Length adjusting structure for steel wire rope of lifting machine

By combining the main wire rope and connecting wire rope with studs, nuts and extended sleeves, the problem of convenience and stability of wire rope length adjustment in the installation of double-column gantry cranes at different heights or widths is solved, realizing convenient length adjustment and installation.

CN223659753UActive Publication Date: 2025-12-12SINO-ITALIAN TAIDA YINGKOU GARAGE EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520421957.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-12
Publication Date
2025-12-12
Estimated Expiration
2035-03-12

AI Technical Summary

Technical Problem

During the installation of existing double-column gantry cranes at different heights or widths, the length of the wire rope needs to be adjusted, but existing technology makes it difficult to achieve convenient and secure length adjustment.

Method used

It adopts a combined structure of main wire rope and connecting wire rope, connected by studs and nuts, and combined with the wrench groove design to realize convenient disassembly, assembly and locking of main wire rope and connecting wire rope. The length can be adjusted by using extended sleeve to adapt to different installation requirements.

Benefits of technology

It enables flexible adjustment of the wire rope length, ensuring a firm and convenient connection during installation at different heights or widths, reducing installation difficulty and time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223659753U_ABST
    Figure CN223659753U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of lifting machines, and particularly relates to a lifting machine steel wire rope length adjusting structure. The utility model provides a lifting machine steel wire rope length adjusting structure. The steel wire rope comprises a main steel wire rope and a connecting steel wire rope, and is characterized in that one end of the main steel wire rope is a main steel wire rope preassembling end; one end of the connecting steel wire rope is a connecting steel wire rope connecting end, and the other end is provided with a connecting steel wire rope joint; the main steel wire rope joint and the connecting steel wire rope joint are studs, the main steel wire rope joint is screwed into one side in the internal thread connecting sleeve, and the connecting steel wire rope joint is screwed into the other side in the connecting sleeve; a main steel wire rope nut is screwed on the main steel wire rope connector outside the connecting sleeve, and a connecting steel wire rope nut is screwed on the connecting steel wire rope connector outside the connecting sleeve.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to lifting machine technical field, especially relate to a lifting machine steel wire rope length adjusting structure. BACKGROUND

[0002] In order to adapt to the different requirements of market installation space, the lifting machine is designed to be installed at different heights or widths, the stand column generally adopts two-section stand column 100 (such as shown in the figure), height-adjustable assembly structure, and the crossbeam adopts inside-out crossbeam sleeve structure, width-adjustable structure. The steel wire rope for double-car synchronization and balance is generally preassembled on the stand column trolley, and during installation, after the stand column and crossbeam are installed, the double-car steel wire rope is installed, and the length of the steel wire rope needs to be adjusted according to the different heights or widths of the machine installation. Figure 11 SUMMARY The utility model discloses a lifting machine steel wire rope length adjusting structure.

[0003] The utility model discloses a lifting machine steel wire rope length adjusting structure.

[0004] To realize above-mentioned purpose, the utility model discloses the following technical scheme, the utility model discloses a main steel wire rope and connecting steel wire rope, and its characterized in that one end of main steel wire rope is main steel wire rope preassembled end, and the other end of main steel wire rope is provided with main steel wire rope joint;

[0005] One end of connecting steel wire rope is connecting steel wire rope connecting end, and the other end of connecting steel wire rope is provided with connecting steel wire rope joint;

[0006] Main steel wire rope joint and connecting steel wire rope joint are threaded studs, and main steel wire rope joint is screwed into one side of inner thread connection sleeve, and connecting steel wire rope joint is screwed into the other side of connection sleeve;Main steel wire rope nut is screwed on the main steel wire rope joint outside the connection sleeve, and connecting steel wire rope nut is screwed on the connecting steel wire rope joint outside the connection sleeve.

[0007] As a preferred scheme, the utility model discloses that main steel wire rope joint is connected with main steel wire rope, and connecting steel wire rope joint is connected with connecting steel wire rope.

[0008] As another preferred scheme, the utility model discloses that main steel wire rope nut and connecting steel wire rope nut adopt M16 nuts.

[0009] As another preferred scheme, the utility model discloses that wrench groove is arranged in the middle of the outer wall of connection sleeve.

[0010] As another preferred scheme, the utility model discloses that the length of main steel wire rope joint and connecting steel wire rope joint in connection sleeve is greater than 20mm.

[0011] As another preferred solution, the main steel wire rope preloading end and the connecting steel wire rope connecting end are threaded studs, the main steel wire rope preloading end passes through a first connecting hole on the first side vertical column pulley and is screwed with a steel wire rope first locking nut;

[0012] The second side vertical column pulley is provided with a second connecting hole corresponding to the connecting steel wire rope connecting end and the main steel wire rope joint, the connecting steel wire rope connecting end or the main steel wire rope joint passes through the second connecting hole and is screwed with a steel wire rope second locking nut.

[0013] As another preferred solution, the number of the second connecting holes is multiple, and the second connecting holes are arranged vertically.

[0014] Secondly, the number of the second connecting holes is two.

[0015] In addition, the lower end of the second connecting hole is provided with an elongated sleeve, the connecting steel wire rope connecting end or the main steel wire rope joint passes through the second connecting hole and the elongated sleeve in sequence and is screwed with the steel wire rope second locking nut, the upper end of the elongated sleeve abuts against the periphery of the second connecting hole, and the upper end of the second locking nut abuts against the lower end of the elongated sleeve.

[0016] The utility model has the advantages that:

[0017] When the utility model is used, the main steel wire rope preloading end is connected with the first side vertical column pulley.

[0018] The steel wire rope joint is screwed into the connecting sleeve and is locked through the nut on the steel wire rope joint, the main steel wire rope and the connecting steel wire rope are convenient to disassemble and assemble and are firmly connected, the nut is arranged to prevent the connecting sleeve from rotating and to ensure the adjusted screwing length.

[0019] The utility model is an adjusting structure designed to solve the problem that the steel wire rope needs different lengths during installation of the existing machine, the structure uses component combination (a combination mode of the main steel wire rope and the connecting steel wire rope or only the main steel wire rope) or different lifting point positions during installation of the machine at different heights or widths, so that one set of steel wire rope meets the adjusting requirement of the steel wire rope length during installation of the machine at different heights or widths. BRIEF DESCRIPTION OF DRAWINGS

[0020] The utility model will be further described in connection with the drawings and specific embodiments.

[0021] Figure 1 It is a structural schematic diagram of the utility model.

[0022] Figure 2 Is the connection sleeve connection schematic diagram of the utility model.

[0023] Figure 3 Is the structure schematic diagram of the utility model that the pulley increases the lifting point (the second connecting hole lower connecting hole 10).

[0024] Figure 4 Is the structure schematic diagram of the utility model that the pulley uses the lengthened sleeve pipe.

[0025] Figure 5 Is the structure schematic diagram of the utility model that the main steel wire rope preloading end is connected.

[0026] Figure 6 Is the structure schematic diagram of the utility model that the standard position installs the connecting steel wire rope connecting end.

[0027] Figure 7 Is the structure schematic diagram of the utility model that the low position H1 installs the main steel wire rope joint.

[0028] Figure 8 Is the structure schematic diagram of the utility model that the low position H2 installs the main steel wire rope joint.

[0029] Figure 9 Is the structure schematic diagram of the utility model that the standard position, minimum width W1 installs the connecting steel wire rope connecting end and sets up the lengthened sleeve pipe.

[0030] Figure 10 Is the structure schematic diagram of the utility model that the low position H1, minimum width W1 installs the main steel wire rope joint and sets up the lengthened sleeve pipe.

[0031] Figure 11 Is the use state diagram of the utility model.

[0032] In the drawing, 1 is the connecting steel wire rope connecting end, 2 is the connecting steel wire rope, 3 is the connecting steel wire rope joint, 4 is the connecting steel wire rope nut, 5 is the connecting sleeve, 6 is the main steel wire rope nut, 7 is the main steel wire rope joint, 8 is the main steel wire rope, 9 is the main steel wire rope preloading end, 10 is the second connecting hole lower connecting hole, 11 is the second side column pulley, 12 is the second connecting hole upper connecting hole, 13 is the lengthened sleeve pipe, 14 is the first connecting hole, 15 is the first side column pulley, 16 is the first locking nut, 17 is the second locking nut, 18 is the wrench groove, 100 is two-section column. Specific implementation

[0033] As Figure 1 Shown, the utility model includes main steel wire rope 8 and connecting steel wire rope 2, main steel wire rope 8 one end is main steel wire rope preloading end 9, and the other end of main steel wire rope 8 is provided with main steel wire rope joint 7;

[0034] The one end of the connecting steel wire rope 2 is a connecting steel wire rope connecting end 1, and the other end of the connecting steel wire rope 2 is provided with a connecting steel wire rope joint 3.

[0035] The main steel wire rope joint 7 and the connecting steel wire rope joint 3 are threaded rods, the main steel wire rope joint 7 is screwed into one side of the inner threaded connecting sleeve 5, and the connecting steel wire rope joint 3 is screwed into the other side of the connecting sleeve 5; the main steel wire rope joint 7 on the outer side of the connecting sleeve 5 is screwed with a main steel wire rope nut 6, and the connecting steel wire rope joint 3 on the outer side of the connecting sleeve 5 is screwed with a connecting steel wire rope nut 4.

[0036] The main steel wire rope joint 7 is press-fit connected with the main steel wire rope 8, and the connecting steel wire rope joint 3 is press-fit connected with the connecting steel wire rope 2.

[0037] The main steel wire rope nut 6 and the connecting steel wire rope nut 4 are M16 nuts.

[0038] The outer wall of the connecting sleeve 5 is provided with a wrench groove 18 in the middle. One wrench head is clamped at the wrench groove 18, and the other wrench is used to tighten the connecting steel wire rope nut 4 or the main steel wire rope nut 6, so as to lock the connecting steel wire rope nut 4 and the main steel wire rope nut 6.

[0039] The function of this groove: wrench, when locking 4, 5 or 5, 6, the groove position uses a dead wrench or an open wrench

[0040] The length of the main steel wire rope joint 7 and the connecting steel wire rope joint 3 placed in the connecting sleeve 5 is greater than 20 mm.

[0041] The main steel wire rope preloading end 9 and the connecting steel wire rope connecting end 1 are threaded rods, the main steel wire rope preloading end 9 passes through the first connecting hole 14 on the first side vertical pulley 15 and is screwed with a steel wire rope first locking nut 16.

[0042] The second side vertical pulley 11 is provided with a second connecting hole corresponding to the connecting steel wire rope connecting end 1 and the main steel wire rope joint 7, the connecting steel wire rope connecting end 1 or the main steel wire rope joint 7 passes through the second connecting hole and is screwed with a steel wire rope second locking nut 17.

[0043] The number of the second connecting holes is multiple, which are arranged vertically.

[0044] The number of the second connecting holes is two, one is an upper connecting hole 12 of the second connecting hole, and the other is a lower connecting hole 10 of the second connecting hole.

[0045] The lower end of the second connecting hole is provided with an extension sleeve 13, the connecting steel wire rope connecting end 1 or the main steel wire rope joint 7 is sequentially threaded through the second connecting hole, the extension sleeve 13 and is screwed with a steel wire rope second locking nut 17; the upper end of the extension sleeve 13 abuts against the periphery of the second connecting hole, and the upper end of the second locking nut 17 abuts against the lower end of the extension sleeve 13. The extension sleeve 13 is provided, which is equivalent to reducing the effective working length of the steel wire rope, and is suitable for the minimum width installation of the machine.

[0046] The utility model is suitable for the adjustment of the length of the steel wire rope when the double-column series gantry lifting machine needs different heights or widths.

[0047] The key of the steel wire rope length adjustment structure is that the length of the steel wire rope group (the main steel wire rope 8 + the connecting steel wire rope 2) is designed according to the maximum height H and the maximum width W when installation, and is used as the standard installation position of the machine.

[0048] When the second height H1 of the machine is reached, the connecting steel wire rope 2 and the connecting sleeve 5 are removed, so that the height of the machine is reduced, and the length of the steel wire rope is shortened.

[0049] When the third height H2 (the lowest position) of the machine is reached, the connecting steel wire rope 2 and the connecting sleeve 5 are removed, and the second steel wire rope lifting point (that is, the lower connecting hole 10 of the second connecting hole) of the increased pulley part is used, so that the length of the steel wire rope is deepened into the pulley part, and the purpose that the steel wire rope is not replaced and can be continuously used when the height of the machine is continuously reduced is achieved.

[0050] When the minimum width W1 of the machine is used, the extension sleeve 13 mode can be used in combination with the standard installation position or the low position H1.

[0051] The assembly process of the steel wire rope length adjustment structure is as follows (see Figure 1 ):

[0052] (1) the steel wire rope is cut according to the length required by the drawing after pre-stretching, and the steel wire rope is pressed according to the steel wire rope pressing requirement.

[0053] (2) the main steel wire rope nut 6 and the connecting sleeve 5 are installed in the main steel wire rope joint 7, the joint is screwed in with a length greater than 20mm, and the main steel wire rope nut 6 is locked.

[0054] (3) the connecting steel wire rope nut 4 is installed on the connecting steel wire rope joint 3, then the connecting steel wire rope joint 3 is screwed into the connecting sleeve 5, the screwing length is required to be greater than 20mm, and the connecting steel wire rope nut 4 is locked.

[0055] (4) the main steel wire rope preloading end 9 is preloaded to the first side column pulley 15 according to the standard installation position (see Figure 5 ).

[0056] The following steps need to be carried out at the customer's place, and there are five installation modes:

[0057] The first installation method: when installed in the standard position, the connecting steel wire connecting end 1 is connected to the standard position (i.e., the connecting hole 12 above the second connecting hole) on the second side column pulley 11 (see Figure 6 ).

[0058] The second installation method: when installed in the low position H1, the connecting steel wire 2 and the connecting sleeve 5 are disassembled (equivalent to reducing the overall length of the steel wire), and the main steel wire joint 7 is connected to the standard position (i.e., the connecting hole 12 above the second connecting hole) on the second side column pulley 11 (see Figure 7 ).

[0059] The third installation method: when installed in the low position H2 (the lowest position), the connecting steel wire 2 and the connecting sleeve 5 are disassembled, and the main steel wire pre-installed end 9 is connected to the second lifting point position (i.e., the connecting hole 10 below the second connecting hole) on the second side column pulley 11 (see Figure 8 ).

[0060] When installed in the minimum width W1, the lengthening sleeve 13 method needs to be used, which can be used in combination with the standard position and the low position H1. Due to structural reasons, the low position H2 cannot be combined with the lengthening sleeve 13 method.

[0061] The fourth installation method: when installed in the standard position and the minimum width W1, the connection method of the connecting steel wire connecting end 1 is shown in Figure 9 .

[0062] The fifth installation method: when installed in the low position H1 and the minimum width W1, the connection method of the main steel wire joint 7 is shown in Figure 10 .

[0063] As shown in Figure 11 , one side column is the main column, and the other side column is the auxiliary column. The minimum width W1 refers to the minimum width between the main column and the auxiliary column. The minimum width W1 is set to limit the size requirements of the lifting machine installation site, while meeting the vehicle width requirements. If the width between the main column and the auxiliary column is less than the minimum width W1, it cannot meet the vehicle width requirements.

[0064] Whether it is high or low installation or minimum width, it is completed by adjusting the overall length of the steel wire, and the lengthening sleeve 13 is additionally set, rather than multiple lifting point positions. The reasons are as follows:

[0065] In theory, multiple lifting point positions can be set, but in actual use, generally only two lifting points are set, and at most three lifting points are set, which is to reduce the installation difficulty at the user's place, Figure 5 which is generally pre-installed in the factory, Figure 6 , Figure 7 , Figure 8 ,Figure 9 is installed at the user, at this time the cylinder, chain and other components in the trolley are installed, the space for installing the steel wire rope is small. Figure 9 The lower end position of the lengthened sleeve 13 needs to increase a lifting point, which is basically at the middle position of the trolley, and it is more difficult to pass the steel wire rope joint into the lifting point. In addition, when the second lifting point position is used, the steel wire rope needs to pass through the newly added lifting point, which also increases the installation difficulty at the user. Figure 8

[0066] It can be understood that the above specific description of the utility model is only used for illustration of the utility model and is not limited to the technical solutions described in the utility model embodiments, and those skilled in the art should understand that the utility model can still be modified or replaced equivalently to achieve the same technical effect, as long as the use needs are met, which is within the protection scope of the utility model.​

Claims

1. A lifting machine wire rope length adjustment structure, comprising a main wire rope and a connecting wire rope, characterized in that... One end of the main wire rope is the pre-installed end, and the other end of the main wire rope is equipped with a main wire rope joint. One end of the connecting wire rope is the connecting wire rope connector, and the other end of the connecting wire rope is equipped with a connecting wire rope joint. The main wire rope joint and the connecting wire rope joint are studs. The main wire rope joint is screwed into one side of the internal thread connecting sleeve, and the connecting wire rope joint is screwed into the other side of the connecting sleeve. The main wire rope joint on the outside of the connecting sleeve is screwed with a main wire rope nut, and the connecting wire rope joint on the outside of the connecting sleeve is screwed with a connecting wire rope nut.

2. The lifting machine wire rope length adjustment structure according to claim 1, characterized in that... The main wire rope joint is press-fitted to the main wire rope, and the connecting wire rope joint is press-fitted to the connecting wire rope.

3. The lifting machine wire rope length adjustment structure according to claim 1, characterized in that... The main wire rope nut and the connecting wire rope nut are M16 nuts.

4. The lifting machine wire rope length adjustment structure according to claim 1, characterized in that... A wrench groove is provided in the middle of the outer wall of the connecting sleeve.

5. The lifting machine wire rope length adjustment structure according to claim 1, characterized in that... The length of the main wire rope joint and the connecting wire rope joint placed inside the connecting sleeve is greater than 20mm.

6. The lifting machine wire rope length adjustment structure according to claim 1, characterized in that... The pre-installed end of the main wire rope and the connecting end of the connecting wire rope are studs. The pre-installed end of the main wire rope passes through the first connecting hole on the first side column trolley and is screwed with the first locking nut of the wire rope. The second side column trolley is provided with a second connecting hole corresponding to the connecting end of the connecting wire rope and the main wire rope joint. The connecting end of the connecting wire rope or the main wire rope joint passes through the second connecting hole and is screwed with a second locking nut for the wire rope.

7. The lifting machine wire rope length adjustment structure according to claim 6, characterized in that... There are multiple second connecting holes, arranged vertically.

8. The lifting machine wire rope length adjustment structure according to claim 7, characterized in that... There are two second connecting holes.

9. The lifting machine wire rope length adjustment structure according to claim 6, characterized in that... An extended sleeve is provided at the lower end of the second connecting hole. The connecting end of the wire rope or the main wire rope joint passes through the second connecting hole and the extended sleeve in sequence and is screwed with the second locking nut of the wire rope. The upper end of the extended sleeve abuts against the periphery of the second connecting hole, and the upper end of the second locking nut abuts against the lower end of the extended sleeve.