By designing a combined architectural curtain wall, using the combination of embedded boards, keel frames and frame grooves, a single person is quickly installed, solving the problems of cumbersome installation and manual waste of existing curtain walls, improving installation efficiency and maintaining aesthetics.
Patent Information
- Application Number
- CN202422263992.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-16
- Publication Date
- 2025-06-27
- Estimated Expiration
- 2034-09-16
AI Technical Summary
The existing architectural curtain walls are cumbersome when installing, requiring two workers to work at the same time, wasting labor.
A combined architectural curtain wall was designed, and the combination of embedded plates and keels was used to achieve the function of quick installation of single persons by using the combination of screws and frame grooves.
The installation process is simplified, labor waste is reduced, installation efficiency is improved, and the screws can be hidden inside the frame slot after being completely screwed in, making the appearance beautiful.
Smart Images

Figure CN223034290U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building curtain walls, in particular to a combined building curtain wall. Background Technique
[0002] A curtain wall is the external wall enclosure of a building, which does not bear weight and is hung like a curtain, so it is also called a "curtain wall". It is a lightweight wall with decorative effects commonly used in modern large-scale and high-rise buildings. It is composed of a panel and a support structure system, and can have a certain displacement ability relative to the main structure or have a certain deformation ability itself, and does not bear the action of the main structure. However, in actual use, there are still many defects in similar building curtain walls. For example, the installation steps of the existing building curtain walls are too cumbersome, the area of the curtain wall is large, and two workers are required to work simultaneously during installation. One person fixes the position of the curtain wall, and the other person drives the screws, which is a waste of labor. Content of the Utility Model
[0003] The purpose of the utility model is to provide a combined building curtain wall to solve the problems raised in the above background technique.
[0004] To achieve the above purpose, the utility model provides the following technical solution: A combined building curtain wall, including an embedded plate, two groups of keel frames are fixedly installed at one end of the embedded plate, two groups of skeleton holes are opened at one end of the two groups of keel frames, one end of the skeleton hole is connected with a frame, two groups of frame grooves are opened on both sides at one end of the frame, screw holes are opened inside the frame grooves, and the screw holes are matched with the skeleton holes.
[0005] When using the combined building curtain wall, the embedded plate is buried in the wall in advance, the keel frame is fixed on the embedded part by screws. The worker holds up the frame and pushes it inward after aligning the fixing block at the rear end of the curtain wall with the upper end of the limiting rod. When the telescopic rod touches the limiting rod, it will be stressed and squeezed into the receiving groove. When the rear end of the curtain wall is completely attached to one side of the fixing plate, the telescopic rod can extend under the influence of the spring, so as to hook the limiting rod, playing a role of pre-installation. At this time, the worker can let go, and then screw the screw into the screw hole to completely fix the screw hole and the keel frame together. After the screw is completely screwed in, it can be hidden inside the frame groove, and the exterior is also more beautiful.
[0006] As a preferred technical solution of the utility model, two groups of fixing plates are fixedly installed between the two groups of keel frames, and two groups of limiting rods are fixedly installed between the two groups of fixing plates.
[0007] As a preferred technical solution of the utility model, a curtain wall is fixedly installed at the center of the frame, and four groups of fixing blocks are fixedly installed on one side of the curtain wall; by setting four groups of fixing blocks, the telescopic rods at the lower ends of the four groups of fixing blocks can have a better stabilizing effect after hanging on the limiting rods.
[0008] As a preferred technical solution of the present utility model, receiving grooves are provided at the lower ends of the fixing blocks, and springs are fixedly installed inside the receiving grooves; by providing springs, after pre-installation, the springs can support the telescopic rods, so that the telescopic rods are hung on the limiting rods and will not easily fall off.
[0009] As a preferred technical solution of the present utility model, the other ends of the springs are fixedly installed with moving plates, and the moving plates are slidably installed inside the receiving grooves.
[0010] As a preferred technical solution of the present utility model, the other ends of the moving plates are fixedly installed with telescopic rods, and the telescopic rods are tangent to the limiting rods; by setting the limiting rods to be circular, during the process of pushing the frame in, the circular surface can enable the telescopic rods to contract inward with less force and will not get stuck.
[0011] Compared with the prior art, the beneficial effects of the present utility model are:
[0012] 1. When using the combined building curtain wall, the embedded plate is buried in the wall in advance, the keel frame is fixed to the embedded part by screws. The worker holds up the frame, aligns the fixing blocks at the rear end of the curtain wall with the upper ends of the limiting rods and then pushes it inward. When the telescopic rods touch the limiting rods, they will be stressed and thus be squeezed into the receiving grooves. When the rear end of the curtain wall is completely attached to one side of the fixing plate, the telescopic rods can extend under the influence of the springs, so as to hook the limiting rods, playing a role in pre-installation. At this time, the worker can let go, and then screw the screws into the screw holes, so that the screw holes are completely fixed to the keel frame. After the screws are completely screwed in, they can be hidden inside the frame grooves, and the exterior is also more beautiful.
[0013] 2. By providing frame grooves, the worker screws the screws into the screw holes, so that the screw holes are completely fixed to the keel frame. After the screws are completely screwed in, they can be hidden inside the frame grooves, and the exterior is also more beautiful. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 is the front view structural schematic diagram of the present utility model;
[0015] Figure 2 is the exploded structural schematic diagram of the present utility model;
[0016] Figure 3 is the exploded rear view structural schematic diagram of the present utility model;
[0017] Figure 4 is the half-sectional structural schematic diagram of the present utility model;
[0018] Figure 5 is the present utility model Figure 4 the enlarged schematic diagram at A in.
[0019] In the figure: 1. Embedded plate; 2. Skeleton frame; 3. Screw; 4. Frame; 5. Curtain wall panel; 6. Frame groove; 7. Screw hole; 8. Skeleton hole; 9. Fixed plate; 10. Limit rod; 11. Fixed block; 12. Storage groove; 13. Spring; 14. Movable plate; 15. Telescopic rod. Specific implementation mode
[0020] The technical solution of the present utility model will be further described below in conjunction with the drawings and specific embodiments.
[0021] Embodiment 1
[0022] As Figure 1 - Figure 5 shown, a combined building curtain wall proposed by the present utility model includes an embedded plate 1. Two groups of skeleton frames 2 are fixedly installed at one end of the embedded plate 1. Skeleton holes 8 are opened at one end of the two groups of skeleton frames 2. One end of the skeleton hole 8 is connected to a frame 4. Two groups of frame grooves 6 are opened on both sides at one end of the frame 4. Screw holes 7 are opened inside the frame groove 6. The screw holes 7 cooperate with the skeleton holes 8.
[0023] Two groups of fixed plates 9 are fixedly installed between the two groups of skeleton frames 2. Two groups of limit rods 10 are fixedly installed between the two groups of fixed plates 9.
[0024] A curtain wall 5 is fixedly installed at the center of the frame 4. Four groups of fixed blocks 11 are fixedly installed on one side of the curtain wall 5.
[0025] The working principle of a combined building curtain wall based on Embodiment 1 is as follows: When using the combined building curtain wall, the embedded plate 1 is buried in the wall in advance. The skeleton frame 2 is fixed on the embedded part 1 through screws 3. Workers lift the frame 4 and push it inward after aligning the fixed block 11 at the rear end of the curtain wall 5 with the upper end of the limit rod 10. When the telescopic rod 15 touches the limit rod 10, it will be stressed and thus be squeezed into the storage groove 12. When the rear end of the curtain wall 5 is completely attached to one side of the fixed plate 9, the telescopic rod 15 can extend under the influence of the spring 13, so as to hook the limit rod 10, playing a role in pre-installation. At this time, the workers can let go, and then screw the screws into the screw holes 7 to completely fix the screw holes 7 and the skeleton frame 2 together. After the screws are completely screwed in, they can be hidden inside the frame groove 6, and the exterior is also more beautiful.
[0026] Embodiment 2
[0027] As Figure 1 - Figure 5As shown in the figure, a combined building curtain wall proposed by the present utility model, compared with the first embodiment, this embodiment further includes: receiving grooves 12 are respectively opened at the lower ends of the fixing blocks 11, springs 13 are fixedly installed inside the receiving grooves 12, the other ends of the springs 13 are fixedly installed with moving plates 14, the moving plates 14 are slidably installed inside the receiving grooves 12, the other ends of the moving plates 14 are fixedly installed with telescopic rods 15, and the telescopic rods 15 are tangent to the limiting rods 10.
[0028] In this embodiment, as Figure 3 shown, by providing four groups of fixing blocks 11, the telescopic rods 15 at the lower ends of the four groups of fixing blocks 11 can have a better stabilizing effect after being hung on the limiting rods 10; as Figure 5 shown, by providing springs 13, after pre-installation, the springs 13 can support the telescopic rods 15, so that the telescopic rods 15 are hung on the limiting rods 10 and will not fall off easily; as Figure 2 shown, by setting the limiting rods 10 to be circular, during the process of pushing the frame 4 in, the circular surface can enable the telescopic rods 15 to contract inward with less force and will not get stuck.
[0029] The above specific embodiments are merely several preferred embodiments of the present utility model. Based on the technical solutions of the present utility model and the relevant revelations of the above embodiments, those skilled in the art can make various alternative improvements and combinations to the above specific embodiments.
Claims
1. A modular building curtain wall, comprising a pre-embedded plate (1), characterized in that: Two groups of keel frames (2) are fixedly installed at one end of the embedded plate (1), and one end of the two groups of keel frames (2) is provided with a frame hole (8), one end of the frame hole (8) is connected to a frame (4), and two groups of frame grooves (6) are provided on both sides of one end of the frame (4), and screw holes (7) are provided inside the frame grooves (6), and the screw holes (7) match the frame holes (8).
2. A modular building curtain wall according to claim 1, characterized in that: Two groups of fixing plates (9) are fixedly installed between the two groups of keel frames (2), and two groups of limiting rods (10) are fixedly installed between the two groups of fixing plates (9).
3. A modular building curtain wall according to claim 2, characterized in that: A curtain wall (5) is fixedly installed at the center of the frame (4), and four groups of fixing blocks (11) are fixedly installed on one side of the curtain wall (5).
4. The combined building curtain wall according to claim 3, characterized in that: The lower end of each of the fixed blocks (11) is provided with a receiving groove (12), and a spring (13) is fixedly installed inside the receiving groove (12).
5. The combined building curtain wall according to claim 4, characterized in that: A movable plate (14) is fixedly mounted on the other end of the spring (13), and the movable plate (14) is slidably mounted inside the receiving groove (12).
6. The combined building curtain wall according to claim 5, characterized in that: A telescopic rod (15) is fixedly mounted on the other end of the movable plate (14), and the telescopic rod (15) is tangent to the limiting rod (10).