Pile foundation construction hole cleaning and slag salvaging barrel and pile foundation construction equipment
By designing a pile foundation construction hole cleaning and slag scooping bucket, and using lifting cables and opening and closing cables to drive the movable base plate to open and close reciprocally in the pile foundation hole, the problems of complex structure and high cost of existing devices are solved, and efficient and low-cost sediment cleaning effects are achieved.
Patent Information
- Application Number
- CN202422374830.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2025-09-09
- Estimated Expiration
- 2034-09-27
AI Technical Summary
Existing pile foundation construction hole cleaning devices have complex structures, high costs and poor applicability, especially in deep hole cleaning, where the efficiency is low and sediments are difficult to clean thoroughly.
A pile foundation construction hole cleaning and slag scooping bucket is designed. The lifting cable and the opening and closing cable are used to drive the movable bottom plate to open and close reciprocally in the pile foundation hole, thereby realizing efficient scooping of sediment. The structure is simple and can be flexibly adapted to pile foundation holes with different inner diameters.
It improves the hole cleaning efficiency, reduces the cost, can meet the hole filling requirements in a short time, and has strong applicability, suitable for pile foundation holes of different sizes.
Smart Images

Figure CN223317820U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pile foundation construction, in particular to a pile foundation construction hole cleaning slag bucket and pile foundation construction equipment. Background Art
[0002] During the construction of mud-wall impact hammer pile foundation, hole cleaning is required before the pile foundation is cast. Generally, the hole is cleaned by multiple slurry changes, slurry extraction and other methods. After the hole is cleaned, the mud index and the sediment at the bottom of the hole must meet the requirements of the hole casting index before concrete can be cast. According to the actual measurement records at the construction site, when the pile foundation hole depth is greater than 20 meters, the time for cleaning the hole using this method is generally more than 10 hours, and when the pile foundation hole is deep, the sediment at the bottom of the hole cannot be discharged smoothly.
[0003] In this regard, Chinese utility model patent CN213928296U provides a hole cleaning device for pile foundation construction, which can improve the hole cleaning efficiency and effect, but its structure is complex, the cost is high, and it cannot be flexibly adapted to pile foundation holes of different inner diameters. Utility Model Content
[0004] The utility model primarily provides a pile foundation construction hole cleaning slag bucket to solve the technical problems of the existing pile foundation construction hole cleaning device having a complex structure, high cost and poor applicability.
[0005] The utility model also provides a pile foundation construction device, which adopts the pile foundation construction hole cleaning and slag scooping bucket.
[0006] According to one aspect of the utility model, a pile foundation construction hole cleaning and slag scooping bucket is provided, comprising a bucket body, a movable bottom plate, a lifting cable and an opening and closing cable. The movable bottom plate is arranged at the bottom opening of the bucket body and is hinged to the barrel body. The lifting cable is connected to the barrel body and is used to drive the barrel body to move up and down along the pile foundation hole. The opening and closing cable is connected to the movable bottom plate and is used to drive the movable bottom plate to close relative to the bottom opening of the barrel body through a pulling action. The opening and closing cable is also used to drive the movable bottom plate to open relative to the bottom opening of the barrel body through a lowering action, thereby realizing the reciprocating opening and closing action of the movable bottom plate to scoop the sediment in the pile foundation hole into the barrel body through the movable bottom plate.
[0007] Preferably, there are two movable bottom plates, which are respectively arranged on opposite sides of the barrel body. The two movable bottom plates are used to be spliced together when closed to jointly block the bottom opening of the barrel body.
[0008] Preferably, the edge of the movable bottom plate for splicing with another movable bottom plate is set as a serrated structure, and the serrated structure is used to insert into the sediment in the pile foundation hole when the movable bottom plate is in the open state. The serrated structures of the two movable bottom plates can be spliced and closed with each other.
[0009] Preferably, there are two opening and closing cables, which are connected to the two movable bottom plates in a one-to-one correspondence, and the opening and closing cables are arranged at the center position of one side of the movable bottom plate close to the other movable bottom plate.
[0010] Preferably, there are two lifting cables, which are arranged on opposite sides of the barrel body, and the connection direction of the two lifting cables is parallel to the rotation axis of the movable bottom plate.
[0011] Preferably, the barrel body and the movable bottom plate are both provided with connecting rings, the lifting cable is detachably mounted on the connecting rings of the barrel body, and the opening and closing cable is detachably mounted on the connecting rings of the movable bottom plate.
[0012] Preferably, the barrel body is formed by enclosing steel plates, and the outer diameter of the barrel body is adapted to the inner diameter of the pile foundation hole.
[0013] Preferably, drainage holes are provided on the barrel body and / or the movable bottom plate.
[0014] Preferably, the pile foundation construction hole cleaning and slag scooping bucket further comprises a hinge provided between the movable bottom plate and the barrel body, and the movable bottom plate is hinged relative to the barrel body via the hinge.
[0015] As a second aspect, the utility model also provides a pile foundation construction equipment, including the above-mentioned pile foundation construction hole cleaning and slag collecting bucket.
[0016] The utility model has the following beneficial effects:
[0017] The pile foundation hole cleaning and slag scooping bucket provided by the utility model is driven by the lifting cable to lift the bucket body along the pile foundation hole, and the movable bottom plate is driven to open and close reciprocally relative to the bottom opening of the bucket body by the opening and closing cable, so that the movable bottom plate can be impacted and inserted into the sediment at the bottom of the pile foundation hole and the sediment can be scooped into the bucket body. The lifting and lowering action of the barrel body and the reciprocating opening and closing action of the movable bottom plate are repeated many times, and more sediment can be continuously scooped. After the barrel body is full, the opening and closing cable is tightened to close the movable bottom plate, and then the lifting cable is pulled to bring the pile foundation hole cleaning and slag scooping bucket as a whole out to the ground, so that the sediment in the bucket is conveniently discharged. The overall structure is simple and efficient, the slag scooping effect is good, it can be made from materials on the construction site, and can be flexibly adapted to different pile foundation hole sizes. It has low cost and strong applicability.
[0018] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The accompanying drawings, which constitute part of this application, are intended to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are intended to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:
[0020] Figure 1 A schematic structural diagram of a pile foundation construction hole cleaning and slag removal bucket provided by an embodiment of the present utility model;
[0021] Figure 2 for Figure 1 The top view of the pile foundation construction hole cleaning and slag bucket is shown.
[0022] Legend:
[0023] 1000. Drain bucket for clearing holes in pile foundation construction; 1. Bucket body; 2. Movable bottom plate; 21. Sawtooth structure; 3. Lifting cable; 4. Opening and closing cable; 5. Connecting ring; 6. Hinge. DETAILED DESCRIPTION
[0024] The embodiments of the present invention are described in detail below with reference to the accompanying drawings. However, the present invention can be implemented in a variety of different ways as defined and covered below.
[0025] Figure 1 and Figure 2 The utility model is used to clean and remove slag from pile foundation holes, so that the mud index and bottom sediment of the pile foundation hole meet the requirements of hole filling index. The structure is simple, efficient and low-cost.
[0026] like Figure 1 As shown, the pile foundation construction hole cleaning and slag dredging bucket 1000 includes a bucket body 1, a movable bottom plate 2, a lifting cable 3, and an opening and closing cable 4. The movable bottom plate 2 is located at the bottom opening of the bucket body 1 and is hinged to the bucket body 1. The movable bottom plate 2 opens by rotating downwardly toward the bucket body 1 and is used to seal the bottom opening of the bucket body 1 when closed. The lifting cable 3 is connected to the bucket body 1 and is used to drive the bucket body 1 to move up and down along the pile foundation hole. The opening and closing cable 4 is connected to the movable bottom plate 2 and is used to pull the movable bottom plate 2 closed relative to the bottom opening of the bucket body 1 by pulling up. The opening and closing cable 4 is also used to lower the movable bottom plate 2 to open relative to the bottom opening of the bucket body 1 by lowering. This enables the movable bottom plate 2 to reciprocate and open, thereby scooping sediment from the pile foundation hole into the bucket body 1 through the movable bottom plate 2.
[0027] Specifically, the pile foundation construction hole cleaning and slag scooping bucket 1000 drives the bucket body 1 to move up and down along the pile foundation hole through the lifting cable 3, and drives the movable bottom plate 2 to open and close reciprocally relative to the bottom opening of the bucket body 1 through the opening and closing cable 4, so that the movable bottom plate 2 can be impacted and inserted into the sediment at the bottom of the pile foundation hole and the sediment can be scooped into the inner cavity of the bucket body 2. The lifting and lowering action of the bucket body 1 and the reciprocating opening and closing action of the movable bottom plate 2 are repeated many times, and more sediment can be continuously scooped. After the barrel body 1 is full, the opening and closing cable 4 is tightened to close the movable bottom plate 2, and then the lifting cable 3 is pulled to bring the pile foundation construction hole cleaning and slag scooping bucket 1000 as a whole out to the ground, which is convenient for discharging the sediment in the bucket. The overall structure is simple and efficient, the slag scooping effect is good, it can be made from materials on the construction site, and can be flexibly adapted to different pile foundation hole sizes. It is low in cost and has strong applicability.
[0028] Please combine Figure 1 and Figure 2 Two movable bottom plates 2 are provided, and are disposed on opposite sides of the barrel body 1. The two movable bottom plates 2 are configured to be joined together when closed to jointly block the bottom opening of the barrel body 1. The two movable bottom plates 2 are used to perform slag scooping operations on opposite sides of the barrel body 1, respectively. This not only improves slag scooping efficiency, but also shortens the rotational travel of a single movable bottom plate 2, reduces the force applied to a single movable bottom plate 2, enhances the structural strength and stability of the movable bottom plates 2, and improves the slag scooping effect.
[0029] Preferably, the edge of the movable bottom plate 2, which is used for connecting with another movable bottom plate 2, is configured as a serrated structure 21. This serrated structure 21 is used to penetrate into the sediment in the pile foundation hole when the movable bottom plate 2 is in the open position. The serrated structures 21 of the two movable bottom plates 2 can be spliced together and closed. That is, when the movable bottom plate 2 is in the open position, the edge of the movable bottom plate 2 facing away from the barrel body 1 is configured as a serrated structure 21, enabling impact slag breaking during descent, allowing for smoother penetration into the sediment, preventing the inability to thoroughly clean out deep sediment at the bottom of the pile foundation hole, and further improving the slag removal effect.
[0030] Preferably, two opening and closing cables 4 are provided, and the two opening and closing cables 4 are connected to the two movable bottom plates 2 in a one-to-one correspondence. The opening and closing cables 4 are arranged at the center position of one side of the movable bottom plate 2 close to the other movable bottom plate 2 .
[0031] By driving the opening and closing actions of the two movable bottom plates 2 respectively through two opening and closing cables 4, not only can the synchronous opening and closing of the two movable bottom plates 2 be achieved, but also the sequential opening and closing of the two movable bottom plates 2 can be achieved, different slag removal actions can be switched, and sediments in different states can be adapted. Secondly, since the opening and closing cables 4 are arranged at the center position of the movable bottom plate 2 on the side close to the other movable bottom plate 2, not only can the lever principle be used to reduce the force of the opening and closing cables 4, and the movable bottom plates 2 can be opened and closed more effortlessly, but also since the side of the movable bottom plate 2 close to the other movable bottom plate 2 is not connected to the barrel body 1, the movable end of the movable bottom plate 2 is fixed by the opening and closing cables 4, so that the movable bottom plate 2 is more stable and not easy to loosen, and can stably drive the sediment out of the ground.
[0032] Preferably, there are two lifting cables 3, which are arranged on opposite sides of the barrel body 1. The connection direction of the two lifting cables 3 is parallel to the rotating axis of the movable bottom plate 2, so that the connection direction of the two lifting cables 3 is perpendicular to the connection direction of the two opening and closing cables 4. The slag bucket is lifted together by the two lifting cables 3 and the two opening and closing cables 4 to improve stability.
[0033] In other embodiments, when there is only one movable bottom plate 2, since the connection direction of the two lifting cables 3 is parallel to the rotation axis of the movable bottom plate 2, the barrel body 1 can also be slightly rotated along the connection direction of the two lifting cables 3 as the axis, and the sediment is shaken into the barrel body 1, thereby improving the sediment scooping effect.
[0034] Furthermore, the barrel body 1 and the movable bottom plate 2 are both provided with a connecting ring 5, the lifting cable 3 is detachably mounted on the connecting ring 5 of the barrel body 1, and the opening and closing cable 4 is detachably mounted on the connecting ring 5 of the movable bottom plate 2. The lifting cable 3 and the opening and closing cable 4 are fixed by the connecting ring 5, making them easy to disassemble and use.
[0035] Furthermore, the barrel body 1 is formed into a cylindrical shape by enclosing steel plates and finalized by welding. The outer diameter of the barrel body 1 is adapted to the inner diameter of the pile foundation hole. The barrel body 1 has a simple structure and is easy to manufacture. It can be made from materials on the construction site, and the actual size can be precisely adjusted according to the inner diameter of the pile foundation hole.
[0036] Preferably, drainage holes (not shown in the figure, the same below) are provided on the barrel body 1 and / or the movable bottom plate 2, and the liquid in the inner cavity of the barrel body 1 is discharged through the drainage holes during the slag scooping process to avoid excessive mud from entering and occupying the slag scooping space.
[0037] Preferably, the pile foundation construction hole cleaning and slag scooping bucket 1000 also includes a hinge 6 arranged between the movable bottom plate 2 and the barrel body 1, and the movable bottom plate 2 is hinged relative to the barrel body 1 through the hinge 6, so that the movable bottom plate 2 can smoothly rotate and open and close relative to the barrel body 1.
[0038] As a second aspect, the utility model also provides a pile foundation construction equipment (not shown in the figure, the same below), including the above-mentioned pile foundation construction hole cleaning and slag bucket, the pile foundation construction equipment also includes an impact drilling pile driver, the main steel cable of the impact drilling pile driver is used as the lifting cable 3, and the auxiliary steel cable of the impact drilling pile driver is used as the opening and closing cable 4. The impact drilling pile driver can drive the pile foundation construction hole cleaning and slag bucket to any depth position of the pile foundation hole for hole cleaning operations without manual operation.
[0039] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Those skilled in the art will readily appreciate that the present invention is susceptible to various modifications and variations. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.
Claims
1. A pile foundation construction hole cleaning slag bucket, characterized in that: The utility model comprises a barrel body (1), a movable bottom plate (2), a lifting cable (3) and an opening and closing cable (4), wherein the movable bottom plate (2) is arranged at the bottom opening of the barrel body (1) and is hinged to the barrel body (1), the lifting cable (3) is connected to the barrel body (1) and is used to drive the barrel body (1) to move up and down along the pile foundation hole, the opening and closing cable (4) is connected to the movable bottom plate (2) and is used to drive the movable bottom plate (2) to close relative to the bottom opening of the barrel body (1) by a pulling action, and the opening and closing cable (4) is also used to drive the movable bottom plate (2) to open relative to the bottom opening of the barrel body (1) by a lowering action, thereby realizing the reciprocating opening and closing action of the movable bottom plate (2) so as to scoop the sediment in the pile foundation hole into the barrel body (1) through the movable bottom plate (2).
2. The pile foundation construction hole cleaning slag bucket according to claim 1, characterized in that: There are two movable bottom plates (2), which are respectively arranged on opposite sides of the barrel body (1). The two movable bottom plates (2) are used to be spliced together when closed to jointly block the bottom opening of the barrel body (1).
3. The pile foundation construction hole cleaning slag bucket according to claim 2, characterized in that: The edge of the movable bottom plate (2) for splicing with another movable bottom plate (2) is provided as a sawtooth structure (21). The sawtooth structure (21) is used to be inserted into the sediment in the pile foundation hole when the movable bottom plate (2) is in an open state. The sawtooth structures (21) of the two movable bottom plates (2) can be spliced together and closed.
4. The pile foundation construction hole cleaning slag bucket according to claim 2 or 3, characterized in that: Two opening and closing cables (4) are provided, and the two opening and closing cables (4) are connected to the two movable bottom plates (2) in a one-to-one correspondence. The opening and closing cables (4) are arranged at the center position of one side of the movable bottom plate (2) close to the other movable bottom plate (2).
5. The pile foundation construction hole cleaning slag bucket according to claim 1, characterized in that: There are two lifting cables (3), which are arranged on opposite sides of the barrel body (1). The connection direction of the two lifting cables (3) is parallel to the rotation axis of the movable bottom plate (2).
6. The pile foundation construction hole cleaning and slag removal bucket according to claim 1, characterized in that: The barrel body (1) and the movable bottom plate (2) are both provided with a connecting ring (5); the lifting cable (3) is detachably mounted on the connecting ring (5) of the barrel body (1); and the opening and closing cable (4) is detachably mounted on the connecting ring (5) of the movable bottom plate (2).
7. The pile foundation construction hole cleaning slag bucket according to claim 1, characterized in that: The barrel body (1) is formed by enclosing steel plates, and the outer diameter of the barrel body (1) is adapted to the inner diameter of the pile foundation hole.
8. The pile foundation construction hole cleaning and slag removal bucket according to claim 1, characterized in that: Drain holes are provided on the barrel body (1) and / or the movable bottom plate (2).
9. The pile foundation construction hole cleaning and slag removal bucket according to claim 1, characterized in that: The pile foundation construction hole cleaning and slag scooping bucket further comprises a hinge (6) provided between the movable bottom plate (2) and the bucket body (1); the movable bottom plate (2) is hinged relative to the bucket body (1) via the hinge (6).
10. A pile foundation construction equipment, characterized in that: It comprises the pile foundation construction hole cleaning and slag scooping bucket according to any one of claims 1 to 9.