Integrated construction platform

Through the design of an integrated construction platform, the problem of low transportation efficiency of construction equipment in a narrow working environment is solved, automated construction and material transportation are realized, construction efficiency is improved and costs are reduced.

CN223446581UActive Publication Date: 2025-10-17NO 2 CONSTR GRP CO LTD OF SHANGHAI CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422720357.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-10-17
Estimated Expiration
2034-11-08

AI Technical Summary

Technical Problem

Existing construction equipment has low transportation efficiency and high cost in a narrow working environment, and is unable to effectively transport materials and carry out construction, resulting in low construction efficiency.

Method used

An integrated construction platform is designed, including tracks, a portal steel frame, a power motor, slide rails, a hook, a conveyor belt, integrated pipelines, a pedestrian walkway and a protective shed. The portal steel frame is driven by a power motor to move on the track, realizing material transmission and construction automation, reducing manual handling.

Benefits of technology

It improves construction efficiency in narrow spaces, reduces operating costs, adapts to complex environments, reduces dependence on large equipment, and achieves efficient material transmission and construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223446581U_ABST
    Figure CN223446581U_ABST
Patent Text Reader

Abstract

The utility model discloses an integrated construction platform which is characterized in that a portal steel frame is arranged on a pair of rails in a spanning manner, and the position of the portal steel frame on the rails is regulated and controlled under the driving of a power motor; the sliding rail is arranged at the top of the portal frame, and the lifting hook is hung below the sliding rail and can slide along the sliding rail; the conveying belt and the integrated pipeline are arranged at the bottom of the portal steel frame, and are driven by the power motor to synchronously move the laying position along with the portal steel frame; the pedestrian path and the protective shed arranged above the pedestrian path are arranged in the middle of the portal steel frame. The integrated construction platform and high-integration equipment facilities based on the integrated construction platform are built in the dense three-dimensional space, material conveying and construction in the dense three-dimensional space are achieved, the problem that large equipment cannot be used in the narrow space is solved, the construction efficiency in the working environment with the complex environment and the narrow space is improved, and the construction cost is reduced. And the operation cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to construction technology field especially relates to an integrated construction platform. BACKGROUND

[0002] The construction site cannot leave the traffic organization of construction site, material transportation, personnel traffic and temporary facility arrangement. However, the conventional limited transport equipment such as car hoist, caterpillar crane, long board car, excavator etc. all exist big volume, high demand to construction road transportation, need to consider the size and demand of equipment itself, such as through manpower transportation, low efficiency, heavy goods are not easy to transport, and cause the increase of construction cost.

[0003] In summary, due to the rapid development of city, the surrounding environment is complex, and the construction site is more and more narrow, how to carry out efficient and low cost construction in the narrow working environment is a technical problem to be solved. UTILITY MODEL CONTENT

[0004] The utility model discloses a kind of integrated construction platforms, to solve the construction work and material transportation in dense three-dimensional space, improve the construction efficiency under the working environment of complex space narrow, reduce the working cost.

[0005] In order to solve the above technical problems, the utility model provides an integrated construction platform, the integrated construction platform includes: a pair of mutually parallel tracks, door type steel frame, power motor, slide rail, lifting hook, conveyor belt, integrated pipeline, pedestrian passageway and protective shed, door type steel frame is straddled on a pair of tracks, and the position of door type steel frame on track is regulated and controlled under the driving of power motor;Slide rail is arranged at the top of door type steel frame, lifting hook is hung under slide rail, and can slide along it;Conveyor belt and integrated pipeline are arranged at the bottom of door type steel frame, and are driven to move synchronous laying position with door type steel frame under the driving of power motor;Pedestrian passageway and protective shed arranged above it are arranged at the middle of door type steel frame.

[0006] Optionally, in the integrated construction platform, the number of power motors is four, and every two power motors are symmetrically arranged on the two sides of the leg of door type steel frame on a track.

[0007] Optionally, in the integrated construction platform, it further includes two pairs of pulley rollers, each pair of pulley rollers is oppositely arranged in the inside of a leg of door type steel frame, and track is lapped on the pair of pulley rollers.

[0008] Optionally, in the integrated construction platform, the number of lifting hooks is at least one.

[0009] Optionally, in the integrated construction platform, the cross section of slide rail is T-shaped.

[0010] Optionally, in the integrated construction platform, the slide rail is a telescopic slide rail, and when the slide rail is extended, part of the slide rail extends from both sides of the portal frame; when the slide rail is shortened, the slide rail is inside the portal frame.

[0011] In the integrated construction platform, the integrated construction platform comprises a pair of parallel rails, a portal frame, a power motor, a slide rail, a lifting hook, a conveyor belt, an integrated pipeline, a pedestrian passage and a protective shed, the portal frame is arranged on the pair of rails, and the position of the portal frame on the rails is controlled under the driving of the power motor; the slide rail is arranged at the top of the portal frame, the lifting hook is hung below the slide rail and can slide along the slide rail; the conveyor belt and the integrated pipeline are arranged at the bottom of the portal frame and move synchronously with the portal frame under the driving of the power motor; the pedestrian passage and the protective shed arranged above the pedestrian passage are arranged at the middle part of the portal frame. By arranging the integrated construction platform in the dense three-dimensional space, based on the high-integration equipment and facilities of the integrated construction platform, material transmission and construction in the dense three-dimensional space are realized, thereby solving the problem that large equipment cannot be used in narrow space, improving the construction efficiency in the complex narrow working environment, and reducing the operation cost. BRIEF DESCRIPTION OF DRAWINGS

[0012] Figure 1 is a perspective view of the integrated construction platform in an embodiment of the utility model;

[0013] Figure 2 is a sectional view of the integrated construction platform in an embodiment of the utility model;

[0014] Figure 3 is a bottom node view of the integrated construction platform in an embodiment of the utility model;

[0015] Figure 4 is an application working environment view of the integrated construction platform in an embodiment of the utility model.

[0016] In the drawings:

[0017] 1-portal frame; 2-slide rail; 3-lifting hook; 4-protective shed; 5-pedestrian passage; 6-integrated pipeline; 7-conveyor belt; 8-power motor; 9-rail. DETAILED DESCRIPTION

[0018] The integrated construction platform provided by the utility model will be further described in detail below in combination with the drawings and specific embodiments. The advantages and features of the utility model will be clearer according to the following description and claims. It should be noted that the drawings are all very simplified and use non-precise proportions, and are only used to facilitate and clearly assist the purpose of describing the embodiments of the utility model.

[0019] The utility model will be described further in detail in combination with the drawings. These drawings are all simplified schematic diagrams, and only schematically show the basic structure of the utility model, so they only show the structure related to the utility model.

[0020] In the description of the utility model, it should be understood that the directions or positional relationships indicated by the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and therefore cannot be understood as indicating or implying that the devices or elements indicated must have a particular direction, be constructed and operated in a particular direction, and therefore cannot be understood as limiting the utility model.

[0021] In addition, the terms "first" and "second" are only for the purpose of description, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" can explicitly or implicitly include one or more of the features. In the description of the utility model, the meaning of "multiple" is two or more, unless otherwise specifically limited.

[0022] In the utility model, unless otherwise specifically defined and limited, the terms "mounting", "connection", "connection", "fixing" and the like should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or it can be integrally connected; it can be mechanically connected, or it can be electrically connected; it can be directly connected, or it can be indirectly connected through an intermediate medium; it can be the communication inside two elements. For ordinary skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific situation.

[0023] Please refer to Figures 1 to 3 , the integrated construction platform includes: a pair of mutually parallel tracks 9, a portal steel frame 1, a power motor 8, a slide rail 2, a lifting hook 3, a conveyor belt 7, an integrated pipeline 6, a pedestrian passage 5 and a protective shed 4, the portal steel frame 1 is arranged on a pair of tracks 9, and the position of the portal steel frame 1 on the track 9 is controlled under the driving of the power motor 8; the slide rail 2 is arranged at the top of the portal steel frame 1, the lifting hook 3 is hung below the slide rail 2 and can slide along it; the conveyor belt 7 and the integrated pipeline 6 are arranged at the bottom of the portal steel frame 1 and move synchronously with the portal steel frame 1 under the driving of the power motor 8; the pedestrian passage 5 and the protective shed 4 arranged above it are arranged in the middle of the portal steel frame 1.

[0024] The integrated construction platform based on the utility model is assembled according to the size of the narrow space and can meet the construction operation demand required in the narrow space, and the automatic construction does not need to rely on manpower transportation, the large-size large equipment is saved, the problem that the large equipment cannot be used in the narrow space is solved, the labor loss is reduced, and the construction efficiency is improved. In addition, the integrated construction platform can be adjusted and assembled according to the size of the narrow space (namely different construction operation environment), and can be recycled, thereby saving the construction cost.

[0025] Specifically, the portal steel frame has the characteristics of light structure, rapid erection and high efficiency, and is usually applied to energy-saving and environment-friendly new building materials to realize factory processing and manufacturing, on-site construction and assembly, convenient and fast assembly process, construction period saving, in addition, the portal steel frame has the advantages of solid and durable structure, novel and beautiful building appearance, high quality and low price, and obvious economic benefits. Therefore, the size of the portal steel frame 1 can be adjusted according to the actual situation on site to adapt to the narrow operation environment.

[0026] The power motor 8 arranged at the bottom of the portal steel frame 1 is used to start or stop the portal steel frame 1, the integrated pipeline 6 arranged at the bottom of the portal steel frame 1 is used to set a sub-compartment to ensure on-site water, electricity, fire-fighting and use, the conveying belt 7 is used to transport materials or construction waste, the pedestrian passage 5 and the protective shed 4 arranged in the middle of the portal steel frame 1 are used for on-site personnel command and standing, and the lifting hook 3 arranged on the portal steel frame 1 can be hoisted through the sliding rail 2 on the top of the portal steel frame 1 to support the hoisting operation demand of the construction site without using a large automobile crane or a crawler crane.

[0027] Further, the number of the lifting hooks is at least one, and preferably two in the embodiment.

[0028] As shown in Figure 1 , the number of the power motor 8 is four, and each two power motors 8 are symmetrically arranged on the two sides of the leg of the portal steel frame 1 on the track 9.

[0029] As shown in Figure 3 , the integrated construction platform further comprises two pairs of pulley rollers 10, each pair of pulley rollers 10 is arranged opposite to the inside of a leg of the portal steel frame, and the track 9 is lapped on the pair of pulley rollers 10 to provide a smooth and stable movement path for the portal steel frame 1, reduce friction and wear, ensure the accurate movement of the portal steel frame 1 and prolong the service life.

[0030] In the embodiment, as shown in Figure 1 , the cross section of the sliding rail 2 is in T shape; preferably, as shown in Figure 2As shown, the slide rail 2 is a telescopic slide rail. When the slide rail 2 is extended, part of the slide rail extends from both sides of the portal steel frame; when the slide rail 2 is shortened, the slide rail is inside the portal steel frame.

[0031] In order to better understand the integrated construction platform designed by this utility model, the following will be combined with Figures 1 to 4 ,The construction process of the integrated construction platform is elaborated in detail as follows:

[0032] S1: First, lay the bottom track 9 to adapt to the current narrow working space.

[0033] S2: Set up a portal steel frame 1 on 9 according to the on-site conditions, connect the portal steel frame 1 with the pulley roller 10 and fix it on the track 9.

[0034] S3: Install the slide rail 2 and hook 3 on the top of the gantry;

[0035] S4: Use the hook 3 to install the power motor 8 and fix it at both ends of the bottom of the portal steel frame 1.

[0036] S5: Use the hook 3 to install the protective shed 4 and the pedestrian passage 5.

[0037] S6: The portal steel frame 1 is pushed by the power motor 8 to lay the conveyor belt 7 and the integrated pipeline 6 to the designated position.

[0038] It can be understood that the above examples are merely examples listed for a better understanding of the technical solutions of the embodiments of the present application, and are not intended to be the sole limitation on the embodiments.

[0039] Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for this application.

[0040] In summary, in the integrated construction platform provided by the present invention, by setting up the integrated construction platform in a dense three-dimensional space, based on the highly integrated equipment and facilities of the integrated construction platform, material transportation and construction in the dense three-dimensional space are realized, thereby solving the problem that large equipment cannot be used in narrow spaces, improving the construction efficiency in working environments with complex environments and narrow spaces, and reducing operating costs.

[0041] Obviously, those skilled in the art may make various modifications and variations to the utility model without departing from the spirit and scope of the utility model. Thus, if such modifications and variations of the utility model fall within the scope of the claims of the utility model and their equivalents, the utility model is intended to include such modifications and variations.

Claims

1. An integrated construction platform, characterized in that: include: A pair of mutually parallel rails (9), a portal steel frame (1), a power motor (8), a slide rail (2), a hook (3), a conveyor belt (7), an integrated pipeline (6), a pedestrian walkway (5) and a protective shed (4); the portal steel frame (1) is arranged astride the pair of rails (9), and the position of the portal steel frame (1) on the rails (9) is adjusted by the drive of the power motor (8); the slide rail (2) is arranged on the top of the portal steel frame (1), and the hook (3) is suspended below the slide rail (2) and can slide along the slide rail; The conveyor belt (7) and the integrated pipeline (6) are arranged at the bottom of the portal steel frame (1) and are moved synchronously with the portal steel frame (1) to a laying position under the drive of a power motor (8); the pedestrian passage (5) and the protective shed (4) arranged above it are arranged in the middle of the portal steel frame (1).

2. The integrated construction platform according to claim 1, characterized in that: The number of the power motors (8) is four, and each two power motors (8) form a group and are symmetrically arranged on both sides of the legs of the portal steel frame (1) on a track (9).

3. The integrated construction platform according to claim 1, characterized in that: The invention also comprises two pairs of pulley rollers (10), each pair of pulley rollers (10) is respectively arranged oppositely inside a leg of the portal steel frame, and the track (9) is overlapped on the pair of pulley rollers (10).

4. The integrated construction platform according to claim 1, characterized in that: The number of the hook is at least one.

5. The integrated construction platform according to claim 1, characterized in that: The cross section of the slide rail (2) is T-shaped.

6. The integrated construction platform according to claim 4, characterized in that: The slide rail (2) is a telescopic slide rail. When the slide rail (2) is extended, part of the slide rail extends from both sides of the portal steel frame; when the slide rail (2) is shortened, the slide rail is inside the portal steel frame.