Fabricated building pouring formwork

By using a butt-joint sealing connection device and a plug-in magnetic connection, the problems of insufficient connection strength and gap sealing in prefabricated building casting formwork are solved, achieving efficient formwork connection and improved stability.

CN223593799UActive Publication Date: 2025-11-25ZHEJIANG KASEN CONSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423045563.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-11-25
Estimated Expiration
2034-12-11

AI Technical Summary

Technical Problem

Existing prefabricated building casting formwork has insufficient connection strength during splicing and lacks gap sealing, resulting in poor performance.

Method used

The device employs a butt-sealed connection device and a plug-in magnetic connection method. The gaps are filled by injecting sealant into the ring, and the magnetic connection of the magnetic strip plate is used to enhance the connection strength.

Benefits of technology

It achieves high strength and gap sealing in the template connection, improves the template's performance and stability, and simplifies the installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223593799U_ABST
    Figure CN223593799U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pouring formworks, and discloses an assembly type building pouring formwork which comprises a first pouring formwork body and a second pouring formwork body, and a butt joint sealing connecting device is arranged at the top of the first pouring formwork body. The butt-joint sealing connection device comprises a butt-joint insertion groove, a butt-joint insertion block, a memory elastic pad, a top end hollow box, a bayonet socket, a sealant filling ring piece, a sealing baffle, an insertion plate piece and a sealing block. According to the fabricated building pouring formwork, the butt joint sealing connection device is arranged, sealant is injected through the sealant pouring ring piece, the sealant flows into a seam where the formwork is connected, the seam is filled, after glue injection is completed, the sealing stop block corresponds to the sealant pouring ring piece and then is placed on the top of the sealant pouring ring piece, and connection of the formwork is completed; a threaded connection mode is not adopted, an upper base surface and a lower base surface are aligned during installation, a gap can be filled with sealant after installation, the connection strength is sufficient, and the effect is good during use.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of pouring formwork, in particular to a fabricated building pouring formwork. BACKGROUND

[0002] With the acceleration of modern building industrialization process, the fabricated building is increasing in the building industry because of its fast construction speed, controllable quality, environmental protection and energy saving, and relatively less labor demand, and the fabricated building now processes a large number of building components in the factory, and then transports to the construction site for assembly and splicing, which greatly shortens the construction period.

[0003] The prior art discloses a fabricated building pouring formwork with the publication number CN221896227U, which belongs to the technical field of building pouring formwork and aims to solve the problems of low assembly efficiency of the formwork and poor stability of the assembled formwork. The fabricated building pouring formwork comprises two formwork bodies, two mounting plates, two mounting grooves symmetrically arranged on one side wall of the formwork body, and a mounting assembly arranged on one side of the formwork body. The mounting plate is engaged with the mounting groove. The mounting assembly can accurately and stably install the formwork body, ensure that the installed formwork body is in a relatively stable state, avoid the shaking caused by the gap between the formwork bodies, and facilitate the disassembly and assembly of the staff. The structure is simple and reliable.

[0004] The fabricated building pouring formwork can complete the secondary installation of the two formwork bodies according to the installation requirements, thereby further improving the stability of the two formwork bodies after installation, and the installation method is more simple and effective, the operation is more convenient, and the applicability is strong. However, the pouring formwork before and after splicing is single threaded connection, multiple points need to be installed during installation, and there is no way to fill the sealant in the gap after installation, the connection strength is insufficient, the effect is not good during use, and improvement is needed. UTILITY MODEL CONTENTS

[0005] The utility model aims to provide a fabricated building pouring formwork to solve the problems in the background art.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a fabricated building pouring formwork, comprising a first pouring formwork body and a second pouring formwork body, the top of the first pouring formwork body is provided with a butt sealing connection device, and the front of the first pouring formwork body is provided with a plug-in device.

[0007] The butt joint sealing connecting device comprises a butt joint insertion slot, a butt joint plug, a memory elastic pad, a top hollow box, a plug seat, a sealant pouring ring, a sealing baffle, a plug plate and a blocking block, the butt joint insertion slot is arranged on the left side of the first pouring formwork body, the butt joint plug is fixedly connected to the right side of the first pouring formwork body, the butt joint plug is matched with the butt joint insertion slot, the butt joint plug is inserted into the butt joint insertion slot, the memory elastic pad is fixedly connected to the surface of the butt joint plug, the memory elastic pad is inserted into the butt joint insertion slot, the top hollow box is fixedly connected to the top of the first pouring formwork body, the plug seat is fixedly connected to the front face and the back face of the top hollow box, the sealant pouring ring is fixedly connected to the top of the top hollow box, the plug plate is inserted into the plug seat, the sealing baffle is fixedly connected to the end close to each other of the plug plate, and the blocking block is fixedly connected to the bottom of the sealing baffle.

[0008] Preferably, the plug-in device comprises a connecting seat, an insertion piece, an inner magnetic block, a holding piece, an intermediate connecting thin rod, a butt joint insertion seat and a magnet strip, the connecting seat is fixedly connected to the front right side of the first pouring formwork body, the butt joint insertion seat is fixedly connected to the front left side of the second pouring formwork body, the magnet strip is fixedly connected to the right side of the inside of the butt joint insertion seat, the insertion piece is slidingly connected to the inside of the connecting seat, the inner magnetic block is connected to the top right side of the insertion piece, the holding piece is fixedly connected to the left side of the insertion piece, and the intermediate connecting thin rod is fixedly connected to the bottom of the holding piece.

[0009] Preferably, the inside of the connecting seat is provided with a sliding groove, the inside of the butt joint insertion seat is provided with an insertion slot, and the area of the sliding groove is equal to the area of the insertion slot.

[0010] Preferably, the top of the insertion piece is provided with a rectangular groove, the inner magnetic block is fixedly connected to the inside of the rectangular groove, the rectangular groove is arranged to place the inner magnetic block, and the protruding inner magnetic block is prevented from sliding the insertion piece, so that the normal use of the device is ensured.

[0011] Preferably, the inside of the sealant pouring ring is provided with a glue pouring groove, the area of the blocking block is equal to the top area of the sealant pouring ring, and the area of the blocking block is greater than the area of the glue pouring groove.

[0012] Preferably, the inside of the plug seat is provided with an insertion slot body, and the bottom area of the plug plate is matched with the area of the insertion slot body.

[0013] Preferably, the sealant pouring ring extends into the inside of the hollow box at the top end and is connected to the top of the first pouring formwork body, the sealant is injected through the sealant pouring ring, flows into the hollow box at the top end, and then flows into the gap between the formworks, fills the gap, and the sealant pouring ring can pour glue to help connect the front and rear formworks.

[0014] Compared with the prior art, the utility model has the beneficial effects that:

[0015] 1、The assembly type building pouring formwork is provided with the butt joint sealing connecting device, the sealant is injected through the sealant pouring ring, flows into the gap between the formworks, fills the gap, the sealing block is placed on the top of the sealant pouring ring after the injection of the glue is completed, the connection of the formworks is completed, the threaded connection mode is not used, the upper and lower bases are aligned during installation, the sealant can be filled in the gap after installation, the connection strength is sufficient, and the effect during use is good.

[0016] 2、The assembly type building pouring formwork is provided with the plug-in device, the plug-in part is inserted into the inside of the connecting seat and then inserted to the right after being connected, until the inner magnetic suction block contacts the magnet strip plate, the two are magnetically attracted and adsorbed together after contacting, a magnetic attraction connection is formed, the first pouring formwork body and the second pouring formwork body are further connected together, and the connection strength can be guaranteed. BRIEF DESCRIPTION OF DRAWINGS

[0017] Figure 1 It is a whole three-dimensional front view structural schematic diagram of the utility model;

[0018] Figure 2 It is a whole three-dimensional front view structural schematic diagram of the utility model; Figure 1 It is an enlarged structure schematic diagram of A in the utility model;

[0019] Figure 3 It is a whole three-dimensional side view structural schematic diagram of the utility model;

[0020] Figure 4 It is an enlarged structure schematic diagram of B in the utility model; Figure 3

[0021] Figure 5 It is an enlarged structure schematic diagram of C in the utility model. Figure 3

[0022] ​​In the figure: 1, the first pouring formwork body; 2, the second pouring formwork body; 3, the butt joint sealing connecting device; 301, the butt joint insertion slot; 302, the butt joint insertion block; 303, the memory elastic pad; 304, the top hollow box; 305, the plug-in seat; 306, the sealing glue pouring ring; 307, the sealing baffle; 308, the plug-in plate; 309, the blocking block; 4, the plug-in device; 401, the connecting seat; 402, the insertion piece; 403, the inner magnetic block; 404, the holding piece; 405, the middle connecting thin rod; 406, the butt joint insertion seat; 407, the magnet strip plate. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.

[0024] Please refer to Figures 1-5 The present application provides the following technical solutions:

[0025] The prefabricated building pouring formwork comprises a first pouring formwork body 1 and a second pouring formwork body 2, the top of the first pouring formwork body 1 is provided with a butt joint sealing connecting device 3, and the front of the first pouring formwork body 1 is provided with a plug-in device 4.

[0026] The butt joint sealing connecting device 3 comprises a butt joint insertion slot 301, a butt joint insertion block 302, a memory elastic pad 303, a top hollow box 304, a plug-in seat 305, a sealant pouring ring 306, a sealing baffle 307, a plug-in plate 308 and a sealing block 309. The butt joint insertion slot 301 is arranged on the left side of the first pouring formwork body 1. The butt joint insertion block 302 is fixedly connected to the right side of the first pouring formwork body 1. The butt joint insertion block 302 is matched with the butt joint insertion slot 301. The butt joint insertion block 302 is inserted into the butt joint insertion slot 301. The memory elastic pad 303 is fixedly connected to the surface of the butt joint insertion block 302. The memory elastic pad 303 is inserted into the butt joint insertion slot 301. The top hollow box 304 is fixedly connected to the top of the first pouring formwork body 1. The plug-in seat 305 is fixedly connected to the front and back of the top hollow box 304. The sealant pouring ring 306 is fixedly connected to the top of the top hollow box 304. The plug-in plate 308 is inserted into the plug-in seat 305. The sealing baffle 307 is fixedly connected to the end of the plug-in plate 308. The sealing block 309 is fixedly connected to the bottom of the sealing baffle 307. The sealant pouring ring 306 extends through the inside of the top hollow box 304 and is connected to the top of the first pouring formwork body 1. The sealant pouring ring 306 is used to pour sealant. The sealant flows into the top hollow box 304 and then flows into the gap between the formworks. The gap is filled with the sealant. The sealant pouring ring 306 can help to connect the front and back formworks. The inside of the sealant pouring ring 306 is provided with a sealant pouring groove. The area of the sealing block 309 is equal to the top area of the sealant pouring ring 306. The area of the sealing block 309 is greater than the area of the sealant pouring groove. The inside of the plug-in seat 305 is provided with a plug-in slot. The bottom area of the plug-in plate 308 is matched with the area of the plug-in slot.

[0027] The plug-in device 4 comprises a connecting seat 401, an insertion piece 402, an inner magnetic block 403, a holding piece 404, a middle connecting thin rod 405, a butt joint insertion seat 406 and a magnetic strip 407. The connecting seat 401 is fixedly connected to the front right side of the first pouring formwork body 1. The butt joint insertion seat 406 is fixedly connected to the front left side of the second pouring formwork body 2. The magnetic strip 407 is fixedly connected to the inside right side of the butt joint insertion seat 406. The insertion piece 402 is slidingly connected to the inside of the connecting seat 401. The inner magnetic block 403 is connected to the top right side of the insertion piece 402. The holding piece 404 is fixedly connected to the left side of the insertion piece 402. The middle connecting thin rod 405 is fixedly connected to the bottom of the upper holding piece 404. The inside of the connecting seat 401 is provided with a sliding groove. The inside of the butt joint insertion seat 406 is provided with a plug-in slot. The area of the sliding groove is equal to the area of the plug-in slot. The top of the insertion piece 402 is provided with a rectangular slot. The inner magnetic block 403 is fixedly connected to the inside of the rectangular slot. The rectangular slot is arranged to place the inner magnetic block 403 and avoid the inner magnetic block 403 from protruding to prevent the insertion piece 402 from sliding. The normal use of the device is ensured.

[0028] In use, the first pouring formwork body 1 and the second pouring formwork body 2 can be installed together in abutment, and in abutment, the first pouring formwork body 1 and the second pouring formwork body 2 are first aligned at the top, at which time the abutment plug 302 and the memory elastic pad 303 on the right side of the first pouring formwork body 1 can be aligned with the abutment insertion slot 301 on the left side of the second pouring formwork body 2, then the abutment plug 302 and the memory elastic pad 303 are inserted into the abutment insertion slot 301 on the left side of the second pouring formwork body 2, and the memory elastic pad 303 is squeezed during pushing, the elastic force generated by the reset of the memory elastic pad 303 helps to squeeze the connection, and the top hollow box 304, the plug seat 305 and other components provided at the top can help to install the front and rear formworks, the plug plate 308, the sealing baffle 307 and the blocking block 309 are removed before installing the front and rear formworks, then the sealing glue is poured into the ring 306, the sealing glue flows into the top hollow box 304, then flows into the gap between the formworks, and fills the gap, and after the pouring of the glue is completed, the blocking block 309 is placed on the top of the sealing glue pouring ring 306 corresponding to the lower sealing glue pouring ring 306, and the top of the sealing glue pouring ring 306 also has the excess glue just poured, which helps the connection between the sealing baffle 307 and the top of the sealing glue pouring ring 306, at which time the plug plate 308 is inserted into the inside of the plug seat 305, and the connection of the formworks is completed, without using a threaded connection mode, and the upper and lower bases can be aligned during installation, and after installation, the sealing glue can be filled in the gap, the connection strength is sufficient, the effect in use is good, and the plug device 4 is provided on the front of the first pouring formwork body 1 and the second pouring formwork body 2, and after connection, the insertion piece 402 is inserted into the inside of the connection seat 401 and then inserted to the right, and the insertion piece 402 is inserted into the inside of the abutment insertion seat 406 by pushing to the right, and the insertion piece 402 is continuously pushed until the inner magnetic attraction block 403 on the right side of the top of the insertion piece 402 can contact the magnet strip 407 inside the abutment insertion seat 406, and the two can be magnetically attracted and attached together after contact, forming a magnetic attraction connection, further helping the first pouring formwork body 1 and the second pouring formwork body 2 to be connected together, and ensuring the connection strength.

[0029] Although the embodiments of the present application have been shown and described, it should be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and spirits of the present application, and the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A prefabricated building casting formwork, comprising a first casting formwork body (1) and a second casting formwork body (2), characterized in that: The top of the first casting template body (1) is provided with a butt sealing connection device (3), and the front of the first casting template body (1) is provided with a plug-in device (4). The docking sealing connection device (3) includes a docking insertion groove (301), a docking block (302), a memory elastic pad (303), a top hollow box (304), a plug-in seat (305), a sealant injection ring (306), a sealing baffle (307), a plug-in plate (308), and a sealing block (309). The docking insertion groove (301) is located on the left side of the first casting template body (1), and the docking block (302) is fixedly connected to the right side of the first casting template body (1). The docking block (302) is adapted to the docking insertion groove (301) and is inserted into the inside of the docking insertion groove (301). The memory elastic pad (309) is located on the left side of the first casting template body (1). 3) The memory elastic pad (303) is fixedly connected to the surface of the docking block (302), the memory elastic pad (303) is inserted into the inside of the docking insertion groove (301), the top hollow box (304) is fixedly connected to the top of the first casting template body (1), the plug seat (305) is fixedly connected to the front and back of the top hollow box (304), the sealant injection ring (306) is fixedly connected to the top of the top hollow box (304), the plug plate (308) is inserted into the inside of the plug seat (305), the sealing baffle (307) is fixedly connected to the adjacent ends of the plug plate (308), and the sealing block (309) is fixedly connected to the bottom of the sealing baffle (307).

2. The prefabricated building casting formwork according to claim 1, characterized in that: The insertion device (4) includes a connecting seat (401), an insert (402), an inner magnetic block (403), a grip (404), a middle connecting rod (405), a docking insert (406), and a magnetic strip plate (407). The connecting seat (401) is fixedly connected to the right side of the front of the first casting template body (1). The docking insert (406) is fixedly connected to the left side of the front of the second casting template body (2). The magnetic strip plate (407) is fixedly connected to the right side inside the docking insert (406). The insert (402) is slidably connected to the inside of the connecting seat (401). The inner magnetic block (403) is connected to the right side of the top of the insert (402). The grip (404) is fixedly connected to the left side of the insert (402). The middle connecting rod (405) is fixedly connected to the bottom of the upper grip (404).

3. The prefabricated building casting formwork according to claim 2, characterized in that: The connecting seat (401) has a sliding groove inside, and the docking insertion seat (406) has an insertion groove inside. The area of ​​the sliding groove is equal to the area of ​​the insertion groove.

4. A prefabricated building casting formwork according to claim 2, characterized in that: The top of the insert (402) is provided with a rectangular groove, and the inner magnetic block (403) is fixedly connected to the inside of the rectangular groove.

5. A prefabricated building casting formwork according to claim 1, characterized in that: The sealant filling ring (306) has an adhesive filling groove inside. The area of ​​the sealing block (309) is equal to the top area of ​​the sealant filling ring (306), and the area of ​​the sealing block (309) is larger than the area of ​​the adhesive filling groove.

6. A prefabricated building casting formwork according to claim 1, characterized in that: The plug-in socket (305) has an insertion slot inside, and the bottom area of ​​the plug-in plate (308) is adapted to the area of ​​the insertion slot.

7. A prefabricated building casting formwork according to claim 1, characterized in that: The sealant injection ring (306) extends through the interior of the top hollow box (304) and connects to the top of the first casting template body (1).

Citation Information

Patent Citations

  • Fabricated building pouring formwork

    CN221896227U