Building curtain wall
By setting up sealing components of buffer layer, waterproof layer, sealing layer and corrosion-proof layer in the curtain wall frame, the problem of glue-on treatment in the existing curtain wall is solved, and the efficient sealing effect of glue-free installation is achieved.
Patent Information
- Application Number
- CN202421914478.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2025-07-22
- Estimated Expiration
- 2034-08-08
AI Technical Summary
The existing architectural curtain wall needs to be glued after installation to achieve the sealing effect. The sealing glue is prone to fall off and affects the sealing property.
A sealing assembly is provided in the curtain wall frame, including a buffer layer, a waterproof layer, a sealing layer and a corrosion-proof layer, combined with a sealing groove and a sealing plate to improve the sealing property of the bonding area.
A good sealing effect can be achieved without glueing treatment and improve the overall sealing of the curtain wall.
Smart Images

Figure CN223135419U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building curtain walls, and specifically relates to a building curtain wall. Background Technique
[0002] A building curtain wall is a non-load-bearing outer enclosure of a building, and is a lightweight wall with a decorative effect commonly used in modern high-rise buildings. It is composed of a panel and a support structure system. At the same time, building curtain walls can be divided into closed and open types. At the same time, according to different materials used, building curtain walls can be divided into multiple types. Most current building curtain walls are installed on keels, and during installation, the side walls of the building curtain wall are precisely fitted. The side walls of the existing building curtain walls are installation frames, and no sealing structure is provided to seal and fit the building curtain wall. After installation, caulking treatment needs to be carried out at the fitting place to achieve the sealing effect. Over time, the sealant will fall off, affecting the sealing effect. Therefore, we propose a building curtain wall. Content of the Utility Model
[0003] The purpose of the utility model is to provide a building curtain wall to solve the problems raised in the above background technique.
[0004] To achieve the above purpose, the utility model provides the following technical solution: A building curtain wall, including a curtain wall frame, a curtain wall glass is provided on the inner wall of the curtain wall frame, a sealing ring matching the curtain wall glass is provided on the inner side wall of the curtain wall frame, a sealing component is provided on the outer side wall of the curtain wall frame, the sealing component includes a buffer layer provided on the outer side wall of the curtain wall frame, a waterproof layer is provided on the outer side wall of the buffer layer, a sealing layer is provided on the outer side wall of the waterproof layer, and an anti-corrosion layer is provided on the outer side wall of the sealing layer.
[0005] Further, the buffer layer is made of rubber material.
[0006] Further, the waterproof layer is made of polyethylene material.
[0007] Further, the sealing layer is made of silicone rubber material.
[0008] Further, sealing grooves are provided on the top wall and the right side wall of the curtain wall frame, and sealing plates matching the sealing grooves are provided on the left side wall and the bottom wall of the curtain wall frame.
[0009] Further, the anti-corrosion layer is a polyester powder coating.
[0010] Compared with the prior art, the beneficial effects of the utility model are: With the cooperation of the sealing component, the sealing grooves and the sealing plates, the sealing performance of the fitting place of the building curtain wall after installation can be improved. After installation, caulking treatment does not need to be carried out at the fitting place, and the sealing effect can also be well achieved, improving the sealing performance between building curtain walls. Description of the Drawings
[0011] Figure 1 Structural schematic diagram of the present utility model;
[0012] Figure 2 Structural schematic diagram of Structure A of the present utility model.
[0013] In the figure: 1, curtain wall frame; 2, curtain wall glass; 3, sealing assembly; 30, buffer layer; 31, waterproof layer; 32, sealing layer; 33, anti-corrosion layer; 4, sealing ring; 5, sealing groove; 6, sealing plate. Specific implementation manners
[0014] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.
[0015] Embodiment 1:
[0016] Please refer to Figure 1-2 , the present utility model provides a technical solution: a building curtain wall, including a curtain wall frame 1, a curtain wall glass 2 is provided on the inner wall of the curtain wall frame 1, a sealing ring 4 matching the curtain wall glass 2 is provided on the inner side wall of the curtain wall frame 1, sealing grooves 5 are opened on the top wall and the right side wall of the curtain wall frame 1, and sealing plates 6 matching the sealing grooves 5 are provided on the left side wall and the bottom wall of the curtain wall frame 1, which can improve the sealing performance of the joint of the building curtain wall. A sealing assembly 3 is provided on the outer side wall of the curtain wall frame 1. The sealing assembly 3 includes a buffer layer 30 provided on the outer side wall of the curtain wall frame 1. The buffer layer 30 is made of rubber material. Under the action of the buffer layer 30, the joint of the building curtain wall can play a buffering role when fitting. A waterproof layer 31 is provided on the outer side wall of the buffer layer 30. The waterproof layer 31 is made of polyethylene material. Under the action of the waterproof layer 31, the waterproof effect can be improved, and rainwater can be prevented from penetrating into the house from the joint of the building curtain wall. A sealing layer 32 is provided on the outer side wall of the waterproof layer 31. The sealing layer 32 is made of silicone rubber material. Under the action of the sealing layer 32, the sealing performance of the joint of the building curtain wall after installation can be improved. An anti-corrosion layer 33 is provided on the outer side wall of the sealing layer 32. The anti-corrosion layer 33 is a polyester powder coating. Under the action of the anti-corrosion layer 33, the sealing layer 32 can be prevented from being corroded.
[0017] Although the embodiments of the present utility model have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present utility model. The scope of the present utility model is defined by the appended claims and their equivalents.
Claims
1. A building curtain wall, comprising a curtain wall frame (1), wherein a curtain wall glass (2) is provided on the inner wall of the curtain wall frame (1), and is characterized in that: On the inner side wall of the curtain wall frame (1), there is a sealing ring (4) matching the curtain wall glass (2). On the outer side wall of the curtain wall frame (1), there is a sealing assembly (3). The sealing assembly (3) includes a buffer layer (30) provided on the outer side wall of the curtain wall frame (1). On the outer side wall of the buffer layer (30), there is a waterproof layer (31). On the outer side wall of the waterproof layer (31), there is a sealing layer (32). On the outer side wall of the sealing layer (32), there is an anti-corrosion layer (33).
2. The building curtain wall according to claim 1, wherein: The buffer layer (30) is made of rubber material.
3. The building curtain wall according to claim 1, characterized in that: The waterproof layer (31) is made of polyethylene material.
4. The building curtain wall according to claim 1, wherein: The sealing layer (32) is made of silicone rubber material.
5. The building curtain wall according to claim 1, characterized in that: Sealing grooves (5) are formed on the top wall and the right side wall of the curtain wall frame (1). Sealing plates (6) matching the sealing grooves (5) are provided on the left side wall and the bottom wall of the curtain wall frame (1).
6. The building curtain wall according to claim 1, characterized in that: The anti-corrosion layer (33) is a polyester powder coating.