Pipeline support for air conditioner engineering installation

By employing an upper and lower sliding groove design in the pipe support for air conditioning engineering installation, combined with a magnet and spring structure, the air conditioning pipes can be quickly fixed, solving the problem of cumbersome installation in existing technologies and improving installation efficiency and structural stability.

CN223579140UActive Publication Date: 2025-11-21GUANGDONG SANHAO ENG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520116455.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2025-11-21
Estimated Expiration
2035-01-17

AI Technical Summary

Technical Problem

The existing methods for installing pipe supports in air conditioning projects are cumbersome, especially when central air conditioning connects multiple rooms, requiring the operation of multiple bolts, resulting in a large workload and high time and labor costs for workers.

Method used

The bracket body features an upper and lower sliding groove design. Through the sliding connection of the upper and lower clamping plates, combined with a magnet and spring structure, the air conditioning pipe can be quickly fixed, reducing the possibility of it falling off.

Benefits of technology

It simplifies the installation process, improves installation efficiency, reduces operation time and workload, and enhances the stability and service life of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223579140U_ABST
    Figure CN223579140U_ABST
Patent Text Reader

Abstract

The utility model discloses a pipeline support for air conditioner engineering installation, which relates to the field of air conditioner engineering and comprises a support body, an upper sliding groove is arranged on the upper portion inside the support body, an upper clamping plate is connected inside the upper sliding groove through an upper sliding block, a spring is connected to the top of the upper sliding block, and a lower sliding groove is arranged on the lower portion inside the support body. Through the arrangement of the upper clamping plate, the lower clamping plate, the spring and the lower sliding groove, the air conditioner pipe is pushed upwards to jack up the upper clamping plate, then the lower clamping plate is arranged below the support body and moves along the n-shaped lower sliding groove, the lower clamping plate is connected with the support body and supported by the support body, and then the air conditioner pipe only needs to be put down. Finally, the spring is matched with gravity to enable the upper clamping plate to move downwards to abut against the lower clamping plate, the lower clamping plate is pressed through elasticity of the spring and the weight of the upper clamping plate and the air conditioner pipe, and the lower clamping plate is prevented from falling off after moving upwards; and the operation is simple, convenient and fast.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to air conditioning engineering field, concretely is a pipeline support for air conditioning engineering installation. BACKGROUND

[0002] Air conditioner is air conditioner, is by refrigeration, heating cycle system, air circulation ventilation system, electrical control system etc. Compose, make the air of the space that adjusts to keep certain temperature, humidity, flow velocity, cleanness and freshness, air conditioner mainly divides into wall -hanging air conditioner, stand -type air conditioner, central air conditioning etc. Central air conditioning is mainly used for multiple rooms simultaneously refrigeration or heating, so air conditioner will have multiple pipelines enter the room and refrigerate or heat multiple rooms simultaneously, for the convenience of stabilizing support to multiple pipelines, needs to use pipeline support for air conditioning engineering installation at this moment.

[0003] The existing pipeline support for air conditioning engineering installation usually supports the air conditioner pipeline through the way of support plus hoop, needs to fix the support through the expansion bolt, then connects the air conditioner pipeline and the support through the hoop to complete the installation, such installation method is more complicated, since the central air conditioner connects more rooms, leads to the quantity of pipeline is more and long, thus needs the quantity of support to increase linearly, leads to the worker to operate multiple bolts through the wrench, and the operation is time -consuming and labor -intensive. UTILITY MODEL CONTENTS

[0004] Therefore, the utility model aims at providing a pipeline support for air conditioning engineering installation to solve the technical problems mentioned in the background.

[0005] To achieve the above -mentioned purpose, the utility model provides the following technical scheme: a pipeline support for air conditioning engineering installation, including support main part, the upper portion of support main part inside is equipped with upper sliding slot, and the upper sliding slot is internally connected with upper clamping plate through upper sliding block, the top of upper sliding block is connected with spring, the lower portion of support main part inside is equipped with lower sliding slot, and the lower sliding slot is internally connected with lower clamping plate through lower sliding block, the inside of lower clamping plate and upper clamping plate is equipped with magnet.

[0006] Through the above technical scheme, after the bracket body is installed, the worker pushes the air conditioner pipe upward to make the air conditioner pipe lift the upper clamping plate, then places the lower clamping plate below the bracket body and moves along the n-shaped lower sliding groove, so that the lower clamping plate is connected with the bracket body and supported by the bracket body, then only needs to put down the air conditioner pipe, finally makes the upper clamping plate move downward to abut against the lower clamping plate through the spring and gravity, during which the structural strength between the upper clamping plate and the lower clamping plate is increased through the setting of the magnet, so that the possibility of air conditioner pipe falling off is reduced, then the lower clamping plate is pressed by the elasticity of the spring and the weight of the upper clamping plate and the air conditioner pipe, so as to avoid the lower clamping plate from moving upward and then translating to fall off, at this time, the air conditioner pipe is limited in the upward, downward, leftward and rightward directions and cannot fall off, so that the installation work is completed, and the installation methods of the other two upper clamping plates and lower clamping plates are the same.

[0007] Further, the lower sliding groove is in the shape of "n", and the lower sliding block is in sliding connection with the lower sliding groove.

[0008] Through the above technical scheme, after the bracket body is installed, the worker pushes the air conditioner pipe upward to make the air conditioner pipe lift the upper clamping plate, then places the lower clamping plate below the bracket body and moves along the n-shaped lower sliding groove, so that the lower clamping plate is connected with the bracket body and supported by the bracket body.

[0009] Further, the lower clamping plate is in abutment with the upper clamping plate, and the upper clamping plate is in sliding connection with the upper sliding groove through the upper sliding block.

[0010] Through the above technical scheme, the air conditioner pipe is pushed upward to abut against the upper clamping plate, the upper clamping plate moves upward to leave space, the lower clamping plate is placed, then the air conditioner pipe is put down, finally the upper clamping plate moves downward to abut against the lower clamping plate through the spring and gravity, at this time, the lower clamping plate is pressed by the elasticity of the spring and the weight of the upper clamping plate and the air conditioner pipe, so as to avoid the lower clamping plate from moving upward and then translating to fall off.

[0011] Further, the bracket body, the upper clamping plate and the lower clamping plate are all made of aluminum alloy material, and the spring is made of stainless steel material.

[0012] Through the above technical scheme, the bracket body, the upper clamping plate and the lower clamping plate made of aluminum alloy material, and the spring made of stainless steel material all have good corrosion resistance, so as to prolong the service life of the structure.

[0013] Further, the upper clamping plate is in the shape of "n", and the lower clamping plate is in the shape of "u".

[0014] Through the above technical scheme, the air conditioner pipe can be clamped and limited after the shape cooperation of the upper clamping plate and the lower clamping plate, so as to avoid the phenomenon of air conditioner pipe falling off and translating.

[0015] Further, the upper clamping plates and the lower clamping plates are provided with three, and the upper sliding blocks, the upper sliding grooves, the springs, the lower sliding blocks, the lower sliding grooves and the magnets are provided with three groups.

[0016] By adopting the above technical scheme, by providing three upper clamping plates and three lower clamping plates, a single support body can simultaneously limit three air conditioner pipes, thereby improving the utilization rate and reducing the work of installing the support body.

[0017] Further, the upper clamping plate bottoms and the lower clamping plate tops are connected with buffer pads, and the buffer pads are semicircular rings.

[0018] By adopting the above technical scheme, the friction between the air conditioner pipe and the upper clamping plate and the lower clamping plate is increased, the air conditioner pipe is prevented from displacement, and the buffer pad can protect the air conditioner pipe and the support body.

[0019] Further, the buffer pad is made of silica gel material.

[0020] By adopting the above technical scheme, the silica gel material is soft, can effectively buffer and prevent slipping, and can prevent the air conditioner pipe from displacement and protect the air conditioner pipe and the support body.

[0021] Further, the upper clamping plate and the lower clamping plate are provided with an air conditioner pipe, and the air conditioner pipe is provided with three.

[0022] By adopting the above technical scheme, after the support body is installed, the worker pushes the air conditioner pipe upwards to make the air conditioner pipe lift the upper clamping plate, so as to facilitate installation operation.

[0023] Further, the support body is connected with a mounting plate.

[0024] By adopting the above technical scheme, if the ceiling is suitable for installing the support body, the mounting plate can be fixed to the pipeline support on the top of the support body, so that the support body is fixed below the ceiling, and if the height of the ceiling is high, the number of pipeline of the ceiling is large or the like, the mounting plate can be fixed to the pipeline support on the side of the support body, so that the air conditioner pipe is supported by a wall-mounted installation method.

[0025] In summary, the utility model mainly has the following beneficial effects:

[0026] 1. The utility model discloses a through the setting of upper clamping plate, lower clamping plate, spring and lower sliding slot, pushes the air conditioner pipe upward and makes the air conditioner pipe lift the upper clamping plate, then places the lower clamping plate below the support main body, and moves along the lower sliding slot of n shape, makes the lower clamping plate connect with the support main body and is supported by the support main body, then only needs to put down the air conditioner pipe, finally through the spring cooperation gravity makes the upper clamping plate move down and stop the lower clamping plate, when through the elasticity of spring and the weight of upper clamping plate and air conditioner pipe press the lower clamping plate, avoid the lower clamping plate to move up and appear to fall again, when the air conditioner pipe is all limited in the up and down and left and right directions and cannot fall off, thereby completes the installation work, simple operation is convenient and fast;

[0027] 2. The utility model discloses a through the setting of magnet, through the setting of magnet increases the structural strength between upper clamping plate and lower clamping plate, can reduce the possibility of air conditioner pipe falling off to occur, increase structural strength;

[0028] 3. The utility model discloses a through the setting of upper clamping plate and lower clamping plate, through setting three upper clamping plates and lower clamping plates, make a single support main body can simultaneously to three air conditioner pipes make limit, thereby improve utilization, reduce the work of installing support main body, further reduce the work intensity of installation. ACCURACY OF DRAWINGS

[0029] Figure 1 It is structural schematic diagram of the utility model embodiment one;

[0030] Figure 2 It is back structure schematic diagram of the utility model embodiment one;

[0031] Figure 3 It is structural schematic diagram of the utility model embodiment two;

[0032] Figure 4 It is support section structure schematic diagram of the utility model;

[0033] Figure 5 It is support explosion structure schematic diagram of the utility model.

[0034] In the drawing: 1, support main body;2, air conditioner pipe;3, mounting plate;4, upper clamping plate;5, lower clamping plate;6, upper sliding block;7, upper sliding slot;8, spring;9, lower sliding block;10, lower sliding slot;11, magnet;12, buffer pad. DETAILED DESCRIPTION

[0035] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings of the embodiments of the utility model. The embodiments described below with reference to the drawings are exemplary and are only used to explain the utility model, and cannot be understood as limiting the utility model.

[0036] The overall structure of the utility model will be described below, and its embodiments will be explained. Embodiment one

[0037] A pipeline support for air conditioning engineering installation, as shown in Figures 1-5 The upper slide groove 7 is internally connected with the upper clamping plate 4 through the upper sliding block 6, the upper clamping plate 4 is in the shape of "n", the upper clamping plate 4 is slidably connected with the upper slide groove 7 through the upper sliding block 6, the top of the upper sliding block 6 is connected with the spring 8, the spring 8 is made of stainless steel material, the lower part of the inside of the support body 1 is provided with the lower slide groove 10, the lower slide groove 10 is in the shape of "n", the lower slide groove 10 is internally connected with the lower clamping plate 5 through the lower sliding block 9, the lower clamping plate 5 is in the shape of "u", the lower sliding block 9 is slidably connected with the lower slide groove 10, the lower clamping plate 5 abuts against the upper clamping plate 4, the support body 1, the upper clamping plate 4 and the lower clamping plate 5 are all made of aluminum alloy material, the inside of the lower clamping plate 5 and the upper clamping plate 4 is both installed with the magnet 11, the upper clamping plate 4 and the lower clamping plate 5 are both provided with three, the upper sliding block 6, the upper slide groove 7, the spring 8, the lower sliding block 9, the lower slide groove 10 and the magnet 11 are all provided with three groups, after the installation of the support body 1, the staff pushes the air conditioner pipe 2 upwards to make the air conditioner pipe 2 lift up the upper clamping plate 4, then the lower clamping plate 5 is placed below the support body 1 and moves along the lower slide groove 10 in the shape of "n" to make the lower clamping plate 5 connected with the support body 1 and supported by the support body 1, then the air conditioner pipe 2 is simply put down, finally the upper clamping plate 4 is moved downwards to abut against the lower clamping plate 5 through the spring 8 and gravity, the structural strength between the upper clamping plate 4 and the lower clamping plate 5 is increased through the setting of the magnet 11 to reduce the possibility of the air conditioner pipe 2 falling off, then the lower clamping plate 5 is pressed down by the elasticity of the spring 8 and the weight of the upper clamping plate 4 and the air conditioner pipe 2 to avoid the falling off of the lower clamping plate 5 due to the upward movement and translation, at this time the air conditioner pipe 2 is limited in the up-down and left-right directions and cannot fall off, thereby the installation work is completed, and the installation method of the other two upper clamping plates 4 and lower clamping plates 5 is the same.

[0038] Referring to Figure 1 and Figure 3 In the above embodiment, the air conditioner pipe 2 is arranged between the upper clamping plate 4 and the lower clamping plate 5, and three air conditioner pipes 2 are arranged to facilitate the medium conveying of the central air conditioning unit. Embodiment two

[0039] On the basis of the above embodiment one, in order to increase the flexibility of installation and adapt to different scenes, the following settings are made.

[0040] Referring to Figures 1-3In the above embodiment, the top or one side of the bracket body 1 is connected with the mounting plate 3, if the ceiling is suitable for installing the bracket body 1, the mounting plate 3 can be fixed to the pipeline support at the top of the bracket body 1, so that the bracket body 1 is fixed below the ceiling, if the height of the ceiling is high, the number of pipeline of the ceiling is large and the like, the bracket body 1 is not suitable to be installed on the ceiling, the mounting plate 3 can be fixed to the pipeline support at the side of the bracket body 1, so that the air conditioner pipe 2 is supported by the wall-mounted installation method. Embodiment three:

[0041] On the basis of the above embodiment one, in order to increase stability and safety, the following settings are made.

[0042] Referring to Figure 2 , Figure 4 and Figure 5 , in the above embodiment, the bottom of the upper clamping plate 4 and the top of the lower clamping plate 5 are connected with the buffer pad 12, the buffer pad 12 is in the shape of a semicircular ring, the buffer pad 12 is made of silica gel material, one is to increase the friction between the air conditioner pipe 2 and the upper clamping plate 4 and the lower clamping plate 5, so as to avoid displacement of the air conditioner pipe 2, the other is to play a buffering role, so as to protect the air conditioner pipe 2 and the bracket body 1.

[0043] The implementation principle of the utility model is as follows: first, the staff passes the expansion bolt through the mounting plate 3, so as to fix the bracket body 1 in the room, if the ceiling is suitable for installing the bracket body 1, the mounting plate 3 can be fixed to the pipeline support at the top of the bracket body 1, so that the bracket body 1 is fixed below the ceiling, as shown in Figure 1 and Figure 2 , if the height of the ceiling is high, the number of pipeline of the ceiling is large and the like, the bracket body 1 is not suitable to be installed on the ceiling, the mounting plate 3 can be fixed to the pipeline support at the side of the bracket body 1, so that the air conditioner pipe 2 is supported by the wall-mounted installation method, as shown in Figure 3 ;

[0044] After the bracket body 1 is installed, the staff pushes the air conditioner pipe 2 upward, so that the air conditioner pipe 2 lifts up the upper clamping plate 4, then places the lower clamping plate 5 under the bracket body 1 and moves along the n-shaped lower sliding groove 10, so that the lower clamping plate 5 is connected with the bracket body 1 and is supported by the bracket body 1, then only needs to put down the air conditioner pipe 2, finally through the spring 8 cooperating with gravity, the upper clamping plate 4 moves downward and abuts against the lower clamping plate 5, during which the structure strength between the upper clamping plate 4 and the lower clamping plate 5 is increased through the setting of the magnet 11, which can reduce the possibility of the air conditioner pipe 2 falling off, then the spring 8 is elastically compressed and the upper clamping plate 4 and the air conditioner pipe 2 press the lower clamping plate 5, avoiding the lower clamping plate 5 moving upward and then translating and falling off, at this time the air conditioner pipe 2 is limited in the up-down and left-right directions and cannot fall off, so that the installation work is completed, the other two upper clamping plates 4 and lower clamping plates 5 install the air conditioner pipe 2 in the same way, and through the setting of the buffer pad 12, one is to increase the friction between the air conditioner pipe 2 and the upper clamping plate 4 and the lower clamping plate 5, avoiding the displacement of the air conditioner pipe 2, the other is to play a buffering role, protecting the air conditioner pipe 2 and the bracket body 1.

[0045] Although the embodiments of the present application have been shown and described, the specific embodiments are only an explanation of the present application, and are not a limitation of the present application, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable way, and the person skilled in the art can make modifications, replacements and variations of the embodiments without creative contribution after reading the specification, but as long as it is within the scope of the claims of the present application, it is protected by the patent law.

Claims

1. A pipe support for air conditioning engineering installation, comprising a support body (1), characterized in that: The upper slide groove (7) is arranged in the upper portion of the bracket body (1), the upper clamp plate (4) is connected to the upper slide groove (7) through the upper slide block (6), the spring (8) is connected to the top of the upper slide block (6), the lower slide groove (10) is arranged in the lower portion of the bracket body (1), the lower clamp plate (5) is connected to the lower slide groove (10) through the lower slide block (9), and the magnets (11) are arranged in the upper clamp plate (4) and the lower clamp plate (5).

2. The duct support for air conditioning work installation according to claim 1, characterized in that: The lower slide groove (10) is in the shape of "n", and the lower slide block (9) is slidably connected to the lower slide groove (10).

3. The duct support for air conditioning work installation according to claim 1, characterized in that: The lower clamp plate (5) is abutted with the upper clamp plate (4), and the upper clamp plate (4) is slidably connected to the upper slide groove (7) through the upper slide block (6).

4. The duct support for air conditioning work installation according to claim 3, characterized in that: The bracket body (1), the upper clamp plate (4) and the lower clamp plate (5) are made of aluminum alloy material, and the spring (8) is made of stainless steel material.

5. The duct support for air conditioning work installation according to claim 4, characterized in that: The upper clamp plate (4) is in the shape of "n", and the lower clamp plate (5) is in the shape of "u".

6. The duct support for air conditioning work installation according to claim 5, characterized in that: The upper clamp plate (4) and the lower clamp plate (5) are provided with three, and the upper slide block (6), the upper slide groove (7), the spring (8), the lower slide block (9), the lower slide groove (10) and the magnet (11) are provided with three groups.

7. The duct support for air conditioning work installation according to claim 1, characterized in that: The upper clamp plate (4) and the lower clamp plate (5) are provided with three, and the upper slide block (6), the upper slide groove (7), the spring (8), the lower slide block (9), the lower slide groove (10) and the magnet (11) are provided with three groups.

8. The duct support for air conditioning work installation according to claim 7, characterized in that: The upper clamp plate (4) and the lower clamp plate (5) are provided with three, and the upper slide block (6), the upper slide groove (7), the spring (8), the lower slide block (9), the lower slide groove (10) and the magnet (11) are provided with three groups.

9. The duct support for air conditioning work installation according to claim 1, characterized in that: The upper clamp plate (4) and the lower clamp plate (5) are provided with three, and the upper slide block (6), the upper slide groove (7), the spring (8), the lower slide block (9), the lower slide groove (10) and the magnet (11) are provided with three groups.

10. The duct support for air conditioning work installation according to claim 9, characterized in that: The mounting plate (3) is connected to the bracket body (1).