Pile foundation concrete pouring construction hopper
By introducing an adjustment platform and flow controller into the concrete hopper for pile foundations, the problems of hopper height and flow rate adjustment were solved, improving the quality and stability of pouring, reducing reliance on manual labor, and ensuring the sealing and precise control of the pouring process.
Patent Information
- Application Number
- CN202423243455.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-27
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2034-12-27
AI Technical Summary
The existing concrete pouring hoppers for pile foundations cannot adjust the height and flow rate, have poor sealing performance, which affects the pouring quality, and lack stability, making the discharge port prone to collisions and requiring manual operation.
A hopper comprising an adjustment platform and a flow controller was designed. The height is adjusted by adjusting the column, the flow rate is adjusted by the flow controller, and the stability and precise control of the pouring process are ensured by a sealed guide pipe.
It enables adjustment of the height of the feed pipe and precise control of the flow rate, ensuring the sealing of the pouring process, preventing the formation of air bubbles, and improving the pouring quality and construction efficiency.
Smart Images

Figure CN223577114U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to concrete hopper technical field especially relates to a pile foundation concrete perfusion construction hopper. BACKGROUND
[0002] With the increasing of modern buildings, the amount of required reinforced concrete is also increasing, and the concrete hopper is a container for mixing, storing and transporting concrete, which is one of the indispensable tools in the construction industry. They help to improve construction efficiency and quality, while ensuring the neatness and safety of the construction site, and they play an important role in construction. When perfusing concrete for pile foundation, most of the existing hoppers cannot adjust the height and flow rate, and a few with control valves cannot accurately control the flow rate, and the degree of dependence on artificial is high, and the valve sealing is poor, and the pouring amount cannot be accurately recorded. And the existing hopper is mostly supported by four columns, which lacks stability and is easy to collide with the casing during pouring, thereby affecting the quality of the final pouring. SUMMARY
[0003] The utility model discloses a pile foundation concrete perfusion construction hopper, which solves the problem of slight misalignment of the upper and lower mold bases after long-term use, and the positioning column cannot be accurately inserted into the positioning slot during mold closing, which makes the upper and lower mold bases cannot be closed, cannot assist positioning and hinder mold closing, and the utility model is not reliable in use.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical scheme:
[0005] A pile foundation concrete perfusion construction hopper, comprising an adjusting platform, the adjusting platform is adjusted in height by adjusting columns arranged on four corners thereof, a hopper is arranged on the upper end face of the adjusting platform, and a material guide pipe is arranged on the lower end face.
[0006] In some embodiments, the upper end face of the adjusting platform is provided with a hopper stabilizing groove in the center, and the hopper is placed in the hopper stabilizing groove.
[0007] In some embodiments, the adjusting column comprises a bottom plate, the bottom plate is provided with an adjusting bolt, and the adjusting bolt penetrates through the adjusting platform.
[0008] In some embodiments, the outer wall of the hopper is provided with two pairs of oppositely arranged lifting rings.
[0009] In some embodiments, the flow controller comprises a connecting block, a side of the connecting block is provided with a screw rod motor, the screw rod motor is connected with a fixed block through a screw rod, an upper end surface of the connecting block is provided with a flow control plate, the flow control plate extends towards the fixed block, the fixed block is fixed on an outer wall of the material guide pipe, and the adjusting platform is provided with a through groove matched with the flow control plate.
[0010] In some embodiments, an end of the flow control plate away from the connecting block is a bevel cut.
[0011] Compared with the prior art, the flow controller has the following beneficial effects:
[0012] In the process of pouring concrete, the height of the material guide pipe can be adjusted through the height adjusting column, and the discharging speed can be adjusted through the flow controller, in addition, the sealing property between the material guide pipe and the pile foundation pouring opening (the passage between the material guide pipe and the hopper is closed after the flow control plate is closed) is maintained, air entering during pouring is prevented, bubbles are not formed in the concrete, and the pouring quality is ensured. BRIEF DESCRIPTION OF DRAWINGS
[0013] Fig. 1 It is a whole structure schematic view of the utility model;
[0014] Fig. 2 It is a side view schematic view of the utility model;
[0015] Fig. 3 It is a structure schematic view of the flow controller of the utility model.
[0016] In the drawings:
[0017] 1, hopper, 2, lifting ring, 3, adjusting platform, 4, height adjusting column, 5, flow controller, 6, material guide pipe, 31, hopper stabilizing groove, 41, height adjusting bolt, 42, bottom plate, 51, flow control plate, 52, screw rod motor, 53, connecting block, 54, screw rod, 55, fixed block, 58, bevel cut. DETAILED DESCRIPTION
[0018] The technical scheme in the embodiments of the utility model will be described clearly and completely in combination with the drawings in the embodiments of the utility model, and obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments; based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0019] Please refer to Figs. 1-3The utility model provides a kind of pile foundation concrete pouring construction hopper, including adjusting platform 3, the upper end face central of the adjusting platform 3 is equipped with hopper stable groove 31, for placing hopper 1.The height of the hopper stable groove 31 is slightly higher than adjusting platform 3, and is equipped with the slope matching with hopper outlet, so that hopper is placed in hopper stable groove 31 more stable.
[0020] The adjusting platform 3 is provided with height-adjusting column 4 on four corners, for adjusting the height of adjusting platform 3, the height-adjusting column 4 includes bottom plate 42, for supporting ground, can maintain the stability of the whole device, the bottom plate 42 is equipped with height-adjusting bolt 41, the lower end of the height-adjusting bolt 41 is rotationally connected with bottom plate 42, and the upper end penetrates adjusting platform 3, and the adjusting platform 3 is equipped with screw thread matching with height-adjusting bolt 41.In use, the purpose of adjusting platform 3 lifting can be realized by rotating height-adjusting bolt 41.
[0021] The upper end inlet of the hopper 1 is cylindrical, and the lower end outlet is frustum-shaped, two pairs of lifting rings 2 are fixed on the outer wall of the hopper 1, each pair of lifting rings 2 is oppositely arranged, and each lifting ring is located in four directions of the outer periphery of the hopper, so that the hopper 1 is hoisted conveniently.
[0022] The lower end of the adjusting platform 3 is fixed with guide pipe 6, and is located directly below the outlet of the hopper 1, and the concrete of the hopper 1 is discharged through the guide pipe 6.
[0023] The flow controller 5 includes connecting block 53, the side surface of the connecting block 53 is fixedly installed with lead screw motor 52, the lead screw motor 52 is connected with fixed block 55 through lead screw 54, the upper end surface of the connecting block 53 is fixedly installed with flow control plate 51, the flow control plate 51 extends to the fixed block 55 direction, and the fixed block 55 is fixed on the outer wall of the guide pipe 6.The lead screw 54 penetrates the fixed block 55 and extends into the guide pipe 6, and the adjusting platform 3 is provided with through slot matching with the flow control plate 51, the flow control plate 51 penetrates the through slot and can move back and forth in the through slot, the flow control plate 51 closes the guide pipe 6 from the upper opening of the guide pipe 6, so as to realize the flow of concrete flowing into the guide pipe 6.
[0024] The flow control plate 51 is beveled at one end away from the connecting block 53. When the two flow control plates 51 of the flow controller 5 are closed, the beveled cut 58 can achieve seamless and labor-saving docking. The connecting block 53 is provided with a controller, which is a servo stepping motor controller (prior art) for controlling the lead screw motor 52. By controlling the forward and reverse rotation of the lead screw motor 52, the connecting block 53 is driven to approach or move away from the guide pipe 6, thereby realizing the opening and closing of the two flow control plates 51. When the two flow control plates 51 are closed, the two flow control plates 51 are located above the guide pipe 6 and can close the opening of the guide pipe 6, thereby controlling the flow rate of the concrete and achieving the purpose of controlling the pouring flow rate.
Claims
1. A hopper for concrete pouring in pile foundations, characterized in that, It includes an adjustment platform (3), the height of which is adjusted by height adjustment columns (4) set at its four corners. The upper end of the adjustment platform (3) is provided with a hopper (1) and the lower end is provided with a guide pipe (6). A pair of flow controllers (5) are provided on the guide pipe (6).
2. The hopper for pile foundation concrete pouring construction according to claim 1, characterized in that, The upper surface of the adjustment platform (3) is provided with a hopper stabilizing groove (31) in the center, and the hopper (1) is placed in the hopper stabilizing groove (31).
3. The hopper for pile foundation concrete pouring construction according to claim 1, characterized in that, The height adjustment column (4) includes a base plate (42), on which a height adjustment bolt (41) is provided, and the height adjustment bolt (41) passes through the adjustment platform (3).
4. The hopper for concrete pouring in pile foundations according to claim 1, characterized in that, The outer wall of the hopper (1) is provided with two pairs of oppositely arranged lifting rings (2).
5. The hopper for pile foundation concrete pouring construction according to claim 1, characterized in that, The flow controller (5) includes a connecting block (53), and a lead screw motor (52) is provided on the side of the connecting block (53). The lead screw motor (52) is connected to a fixed block (55) through a lead screw (54). A flow control plate (51) is provided on the upper end face of the connecting block (53). The flow control plate (51) extends toward the fixed block (55). The fixed block (55) is fixed on the outer wall of the guide pipe (6). A through groove matching the flow control plate (51) is provided on the adjustment platform (3).
6. The hopper for pile foundation concrete pouring construction according to claim 5, characterized in that, The end of the flow control plate (51) away from the connecting block (53) has a beveled cut (58).