Steel sheet pile hoisting structure for deep foundation pit construction
By introducing a return spring and support protrusions into the sheet pile hoisting structure, the problem of hook slippage was solved, ensuring safety and stability during hoisting and preventing hook swing and damage to the sheet piles.
Patent Information
- Application Number
- CN202423288591.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2034-12-31
AI Technical Summary
When hoisting sheet piles, the hook is prone to slipping off the lifting hook, causing the hook to swing wildly and the sheet pile to fall rapidly, posing a safety hazard.
Design a steel sheet pile hoisting structure that uses a return spring, connecting plate, and traction rope in conjunction with a hook blocking rod to ensure that the hook blocking rod automatically resets after the hook is removed, preventing re-hooking; at the same time, upper and lower support protrusions are used to tilt the hook and prevent it from swinging.
This effectively prevents the hook from getting caught again during hoisting, prevents swinging, ensures safety, protects workers from injury, and reduces damage to steel sheet piles.
Smart Images

Figure CN223575951U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The application relates to the hoisting technology of steel sheet piles and particularly relates to a steel sheet pile hoisting structure for deep foundation pit construction. BACKGROUND
[0002] When the steel sheet pile is hoisted, a worker needs to install a hoisting hook at a rolled position on the side of the steel sheet pile. After the hoisting is completed, the hooks at the two ends of the steel sheet pile are sequentially removed. After the hooks are removed, the hooks are moved by a hoisting rope. However, since the end of the hook is outwardly bent and extended and the outside is not shielded, when the hoisting rope moves the hook, the end of the hook is freely hooked on the side of the steel sheet pile. After the rope and the hook are straightened, the hook slides off the steel sheet pile, which causes the hook to swing greatly and causes the worker to be injured, or the hook slides off the steel sheet pile after the steel sheet pile is lifted, which not only causes the hook to swing greatly but also causes the steel sheet pile to fall rapidly and be damaged.
[0003] Therefore, the inventor needs to design a new steel sheet pile hoisting structure to overcome the above problems. SUMMARY
[0004] The main purpose of the application is to provide a steel sheet pile hoisting structure for deep foundation pit construction to solve the problem that the steel sheet pile is easily slid off the hook in the related art.
[0005] In order to achieve the above purpose, the application provides a steel sheet pile hoisting structure for deep foundation pit construction, which comprises a steel sheet pile hoisting hook, a hook shielding rod is hinged on one side of the steel sheet pile hoisting hook, a reset spring is arranged in the steel sheet pile hoisting hook, a connecting plate is fixedly connected to one side of the reset spring, a traction rope is fixedly connected to one side of the connecting plate, the traction rope is fixedly connected with the hook shielding rod, upper support protrusions are fixedly connected to the two sides of the steel sheet pile hoisting hook, and lower support protrusions are fixedly connected to the two sides of the steel sheet pile hoisting hook.
[0006] Optionally, a limiting guide groove is formed in the side wall of the steel sheet pile hoisting hook, a giving hole is formed in the side wall of the steel sheet pile hoisting hook, the limiting guide groove is communicated with the giving hole, the reset spring and the connecting plate are located in the limiting guide groove, and the traction rope passes through the giving hole.
[0007] Optionally, a connecting shaft is fixedly connected to one side of the hook shielding rod, the connecting shaft is fixedly connected with the steel sheet pile hoisting hook, and the hook shielding rod is hinged with the steel sheet pile hoisting hook through the connecting shaft.
[0008] Optionally, a damping pad sleeve is sleeved outside the reset spring, a supporting pad sleeve is fixedly connected to one side of the damping pad sleeve, and the damping pad sleeve and the supporting pad sleeve are fixedly connected to the inner wall of the limiting guide groove.
[0009] Optionally, the steel sheet pile hoisting hook is fixedly connected with a guide inclined block on one side of the connecting shaft.
[0010] Compared with the prior art, the steel sheet pile hoisting structure for deep foundation pit construction has the beneficial effects that:
[0011] With the cooperation of the reset spring, the connecting plate and the traction rope, the hook shielding rod can be automatically turned over and reset to the outside of the steel sheet pile hoisting hook after the steel sheet pile hoisting hook is taken off from the steel sheet pile by the staff, so that the steel sheet pile hoisting hook is prevented from being hooked on the steel sheet pile or other workpieces in the site again when the hoisting equipment pulls the steel sheet pile hoisting hook, thereby avoiding the staff from being injured due to the large swing of the steel sheet pile hoisting hook caused by the falling of the steel sheet pile hoisting hook and the steel cable after being stretched straight, and the cooperation of the upper support protrusion and the lower support protrusion enables the steel sheet pile hoisting hook to be tilted to the rear side, so that the hook shielding rod is in a suspended state, and the turning over and resetting of the hook shielding rod are prevented from being hindered. BRIEF DESCRIPTION OF DRAWINGS
[0012] The accompanying drawings, which form a part of this application, are included to provide a further understanding of the application and are incorporated in and constitute a part of this application. The drawings illustrate embodiments of the present application and, together with the description, serve to explain the principles of the present application. In the drawings:
[0013] Figure 1 is a structural schematic view of the present application;
[0014] Figure 2 is Figure 1 is an enlarged view of part A in the figure;
[0015] Figure 3 is a back structure schematic view of the present application;
[0016] Figure 4 is a turning over state schematic view of the hook shielding rod in the present application.
[0017] In the figure: 1, steel sheet pile hoisting hook; 11, limiting guide groove; 12, give way through hole; 2, hook shielding rod; 21, connecting shaft; 3, reset spring; 31, connecting plate; 32, traction rope; 33, damping pad sleeve; 34, support pad sleeve; 4, upper support protrusion; 41, lower support protrusion; 5, guide inclined block. DETAILED DESCRIPTION
[0018] In order to make the personnel in the technical field better understand the scheme of the present application, the technical scheme in the embodiments of the present application will be clearly and completely described below in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, not all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative labor should belong to the scope of protection of the present application.
[0019] It should be noted that the terms "first", "second", and the like in the specification of the present application and the above-described drawings are used to distinguish similar objects, and do not necessarily indicate a specific order or a chronological sequence. It should be understood that the data thus used can be interchanged under appropriate circumstances, so that the embodiments of the present application described herein can be implemented. In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusion, for example, a process, method, system, product or device that includes a series of steps or units does not necessarily have to be limited to those steps or units clearly listed, but can include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0020] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0021] Also, in addition to indicating the orientation or positional relationship, the above-mentioned part of the terms can also be used to indicate other meanings, for example, the term "upper" can also be used to indicate a certain dependent relationship or connection relationship in some cases. For those of ordinary skill in the art, the specific meaning of these terms in the present application can be understood according to the specific circumstances.
[0022] In addition, the meaning of the term "a plurality of" should be two and more than two.
[0023] It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict. The present application will be described in detail below with reference to the drawings and in combination with the embodiments.
[0024] As Figures 1 to 4As shown, a steel sheet pile hoisting structure for deep foundation pit construction, comprising a steel sheet pile hoisting hook 1, one side of the steel sheet pile hoisting hook 1 is hinged with a hook shielding rod 2, the steel sheet pile hoisting hook 1 is provided with a reset spring 3, one side of the reset spring 3 is fixedly connected with a connecting plate 31, one side of the connecting plate 31 is fixedly connected with a traction rope 32, the traction rope 32 is fixedly connected with the hook shielding rod 2, both sides of the steel sheet pile hoisting hook 1 are fixedly connected with an upper supporting convex point 4, both sides of the steel sheet pile hoisting hook 1 are fixedly connected with a lower supporting convex point 41.
[0025] Specifically, before hoisting the steel sheet pile, the staff manually flips the hook shielding rod 2 and hooks it on the steel sheet pile, and the hook shielding rod 2 will pull the traction rope 32 during the flipping process, thereby pulling the connecting plate 31 to compress the reset spring 3 and shrink, after the steel sheet pile is hoisted, the staff removes the steel sheet pile hoisting hook 1 from the steel sheet pile, after the hook shielding rod 2 loses the limit, the reset spring 3 resets under the action of its own elastic force, with the cooperation of the reset spring 3, the connecting plate 31 and the traction rope 32, the hook shielding rod 2 can automatically flip and reset to block outside the steel sheet pile hoisting hook 1, to avoid the steel sheet pile hoisting hook 1 from being hooked on the steel sheet pile or other workpieces in the site again when the hoisting equipment lifts the steel sheet pile hoisting hook 1, thereby avoiding the steel sheet pile hoisting hook 1 and the steel cable from being suddenly dropped after being stretched straight, causing the steel sheet pile hoisting hook 1 to swing greatly and causing the staff to be injured, the upper supporting convex point 4 and the lower supporting convex point 41 are arranged at the part of the steel sheet pile hoisting hook 1 close to the hook shielding rod 2, the center of gravity of the steel sheet pile hoisting hook 1 is close to the rear side of the steel sheet pile hoisting hook 1, the cooperation of the upper supporting convex point 4 and the lower supporting convex point 41 enables the steel sheet pile hoisting hook 1 to fall to the rear side when placed on the ground, so that the hook shielding rod 2 is in a suspended state, to avoid the flipping and resetting of the hook shielding rod 2 being hindered.
[0026] The side wall of the steel sheet pile hoisting hook 1 is provided with a limiting guide groove 11, the side wall of the steel sheet pile hoisting hook 1 is provided with a yielding through hole 12, the limiting guide groove 11 and the yielding through hole 12 are communicated, the reset spring 3 and the connecting plate 31 are located in the limiting guide groove 11, and the traction rope 32 passes through the yielding through hole 12. Specifically, the limiting guide groove 11 can yield the reset spring 3 and the connecting plate 31, and the yielding through hole 12 can yield the traction rope 32.
[0027] One side of the hook shielding rod 2 is fixedly connected with a connecting shaft 21, the connecting shaft 21 is fixedly connected with the steel sheet pile hoisting hook 1, and the hook shielding rod 2 is hinged with the steel sheet pile hoisting hook 1 through the connecting shaft 21. Specifically, the connecting shaft 21 can realize the hinge connection of the hook shielding rod 2 and the steel sheet pile hoisting hook 1.
[0028] The reset spring 3 is sleeved outside the damping pad sleeve 33, one side of the damping pad sleeve 33 is fixedly connected with the supporting pad sleeve 34, and the damping pad sleeve 33 and the supporting pad sleeve 34 are both fixedly connected with the inner wall of the limiting guide groove 11. Specifically, after the hook shielding rod 2 is turned over and opened, the position of the connecting plate 31 corresponds to the damping pad sleeve 33, the connecting plate 31 is subjected to the elastic force of the reset spring 3 and the resistance between the connecting plate 31 and the damping pad sleeve 33, so as to reduce the working speed of the connecting plate 31, so that after the hook shielding rod 2 is turned over and opened by the worker, the steel sheet pile hoisting hook 1 is hooked on the steel sheet pile during the process of hoisting the steel sheet pile, it is not necessary to manually limit the hook shielding rod 2 all the time, the supporting pad sleeve 34 which is flush with the damping pad sleeve 33 can play the role of cushioning, so that there is no concave-convex difference in the movement range of the connecting plate 31, so that the connecting plate 31 can slide smoothly.
[0029] The steel sheet pile hoisting hook 1 is fixedly connected with the guide inclined block 5 on one side, and the guide inclined block 5 is located on one side of the connecting shaft 21. Specifically, by arranging the guide inclined block 5, the recess at the position of the connecting shaft 21 and the steel sheet pile hoisting hook 1 can be shielded, so as to avoid that the connecting shaft 21 is hooked on the steel sheet pile, and a gap is left between the guide inclined block 5 and the connecting shaft 21, so that the guide inclined block 5 does not hinder the rotation of the connecting shaft 21.
[0030] Working principle and use process: before hoisting the steel sheet pile, the worker manually turns over the hook shielding rod 2, then hooks the hook shielding rod 2 on the steel sheet pile, the hook shielding rod 2 will pull the traction rope 32 during the turning over process, so as to pull the connecting plate 31 to compress the reset spring 3, after the hoisting of the steel sheet pile is completed, the worker removes the steel sheet pile hoisting hook 1 from the steel sheet pile, after the hook shielding rod 2 loses the limiting, the reset spring 3 resets under the action of its own elastic force, the hook shielding rod 2 is automatically turned over and reset and intercepted outside the steel sheet pile hoisting hook 1 by means of the connecting plate 31 and the traction rope 32, so as to avoid that the steel sheet pile hoisting hook 1 is hooked on the steel sheet pile or the remaining workpieces in the site again when the hoisting equipment lifts the steel sheet pile hoisting hook 1, the upper supporting convex point 4 and the lower supporting convex point 41 cooperate to make the steel sheet pile hoisting hook 1 be able to fall backward when placed on the ground, so that the hook shielding rod 2 is in a suspended state, so as to avoid that the turning over and resetting of the hook shielding rod 2 is hindered.
[0031] The above only describes the preferred embodiments of the present application and is not used to limit the present application. For those skilled in the art, the present application can have various changes and modifications. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A steel sheet pile hoisting structure for deep foundation pit construction, comprising a steel sheet pile hoisting hook (1), characterized in that: The sheet pile hoisting hook (1) is hinged to one side with a hook cover rod (2). The sheet pile hoisting hook (1) is equipped with a return spring (3). A connecting plate (31) is fixedly connected to one side of the return spring (3). A traction rope (32) is fixedly connected to one side of the connecting plate (31). The traction rope (32) is fixedly connected to the hook cover rod (2). Upper support protrusions (4) are fixedly connected to both sides of the sheet pile hoisting hook (1). Lower support protrusions (41) are fixedly connected to both sides of the sheet pile hoisting hook (1).
2. The steel sheet pile hoisting structure for deep foundation pit construction according to claim 1, characterized in that: The sheet pile hoisting hook (1) has a limiting guide groove (11) on its side wall and a clearance through hole (12) on its side wall. The limiting guide groove (11) and the clearance through hole (12) are connected. The reset spring (3) and the connecting plate (31) are located in the limiting guide groove (11) and the traction rope (32) passes through the clearance through hole (12).
3. The steel sheet pile hoisting structure for deep foundation pit construction according to claim 1, characterized in that: A connecting shaft (21) is fixedly connected to one side of the hook blocking rod (2). The connecting shaft (21) is fixedly connected to the sheet pile hoisting hook (1). The hook blocking rod (2) is hinged to the sheet pile hoisting hook (1) through the connecting shaft (21).
4. A steel sheet pile hoisting structure for deep foundation pit construction according to claim 2, characterized in that: The reset spring (3) is fitted with a damping pad (33) on its outer side. A support pad (34) is fixedly connected to one side of the damping pad (33). Both the damping pad (33) and the support pad (34) are fixedly connected to the inner wall of the limiting guide groove (11).
5. A steel sheet pile hoisting structure for deep foundation pit construction according to claim 3, characterized in that: A guide block (5) is fixedly connected to one side of the steel sheet pile hoisting hook (1), and the guide block (5) is located on one side of the connecting shaft (21).