Foldable building construction scaffold
By introducing lateral scaling modules, protective modules and fallback modules into the foldable building construction scaffolding, the problem of the device being unable to shrink horizontally and lack of protective railings and safety belt suspension is solved, space saving and high-altitude operations are achieved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202422235997.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2025-07-04
- Estimated Expiration
- 2034-09-12
AI Technical Summary
The existing foldable building construction scaffolding cannot shrink horizontally, occupying a large amount of space, the absence of protective railings increases the psychological burden on workers, and the lack of five-point safety belt suspension device, poses safety hazards.
A foldable building construction scaffolding including wheel base, vertical and horizontal scaling module, protective module and fall-proof module was designed to achieve transverse shrinkage, a protective module was set up to provide edge protection, and a fall-proof module was equipped to hang five-point safety belts.
It realizes space savings for the device when it is not in use, reduces the psychological burden of workers in aerial work, ensures safety and compliance of aerial work, and improves construction efficiency and safety.
Smart Images

Figure CN223061980U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a foldable building construction scaffold. Background Technique
[0002] A foldable building construction scaffold is a temporary facility widely used in the construction industry. Its main functions are: providing a working platform; stacking and transporting materials; ensuring construction safety; improving construction efficiency; adapting to different terrains; facilitating early demolition; cooperating with other support operations and structural stability. These functions make the foldable building construction scaffold play an important role in building construction, not only improving the construction speed and safety, but also providing a safe and efficient working environment for construction workers.
[0003] A foldable scaffold for indoor construction disclosed in the Chinese Utility Model Patent Application Publication Specification CN220014394U includes a corresponding top frame and a bottom frame. The end corners of the top frame are provided with upper sliding sleeves, and the end corners of the bottom frame are provided with lower sliding sleeves. A folding column is movably inserted through the upper sliding sleeve, and a column is movably inserted through the lower sliding sleeve. The upper sliding sleeve and the lower sliding sleeve are both fastened to the corresponding column bodies through fasteners. The bottom end of the folding column is fixed with an extension shaft. A sliding shaft corresponding to the extension shaft is movably arranged in the column, and the sliding shaft is fastened to the column through a fastener. One end of the sliding shaft corresponding to the extension shaft is hinged. The extension shaft extends into the column to realize the connection between the folding column and the column. Although the above device can realize the approach and separation between the top frame and the bottom frame through the sliding of the upper sliding sleeve on the folding column and the column, and can fix the distance between the top frame and the bottom frame through the fastening bolts. When the top frame slides to the column through the upper sliding sleeve, the folding column is bent inside the top frame to realize the folding of the present utility model. During use, only need to straighten the folding column, insert the folding column onto the column through the extension shaft, and then move the top frame onto the folding column. The specific unfolding height can be determined according to the actual construction. However, the above device still has certain drawbacks: First, the above device can only be vertically contracted and cannot be horizontally contracted, which makes the above device still occupy a large amount of space after folding; Second, although the above device allows people to go up through the stairs for construction, it does not have a guardrail, which makes the workers need to pay attention to their standing positions in real time during work, which undoubtedly increases the mental burden of the workers during construction; Third, the above device does not have a device for hanging a five-point safety belt, which makes it impossible for the workers to hang the hook of the five-point safety belt to a suitable position when climbing onto the outer frame, making the workers' high-altitude operation illegal and posing a great safety hazard. Content of the Utility Model
[0004] (I) Technical Problems to be Solved
[0005] In view of the deficiencies of the prior art, the present utility model provides a foldable construction scaffold, which solves the problems that the device cannot be horizontally contracted and still occupies a large amount of space, the device is not provided with a guardrail, which brings a certain psychological burden to the workers, and the device does not have a suitable hanging device for a five-point safety belt, so that high-altitude operation is illegal construction and there are major safety hazards.
[0006] (II) Technical Solution
[0007] To achieve the above objectives, the present utility model is realized through the following technical solutions: A foldable construction scaffold includes a wheel base, the bottom of the wheel base is threadedly connected with universal wheels, the top of the wheel base is fixedly connected with a vertical scaling module, one end of the vertical scaling module is inserted with a vertical connector, the surface of the vertical connector is fixedly connected with a horizontal connector, the inner wall of the horizontal connector is inserted with a horizontal scaling module, the surface of the horizontal scaling module is installed with a pedal, the inner wall of the top end of the vertical connector is inserted with a protection module, and an anti-falling device module and a ladder are sequentially installed on the surface of the protection module from top to bottom.
[0008] Optionally, the vertical scaling module includes a vertical rod sleeve, the surface of the vertical rod sleeve is provided with a first threaded hole, the inner wall of the first threaded hole is threadedly connected with a first bolt, the first threaded hole is threadedly connected with a first vertical rod through the first bolt, the top of the vertical rod sleeve is provided with a vertical rod hole, the first vertical rod and the vertical rod hole are mutually adapted, and the first vertical rod and the vertical connector are mutually adapted.
[0009] Optionally, the horizontal scaling module includes a horizontal rod sleeve, the surface of the horizontal rod sleeve is provided with a second threaded hole, the inner wall of the second threaded hole is threadedly connected with a second bolt, the second threaded hole is threadedly connected with a first horizontal rod through the second bolt, one end of the horizontal rod sleeve is provided with a horizontal rod hole, the horizontal rod hole and the first horizontal rod are mutually adapted, and the first horizontal rod and the horizontal connector are mutually adapted.
[0010] Optionally, the protection module includes a second vertical rod. A second horizontal rod is fixedly connected to the surface of the second vertical rod. The second vertical rod is fixedly connected to a third vertical rod through the second horizontal rod. A first rotating shaft base is fixedly connected to the top of the second vertical rod. A first rotating shaft hole is formed in the front surface of the first rotating shaft base. A first rotating shaft is installed on the inner wall of the first rotating shaft hole. A first horizontal rod groove is formed in the top of the first rotating shaft base. A third horizontal rod is installed on the inner wall of the first horizontal rod groove. A first insertion rod is inserted into the inner wall of the first rotating shaft. A first insertion rod hole is formed in the side surface of the third horizontal rod. The first insertion rod hole and the first insertion rod are adapted to each other. A first rod groove base is fixedly connected to the top of the third vertical rod. A second horizontal rod groove is formed in the top of the first rod groove base. The second horizontal rod groove and the third horizontal rod are adapted to each other.
[0011] Optionally, a third threaded hole is formed in the surface of the second vertical rod. A third bolt is threadedly connected to the inner wall of the third threaded hole. The third threaded hole is threadedly connected to a fourth horizontal rod through the third bolt. A fourth threaded hole is formed in one end of the fourth horizontal rod. A fourth bolt is threadedly connected to the inner wall of the fourth threaded hole. The fourth threaded hole is threadedly connected to a fourth vertical rod through the fourth bolt. A fifth horizontal rod is fixedly connected to the surface of the fourth vertical rod. The fourth vertical rod is fixedly connected to a fifth vertical rod through the fifth horizontal rod.
[0012] Optionally, a second rotating shaft base is fixedly connected to the top of the fourth vertical rod. A second rotating shaft hole is formed in the side surface of the second rotating shaft base. A second rotating shaft is installed on the inner wall of the second rotating shaft hole. A second insertion rod is inserted into the inner wall of the second rotating shaft. A third horizontal rod groove is formed in the top of the second rotating shaft base. A sixth horizontal rod is installed on the inner wall of the third horizontal rod groove. A second insertion rod hole is formed in the side surface of the sixth horizontal rod. The second insertion rod hole and the sixth horizontal rod are adapted to each other. A second rod groove base is fixedly connected to the top of the fifth vertical rod. A fourth horizontal rod groove is formed in the top of the second rod groove base. The fourth horizontal rod groove and the sixth horizontal rod are adapted to each other.
[0013] Optionally, a fifth threaded hole is formed in the surface of the fifth vertical rod. A fifth bolt is threadedly connected to the inner wall of the fifth threaded hole. The fifth threaded hole is threadedly connected to a seventh horizontal rod through the fifth bolt. A sixth threaded hole is formed in one end of the seventh horizontal rod. A sixth bolt is threadedly connected to the inner wall of the sixth threaded hole. The sixth threaded hole is threadedly connected to the third vertical rod through the sixth bolt.
[0014] Optionally, the anti-falling device module includes an anti-falling device body. A hole base is fixedly connected to the top of the anti-falling device body. A threaded insertion rod is inserted into the inner wall of the hole base. Threaded buttons are threadedly connected to both ends of the threaded insertion rod. An iron ring is installed on the surface of the threaded insertion rod. A first snap hook is installed on the surface of the iron ring. A hanging rope is fixedly connected to the surface of the first snap hook. A second snap hook is fixedly connected to one end of the hanging rope. A steel wire rope protective sleeve is provided at the bottom of the anti-falling device body. A steel wire rope is provided inside the steel wire rope protective sleeve. A third snap hook is fixedly connected to one end of the steel wire rope.
[0015] In summary, the technical effects and advantages of the present utility model are as follows:
[0016] 1. The structure of the present utility model is reasonable. By setting a horizontal scaling module, the device can be horizontally contracted, which saves more space when the device needs to be folded and stored when not in use, greatly increasing the practicality and market competitiveness of the device.
[0017] 2. In the present utility model, by setting a protection module, the edge of the outer frame is protected by setting the protection module around the edge of the outer frame, so as to warn workers to pay attention to the edge of the outer frame during construction. At the same time, because the protection module is set at the edge of the outer frame, workers do not need to pay attention to the edge while constructing, which greatly reduces the psychological burden of workers working at heights and enables workers to concentrate more on completing the construction tasks, contributing to the normal progress of the construction.
[0018] 3. In the present utility model, by setting an anti-falling device module, after workers get on the outer frame, they can hang the five-point safety belt hook on their bodies on the anti-falling device module, making the work of workers at heights legal and compliant. At the same time, due to the use of the anti-falling device module, the personal safety of workers working at heights is fully guaranteed, eliminating the safety hazards caused by working at heights without the protection of a safety belt. Description of the Drawings
[0019] Figure 1 is a schematic structural diagram of the present utility model;
[0020] Figure 2 is a partial view of the vertical scaling module of the present utility model;
[0021] Figure 3 is a partial view of the horizontal scaling module of the present utility model;
[0022] Figure 4 is a partial view of the protection module of the present utility model;
[0023] Figure 5This is a perspective schematic diagram of the anti-falling device module of the present utility model.
[0024] In the figure: 1, wheel base; 2, universal wheel; 3, vertical scaling module; 301, vertical rod sleeve; 302, first vertical rod; 4, vertical connector; 5, horizontal connector; 6, horizontal scaling module; 601, horizontal rod sleeve; 602, first horizontal rod; 7, pedal; 8, protection module; 801, second vertical rod; 802, second horizontal rod; 803, third vertical rod; 804, first rotating shaft base; 805, third horizontal rod; 806, first insertion rod; 807, first rod groove base; 808, fourth horizontal rod; 809, fourth vertical rod; 810, fifth horizontal rod; 811, fifth vertical rod; 812, second rotating shaft base; 813, second insertion rod; 814, sixth horizontal rod; 815, second rod groove base; 816, seventh horizontal rod; 9, anti-falling device module; 901, anti-falling device body; 902, threaded insertion rod; 903, threaded knob; 904, iron ring; 905, first snap hook; 906, hanging rope; 907, second snap hook; 908, wire rope protective sleeve; 909, wire rope; 910, third snap hook; 10, ladder. Specific embodiments
[0025] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.
[0026] Embodiment: Refer to Figures 1 - 3 A foldable construction scaffolding as shown, including a wheel base 1, the bottom of the wheel base 1 is threadedly connected with a universal wheel 2, the top of the wheel base 1 is fixedly connected with a vertical scaling module 3, one end of the vertical scaling module 3 is inserted with a vertical connector 4, the surface of the vertical connector 4 is fixedly connected with a horizontal connector 5, the inner wall of the horizontal connector 5 is inserted with a horizontal scaling module 6, the surface of the horizontal scaling module 6 is provided with a pedal 7, the inner wall of the top end of the vertical connector 4 is inserted with a protection module 8, and an anti-falling device module 9 and a ladder 10 are sequentially installed on the surface of the protection module 8 from top to bottom.
[0027] Screw the universal wheel 2 into the wheel base 1. The vertical scaling module 3 is integrally connected to the wheel base 1. Insert the vertical connector 4 onto the vertical scaling module 3. The horizontal connector 5 is integrally formed with the vertical connector 4. Insert the horizontal scaling module 6 into the horizontal connector 5. Place the pedal 7 on the horizontal scaling module 6. Then insert the protection module 8 into the vertical connector 4. Finally, hang the anti-falling device module 9 on the protection module 8, and then hang the ladder 10 on the protection module 8 to complete the installation.
[0028] When in need of use, move the device to the target position through the universal wheel 2, then raise the device to the appropriate height through the vertical scaling module 3, and then make the device reach the appropriate length through the horizontal scaling module 6. Then assemble the protection module 8 so that the edge of the device has protection measures. Then hang the anti-falling device module 9 on the protection module 8. Finally, hang the ladder 10 on the protection module 8 to complete the process installation. When not needed, remove the protection module 8, then remove the ladder 10, then retract the horizontal scaling module 6, and then retract the vertical scaling module 3 to complete the process operation.
[0029] The vertical scaling module 3 includes a vertical rod sleeve 301. The surface of the vertical rod sleeve 301 is provided with a first threaded hole. The inner wall of the first threaded hole is threadedly connected with a first bolt. The first threaded hole is threadedly connected with a first vertical rod 302 through the first bolt. The top of the vertical rod sleeve 301 is provided with a vertical rod hole. The first vertical rod 302 and the vertical rod hole are mutually adapted. The first vertical rod 302 and the vertical connector 4 are mutually adapted.
[0030] Insert the first vertical rod 302 into the vertical rod sleeve 301, and then screw the first bolt into the first threaded hole on the vertical rod sleeve 301 and continue to rotate until it is screwed into the first vertical rod 302 to complete the installation. When in use, it is necessary to complete the installation according to the above steps first, then loosen the first bolt, pull out the first vertical rod 302 to the appropriate height, and then tighten the first bolt to complete the operation. When not needed, loosen the first bolt and retract the first vertical rod 302 into the vertical rod sleeve 301 to complete the whole set of process operations.
[0031] The horizontal scaling module 6 includes a horizontal rod sleeve 601. The surface of the horizontal rod sleeve 601 is provided with a second threaded hole. The inner wall of the second threaded hole is threadedly connected with a second bolt. The second threaded hole is threadedly connected with a first horizontal rod 602 through the second bolt. One end of the horizontal rod sleeve 601 is provided with a horizontal rod hole. The horizontal rod hole and the first horizontal rod 602 are mutually adapted. The first horizontal rod 602 and the horizontal connector 5 are mutually adapted.
[0032] Insert the first horizontal rod 602 into the horizontal rod sleeve 601, then screw the second bolt into the second threaded hole on the horizontal rod sleeve 601 and continue to rotate until it is screwed into the first horizontal rod 602 to complete the installation. When in use, first assemble according to the above steps, then loosen the second bolt, pull out the first horizontal rod 602, and after reaching the appropriate length, tighten the second bolt to complete the operation. When no longer needed, loosen the second bolt, retract the first horizontal rod 602 into the horizontal rod sleeve 601 and then tighten the second bolt to complete the entire process operation.
[0033] By providing the horizontal scaling module 6, the device can be horizontally contracted, which enables the device to save more space when it needs to be folded and stored when not in use, greatly increasing the practicality and market competitiveness of the device.
[0034] As a preferred implementation in this embodiment, as Figure 4 shown, the protection module 8 includes a second vertical rod 801. The surface of the second vertical rod 801 is fixedly connected with a second horizontal rod 802. The second vertical rod 801 is fixedly connected with a third vertical rod 803 through the second horizontal rod 802. The top of the second vertical rod 801 is fixedly connected with a first rotating shaft base 804. The front of the first rotating shaft base 804 is provided with a first rotating shaft hole. The inner wall of the first rotating shaft hole is provided with a first rotating shaft. The top of the first rotating shaft base 804 is provided with a first horizontal rod groove. The inner wall of the first horizontal rod groove is provided with a third horizontal rod 805. The inner wall of the first rotating shaft is inserted with a first inserting rod 806. The side of the third horizontal rod 805 is provided with a first inserting rod hole, and the first inserting rod hole and the first inserting rod 806 are adapted to each other. The top of the third vertical rod 803 is fixedly connected with a first rod groove base 807. The top of the first rod groove base 807 is provided with a second horizontal rod groove, and the second horizontal rod groove and the third horizontal rod 805 are adapted to each other.
[0035] The second horizontal rod 802 is welded to the second vertical rod 801 and the third vertical rod 803. The first rotating shaft base 804 is welded to the second vertical rod 801. Place the first rotating shaft into the first rotating shaft hole, then put the third horizontal rod 805 into the first horizontal rod groove, and insert the first inserting rod 806 into the first rotating shaft and pass through the third horizontal rod 805 until it reaches the other end of the first rotating shaft base 804. The first rod groove base 807 is welded to the top of the third vertical rod 803 to complete the installation.
[0036] When it is needed, the third transverse rod 805 is lifted up, and then the workers can enter the external frame. After the workers enter the external frame, they push the third transverse rod 805 to make it fit into the second transverse rod groove on the first rod groove base 807. When it is necessary to come down, the workers still push the third transverse rod 805 to lift the third transverse rod 805 to complete the process operation.
[0037] A third threaded hole is provided on the surface of the second vertical rod 801, and a third bolt is threadedly connected to the inner wall of the third threaded hole, and the fourth threaded hole is threadedly connected to the fourth transverse rod 808 through the third bolt. A fourth threaded hole is provided at one end of the fourth transverse rod 808, and a fourth bolt is threadedly connected to the inner wall of the fourth threaded hole, and the fourth threaded hole is threadedly connected to the fourth vertical rod 809 through the fourth bolt. The surface of the fourth vertical rod 809 is fixedly connected to the fifth transverse rod 810, and the fourth vertical rod 809 is fixedly connected to the fifth vertical rod 811 through the fifth transverse rod 810.
[0038] Place the fourth transverse rod 808 between the second vertical rod 801 and the fourth vertical rod 809, then pass the third bolt through the fourth transverse rod 808 and screw it into the third threaded hole, then screw the fourth bolt into the fourth threaded hole and continue to rotate until it is screwed into the fourth vertical rod 809. The fifth transverse rod 810 is welded between the fourth vertical rod 809 and the fifth vertical rod 811, and the installation is completed.
[0039] The top of the fourth vertical rod 809 is fixedly connected to the second rotating shaft base 812, the side of the second rotating shaft base 812 is provided with a second rotating shaft hole, the inner wall of the second rotating shaft hole is installed with a second rotating shaft, the inner wall of the second rotating shaft is plugged with a second plug rod 813, the top of the second rotating shaft base 812 is provided with a third transverse rod groove, the inner wall of the third transverse rod groove is installed with a sixth transverse rod 814, the side of the sixth transverse rod 814 is provided with a second plug rod hole, the second plug rod hole and the sixth transverse rod 814 are adapted to each other, the top of the fifth vertical rod 811 is fixedly connected to the second rod groove base 815, the top of the second rod groove base 815 is provided with a fourth transverse rod groove, the fourth transverse rod groove and the sixth transverse rod 814 are adapted to each other.
[0040] The second rotating shaft base 812 is welded to the fourth vertical rod 809. Place the second rotating shaft into the second rotating shaft hole, then place the sixth transverse rod 814 into the third transverse rod groove, then insert the second insertion rod 813 into the second rotating shaft and pass through the sixth transverse rod 814 until it is inserted into the other end of the second rotating shaft base 812. The second rod groove base 815 is welded to the fifth vertical rod 811, and the installation is completed.
[0041] When it is needed, first assemble it according to the above steps. By toggling the sixth horizontal rod 814, the sixth horizontal rod 814 falls into the fourth horizontal rod groove on the second rod groove base 815, making the edge protection complete. When it is no longer needed, toggle the sixth horizontal rod 814 to lift it, allowing the worker to get off the external scaffold and complete the process operation.
[0042] A fifth threaded hole is provided on the surface of the fifth vertical rod 811. A fifth bolt is threadedly connected to the inner wall of the fifth threaded hole. The fifth threaded hole is threadedly connected to a seventh horizontal rod 816 through the fifth bolt. A sixth threaded hole is provided at one end of the seventh horizontal rod 816. A sixth bolt is threadedly connected to the inner wall of the sixth threaded hole. The sixth threaded hole is threadedly connected to a third vertical rod 803 through the sixth bolt.
[0043] Place the seventh horizontal rod 816 between the fifth vertical rod 811 and the third vertical rod 803. Pass the fifth bolt through the seventh horizontal rod 816 and screw it into the fifth threaded hole on the fifth vertical rod 811. Then screw the sixth bolt into the sixth threaded hole and continue to rotate until it is screwed into the third vertical rod 803 to complete the installation.
[0044] This device is provided with a protection module 8. By setting the protection module 8 around the edge of the external scaffold, the edge of the external scaffold can be protected against edge fall, so as to warn the workers that they should pay attention to the edge of the external scaffold during construction. At the same time, because the protection module 8 is set at the edge of the external scaffold, it also enables the workers not to pay attention to the edge while constructing, which greatly reduces the psychological burden of the workers working at height. At the same time, it enables the workers to concentrate more on completing the construction tasks, which helps the normal progress of the construction.
[0045] As Figure 5 shown, in this embodiment, the anti-falling device module 9 includes an anti-falling device body 901. A hole base is fixedly connected to the top of the anti-falling device body 901. A threaded insertion rod 902 is inserted into the inner wall of the hole base. Threaded buttons 903 are threadedly connected to both ends of the threaded insertion rod 902. An iron ring 904 is installed on the surface of the threaded insertion rod 902. A first buckle hook 905 is installed on the surface of the iron ring 904. A hanging rope 906 is fixedly connected to the surface of the first buckle hook 905. A second buckle hook 907 is fixedly connected to one end of the hanging rope 906. A steel wire rope protective sleeve 908 is provided at the bottom of the anti-falling device body 901. A steel wire rope 909 is provided inside the steel wire rope protective sleeve 908. A third buckle hook 910 is fixedly connected to one end of the steel wire rope 909.
[0046] The hole base is welded on, the threaded rod 902 is inserted into the hole base, and then the threaded button 903 is screwed to the two ends of the threaded rod 902, and then the first snap hook 905 is buckled onto the threaded rod 902, the hanging rope 906 is integrally connected with the first snap hook 905 and the second snap hook 907, the wire rope protection cover 908 is integrally connected with the fall arrester body 901, and the third snap hook 910 is integrally connected with the wire rope 909 to complete the on-site installation.
[0047] When it is needed, first assemble according to the above steps, then hang the second buckle hook 907 on the protection module 8, and then hang the hook of the five-point safety belt on the third buckle hook 910. When it is necessary to walk, the wire rope 909 can be pulled out as you walk slowly. Once a fall occurs, the wire rope 909 will move sharply, thereby limiting the movement of the wire rope 909 and achieving emergency suspension, thereby slowing down the falling speed.
[0048] The device is provided with a fall arrester module 9. Through the use of the fall arrester module 9, the workers can hook the five-point safety belt on the fall arrester module 9 after getting on the external frame, so that the workers' work at height is legal and compliant. At the same time, because of the use of the fall arrester module 9, the personal safety of the workers working at height is fully guaranteed, and the safety hazards caused by the lack of safety belt protection in high-altitude work are eliminated.
[0049] How this utility works:
[0050] Screw the universal wheel 2 into the wheel base 1. The vertical scaling module 3 is integrally connected to the wheel base 1. Insert the vertical connector 4 onto the vertical scaling module 3. The horizontal connector 5 is integrally formed with the vertical connector 4. Insert the horizontal scaling module 6 into the horizontal connector 5. Place the pedal 7 on the horizontal scaling module 6. Then insert the protection module 8 into the vertical connector 4. Finally, hang the anti-falling device module 9 on the protection module 8. Then hang the ladder 10 on the protection module 8 to complete the installation. Insert the first vertical rod 302 into the vertical rod sleeve 301. Then screw the first bolt into the first threaded hole on the vertical rod sleeve 301 and continue to rotate until it is screwed into the first vertical rod 302 to complete the installation. Insert the first horizontal rod 602 into the horizontal rod sleeve 601. Then screw the second bolt into the second threaded hole on the horizontal rod sleeve 601 and continue to rotate until it is screwed into the first horizontal rod 602 to complete the installation. The second horizontal rod 802 is welded to the second vertical rod 801 and the third vertical rod 803. The first shaft base 804 is welded to the second vertical rod 801. Place the first shaft into the first shaft hole. Then place the third horizontal rod 805 into the first horizontal rod groove. Insert the first plug rod 806 into the first shaft and pass through the third horizontal rod 805 until it reaches the other end of the first shaft base 804. The first rod groove base 807 is welded to the top of the third vertical rod 803 to complete the installation. Place the fourth horizontal rod 808 between the second vertical rod 801 and the fourth vertical rod 809. Then pass the third bolt through the fourth horizontal rod 808 and screw it into the third threaded hole. Then screw the fourth bolt into the fourth threaded hole and continue to rotate until it is screwed into the fourth vertical rod 809. The fifth horizontal rod 810 is welded between the fourth vertical rod 809 and the fifth vertical rod 811 to complete the installation. The second shaft base 812 is welded to the fourth vertical rod 809. Place the second shaft into the second shaft hole. Then place the sixth horizontal rod 814 into the third horizontal rod groove. Insert the second plug rod 813 into the second shaft and pass through the sixth horizontal rod 814 until it is inserted into the other end of the second shaft base 812. The second rod groove base 815 is welded to the fifth vertical rod 811 to complete the installation. Place the seventh horizontal rod 816 between the fifth vertical rod 811 and the third vertical rod 803. Pass the fifth bolt through the seventh horizontal rod 816 and screw it into the fifth threaded hole on the fifth vertical rod 811. Then screw the sixth bolt into the sixth threaded hole and continue to rotate until it is screwed into the third vertical rod 803 to complete the installation. The hole base is welded on. Insert the threaded plug rod 902 into the hole base. Then screw the threaded knob 903 onto both ends of the threaded plug rod 902. Then hook the first snap hook 905 onto the threaded plug rod 902. The hanging rope 906 is integrally connected to the first snap hook 905 and the second snap hook 907. The wire rope protective sleeve 908 is integrally connected to the anti-falling device body 901. The third snap hook 910 is integrally connected to the wire rope 909 to complete the installation.
[0051] Finally, it should be noted that the above are only preferred embodiments of the present utility model and are not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions recorded in the foregoing embodiments or perform equivalent replacements on some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present utility model shall be included within the protection scope of the present utility model.
Claims
1. A foldable construction scaffold, comprising a wheel base (1), characterized in that: The bottom of the wheel base (1) is threadedly connected with a universal wheel (2). The top of the wheel base (1) is fixedly connected with a vertical scaling module (3). One end of the vertical scaling module (3) is inserted with a vertical connector (4). The surface of the vertical connector (4) is fixedly connected with a horizontal connector (5). The inner wall of the horizontal connector (5) is inserted with a horizontal scaling module (6). The surface of the horizontal scaling module (6) is provided with a pedal (7). The inner wall of the top end of the vertical connector (4) is inserted with a protection module (8). The surface of the protection module (8) is successively provided with a fall arrester module (9) and a ladder (10) from top to bottom.
2. The foldable construction scaffolding according to claim 1, characterized in that: The vertical scaling module (3) includes a vertical rod sleeve (301). The surface of the vertical rod sleeve (301) is provided with a first threaded hole. The inner wall of the first threaded hole is threadedly connected with a first bolt. The first threaded hole is threadedly connected with a first vertical rod (302) through the first bolt. The top of the vertical rod sleeve (301) is provided with a vertical rod hole. The first vertical rod (302) and the vertical rod hole are mutually adapted. The first vertical rod (302) and the vertical connector (4) are mutually adapted.
3. A foldable construction scaffolding according to claim 1, characterized in that: The horizontal scaling module (6) includes a horizontal rod sleeve (601). The surface of the horizontal rod sleeve (601) is provided with a second threaded hole. The inner wall of the second threaded hole is threadedly connected with a second bolt. The second threaded hole is threadedly connected with a first horizontal rod (602) through the second bolt. One end of the horizontal rod sleeve (601) is provided with a horizontal rod hole. The horizontal rod hole and the first horizontal rod (602) are mutually adapted. The first horizontal rod (602) and the horizontal connector (5) are mutually adapted.
4. A foldable construction scaffold according to claim 1, wherein: The protection module (8) includes a second vertical rod (801). The surface of the second vertical rod (801) is fixedly connected with a second horizontal rod (802). The second vertical rod (801) is fixedly connected with a third vertical rod (803) through the second horizontal rod (802). The top of the second vertical rod (801) is fixedly connected with a first rotating shaft base (804). The front of the first rotating shaft base (804) is provided with a first rotating shaft hole. The inner wall of the first rotating shaft hole is provided with a first rotating shaft. The top of the first rotating shaft base (804) is provided with a first horizontal rod groove. The inner wall of the first horizontal rod groove is provided with a third horizontal rod (805). The inner wall of the first rotating shaft is inserted with a first inserting rod (806). The side of the third horizontal rod (805) is provided with a first inserting rod hole. The first inserting rod hole and the first inserting rod (806) are mutually adapted. The top of the third vertical rod (803) is fixedly connected with a first rod groove base (807). The top of the first rod groove base (807) is provided with a second horizontal rod groove. The second horizontal rod groove and the third horizontal rod (805) are mutually adapted.
5. The foldable construction scaffolding according to claim 4, characterized in that: The surface of the second vertical rod (801) is provided with a third threaded hole, the inner wall of the third threaded hole is threadedly connected with a third bolt, the third threaded hole is threadedly connected with a fourth horizontal rod (808) through the third bolt, one end of the fourth horizontal rod (808) is provided with a fourth threaded hole, the inner wall of the fourth threaded hole is threadedly connected with a fourth bolt, the fourth threaded hole is threadedly connected with a fourth vertical rod (809) through the fourth bolt, the surface of the fourth vertical rod (809) is fixedly connected with a fifth horizontal rod (810), and the fourth vertical rod (809) is fixedly connected with a fifth vertical rod (811) through the fifth horizontal rod (810).
6. The foldable construction scaffolding according to claim 5, wherein: The top of the fourth vertical rod (809) is fixedly connected with a second rotating shaft base (812), the side of the second rotating shaft base (812) is provided with a second rotating shaft hole, the inner wall of the second rotating shaft hole is provided with a second rotating shaft, the inner wall of the second rotating shaft is inserted with a second inserting rod (813), the top of the second rotating shaft base (812) is provided with a third horizontal rod groove, the inner wall of the third horizontal rod groove is provided with a sixth horizontal rod (814), the side of the sixth horizontal rod (814) is provided with a second inserting rod hole, and the second inserting rod hole and the sixth horizontal rod (814) are mutually adapted. The top of the fifth vertical rod (811) is fixedly connected with a second rod groove base (815), the top of the second rod groove base (815) is provided with a fourth horizontal rod groove, and the fourth horizontal rod groove and the sixth horizontal rod (814) are mutually adapted.
7. The foldable construction scaffolding according to claim 6, characterized in that: The surface of the fifth vertical rod (811) is provided with a fifth threaded hole, the inner wall of the fifth threaded hole is threadedly connected with a fifth bolt, the fifth threaded hole is threadedly connected with a seventh horizontal rod (816) through the fifth bolt, one end of the seventh horizontal rod (816) is provided with a sixth threaded hole, the inner wall of the sixth threaded hole is threadedly connected with a sixth bolt, and the sixth threaded hole is threadedly connected with a third vertical rod (803) through the sixth bolt.
8. A foldable construction scaffold according to claim 1, characterized in that: The anti-falling device module (9) includes an anti-falling device body (901), the top of the anti-falling device body (901) is fixedly connected with a hole base, the inner wall of the hole base is inserted with a threaded inserting rod (902), both ends of the threaded inserting rod (902) are threadedly connected with threaded buttons (903), the surface of the threaded inserting rod (902) is provided with an iron ring (904), the surface of the iron ring (904) is provided with a first buckle hook (905), the surface of the first buckle hook (905) is fixedly connected with a hanging rope (906), one end of the hanging rope (906) is fixedly connected with a second buckle hook (907), the bottom of the anti-falling device body (901) is provided with a steel wire rope protective sleeve (908), the inner wall of the steel wire rope protective sleeve (908) is provided with a steel wire rope (909), and one end of the steel wire rope (909) is fixedly connected with a third buckle hook (910).