Assembly type concrete building prefabricated outer wall splicing seam structure

By using prefabricated exterior wall splicing structures in prefabricated concrete buildings, and utilizing components such as clips, rubber seals, waterproof adhesive layers, foam layers, and aerogel layers, the waterproofing and heat insulation problems at the joints of concrete walls are solved, achieving the stability and energy-saving effects of the walls.

CN223523277UActive Publication Date: 2025-11-07GUANGDONG QIANXING CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423111886.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-17
Publication Date
2025-11-07
Estimated Expiration
2034-12-17

AI Technical Summary

Technical Problem

Condensation is easily generated at the joints of concrete walls when there is a large temperature difference, which affects the service life of the wall. Moreover, existing sealing methods are not effective in preventing the spread of moisture and heat.

Method used

The prefabricated exterior wall splicing structure of the precast concrete building includes components such as slots, clips, rubber seals, waterproof adhesive layer, foam layer, aerogel layer and bolts. Through the tight connection of the clips and rubber seals, the waterproof performance of the waterproof adhesive layer, the heat insulation performance of the foam layer and the heat insulation performance of the aerogel layer, combined with the fixing of the bolts, the stability and waterproof effect of the wall are achieved.

Benefits of technology

It improves the waterproof performance of the wall, reduces condensation, maintains stable indoor temperature, reduces energy consumption, and enhances the stability and tightness of the wall connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223523277U_ABST
    Figure CN223523277U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of concrete prefabricated parts, and discloses an assembly type concrete building prefabricated outer wall splicing seam structure which comprises two wall bodies, a plurality of clamping grooves are formed in the side faces, close to each other, of the two wall bodies, a plurality of clamping parts are arranged between the two wall bodies, and the clamping parts are all located in the clamping grooves close to the clamping parts. The inner wall of each clamping groove is provided with two rubber sealing pieces, and the rubber sealing pieces make contact with the clamping pieces close to the rubber sealing pieces. According to the assembly type concrete building prefabricated outer wall splicing seam structure, the waterproof performance of the two wall bodies can be improved by installing the waterproof glue layers, water vapor is prevented from permeating into the wall bodies, the cavity can communicate with the outside world by installing the communicating pipe, and therefore the temperature in the cavity can be kept balanced with the outside world, condensate water in the cavity is prevented from being generated, and the service life of the cavity is prolonged. And meanwhile, due to the fact that the communicating pipe is arranged obliquely downwards, external rainwater can be prevented from entering the cavity.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of concrete prefabricated parts, in particular to a prefabricated outer wall joint structure of assembled concrete building. BACKGROUND

[0002] The concrete prefabricated part, also known as PC component, is a concrete product processed and produced in a factory through standardization and mechanization, and the traditional cast-in-place concrete needs to be molded, poured and maintained on site.

[0003] When the joint of the concrete wall is treated, PE strips are usually filled inside, and then the joint is sealed. At this time, the reserved cavity is in a closed state. When the temperature difference is large, condensate water is easy to produce in the cavity, which can easily penetrate the wall and affect the service life of the wall. CONTENT OF THE UTILITY MODEL

[0004] In view of the deficiencies of the prior art, the prefabricated outer wall joint structure of assembled concrete building is provided, which has the advantages of improving practicality and solving the problems in the background art.

[0005] To achieve the above purpose, the present application provides the following technical scheme: a prefabricated outer wall joint structure of assembled concrete building, comprising two wall bodies, a plurality of clamping grooves are formed on the side face of each wall body close to each other, a plurality of clamping pieces are arranged between the two wall bodies, the clamping pieces are located in the clamping grooves close to each other, two rubber sealing pieces are installed on the inner wall of each clamping groove, the rubber sealing pieces are in contact with the clamping pieces close to each other, a waterproof adhesive layer is installed on the side face of each wall body close to each other, and a communication pipe is installed on the outer surface of the wall body on the right side.

[0006] Through the above scheme, the waterproof performance of the two wall bodies can be improved by installing the waterproof adhesive layer, so as to avoid water vapor penetrating into the wall body.

[0007] Further, the side face of each waterproof adhesive layer close to each other is provided with a foam layer.

[0008] Through the above scheme, the foam layer installed between the two wall bodies can effectively block the propagation of air due to the excellent heat insulation performance of the foam material, so as to isolate the heat from the outside.

[0009] Further, a cavity is arranged between the two wall bodies, and a PE sealing strip is arranged in the cavity.

[0010] Through the above scheme, the PE sealing strip can seal the cavity and improve the waterproof performance of the joint of the wall body, so as to avoid the rainwater from the outside entering the cavity and affecting the use of the wall body.

[0011] Further, the inner wall of the plurality of card slots is provided with a rigid protrusion.

[0012] Through the above scheme, the installation of the rigid protrusion can push the clamping piece to extrude the rubber sealing piece when installing the wall, so that the rubber sealing piece can be tightly attached to the inner wall of the card slot.

[0013] Further, the outer surface of the plurality of clamping pieces is provided with a slot, and the plurality of rigid protrusions are located in the slot adjacent to the slot.

[0014] Through the above scheme, the slot can facilitate the contact between the clamping piece and the rigid protrusion, so that the tail of the clamping piece can be away from each other and extrude the rubber sealing piece, thereby improving the tight connection between the two walls.

[0015] Further, the plurality of clamping pieces are made of elastic material.

[0016] Through the above scheme, the clamping piece made of elastic material can be deformed to extrude the rubber sealing piece in the card slot, and the cooperation of the rubber sealing piece can increase the resistance between the clamping piece and the card slot, so that the two walls can be stably connected.

[0017] Further, the side surface of the two foam layers adjacent to each other is provided with an aerogel layer.

[0018] Through the above scheme, the aerogel has extremely low thermal conductivity and excellent heat insulation performance. When the aerogel layer is used on the building, it can significantly reduce the heat exchange between the indoor and outdoor, and keep the indoor temperature stable. Therefore, the aerogel layer can greatly reduce the energy consumption of indoor air conditioning and heating, and achieve the goal of energy saving and emission reduction.

[0019] Further, the right side surface of the right wall is provided with a plurality of bolts, and the plurality of bolts are threadedly connected through the right wall and the left wall.

[0020] Through the above scheme, the installation of the plurality of bolts can fix the two walls, so that the two walls can be tightly connected together, and the stability between the two walls is improved.

[0021] Compared with the prior art, the technical scheme of the present application has the following advantages:

[0022] The prefabricated concrete building prefabricated outer wall splicing joint structure can improve the waterproof performance of the two walls by installing the waterproof rubber layer, avoid water vapor penetrating into the wall, and make the cavity communicate with the outside through the installation of the communication pipe, so that the temperature in the cavity can be balanced with the outside, avoid the generation of condensed water in the cavity, thereby reducing the generation of condensed water in the cavity. At the same time, since the communication pipe is inclined downward, it can avoid the entry of external rainwater into the cavity. Attached Figure Description

[0023] Figure 1 This is a cross-sectional view of the overall structure of this application;

[0024] Figure 2 For this application Figure 1 Enlarged schematic diagram of the structure at point A;

[0025] Figure 3 This is a schematic diagram of the card structure for this application;

[0026] Figure 4 This is a schematic diagram of the overall structure of this application.

[0027] In the picture:

[0028] 1. Wall; 2. Slot; 3. Clip; 4. Rubber seal; 5. Waterproof adhesive layer; 6. Connecting pipe; 7. Foam layer; 8. Cavity; 9. PE seal; 10. Rigid protrusion; 11. Slot; 12. Aerogel layer; 13. Bolt. Detailed Implementation

[0029] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0030] Please see Figure 1 , Figure 2 and Figure 3 The prefabricated exterior wall splicing structure of the assembled concrete building in this embodiment includes two walls 1. Multiple slots 2 are provided on the sides of the two walls 1 that are close to each other. Multiple fasteners 3 are provided between the two walls 1, and each fastener 3 is located within a slot 2. Two rubber seals 4 are installed on the inner wall of each slot 2, and each rubber seal 4 is in contact with a fastener 3. A waterproof adhesive layer 5 is installed on the sides of the two walls 1 that are close to each other. A connecting pipe 6 is installed on the outer surface of the right wall 1. The installation of the waterproof adhesive layer 5 improves the waterproof performance of the two walls 1, preventing moisture penetration into the walls 1. The installation of the connecting pipe 6 allows the cavity 8 to connect with the outside, thus maintaining a temperature balance between the cavity 8 and the outside environment, preventing condensation from forming inside the cavity 8, thereby reducing condensation. Furthermore, the downward-sloping design of the connecting pipe 6 prevents rainwater from entering the cavity 8.

[0031] Please see Figure 1 , Figure 2 and Figure 4, two waterproof glue layer 5, one side of each other close to the foam layer 7, 7 installed in the two wall 1 foam layer can be filled with air holes inside the excellent thermal insulation properties of the foam material, effectively hinder the spread of air, so as to isolate the heat from the outside, two wall 1 between the cavity 8, the cavity 8 is provided with PE seal 9, the installation of PE seal 9 can be sealed at the cavity 8, improve the waterproof of the joint of the wall 1, avoid the outside rain into the cavity 8 and affect the use of the wall 1, the inner wall of the plurality of clamping groove 2 is provided with rigid lug 10, the installation of rigid lug 10 can be installed in the wall 1, the rubber seal 4 is extruded by the pushing of the clamping piece 3, so that the rubber seal 4 can be closely attached to the inner wall of the clamping groove 2, the outer surface of the plurality of clamping piece 3 is provided with the slot 11, and the plurality of rigid lug 10 is located in the slot 11 close to it. The slot 11 can facilitate the contact between the clamping piece 3 and the rigid lug 10, so that the tail of the clamping piece 3 can be away from each other and extrude the rubber seal 4, thereby improving the tight connection between the two walls 1.

[0032] Please refer to Figure 1 , Figure 2 and Figure 3 , the plurality of clamping piece 3 is provided with elastic material, the clamping piece 3 is provided with elastic material, which can be deformed and extruded in the rubber seal 4 in the clamping groove 2, and the resistance between the clamping piece 3 and the clamping groove 2 can be increased by the cooperation of the rubber seal 4, so that the two walls 1 can be stably connected, the side of the two foam layers 7 close to each other is provided with aerogel layer 12, the aerogel has very low thermal conductivity, and the thermal insulation performance is excellent. When the aerogel layer 12 is used on the building, the heat exchange between indoor and outdoor can be significantly reduced, the indoor temperature can be kept stable, therefore, the aerogel layer 12 can greatly reduce the energy consumption of indoor air conditioning and heating, realize the goal of energy saving and emission reduction, the right side of the wall 1 on the right side is provided with a plurality of bolts 13, the plurality of bolts 13 are threaded connected with the right wall 1 and the left wall 1, the installation of the plurality of bolts 13 can fix the two walls 1, so that the two walls 1 can be tightly connected together, and the stability between the two walls 1 is improved.

[0033] The prefabricated concrete building prefabricated outer wall joint structure in the embodiment can improve the waterproof performance of the two walls 1 by installing the waterproof glue layer 5, avoid water vapor permeating into the wall 1, the cavity 8 can be communicated with the outside by installing the communication pipe 6, so that the temperature in the cavity 8 can be balanced with the outside, and the generation of condensate water in the cavity 8 can be avoided, so as to reduce the generation of condensate water in the cavity 8. At the same time, since the communication pipe 6 is inclined downward, the rainwater from the outside can be prevented from entering the cavity 8.

[0034] The working principle of the above embodiment is that: firstly, when installing two wall bodies 1, the clamping piece 3 is inserted into the clamping groove 2, and then the wall body 1 is pushed, at this time, the rigid push block cannot enter the insertion groove 11, the clamping piece 3 is deformed and the rubber sealing piece 4 is extruded, so as to increase the friction between the clamping piece 3 and the clamping groove 2, and because the clamping piece 3 is deformed and clamped in the clamping groove 2, the two wall bodies 1 can be tightly connected, then the two wall bodies 1 are fixed by using the bolt 13, so as to improve the stability between the two wall bodies 1, by installing the foam layer 7 between the two wall bodies 1, the excellent heat insulation performance of the foam material can be achieved, the inside is full of air holes, which effectively hinders the spread of air, so as to isolate the heat from the outside, the aerogel has extremely low thermal conductivity, and the heat insulation performance is extremely excellent, when the aerogel layer 12 is used on the building, the heat exchange between the indoor and outdoor can be significantly reduced, and the indoor temperature is stable, therefore, the aerogel layer 12 can greatly reduce the energy consumption of indoor air conditioning and heating, and achieve the energy saving and emission reduction goal, by installing the waterproof glue layer 5, the waterproof performance of the two wall bodies 1 can be improved, and water vapor can be prevented from penetrating into the wall body 1, by installing the communication pipe 6, the cavity 8 can be communicated with the outside, so that the temperature in the cavity 8 can be balanced with the outside, the generation of condensed water in the cavity 8 is avoided, so that the generation of condensed water in the cavity 8 is reduced, and because the communication pipe 6 is inclined downward, the rainwater from the outside can be prevented from entering the cavity 8.

[0035] It should be noted that the relational terms herein such as first and second and the like are used solely to distinguish one entity or action from another, without necessarily requiring or implying any such actual relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element preceded by "comprises a" does not, without more constraints, foreclose the existence of additional identical elements in the process, method, article, or apparatus that comprises the element.

[0036] Although embodiments of the present application have been shown and described, it is to be understood that various modifications, substitutions, replacements and changes can be made to these embodiments without departing from the principles and spirit of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A prefabricated concrete building precast outer wall joint structure, comprising two wall bodies (1), characterized in that: Two sides of the wall body (1) close to each other are provided with a plurality of clamping grooves (2), a plurality of clamping pieces (3) are arranged between the two wall bodies (1), the plurality of clamping pieces (3) are located in the clamping grooves (2) close to them, the inner walls of the plurality of clamping grooves (2) are provided with two rubber sealing pieces (4), the plurality of rubber sealing pieces (4) are in contact with the clamping pieces (3) close to them, the two sides of the wall body (1) close to each other are provided with waterproof adhesive layers (5), and the outer surface of the wall body (1) on the right side is provided with a communication pipe (6).

2. The prefabricated concrete building prefabricated outer wall joint structure according to claim 1, characterized in that: Two sides of the waterproof adhesive layer (5) close to each other are provided with a foam layer (7).

3. The prefabricated concrete building prefabricated outer wall joint structure according to claim 1, characterized in that: A cavity (8) is arranged between the two wall bodies (1), and the cavity (8) is provided with a PE sealing strip (9) inside.

4. The prefabricated concrete building precast outer wall joint structure according to claim 1, characterized in that: The inner walls of the plurality of clamping grooves (2) are provided with rigid protrusions (10).

5. The prefabricated concrete building precast outer wall joint structure according to claim 4, characterized in that: The outer surfaces of the plurality of clamping pieces (3) are provided with insertion grooves (11), and the plurality of rigid protrusions (10) are located in the insertion grooves (11) close to them.

6. The prefabricated concrete building precast outer wall joint structure according to claim 1, characterized in that: The plurality of clamping pieces (3) are made of elastic material.

7. The prefabricated concrete building precast outer wall joint structure according to claim 2, characterized in that: Two sides of the foam layer (7) close to each other are provided with an aerogel layer (12).

8. The prefabricated concrete building precast outer wall joint structure according to claim 1, characterized in that: The right side of the wall body (1) on the right side is provided with a plurality of bolts (13), and the plurality of bolts (13) are in threaded connection with the wall body (1) on the left side and penetrate the wall body (1) on the right side.