Bridge construction bent cap anchor sealing safety operation platform

By designing a safe operation platform for bridge construction capping and anchoring, and utilizing components such as the operating platform, guardrail nets, and cantilever frames, the problems of high cost and low efficiency in traditional capping and anchoring operations have been solved, achieving fast and safe construction results.

CN223317074UActive Publication Date: 2025-09-09INNER MONGOLIA ROAD & BRIDGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422093276.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2025-09-09
Estimated Expiration
2034-08-27

AI Technical Summary

Technical Problem

In traditional bridge construction, beam capping and anchor sealing operations require the establishment of scaffolding in advance, resulting in high construction costs, low efficiency and great safety risks.

Method used

A safe operating platform for bridge construction capping and anchoring has been designed, including components such as a working platform, guardrail net, cantilever frame, connecting rod and hand hoist. These components can be quickly fixed to the bridge to ensure construction safety and simplify the operating process.

Benefits of technology

The construction of cap beam anchoring is fast, safe and cost-effective, which shortens the construction period and reduces the construction cost investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223317074U_ABST
    Figure CN223317074U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge construction capping beam sealing anchor safety operation platform which comprises an operation platform, first fence nets are vertically installed on the top walls of the two ends of the operation platform, a second fence net is vertically installed on the top wall of the outer end of the operation platform, a notch matched with the end of a capping beam is formed in the operation platform, and the first fence net and the second fence net are vertically installed on the top walls of the two ends of the operation platform. The operation platform is connected with the bridge body through a fixing assembly; the safe operation platform has the beneficial effects that the safe operation platform for capping beam anchor sealing can be quickly and safely erected on a bridge, so that the construction period of capping beam anchor sealing is shortened, and the construction cost input is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The utility model belongs to the field of bridge construction, in particular to a bridge construction cap beam anchor sealing safety operation platform. Background technology:

[0002] The cap beam is a crucial component of bridge construction. It's a horizontal beam installed atop bent pile piers to support, distribute, and transfer the loads of the superstructure. Also known as a cap beam, this beam is constructed of reinforced or lightly reinforced concrete and placed on piers (or abutments) or pile rows. Its primary function is to support the bridge superstructure and transfer all loads to the substructure. Sometimes the piles connect directly to the cap beam, while others connect the piles to the columns and then to the cap beam.

[0003] During the construction of a bridge, it is necessary to carry out anchor sealing operations on its cap beam. Specifically, it is an operation to seal and cover the anchors of the cap beam. In traditional processes, scaffolding needs to be erected in advance before the anchor sealing operation. The site requirements are high, and the scaffolding can only be erected after the construction site is hardened, resulting in a large investment in construction costs. When the anchor sealing construction of a cap beam is completed, the original scaffolding needs to be disassembled and transported to the next cap beam anchor sealing station, and then the frame is repeatedly erected, resulting in a long cap beam anchor sealing operation cycle, low construction efficiency, and a high construction safety risk. Utility model content:

[0004] The purpose of the utility model is to provide a safe operation platform for sealing and anchoring cap beams during bridge construction, and to overcome the deficiencies of the above-mentioned prior art, which effectively solves the existing problems of high construction cost and low construction efficiency of the original sealing and anchoring cap beams.

[0005] The content of the utility model: A safe operation platform for sealing and anchoring cap beams during bridge construction, comprising a working platform, a first guardrail net vertically mounted on the top walls at both ends of the working platform, a second guardrail net vertically mounted on the top wall at the outer end of the working platform, a notch matching the end of the cap beam is opened on the working platform, and the working platform is connected to the bridge body via a fixing assembly.

[0006] Furthermore, the fixing assembly includes a pair of longitudinal cantilever frames, the bottom ends of the longitudinal cantilever frames are fixedly connected to the top wall of the working platform, and the top ends of the longitudinal cantilever frames are fixedly connected to transverse cantilever frames matching the top surface of the bridge, and the inner ends of the transverse cantilever frames are fixedly connected to the wet joint steel bars of the bridge deck.

[0007] Furthermore, reinforcing ribs are connected to the transverse cantilever frame.

[0008] Furthermore, a connecting rod is provided in the notch, and both ends of the connecting rod are fixedly connected to the working platform.

[0009] Furthermore, lifting ears are provided on both sides of the notch, the lifting ears are fixedly mounted on the top wall of the working platform, a hand hoist is connected to the lifting ears, and the top end of the hand hoist is connected to the wet joint steel bars of the bridge deck.

[0010] The beneficial effects of the utility model are as follows: the cap beam sealing and anchoring safety operation platform can be quickly and safely erected on the bridge, thereby shortening the cap beam sealing and anchoring construction period and reducing the construction cost investment. Description of the drawings:

[0011] Figure 1 This is a diagram of the use state of the utility model;

[0012] Figure 2 This is the main view of the utility model;

[0013] Figure 3 It is a right side view of the utility model;

[0014] Figure 4 It is a partial cross-sectional view of the top view of the utility model;

[0015] In the figure: 1 working platform, 2 first guardrail net, 3 second guardrail net, 4 cap beam, 5 notch, 6 longitudinal cantilever frame, 7 transverse cantilever frame, 8 bridge deck, 9 reinforcing ribs, 10 connecting rod, 11 lifting lug, 12 hand hoist. Specific implementation method:

[0016] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific embodiments of the present invention are now described with reference to the accompanying drawings:

[0017] like Figures 1 to 4As shown, a bridge construction cap beam anchor sealing safety operation platform, including a work platform 1, a first guardrail net 2 is vertically installed on the top walls at both ends of the work platform 1, a second guardrail net 3 is vertically installed on the top wall of the outer end of the work platform 1, a notch 5 matching the end of the cap beam 4 is opened on the work platform 1, the work platform 1 is connected to the bridge body through a fixing component, a bridge construction cap beam anchor sealing safety operation platform, the fixing component includes a pair of longitudinal cantilever frames 6, the bottom ends of the longitudinal cantilever frames 6 are fixedly connected to the top wall of the work platform 1, and the longitudinal cantilever frames 6 are fixedly connected to the top wall of the work platform 1. The top of the arm 6 is fixedly connected to a transverse cantilever frame 7 that matches the top surface of the bridge. The inner end of the transverse cantilever frame 7 is fixedly connected to the wet joint steel bars of the bridge deck 8. Reinforcement ribs 9 are connected to the transverse cantilever frame 7. A connecting rod 10 is arranged in the notch 5. Both ends of the connecting rod 10 are fixedly connected to the working platform 1. Lifting ears 11 are provided on both sides of the notch 5. The lifting ears 11 are fixedly installed on the top wall of the working platform 1. A hand hoist 12 is connected to the lifting ear 11. The top of the hand hoist 12 is connected to the wet joint steel bars of the bridge deck 8.

[0018] Specifically, the cap beam anchor sealing safety operation platform can be quickly and safely erected on the bridge, thereby shortening the cap beam anchor sealing construction period and reducing construction cost investment.

[0019] During actual use, first use a crane to hoist the cap beam anchor safety operation platform as a whole, and make the notch 5 opened on the working platform 1 connect with the cap beam 4, and the transverse cantilever frame 7 is matched and set on the bridge deck 8, and the inner end of the transverse cantilever frame 7 is welded and fixed to the wet joint steel bar of the bridge deck 8. At this time, the working platform 1 is fixed to the end of the cap beam 4 under the support of the transverse cantilever frame 7 and the longitudinal cantilever frame 6. At this time, the hand chain hoist 12 is connected between the lifting ear 11 and the wet joint steel bar of the bridge deck 8, thereby improving the connection stability between the working platform 1 and the bridge and ensuring construction safety.

[0020] The first guardrail net 2 and the second guardrail net 3 prevent construction workers from falling from the working platform 1, thereby improving construction safety; the connecting rod 10 can further strengthen the structural strength of the working platform 1;

[0021] During construction, a ladder can be set up on the working platform 1 to facilitate the entry and exit of construction workers, and the supporting formwork used in the construction needs to be lifted by a crane;

[0022] After the construction is completed, it is only necessary to disconnect the transverse cantilever frame 7 welded to the wet joint steel bars of the bridge deck 8, and at the same time disconnect the hand hoist 12 from the wet joint steel bars of the bridge deck 8, so that the cap beam anchor sealing safety operation platform can be transported as a whole to the next construction site.

[0023] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A bridge construction cap beam anchor sealing safety operation platform, characterized by: The invention comprises a working platform (1), a first guardrail net (2) is vertically mounted on the top walls at both ends of the working platform (1), a second guardrail net (3) is vertically mounted on the top wall at the outer end of the working platform (1), a notch (5) matching the end of the cap beam (4) is provided on the working platform (1), and the working platform (1) is connected to the bridge body via a fixing assembly.

2. A bridge construction cap beam anchor sealing safety operation platform according to claim 1, characterized in that: The fixing assembly comprises a pair of longitudinal cantilever frames (6), the bottom ends of the longitudinal cantilever frames (6) are fixedly connected to the top wall of the working platform (1), the top ends of the longitudinal cantilever frames (6) are fixedly connected to transverse cantilever frames (7) matching the top surface of the bridge, and the inner ends of the transverse cantilever frames (7) are fixedly connected to the wet joint steel bars of the bridge deck (8).

3. A bridge construction cap beam anchor sealing safety operation platform according to claim 2, characterized in that: A reinforcing rib (9) is connected to the transverse cantilever frame (7).

4. A bridge construction cap beam anchor sealing safety operation platform according to claim 2, characterized in that: A connecting rod (10) is provided in the notch (5), and both ends of the connecting rod (10) are fixedly connected to the working platform (1).

5. A bridge construction cap beam anchor sealing safety operation platform according to claim 4, characterized in that: Lifting ears (11) are provided on both sides of the notch (5), and the lifting ears (11) are fixedly mounted on the top wall of the working platform (1). A hand chain hoist (12) is connected to the lifting ears (11), and the top end of the hand chain hoist (12) is connected to the wet joint steel bars of the bridge deck (8).