Movable operation platform on bridge
By introducing reinforcing crossbars and connecting bars into the hanging columns of the movable operating platform on the bridge, the problem of insufficient fixed points for the climbing ladder was solved, achieving higher safety and stability and improving construction efficiency.
Patent Information
- Application Number
- CN202520041067.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-08
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2035-01-08
AI Technical Summary
When installing movable operating platform ladders on existing bridges, there are not enough fixed connection points, which cannot fully guarantee safety.
By introducing reinforcing crossbars to connect the two vertical bars in the suspended column structure, and setting connecting ribs between the ladder and the reinforcing crossbars, the number of fixed points of the ladder is increased, forming a stable ladder passage. Safety railings are also installed on the construction platform to improve safety.
It improves the connection stability and safety of the ladder, reduces the safety hazards of workers moving up and down, and enhances the safety and efficiency of construction.
Smart Images

Figure CN223688802U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of operation platform for building, specifically, relate to a movable operation platform on bridge. BACKGROUND
[0002] When the longitudinal butt joint of the steel box girder bridge bottom plate is welded, the height is high, the danger coefficient is big, and the post-grinding paint repair work operation is difficult. The traditional method is to lay the operation platform along the bridge bottom plate for construction, which is complex, high in cost, has great influence on ground construction, and occupies the road for a long time. There are serious safety hazards in construction projects, and more manpower and resources are often invested to ensure safety, which also causes resource waste and cost increase. Moreover, the traditional construction method is slow and has low work efficiency. At present, most of the workers in high-altitude construction are migrant workers, who have relatively low safety awareness. If supervision is not in place, they will not construct according to the standard requirements, thereby greatly increasing the probability of safety accidents. Some safety accidents cannot be recovered, causing serious loss of personnel and property. Therefore, it is necessary to provide a device to solve the problems of narrow construction space on the top of the traditional bridge, the inability of construction personnel to move at will for construction, and the need to frequently change the fixing point of the safety rope.
[0003] The patent with publication number CN212000637U discloses a movable operation platform for a mobile support, which moves the operation plate by the connecting plate walking on the track in reverse, and the workers can perform corresponding operations on the operation plate. The structure is simple and convenient to operate. The operation plate and the connecting plate can be detachably arranged, so that the operation platform can follow the mobile support through the hole, reducing the complex disassembly and assembly process and further increasing the work efficiency. Moreover, the arrangement mode of the operation platform is not affected by the terrain and bridge position, and has a wide range of use. However, there is no channel for the workers to move up and down between the operation plate and the bridge deck. When the workers need to move up and down, they still need to rely on the safety rope.
[0004] The patent with publication number CN213538689U discloses a sliding construction platform for assisting in welding the weld of a steel beam, which sets a pulley to realize the longitudinal movement of the platform on the cantilever arm, thereby providing a suitable special construction platform for the welding of the super-long cantilever arm of the steel bridge, and effectively solving the problem of high difficulty in welding the super-long cantilever arm. The patent sets a ladder between the support table and the construction table to solve the problem of the above patent, but the connection points of the ladder are only up and down, and the stability is not enough. UTILITY MODEL CONTENTS
[0005] The utility model aims at solving the problem that the fixed connection points are not enough and the completeness cannot be completely guaranteed when the movable operation platform on the bridge is erected.
[0006] The embodiment of the utility model realizes through the following technical schemes:
[0007] A movable operation platform on bridge, including construction platform, hanger post and moving assembly, the both ends of construction platform connect the bottom of one hanger post, the top of hanger post is connected with moving assembly, moving assembly can drive hanger post along the longitudinal translation of bridge, hanger post includes: two vertical rods, the bottom of vertical rod is connected with construction platform, reinforcing crosspiece is connected with several reinforcing crosspieces between two vertical rods, the operation platform still includes: cat ladder, cat ladder extends from bridge deck to construction platform, connecting rib, cat ladder is connected with reinforcing crosspiece through connecting rib.
[0008] Preferably, the construction platform protrudes from the end of the cantilever along the end of the bridge deck transversely, forming a ladder space; the cat ladder is arranged on the ladder space side of the construction platform.
[0009] Preferably, the cat ladder comprises: a ladder body; a safety fence arranged on the side of the ladder body away from the cantilever, the safety fence is connected with the ladder body to form a complete passageway for workers.
[0010] Preferably, the safety fence comprises: a plurality of arc-shaped railings, the plurality of arc-shaped railings are longitudinally distributed on the ladder body and connected with the ladder body.
[0011] Preferably, the safety fence further comprises: a reinforcing railing longitudinally connecting the plurality of arc-shaped railings.
[0012] Preferably, the moving assembly comprises: a track, the top of the cantilever on both sides of the bridge deck is longitudinally laid along the bridge deck; a roller, each track is provided with the roller; a base, the roller is arranged at the lower end of the base, the side wall of the hanger post is connected with the base; a driving device, the driving device is connected with the roller.
[0013] Preferably, it comprises: a safety connecting rod, the bases on both sides of the bridge deck are connected through the safety connecting rod.
[0014] Preferably, the construction platform comprises: a crossbeam, the both ends of the crossbeam are connected with the hanger posts on both sides of the bridge deck respectively; a bottom plate, the bottom plate is laid on the crossbeam; a guardrail, the guardrail is erected around the crossbeam.
[0015] Preferably, it comprises: a controller, the controller is connected with the driving device, and the controller is arranged on the construction platform.
[0016] The utility model at least has following beneficial effect:
[0017] The utility model improves the structure of the hanging column, through the reinforcement crosspiece connects two vertical poles, not only has improved the strength of the hanging column itself, still provided the fixed point position of the cat ladder through a plurality of reinforcement crosspieces, made the connection of cat ladder more stable, higher safety. BRIEF DESCRIPTION OF DRAWINGS
[0018] In order to more clearly illustrate the technical scheme of the embodiment of the utility model, the following will be briefly introduced the drawing needed to be used in the embodiment, should understand, the following drawing only shows some embodiments of the utility model, therefore should not be regarded as the limitation of the scope, for the ordinary skilled person in the art, under the premise of not paying creative labor, still can obtain other related drawings according to these drawings.
[0019] Figure 1 The structural diagram of the movable operation platform on the bridge provided by the utility model is shown in the figure.
[0020] Figure 2 The right view of Figure 1
[0021] Figure 3 The connection diagram of the cat ladder is shown in the figure.
[0022] Figure 4 The structural diagram of the ladder main body is shown in the figure.
[0023] Figure legend: 1- construction platform, 11- crossbeam, 12- bottom plate, 13- guardrail, 2- hanging column, 21- vertical pole, 22- reinforcement crosspiece, 3- moving assembly, 31- gyro wheel, 32- base, 33- driving device, 4- cat ladder, 41- ladder main body, 411- ladder beam, 412- tread, 42- safety fence, 421- arc rail, 422- reinforcement rail, 5- connecting rib, 6- cantilever arm, 7- ladder space, 8- safety connecting rod, 9- controller. DETAILED DESCRIPTION
[0024] In order to make the purpose, method scheme and advantage of the embodiment of the utility model more clearly, the method scheme in the embodiment of the utility model is clearly and completely described, obviously, the described embodiment is the embodiment of the utility model part, instead of all the embodiments. The components of the embodiment of the utility model described and shown in the drawing here can be arranged and designed in various different configurations.
[0025] As Figures 1-3 As shown, a movable operation platform on a bridge comprises a construction platform 1, a hanging column 2 and a moving assembly 3, the two ends of the construction platform 1 are connected with the bottom ends of one hanging column 2 respectively, the top end of the hanging column 2 is connected with the moving assembly 3, the moving assembly 3 can drive the hanging column 2 to translate along the longitudinal direction of the bridge, the hanging column 2 comprises two vertical rods 21, the bottom ends of the vertical rods 21 are connected with the construction platform 1, and a plurality of reinforcing crosspieces 22 are connected between the two vertical rods 21, the operation platform further comprises a ladder 4 extending from the bridge surface to the construction platform 1, and a connecting rib 5 connecting the ladder 4 with the reinforcing crosspieces 22.
[0026] In the implementation process, the hanging column 2 is arranged in the structure of the reinforcing crosspieces 22 and the vertical rods 21, which not only increases the stability of the hanging column 2 itself, but also increases the connecting points between the ladder 4 and the hanging column 2 through the reinforcing crosspieces 22, thereby increasing the connecting stability of the ladder 4 and improving the safety. Figure 3 As shown, two connecting ribs 5 are welded at each reinforcing crosspiece 22. Since the distance between the adjacent reinforcing crosspieces 22 is large, it is not suitable for the worker's step distance, so a special ladder 4 is additionally arranged for the worker to move up and down.
[0027] The erection process of the operation platform is as follows:
[0028] The moving assembly 3 is installed at the cantilever 6 position of the bridge surface in advance;
[0029] The construction platform 1, the hanging column 2 and the ladder 4 are integrated on the ground, then hoisted to the cantilever 6 position of the bridge surface, and connected with the pre-installed moving assembly 3 through high-strength bolts.
[0030] During construction, the worker can control the moving assembly 3 to realize the longitudinal translation of the operation platform along the bridge surface, and perform the longitudinal butt joint welding of the bridge bottom plate 12 and the later polishing and painting work.
[0031] In order to improve the safety of the worker when getting on and off the ladder 4, as shown in the embodiment, Figure 1 The construction platform 1 protrudes from the end of the cantilever 6 along the lateral direction of the bridge surface to form a ladder space 7, and the ladder 4 is arranged on the side of the ladder space 7 of the construction platform 1.
[0032] In the implementation process, as shown in the embodiment, Figure 1 The left side of the construction platform 1 is flush with the end of the bridge surface, and the upper and lower ends of the left hanging column 2 are respectively adjacent to the end of the bridge surface and the end of the construction platform 1. The right side of the construction platform 1 extends outward from the end of the bridge surface, and the construction platform 1 platform is left on the side of the right hanging column 2 away from the bridge surface for the worker to stand when getting on and off the ladder 4.
[0033] In order to further improve the safety of the worker when getting on and off the ladder 4, as shown in the embodiment, Figure 3As shown, in the embodiment, the ladder 4 comprises: a ladder body 41; a safety fence 42, which is arranged on the side of the ladder body 41 away from the cantilever arm 6, and which is connected with the ladder body 41 to form a complete passage for workers to walk through.
[0034] In the implementation process, the ladder body 41 is a prior art, which can be referred to Figure 4 The safety fence 42 is composed of two ladder beams 411 and a plurality of steps 412 connected between the two ladder beams 411. The safety fence 42 can limit the falling space of workers who accidentally slip down during the process of climbing up and down the ladder 4, and the workers can fall at most to the construction platform 1.
[0035] As shown, in the embodiment, the safety fence 42 comprises: a plurality of arc-shaped fences 421, which are longitudinally distributed on the ladder body 41 and connected with the ladder body 41. Figure 3
[0036] In the implementation process, the distance between adjacent arc-shaped fences 421 should not be too far, and in theory, the closer the distance, the better the safety. However, considering the freedom of movement, comfort and the amount of materials in the enclosed space between the safety fence 42 and the ladder body 41, the distance between adjacent arc-shaped fences 421 can be 40-70 cm.
[0037] In order to increase the stability of the arc-shaped fence 421, as shown, in the embodiment, the safety fence 42 further comprises: a reinforcing fence 422, which longitudinally connects a plurality of the arc-shaped fences 421. Figure 3
[0038] In the implementation process, the reinforcing fence 422 can be arranged in the middle of the arc-shaped fence 421 as shown, and a plurality of reinforcing fences 422 can be arranged as shown, or only one reinforcing fence 422 can be arranged as shown. Figure 3 Figure 3
[0039] As shown, in the embodiment, the moving assembly 3 comprises: a track, which is arranged on the top of the cantilever arm 6 on both sides of the bridge deck in the longitudinal direction of the bridge deck; a roller 31, which is arranged on each track; a base 32, wherein the roller 31 is arranged at the lower end of the base 32, and the side wall of the hoist column 2 is connected with the base 32; and a driving device 33, which is connected with the roller 31. Figure 1
[0040] In the implementation process, a plurality of tracks can be arranged on each side of the bridge deck, or only one track can be arranged. The number of tracks and rollers 31 can be determined according to the carrying capacity of the moving assembly 3 and the weight of the operation platform. The driving device 33 can be a driving motor, and the connection relationship between the driving device 33, the roller 31 and the driving device 33 is a prior art, which will not be described in detail.
[0041] To increase the stability of the connection between the operating platform and the bridge, such as Figure 1 As shown, in this embodiment, a safety connecting rod 8 is included, and the bases 32 on both sides of the bridge deck are connected through the safety connecting rod 8.
[0042] In the specific implementation process, such as Figure 1 As shown, the safety connecting rods 8 connect the hanging columns 2 at both ends of the bridge deck into a whole, increasing the stability of the entire structure of the operating platform.
[0043] like Figures 1-2 As shown, in this embodiment, the construction platform 1 includes: a crossbeam 11, the two ends of which are connected to the hanging columns 2 on both sides of the bridge deck; a base plate 12, on which the base plate 12 is laid; and a guardrail 13, which is erected around the crossbeam 11.
[0044] In practice, the base plate 12 is made of patterned steel plate. The guardrail 13 ensures the safety of workers operating on the construction platform 1.
[0045] To facilitate the control of the operation platform's movement, such as Figure 1 As shown, in this embodiment, a controller 9 is included, which is connected to the drive device 33 and is located on the construction platform 1.
[0046] In practice, the controller 9 is placed on the construction platform 1 for easy control by the workers on the platform. When the workers on the construction platform 1 complete the welding operation or other operations on a certain section of the bridge deck, they can move the operating platform to the next section of the bridge deck by operating the controller 9.
[0047] The above are merely preferred embodiments of this utility model and are not intended to limit the scope of this utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A movable operating platform on a bridge, comprising a construction platform (1), a hanger column (2) and a moving assembly (3), the bottom end of each of the hanger columns (2) is connected to the two ends of the construction platform (1), the top end of the hanger column (2) is connected to the moving assembly (3), the moving assembly (3) can drive the hanger column (2) to move along the longitudinal direction of the bridge, characterized in that, The hanging column (2) comprises: Two vertical rods (21), the bottom end of the vertical rod (21) is connected with the construction platform (1); Strengthening crosspieces (22), a plurality of strengthening crosspieces (22) are connected between the two vertical rods (21); The operation platform further comprises: A ladder (4) extending from the bridge deck to the construction platform (1); A connecting rib (5), the ladder (4) is connected with the strengthening crosspieces (22) through the connecting rib (5).
2. The movable operating platform on a bridge according to claim 1, characterized in that, The construction platform (1) protrudes from the end of the cantilever (6) at one end of the bridge deck transversely, forming a ladder space (7); the ladder (4) is arranged on the ladder space (7) side of the construction platform (1).
3. The movable operating platform on a bridge according to claim 1, characterized in that, The ladder (4) comprises: A ladder body (41); A safety fence (42) arranged on the side of the ladder body (41) away from the cantilever (6), the safety fence (42) is connected with the ladder body (41) to form a complete channel for workers to pass through.
4. The movable operating platform on a bridge according to claim 3, characterized in that, The safety fence (42) comprises: A plurality of arc-shaped fences (421), a plurality of arc-shaped fences (421) are longitudinally distributed on the ladder body (41) and connected with the ladder body (41).
5. The movable operating platform on a bridge according to claim 4, characterized in that, The safety fence (42) further comprises: A reinforcing fence (422) longitudinally connecting a plurality of arc-shaped fences (421).
6. The movable operating platform on a bridge according to any one of claims 1-5, characterized in that, The moving assembly (3) comprises: A track, the track is longitudinally laid on the top end of the cantilever (6) on both sides of the bridge deck; A roller (31), each track is provided with the roller (31); A base (32), the roller (31) is arranged at the lower end of the base (32), and the side wall of the hanging column (2) is connected with the base (32); A driving device (33) connected with the roller (31).
7. The movable operating platform on a bridge according to claim 6, characterized in that, Comprise: A safety connecting rod (8), the bases (32) on both sides of the bridge deck are connected through the safety connecting rod (8).
8. The movable operating platform on a bridge according to claim 6, characterized in that, The construction platform (1) comprises: A crossbeam (11), both ends of the crossbeam (11) are connected with the hanging columns (2) on both sides of the bridge deck; A bottom plate (12), the bottom plate (12) is laid on the crossbeam (11); A guardrail (13), the guardrail (13) is arranged around the crossbeam (11).
9. The movable operating platform on a bridge according to claim 6, characterized in that, Comprise: A controller (9) connected with the driving device (33), the controller (9) is arranged on the construction platform (1).
Citation Information
Patent Citations
Movable operating platform for moving bracket
CN212000637U
Sliding construction platform for assisting welding of steel beam welding seam
CN213538689U