Pipeline laying structure passing through expressway
By designing a base, fixing components, and support components in combination, the problem of inconvenient installation of pipelines under highways was solved, enabling convenient installation and fixation, improving installation efficiency, and reducing safety risks.
Patent Information
- Application Number
- CN202520327965.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-27
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2035-02-27
AI Technical Summary
In existing technologies, pipeline laying structures that cross highways require workers to enter under the highway to install pipe clamps, which is inconvenient.
The structure includes a base, fixing components, mounting components, and support components. Through the cooperation of components such as slide rails, plugs, support plates, and hinges, the pipes can be conveniently installed and fixed, avoiding the need for workers to enter under the highway for installation.
This enables convenient installation and fixation of pipelines under highways, improving installation efficiency and reducing safety risks.
Smart Images

Figure CN223579164U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to pipeline laying structure technical field especially, relates to a pipeline laying structure crossing expressway. BACKGROUND
[0002] Gas transmission pipeline is the main component of gas transportation, and the laying of gas transmission pipeline needs to pass through various complex terrains. The laying of the traditional gas transmission pipeline is carried out in the mode of excavation, that is, the ground is dug, then the gas transmission pipeline is placed in the dug pit, and finally buried. This mode is suitable for general terrain, and is not suitable for the laying of the pipeline crossing under the expressway.
[0003] The existing announcement No. CN213629249U discloses a pipeline laying structure crossing expressway, which comprises a sleeve pipe located below the expressway, an insulating support structure arranged below the gas transmission pipe, an operation pit and a receiving pit arranged at both ends of the sleeve pipe, the operation pit and the receiving pit being respectively located on both sides of the expressway, water accumulation pits being respectively arranged at the bottom of the operation pit and the receiving pit, open ditches being arranged around the top of the operation pit and the receiving pit, the insulating support structure comprising an insulating mounting seat, the bottom surface of the mounting seat being a circular arc surface, the gas transmission pipe being placed on the mounting seat, a pipe clamp being arranged outside the gas transmission pipe, the pipe clamp being fixedly connected with the mounting seat at both ends, and an insulating pad being arranged between the pipe clamp and the gas transmission pipe. The pipeline laying structure crossing expressway realizes the laying of the gas transmission pipeline without damaging the expressway, has the advantage of small influence on the expressway, and has good insulation between the gas transmission pipeline and the sleeve pipe.
[0004] However, the pipeline laying structure crossing expressway needs the staff to enter the below of the expressway to install the pipe clamp, which is inconvenient to install. UTILITY MODEL CONTENTS
[0005] The utility model aims at providing a pipeline laying structure crossing expressway, which solves the problem that the pipeline laying structure crossing expressway needs the staff to enter the below of the expressway to install the pipe clamp, which is inconvenient to install.
[0006] The utility model provides a pipeline laying structure crossing expressway, including base, fixed assembly, installation component and support component, the fixed assembly includes slide rail, insert block, support plate and hinge, the number of slide rail is two, two slide rail is fixedly connected with base respectively, and is located the top of base respectively, the number of insert block is a plurality, a plurality of insert block is slidably connected with slide rail respectively, and is located the inside of slide rail respectively, the number of support plate is a plurality, a plurality of support plate is fixedly connected with insert block respectively, and is located between insert block respectively, the number of hinge is a plurality, a plurality of hinge is connected with support plate respectively, installation component is connected with support plate, support component is connected with base.
[0007] Among them, the fixed assembly further includes fixed bolt and limit block, the number of fixed bolt is a plurality, a plurality of fixed bolt is screwly connected with base respectively, and passes through slide rail respectively, limit block is fixedly connected with slide rail, and is located the middle of slide rail.
[0008] Among them, the fixed assembly further includes fixed frame and positioning bolt, the number of fixed frame is a plurality, a plurality of fixed frame is detachably connected with support plate respectively, and is located the top of support plate respectively, the number of positioning bolt is a plurality, a plurality of positioning bolt is screwly connected with support plate respectively, and passes through support plate and fixed frame respectively.
[0009] Among them, the installation component includes clamping spring and support seat, the number of clamping spring is a plurality, a plurality of clamping spring is fixedly connected with support plate respectively, and is located the top of support plate respectively, the number of support seat is a plurality, a plurality of support seat is fixedly connected with clamping spring respectively, and is located the top of clamping spring respectively.
[0010] Among them, the support component includes support column, roof and reinforcing rod, the number of support column is a plurality, a plurality of support column is fixedly connected with base respectively, and is located the top of base respectively, roof is fixedly connected with support column, and is located the top of support column, the number of reinforcing rod is a plurality, a plurality of reinforcing rod is fixedly connected with support column respectively, and passes through support column respectively.
[0011] The pipeline laying structure crossing the expressway has the advantages that the base provides supporting action, the slide rail provides limiting action for the inserting block and the supporting plate, the supporting plate provides supporting action for the fixing assembly, the hinge provides rotating action for the supporting plate, when in use, after drilling a hole below the expressway, the base, the supporting assembly and the slide rail are synchronously put into the hole, then the pipeline is placed on the top of the supporting seat, the fixing frame is fixed on the top of the supporting plate through the positioning bolt, then the supporting plate is inserted into the base along the inserting block and the slide rail, the pipeline is conveniently installed and fixed, and the problem of inconvenient installation of the pipeline laying structure crossing the expressway is solved. BRIEF DESCRIPTION OF DRAWINGS
[0012] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings needed to be used in the embodiments or the prior art description will be briefly introduced.
[0013] Fig. 1 is the overall structure schematic view of the pipeline laying structure crossing the expressway of the first embodiment of the utility model.
[0014] Fig. 2 is the structure schematic view of the base and the fixing assembly of the first embodiment of the utility model.
[0015] Fig. 3 is the structure schematic view of the fixing assembly and the installation assembly of the first embodiment of the utility model.
[0016] In the drawing: 101-base, 102-slide rail, 103-inserting block, 104-supporting plate, 105-hinge, 106-fixing bolt, 107-limiting block, 108-fixing frame, 109-positioning bolt, 110-clamping spring, 111-supporting seat, 112-supporting column, 113-roof protection, 114-reinforcing rod. DETAILED DESCRIPTION
[0017] The embodiments of the utility model will be described in detail below, the examples of the embodiments are shown in the drawings, the embodiments described below by referring to the drawings are exemplary and are intended to explain the utility model, and cannot be understood as the limitation of the utility model.
[0018] The first embodiment of the present application is:
[0019] Please refer to Figs. 1 to 3 , wherein, Fig. 1 is the overall structure schematic view of the pipeline laying structure crossing the expressway of the first embodiment of the utility model, Fig. 2is a structural schematic view of the base and the fixing assembly of the first embodiment of the utility model, Fig. 3 is a structural schematic view of the fixing assembly and the mounting assembly of the first embodiment of the utility model, the utility model provides a pipeline laying structure crossing expressway, including base 101, fixing assembly, mounting assembly and support assembly, the fixing assembly includes slide rail 102, plug block 103, support plate 104, hinge 105, fixed bolt 106, limiting block 107, fixed frame 108 and positioning bolt 109, the mounting assembly includes clamping spring 110 and support seat 111, the support assembly includes support column 112, roof 113 and reinforcing rod 114, the foregoing scheme has solved the problem that the pipeline laying structure crossing expressway is inconvenient to install when needing staff to enter the below of expressway to install pipe clamp, can understand that the foregoing scheme can be used in the scene of facilitating device installation, and can also be used in the solution of device overall support problem.
[0020] For this specific embodiment, the number of slide rails 102 is two, two slide rails 102 are fixedly connected with the base 101 and are located at the top of the base 101 respectively, the number of plug blocks 103 is multiple, multiple plug blocks 103 are slidingly connected with the slide rails 102 and are located in the slide rails 102 respectively, the number of support plates 104 is multiple, multiple support plates 104 are fixedly connected with the plug blocks 103 and are located between the plug blocks 103 respectively, the number of hinges 105 is multiple, multiple hinges 105 connect the support plates 104 respectively, the mounting assembly is connected with the support plates 104, the support assembly is connected with the base 101, the base 101 provides support for the device, the slide rails 102 provide limiting action for the plug blocks 103 and the support plates 104, the support plates 104 provide support for the fixing assembly, the hinges 105 provide rotation action for the support plates 104, when in use, after drilling a hole below the expressway, the base 101 is placed into the hole together with the support assembly and the slide rails 102, then the pipeline is placed on the top of the support seat 111, the fixed frame 108 is fixed on the top of the support plates 104 through the positioning bolt 109, then the support plates 104 are inserted into the base 101 along the plug blocks 103 and the slide rails 102, facilitating the installation and fixation of the pipeline.
[0021] The number of the fixing bolts 106 is multiple, the fixing bolts 106 are respectively in threaded connection with the base 101 and respectively pass through the sliding rail 102, the limiting block 107 is fixedly connected with the sliding rail 102 and located in the middle of the sliding rail 102, the fixing bolts 106 provide fixing action for the sliding rail 102, and the limiting block 107 provides limiting action for the positions of the plug block 103 and the supporting plate 104.
[0022] Secondly, the number of the fixing frames 108 is multiple, the fixing frames 108 are respectively detachably connected with the supporting plate 104 and respectively located at the top of the supporting plate 104, the number of the positioning bolts 109 is multiple, the positioning bolts 109 are respectively in threaded connection with the supporting plate 104 and respectively pass through the supporting plate 104 and the fixing frame 108, and the fixing frame 108 is used for fixing a pipeline, and the positioning bolts 109 facilitate fixing the fixing frame 108 at the top of the supporting plate 104.
[0023] Thirdly, the number of the clamping springs 110 is multiple, the clamping springs 110 are respectively fixedly connected with the supporting plate 104 and respectively located at the top of the supporting plate 104, the number of the supporting seats 111 is multiple, the supporting seats 111 are respectively fixedly connected with the clamping springs 110 and respectively located at the top of the clamping springs 110, the clamping springs 110 provide elastic force for the supporting seats 111, the supporting seats 111 provide supporting action for a pipeline, and in use, the elastic force provided by the clamping springs 110 for the supporting seats 111 can top the pipeline at the top of the supporting seats 111 in the interior of the fixing frame 108, so that the pipeline is facilitated to be installed and fixed.
[0024] Finally, the number of the supporting columns 112 is multiple, the supporting columns 112 are respectively fixedly connected with the base 101 and respectively located at the top of the base 101, the roof 113 is fixedly connected with the supporting columns 112 and located at the top of the supporting columns 112, the number of the reinforcing rods 114 is multiple, the reinforcing rods 114 are respectively fixedly connected with the supporting columns 112 and respectively pass through the supporting columns 112, the supporting columns 112 provide supporting action for the roof 113, the roof 113 is used for supporting a laying hole below an expressway, and the reinforcing rods 114 provide supporting action for the supporting columns 112, so that the device is avoided from collapsing and causing a safety hazard in use.
[0025] Using the pipeline laying structure crossing the highway in the embodiment, the base 101 provides support for the device, the slide rail 102 provides limiting for the plug block 103 and the support plate 104, the support plate 104 provides support for the fixing assembly, the hinge 105 provides rotation for the support plate 104, in use, after drilling a hole under the highway, the base 101 is communicated with the support assembly and the slide rail 102 is simultaneously put into the hole, then the pipeline is placed on the top of the support seat 111, the fixing frame 108 is fixed on the top of the support plate 104 through the positioning bolt 109, then the support plate 104 is inserted into the base 101 along the plug block 103 and the slide rail 102, so that the pipeline is conveniently installed and fixed, and the problem that the pipeline laying structure crossing the highway needs workers to enter under the highway to install the pipeline is solved.
[0026] The above only discloses one or more preferred embodiments of the application, and cannot limit the scope of the application. Those skilled in the art can understand that the implementation of all or part of the above processes, and the equivalent changes made according to the claims of the application, still belong to the scope covered by the application.
Claims
1. A pipeline laying structure crossing a highway, comprising a base, characterized in that, It also includes a fixing assembly, a mounting assembly and a supporting assembly; The fixing assembly comprises slide rails, plug blocks, support plates and hinges, the number of slide rails is two, two slide rails are fixedly connected with the base respectively and are located on the top of the base, the number of plug blocks is multiple, multiple plug blocks are slidably connected with the slide rails respectively and are located in the slide rails, the number of support plates is multiple, multiple support plates are fixedly connected with the plug blocks respectively and are located between the plug blocks, the number of hinges is multiple, multiple hinges are connected with the support plates respectively, the mounting assembly is connected with the support plates, and the supporting assembly is connected with the base.
2. The pipeline laying structure crossing a highway according to claim 1, characterized in that, The fixing assembly further comprises fixing bolts and limiting blocks, the number of fixing bolts is multiple, multiple fixing bolts are threadedly connected with the base respectively and pass through the slide rails, and the limiting blocks are fixedly connected with the slide rails and are located in the middle of the slide rails.
3. The pipeline laying structure crossing a highway according to claim 2, characterized in that, The fixing assembly further comprises fixing frames and positioning bolts, the number of fixing frames is multiple, multiple fixing frames are detachably connected with the support plates respectively and are located on the top of the support plates, and the number of positioning bolts is multiple, multiple positioning bolts are threadedly connected with the support plates respectively and pass through the support plates and the fixing frames.
4. The pipeline laying structure crossing a highway according to claim 1, characterized in that, The mounting assembly comprises clamping springs and support seats, the number of clamping springs is multiple, multiple clamping springs are fixedly connected with the support plates respectively and are located on the top of the support plates, and the number of support seats is multiple, multiple support seats are fixedly connected with the clamping springs respectively and are located on the top of the clamping springs.
5. The pipeline laying structure crossing a highway according to claim 1, characterized in that, The supporting assembly comprises support columns, roof protectors and reinforcing rods, the number of support columns is multiple, multiple support columns are fixedly connected with the base respectively and are located on the top of the base, the roof protector is fixedly connected with the support columns and is located on the top of the support columns, and the number of reinforcing rods is multiple, multiple reinforcing rods are fixedly connected with the support columns respectively and pass through the support columns.