing from the spirit and scope of the present application, there are various changes and modifications to the present application, and these changes and modifications all fall within the scope of the present application claimed. The scope of protection claimed by the present application is defined by the appended claims and their equivalents.
Claims
1. A prefabricated wall panel quick assembly structure, characterized in that: The assembled wall panel quick-assembly structure comprises a prefabricated wall panel and a fixing assembly, wherein: At least one connection block is fixedly arranged in the horizontal direction on one side of the prefabricated wall panel, and at least one plug-in slot is opened in the horizontal direction on the other side of the prefabricated wall panel, the connection block is correspondingly matched with the plug-in slot, and two adjacent prefabricated wall panels are fixedly connected through the connection block and the plug-in slot; The fixing assembly is installed at the joint of the prefabricated wall panels, and the fixing assembly is configured to assist in pouring concrete at the joint of the prefabricated wall panels to further fix and connect two adjacent prefabricated wall panels.
2. The assembled wall panel quick assembly structure according to claim 1, characterized in that: The fixing assembly includes a first baffle, a second baffle, a sleeve, a screw and a nut. The first baffle and the second baffle are respectively arranged on both sides of the prefabricated wall panel, the sleeve is connected to the connecting block, the screw is arranged in the sleeve, the two ends of the screw extend out corresponding first baffles and second baffles respectively, and the two ends of the screw are respectively provided with the nuts.
3. The assembled wall panel quick-install structure according to claim 2 is characterized in that: The connecting block is provided with a through hole, and the sleeve is inserted into the through hole.
4. The assembled wall panel quick assembly structure according to claim 2, characterized in that: The length of the connecting block is greater than the depth of the plug-in slot.
5. The assembled wall panel quick assembly structure according to claim 2, characterized in that: Two ends of the sleeve respectively abut against the corresponding first baffle plate and the second baffle plate.
6. The assembled wall panel quick assembly structure according to claim 2, characterized in that: The first baffle plate and the second baffle plate are both provided with mounting grooves, and elastic sealing pads are provided in the mounting grooves.