Building water and electricity heating installation supporting frame
By designing a combination of support frame, compensation mechanism and buffer rubber plate, the problem of deformation or cracking during pipeline fastening is solved, achieving stable pipeline fixation and extending service life.
Patent Information
- Application Number
- CN202422850716.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2034-11-22
AI Technical Summary
Existing building water, electricity, and heating pipe installation support frames are prone to pipe deformation or cracking during the tightening process, affecting their service life.
A building water, electricity and heating installation support frame was designed, which includes a support frame, a compensation mechanism, a suspension mechanism and an installation mechanism. It uses a buffer rubber plate and threaded connection to provide space for the pipes to move downward and avoid over-tightening.
This effectively prevents the pipe from deforming or cracking during the tightening process, thus extending the service life of the pipe.
Smart Images

Figure CN223690517U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the installation support frame field of pipeline, specifically is a building water and electricity and warm installation support frame. BACKGROUND
[0002] The pipeline of water, electricity and heating in the building enters the pipeline section and is generally installed on the upper wall of the basement, and when the water, electricity and heating pipeline is fixed, the installation support frame is generally used for fixed installation.
[0003] The existing installation support frame generally uses the mounting frame and the support frame to realize fixed installation, but if the locking is excessive during the fixing of the mounting frame, the pipeline made of plastic will be excessively compressed, which will cause the deformation of the fastening position of the pipeline, or even the cracking of the fastening position of the pipeline, thereby affecting the service life of the pipeline. UTILITY MODEL CONTENTS
[0004] The utility model discloses a building water and electricity and warm installation support frame.
[0005] In order to realize the above-mentioned purpose, the utility model provides the following technical scheme: a building water and electricity and warm installation support frame, including the support frame, the top of support frame installs the compensation mechanism, the bottom of support frame horizontal board part is provided with the suspension mechanism that passes to the compensation mechanism top, the bottom of support frame is installed with the installation mechanism that extends to the compensation mechanism top, the installation mechanism is used for the fixed installation of water, electricity, the pipeline of warm,
[0006] The suspension mechanism includes a connecting rod that penetrates from below the horizontal plate portion of the support frame to above the compensation mechanism, the top end of the connecting rod is fixedly connected with the top wall through expansion bolts, an outer thread is formed on the outer wall of the connecting rod below, and a first fixed hexagonal nut is connected to the outer wall of the connecting rod below through the outer thread.
[0007] As a further scheme of the utility model: the compensation mechanism includes a buffer rubber plate located at the top end of the horizontal plate portion of the support frame, limit side plates are integrally formed at both ends of the buffer rubber plate, the distance between the two limit side plates is equal to the length of the support frame, a limit end plate extending downward is integrally formed below one end of the buffer rubber plate, and when the buffer rubber plate is flush with the vertical plate portion of the support frame in the up-down position, the limit end plate is attached to the outer side of the vertical plate portion of the support frame.
[0008] As a further scheme of the utility model: an upper slot extending through the bottom end of the buffer rubber plate is formed at the top end of the buffer rubber plate, and a lower slot extending through the horizontal plate portion below is formed at the top end of the horizontal plate portion of the support frame.
[0009] As a further scheme of the utility model: the inner wall of the upper strip-shaped groove and the lower strip-shaped groove is inserted with a mounting frame, the mounting frame is a "U" type structure which is turned over by 180 degrees.
[0010] As a further scheme of the utility model: the outer wall of the two vertical rod parts of the mounting frame is formed with external threads, the vertical rod part outer wall of the mounting frame is threadedly connected with a No. 2 fixed hexagonal nut, and the No. 2 fixed hexagonal nut is located below the horizontal plate part of the support frame.
[0011] As a further scheme of the utility model: the horizontal plate part of the support frame and the top end of the buffer rubber plate are provided with a round hole for the connecting rod to penetrate.
[0012] Compared with the prior art, the utility model has the beneficial effects that:
[0013] 1. By setting the compensation mechanism, the compensation mechanism provides a downward moving space for the pipeline, avoiding the problem of direct deformation or rupture of the pipeline when fastening is excessive. BRIEF DESCRIPTION OF DRAWINGS
[0014] Figure 1 It is a structural schematic view of the utility model;
[0015] Figure 2 It is a mounting schematic view of the mounting frame of the utility model;
[0016] Figure 3 It is a Figure 2 It is a local enlarged view of A in the middle;
[0017] Figure 4 It is a butt joint schematic view of the buffer rubber plate and the support frame of the utility model;
[0018] Figure 5 It is a Figure 4 It is a local enlarged view of B in the middle.
[0019] In the drawing: 1, support frame; 2, buffer rubber plate; 3, connecting rod; 4, mounting frame; 5, No. 1 fixed hexagonal nut; 6, No. 2 fixed hexagonal nut; 7, limiting side plate; 8, upper strip-shaped groove; 9, limiting end plate; 10, lower strip-shaped groove. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0021] Please refer to Figures 1-5 In the embodiment of the utility model, a building water, electricity and heating installation support frame, including support frame 1, support frame 1's top end is equipped with compensation mechanism, support frame 1's horizontal plate part bottom is provided with the suspension mechanism that penetrates to compensation mechanism top, support frame 1 below is equipped with the installation mechanism that extends to compensation mechanism top, and installation mechanism is used for the fixed installation of water, electricity, warm pipe;Suspension mechanism includes from support frame 1 horizontal plate part below penetrates to compensation mechanism top's connecting rod 3, connecting rod 3's top end and top wall body are fixedly connected through expansion bolt, the outer wall below of connecting rod 3 is formed with external thread, and the outer wall below of connecting rod 3 is connected with No. fixed hexagon nut 5 through external thread.
[0022] In the embodiment: first, after measuring, carry out the drilling on top wall body, and the expansion pipe of expansion bolt is inserted, then the bolt part of expansion bolt is screwed in the expansion pipe, and is locked and tightened, can the mounting plate of connecting rod 3 top be fixed, and the slot for bolt part penetration is set up on mounting plate;
[0023] Afterwards, compensation mechanism is butt-jointed on the outside of support frame 1 until both are completely effectively butt-jointed, then support frame 1 is pushed upwards, support frame 1 is sleeved with connecting rod 3 until connecting rod 3 moves to the preset height, the bottom end thereof contacts the outer circumferential bottom end of water or electricity or heating pipe, then the position of support frame 1 is fixed, and the fixation of support frame 1 to the pipe is formed.
[0024] Please refer to Figure 1 、 Figure 2 、 Figure 3 、 Figure 4 And Figure 5 , compensation mechanism includes the buffer rubber plate 2 at the top of the horizontal plate part of the support frame 1, the two ends of the buffer rubber plate 2 are integrally formed with limit side plates 7, the distance between the two limit side plates 7 is equal to the length of the support frame 1, and the one end of the buffer rubber plate 2 is integrally formed with a limit end plate 9 extending downward. When the buffer rubber plate 2 is flush with the support frame 1 in the up-down position, the limit end plate 9 is attached to the outer side of the vertical plate part of the support frame 1.
[0025] In the embodiment: when the compensation mechanism is butt-jointed with the support frame 1, the buffer rubber plate 2 is placed on the top of the horizontal plate part of the support frame 1, then the buffer rubber plate 2 is moved, at this time, the limit side plates 7 on both sides of the buffer rubber plate 2 move along the edges of the support frame 1, avoiding the dislocation of the buffer rubber plate 2 and the horizontal plate part of the support frame 1 during the movement, until the limit end plate 9 is attached to the vertical plate part of the support frame 1, at this time, the buffer rubber plate 2 is completely aligned with the support frame 1 in the up-down direction.
[0026] Please refer toFigure 2 、 Figure 3 With Figure 5 The top end of the buffer rubber plate 2 is provided with an upper strip-shaped groove 8 penetrating to the bottom end of the buffer rubber plate 2, and the top end of the horizontal plate part of the support frame 1 is provided with a lower strip-shaped groove 10 penetrating to the lower part of the horizontal plate part, and the inner walls of the upper strip-shaped groove 8 and the lower strip-shaped groove 10 are inserted with the mounting frame 4, and the mounting frame 4 is in a "U" type structure turned over by 180 degrees.
[0027] In this embodiment: after the buffer rubber plate 2 is connected with the support frame 1, and after the support frame 1 is connected with the connecting rod 3, the fixing of the support frame 1 is completed, at this time, the two vertical rod parts of the mounting frame 4 are inserted into the upper strip-shaped groove 8 and the lower strip-shaped groove 10 and penetrate to the lower part of the horizontal plate part of the support frame 1, and after the mounting frame 4 is inserted, the arc-shaped part at the top end of the mounting frame 4 is attached to the upper part of the outer wall of the pipeline, and the limiting of the pipeline is completed.
[0028] Please refer to Figure 3 The outer walls of the two vertical rod parts of the mounting frame 4 are formed with external threads, and the vertical rod part of the mounting frame 4 is threadedly connected with the No. 2 fixed hexagonal nut 6, and the No. 2 fixed hexagonal nut 6 is located below the horizontal plate part of the support frame 1.
[0029] In this embodiment: after the mounting frame 4 is inserted, the No. 2 fixed hexagonal nut 6 is threadedly connected with the vertical rod part of the mounting frame 4, and during the tightening of the No. 2 fixed hexagonal nut 6, a downward force can be formed on the mounting frame 4, so as to realize the installation and fixation of the pipeline, and during the tightening of the No. 2 fixed hexagonal nut 6, a downward pressure is formed on the outer wall of the pipeline, the downward pressure acts on the pipeline, and the local force of the pipeline changes, and the force of the pipeline acts on the buffer rubber plate 2, so as to provide a compensation space for the downward movement of the pipeline, and avoid the situation that the pipeline is tightly fixed and the pipeline is deformed due to excessive pressure;
[0030] After the support frame 1 is connected with the connecting rod 3 and is moved to the preset height, the No. 1 fixed hexagonal nut 5 is used to connect with the connecting rod 3, and after the connection, the support frame 1 can be limited and fixed.
[0031] Please refer to Figure 5 The horizontal plate part of the support frame 1 and the top end of the buffer rubber plate 2 are provided with a circular hole for the connecting rod 3 to penetrate.
[0032] In this embodiment: the circular hole can realize the connection of the connecting rod 3 and the support frame 1.
[0033] The above merely describes a preferred embodiment of the present application, and the protection scope of the present application is not limited thereto, and any skilled person in the art, according to the technical scheme and the inventive concept of the present application, makes equivalent replacement or change within the technical range disclosed by the present application, which should be covered within the protection scope of the present application.
Claims
1. A building water, electricity and heating installation support frame comprising a support frame (1), characterized in that, The top end of the support frame (1) is provided with a compensation mechanism, the bottom end of the horizontal plate part of the support frame (1) is provided with a suspension mechanism penetrating above the compensation mechanism, and the bottom of the support frame (1) is provided with a mounting mechanism extending above the compensation mechanism, which is used for fixing and mounting water, electricity and heating pipes. The suspension mechanism comprises a connecting rod (3) penetrating from below the horizontal plate part of the support frame (1) to above the compensation mechanism, the top end of the connecting rod (3) is fixedly connected with the top wall through expansion bolts, and external threads are formed on the outer wall of the connecting rod (3) below.
2. The building water, electricity and heating installation support frame according to claim 1, characterized in that, The compensation mechanism comprises a buffer rubber plate (2) located at the top end of the horizontal plate part of the support frame (1), both ends of the buffer rubber plate (2) are integrally formed with limiting side plates (7), the distance between the two limiting side plates (7) is equal to the length of the support frame (1), and a limiting end plate (9) extending downward is integrally formed at one end of the buffer rubber plate (2) below.
3. The building water, electricity and heating installation support frame according to claim 2, characterized in that, The top end of the buffer rubber plate (2) is provided with an upper strip-shaped groove (8) penetrating to the bottom end of the buffer rubber plate (2), and the top end of the horizontal plate part of the support frame (1) is provided with a lower strip-shaped groove (10) penetrating to below the horizontal plate part.
4. The building water, electricity and heating installation support frame according to claim 3, characterized in that, The inner walls of the upper strip-shaped groove (8) and the lower strip-shaped groove (10) are inserted with a mounting bracket (4), and the mounting bracket (4) is in a "U" type structure turned by 180 degrees.
5. The support frame according to claim 4, wherein, The outer walls of the two vertical rod parts of the mounting bracket (4) are formed with external threads, the outer wall threads of the vertical rod part of the mounting bracket (4) are connected with a No. 2 fixed hexagon nut (6), and the No. 2 fixed hexagon nut (6) is located below the horizontal plate part of the support frame (1).
6. The support frame according to claim 5, wherein, The top end of the support frame (1) is provided with a compensation mechanism, the bottom end of the horizontal plate part of the support frame (1) is provided with a suspension mechanism penetrating above the compensation mechanism, and the bottom of the support frame (1) is provided with a mounting mechanism extending above the compensation mechanism, which is used for fixing and mounting water, electricity and heating pipes. The suspension mechanism comprises a connecting rod (3) penetrating from below the horizontal plate part of the support frame (1) to above the compensation mechanism, the top end of the connecting rod (3) is fixedly connected with the top wall through expansion bolts, and external threads are formed on the outer wall of the connecting rod (3) below. The compensation mechanism comprises a buffer rubber plate (2) located at the top end of the horizontal plate part of the support frame (1), both ends of the buffer rubber plate (2) are integrally formed with limiting side plates (7), the distance between the two limiting side plates (7) is equal to the length of the support frame (1), and a limiting end plate (9) extending downward is integrally formed at one end of the buffer rubber plate (2) below. The top end of the buffer rubber plate (2) is provided with an upper strip-shaped groove (8) penetrating to the bottom end of the buffer rubber plate (2), and the top end of the horizontal plate part of the support frame (1) is provided with a lower strip-shaped groove (10) penetrating to below the horizontal plate part. The inner walls of the upper strip-shaped groove (8) and the lower strip-shaped groove (10) are inserted with a mounting bracket (4), and the mounting bracket (4) is in a "U" type structure turned by 180 degrees. The outer walls of the two vertical rod parts of the mounting bracket (4) are formed with external threads, the outer wall threads of the vertical rod part of the mounting bracket (4) are connected with a No. 2 fixed hexagon nut (6), and the No. 2 fixed hexagon nut (6) is located below the horizontal plate part of the support frame (1). The top end of the support frame (1) is provided with a compensation mechanism, the bottom end of the horizontal plate part of the support frame (1) is provided with a suspension mechanism penetrating above the compensation mechanism, and the bottom of the support frame (1) is provided with a mounting mechanism extending above the compensation mechanism, which is used for fixing and mounting water, electricity and heating pipes.