Quick connecting structure for building curtain wall
By adopting a quick-connect structure that connects the steel structure and stone units in the building curtain wall, and using the slots of the connectors for positioning and fixing, the problem of long construction period caused by the complexity of stone unit installation in the existing technology is solved, and efficient stone unit installation is achieved.
Patent Information
- Application Number
- CN202520087394.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-15
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2035-01-15
AI Technical Summary
The installation of stone units in existing building curtain wall installation processes is complex, resulting in a long construction period.
A quick-connection structure is adopted to connect the steel structure and the stone unit. By installing connectors on the connecting steel structure and using the slots at the top and bottom of the stone unit to position and fix it with the first and second connecting parts of the connectors, the installation process is simplified.
This improves the ease and efficiency of stone unit installation and shortens the installation period of building curtain walls.
Smart Images

Figure CN223689158U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the field of building curtain wall technology, in particular to a building curtain wall quick connection structure. BACKGROUND
[0002] The stone curtain wall is generally composed of stone panels and supporting structures (beam columns, steel structures, connecting pieces, etc.), and is a building envelope that does not bear the load and action of the main structure. The general construction of stone curtain wall of a building is to use high corrosion-resistant connecting pieces to fix the facing stone on the back surface and install it on the surface of the building.
[0003] In the prior art, the common building curtain wall made of stone is mainly formed by splicing a plurality of stone units of the same specification. When installing the building curtain wall, a connecting steel structure is usually installed on the structure where the curtain wall is installed, and the stone units are spliced and installed on the structure by expansion bolts to form a complete building curtain wall with a certain shape.
[0004] However, the installation method of installing the stone units on the connecting steel structure in the existing building curtain wall installation process is relatively complex, and a long construction period is required, which needs to be improved. CONTENT OF THE INVENTION
[0005] In order to improve the efficiency of installing the stone units of the building curtain wall and shorten the construction period of the building curtain wall, the present application provides a building curtain wall quick connection structure.
[0006] The building curtain wall quick connection structure provided by the present application adopts the following technical scheme:
[0007] A building curtain wall quick connection structure, comprising a connecting steel structure and a plurality of stone units, the connecting steel structure is fixedly installed on the wall of the structure, and the plurality of stone units are detachably installed on the connecting steel structure.
[0008] A plurality of groups of connecting pieces are fixedly installed on the connecting steel structure in parallel, each of the connecting pieces comprises an installation plate, the installation plate is detachably connected with the connecting steel structure, a first connecting part and a second connecting part are fixedly installed on the installation plate, the first connecting part is located at the top of the installation plate, and the second connecting part is located at the bottom of the installation plate.
[0009] The upper and lower ends of any of the stone units are respectively provided with a slot, and the first connecting part and the second connecting part located on the same installation plate are respectively inserted into the slots of the two adjacent stone units.
[0010] By adopting the technical scheme, in the actual installation process, the operator can install the connecting steel structure on the surface of the wall according to the size and installation position of the building curtain wall in advance, then install the connecting piece on the connecting steel structure, and position the upper and lower ends of the stone unit through the first connecting part and the second connecting part on the mounting plate of the connecting piece. Since the upper and lower ends of the stone unit are provided with the insertion slot, the first connecting part and the second connecting part are provided on one connecting piece, and the upper end and the lower end of the adjacent two stone units can be fixed through the same connecting piece when the stone unit is installed, the convenience and efficiency of the operator in installing the stone unit can be effectively improved, and the construction period of the stone curtain wall can be effectively shortened.
[0011] Preferably, the connecting steel structure comprises a plurality of columns fixedly installed on the surface of the wall, the plurality of columns are arranged in parallel on the surface of the wall at a set width and vertically to the ground.
[0012] The side away from the wall of the plurality of columns is fixedly installed with a plurality of H-shaped steels, the plurality of H-shaped steels are arranged in parallel on the surface of the plurality of columns at a set height and horizontally to the ground.
[0013] The plurality of groups of connecting pieces are detachably installed on the plurality of H-shaped steels.
[0014] By adopting the technical scheme, the column is installed on the surface of the wall, the H-shaped steel can be connected, the connecting piece can be conveniently installed through the H-shaped steel, and the stone unit can be installed through the connecting piece.
[0015] Preferably, the top of the H-shaped steel is provided with a plurality of positioning slots matched with the mounting plate.
[0016] By adopting the technical scheme, the positioning slots can be used to quickly position the installation position of the connecting piece by the installation personnel, the measuring process of the operator in installing the connecting piece is saved, and the efficiency of installing the stone unit and the building curtain wall is further improved.
[0017] Preferably, the bottom of the mounting plate is fixedly installed with a first limiting plate and a second limiting plate, and the first limiting plate and the second limiting plate are respectively clamped on the front and rear sides of the H-shaped steel.
[0018] By adopting the technical scheme, the first limiting plate and the second limiting plate are clamped on the front and rear sides of the H-shaped steel, so that the operator can be free from holding the connecting plate during the installation process, and the mounting plate as a whole is fixed on the H-shaped steel through the first limiting plate and the second limiting plate.
[0019] Preferably, a plurality of said columns are detachably installed with a plurality of fixing members at a set height interval, said fixing members each include a C-shaped member and two fixing plates, two said fixing plates are located on both sides of said C-shaped member, and two said fixing plates are fixedly installed on the wall body by expansion bolts;
[0020] Said C-shaped members are each provided with a C-shaped groove, said columns are embedded in said C-shaped groove, and said columns are fixedly connected with said C-shaped members by bolts.
[0021] By adopting the above technical scheme, through a plurality of fixing members, an installer can fix the columns on the surface of the wall body by expansion bolts.
[0022] Preferably, the side of said column away from the wall body is provided with a connecting groove for limiting the position of said H-shaped steel, and a clamping groove is formed in the inner wall of the bottom of said connecting groove.
[0023] Said H-shaped steels each include a clamping plate at the bottom, and said clamping plates are respectively embedded in said clamping grooves.
[0024] By adopting the above technical scheme, through the clamping groove at the bottom of the connecting groove, the clamping plate at the bottom of the H-shaped steel can be limited in position, further improving the stability of the connection between the H-shaped steel and the column.
[0025] In summary, the building curtain wall quick connection structure of the present application has at least one of the following beneficial technical effects:
[0026] 1. During actual installation, an operator can install a connecting steel structure on the surface of the wall body in advance according to the size and installation position of the building curtain wall, then install a connecting member on the connecting steel structure, and position the upper and lower ends of the stone unit by the first connecting part and the second connecting part on the installation plate of the connecting member. Since the upper and lower ends of the stone unit are each provided with a slot, and the first connecting part and the second connecting part are provided on one connecting member, the same connecting member can be used to fix the upper end and the lower end of two adjacent stone units when installing the stone unit, which can effectively improve the convenience and efficiency of the operator in installing the stone unit and effectively shorten the construction period of the stone curtain wall.
[0027] 2. Through the provision of the positioning groove, an installer can quickly position the installation position of the connecting member, saving the measurement process during the installation of the connecting member, and further improving the efficiency of installing the stone unit and the building curtain wall. BRIEF DESCRIPTION OF DRAWINGS
[0028] Figure 1 is a schematic view of the stone unit overall installation structure of the embodiment of the present application.
[0029] Figure 2 is a schematic view of the stone unit overall installation structure of the embodiment of the present application.Figure 1 Enlarged schematic view at A.
[0030] Figure 3 is a schematic diagram of the connection relationship between the column and the H-shaped steel.
[0031] Label explanation: 1, stone unit; 11, slot; 2, wall; 3, connecting piece; 31, mounting plate; 32, first connecting part; 33, second connecting part; 34, first limiting plate; 35, second limiting plate; 4, column; 41, connecting groove; 42, clamping groove; 5, H-shaped steel; 51, positioning groove; 52, clamping plate; 6, fixing piece; 61, C-shaped piece; 62, fixing plate. DETAILED DESCRIPTION
[0032] The following will be combined with the Figures 1-3 Further detailed description of the present application.
[0033] Embodiments
[0034] The embodiments of the present application disclose a building curtain wall quick connection structure. Referring to Figures 1-3 , mainly including connecting steel structure and a plurality of stone units 1, the connecting steel structure is fixedly installed on the wall 2 of the building, and the plurality of stone units 1 can be detachably installed on the connecting steel structure; a plurality of groups of connecting pieces 3 are fixedly installed on the connecting steel structure and arranged in parallel, the connecting piece 3 includes a mounting plate 31, the mounting plate 31 is detachably connected with the connecting steel structure, the first connecting part 32 and the second connecting part 33 are fixedly installed on the mounting plate 31, the first connecting part 32 is located at the top of the mounting plate 31, and the second connecting part 33 is located at the bottom of the mounting plate 31; the upper and lower ends of any stone unit 1 are respectively provided with slots 11, and the first connecting part 32 and the second connecting part 33 located on the same mounting plate 31 are respectively inserted into the slots 11 of the upper and lower adjacent two stone units 1.
[0035] In the actual installation process, the operator can install the connecting steel structure on the surface of the wall 2 according to the size and installation position of the building curtain wall, then install the connecting piece 3 on the connecting steel structure, and position the upper and lower ends of the stone unit 1 through the first connecting part 32 and the second connecting part 33 on the mounting plate 31 of the connecting piece 3, since the upper and lower ends of the stone unit 1 are provided with the slots 11 and the first connecting part 32 and the second connecting part 33 are provided on one connecting piece 3, the upper end and the lower end of the adjacent two stone units 1 can be fixed through the same connecting piece 3 when the stone unit 1 is installed, which can effectively improve the convenience and efficiency of the operator in installing the stone unit 1 and effectively shorten the construction period of the stone curtain wall.
[0036] It needs to be explained that in the embodiment of the application, each stone unit 1 is connected by four connecting pieces 3, and the four connecting pieces 3 are located at the top and bottom ends of the stone unit 1.
[0037] With reference to Figure 1 And Figure 3 The connecting steel structure comprises a plurality of columns 4 fixedly installed on the surface of the wall 2, the plurality of columns 4 are arranged in parallel on the surface of the wall 2 at a set width and are arranged vertically to the ground, and a plurality of H-shaped steels 5 are fixedly installed on the side of the plurality of columns 4 away from the wall 2, the plurality of H-shaped steels 5 are arranged in parallel on the surface of the plurality of columns 4 at a set height and are arranged horizontally to the ground.
[0038] The column 4 is installed on the surface of the wall 2, which can realize the connection of the H-shaped steel 5, and through the H-shaped steel 5, the connecting piece 3 can be conveniently installed, and the stone unit 1 can be installed through the connecting piece 3.
[0039] With reference to the drawings, the top of the H-shaped steel 5 is provided with a plurality of positioning grooves 51 matched with the installation plate 31. Through the positioning grooves 51, the installation position of the connecting piece 3 can be quickly positioned by the installer, the measuring process in the process of installing the connecting piece 3 by the operator is saved, and the efficiency of installing the stone unit 1 and the building curtain wall is further improved.
[0040] It needs to be explained that in the embodiment of the application, the positioning grooves 51 are opened at the top of the H-shaped steel 5 according to the width size of the stone unit 1, the installation position of the connecting piece 3 and the stone unit 1; before installation, the operator can preinstall the column 4 and the H-shaped steel 5 to form the main structure of the connecting steel structure, and then fix the column 4 on the surface of the structure through the fixing piece 6.
[0041] With reference to Figure 2 The bottom of the installation plate 31 is fixedly installed with a first limiting plate 34 and a second limiting plate 35, and the first limiting plate 34 and the second limiting plate 35 are respectively clamped on the front and rear sides of the H-shaped steel 5.
[0042] The first limiting plate 34 and the second limiting plate 35 are clamped on the front and rear sides of the H-shaped steel 5, so that the operator can avoid holding the connecting plate during installation, and the installation plate 31 can be fixed on the H-shaped steel 5 as a whole through the first limiting plate 34 and the second limiting plate 35.
[0043] With reference to Figure 1 And Figure 3Each of the columns 4 is detachably equipped with several fasteners 6 at predetermined height intervals. Each fastener 6 includes a C-shaped component 61 and two fixing plates 62. The two fixing plates 62 are located on both sides of the C-shaped component 61 and are fixed to the wall 2 by expansion bolts. Each C-shaped component 61 has a C-shaped groove, in which the columns 4 are embedded, and the columns 4 are fixedly connected to the C-shaped components 61 by bolts. The multiple fasteners 6 allow installers to easily fix the columns 4 to the surface of the wall 2 using expansion bolts.
[0044] Reference Figure 2 On the side of the column 4 away from the wall 2, there are several connecting grooves 41 for limiting the position of the H-beams 5. A slot 42 is formed on the bottom inner wall of the connecting groove 41. Each H-beam 5 includes a bottom retaining plate 52, which is embedded in the slot 42. The slot 42 at the bottom of the connecting groove 41 limits the position of the retaining plate 52 at the bottom of the H-beam 5, further improving the stability of the connection between the H-beam 5 and the column 4.
[0045] The implementation principle of a quick connection structure for building curtain walls in this application embodiment is as follows: During the actual installation process, the operator can pre-install the connecting steel structure on the surface of the wall 2 according to the size and installation position of the building curtain wall. Then, by installing the connector 3 on the connecting steel structure, the upper and lower ends of the stone unit 1 are positioned by the first connecting part 32 and the second connecting part 33 on the mounting plate 31 of the connector 3. Since the upper and lower ends of the stone unit 1 are provided with slots 11, and the first connecting part 32 and the second connecting part 33 are provided on one connector 3, the upper and lower ends of two adjacent stone units 1 can be fixed by the same connector 3 when installing the stone unit 1. This can effectively improve the convenience and efficiency of the operator in installing the stone unit 1 and can effectively shorten the construction period of the stone curtain wall installation.
[0046] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A quick connection structure of a building curtain wall, characterized by, The application relates to a connecting steel structure and a plurality of stone units (1), wherein the connecting steel structure is fixedly installed on a wall (2) of a building, and the plurality of stone units (1) are detachably installed on the connecting steel structure. A plurality of groups of connecting members (3) are fixedly installed on the connecting steel structure in parallel, wherein each connecting member (3) comprises an installation plate (31) which is detachably connected with the connecting steel structure, a first connecting part (32) and a second connecting part (33) are fixedly installed on the installation plate (31), the first connecting part (32) is located at the top of the installation plate (31), and the second connecting part (33) is located at the bottom of the installation plate (31). The upper and lower ends of any stone unit (1) are respectively provided with insertion grooves (11), and the first connecting part (32) and the second connecting part (33) located on the same installation plate (31) are respectively inserted into the insertion grooves (11) of two adjacent stone units (1) above and below.
2. The quick connection structure of a building curtain wall according to claim 1, characterized in that, The connecting steel structure comprises a plurality of vertical columns (4) which are fixedly installed on the surface of the wall (2), the plurality of vertical columns (4) are arranged on the surface of the wall (2) in parallel at a set width interval, and the plurality of vertical columns (4) are arranged on the surface of the wall (2) in parallel at a set height interval. A plurality of H-shaped steels (5) are fixedly installed on the side of the plurality of vertical columns (4) away from the wall (2), the plurality of H-shaped steels (5) are arranged on the surface of the plurality of vertical columns (4) in parallel at a set height interval, and the plurality of H-shaped steels (5) are arranged on the surface of the plurality of vertical columns (4) in parallel at a set height interval. A plurality of groups of connecting members (3) are detachably installed on the plurality of H-shaped steels (5).
3. The quick connection structure of a building curtain wall according to claim 2, characterized in that, The top of each H-shaped steel (5) is provided with a plurality of positioning grooves (51) which are matched with the installation plates (31).
4. The quick connection structure of a building curtain wall according to claim 3, characterized in that, The bottom of each installation plate (31) is fixedly provided with a first limiting plate (34) and a second limiting plate (35), the first limiting plate (34) and the second limiting plate (35) are respectively clamped on the front and back sides of the H-shaped steel (5).
5. The quick connection structure of a building curtain wall according to claim 4, characterized in that, A plurality of fixing members (6) are detachably installed on the plurality of vertical columns (4) at a set height interval, each fixing member (6) comprises a C-shaped member (61) and two fixing plates (62), the two fixing plates (62) are located on the two sides of the C-shaped member (61), and the two fixing plates (62) are fixedly installed on the wall (2) through expansion bolts. Each C-shaped member (61) is provided with a C-shaped groove, the vertical column (4) is embedded in the C-shaped groove, and the vertical column (4) is fixedly connected with the C-shaped member (61) through bolts.
6. The quick connection structure of a building curtain wall according to claim 5, characterized in that, The side of the vertical column (4) away from the wall (2) is provided with a connecting groove (41) for limiting the position of the H-shaped steel (5), and a clamping groove (42) is formed in the bottom inner wall of the connecting groove (41). Each H-shaped steel (5) comprises a clamping plate (52) at the bottom, and the clamping plate (52) is embedded in the clamping groove (42).