Foundation gas content tester for concrete pipeline
By introducing a fastening mechanism into the concrete air content analyzer, and utilizing the combination of bolts and springs, the problems of cumbersome connection between the cover and the barrel and poor sealing performance are solved, achieving simple and reliable sealing and efficient operation.
Patent Information
- Application Number
- CN202522432399.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-17
- Publication Date
- 2025-12-19
- Estimated Expiration
- 2035-11-17
AI Technical Summary
The existing fastening structure between the cover and the barrel of the concrete air content meter is cumbersome to operate and makes it difficult to guarantee the sealing, which affects the measurement efficiency and accuracy.
The system employs a fastening mechanism between the barrel and the lid, including a connecting buckle, studs, bolts, and springs. Through the bolt connection and the cooperation of the springs, it achieves simple and reliable sealing and opening. The connecting buckle is always connected to the lid and is not easily lost.
It achieves a simple and reliable connection between the barrel and the lid, ensuring sealing and operational efficiency, and improving the accuracy and convenience of measurement.
Smart Images

Figure CN223692377U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to pipeline construction technical field, concretely is concrete pipeline foundation air content tester. BACKGROUND
[0002] In the pipeline construction technical field, accurately determining the air content of concrete pipeline foundation is crucial to ensure the quality of the project.
[0003] At present, the widely used traditional concrete air content tester usually contains a barrel, a cover, a barometer, a pressure pump and multiple valves. In actual operation, it is necessary to frequently open and close the cover and the barrel for loading, tamping and cleaning. After each cover is closed, the sealing surface between the two must be ensured to have high sealing performance to prevent gas leakage during work. The existing buckle structure between the cover and the barrel is complicated to operate, low in efficiency, and difficult to stably ensure the sealing reliability. UTILITY MODEL CONTENT
[0004] In order to solve the technical problems existing in the background art, the utility model provides a concrete pipeline foundation air content tester, which is more convenient and reliable in connecting and fixing between the barrel and the cover.
[0005] The technical scheme adopted by the utility model to solve its technical problems is:
[0006] The concrete pipeline foundation air content tester comprises:
[0007] The barrel is provided with a barrel edge;
[0008] The cover is provided with a cover edge;
[0009] The buckle mechanism is used for fixing the cover on the barrel;
[0010] The buckle mechanism comprises:
[0011] The connecting buckle is provided with a groove for accommodating the barrel edge and the cover edge;
[0012] The stud is threadedly connected to the upper end of the connecting buckle, and the lower end of the stud can be pressed on the upper end surface of the cover edge;
[0013] The bolt is fixedly arranged on the upper end of the cover edge, and the connecting buckle is movably sleeved on the bolt.
[0014] Further, the connecting buckle comprises a first connecting piece, a second connecting piece and a third connecting piece;
[0015] The first connecting piece is arranged on the upper end of the cover edge in the horizontal direction and movably sleeved on the bolt;
[0016] The second connecting piece is arranged on the lower end of the first connecting piece in the vertical direction;
[0017] The third connecting piece is arranged at the lower end of the second connecting piece in a horizontal direction;
[0018] The first connecting piece, the second connecting piece and the third connecting piece are combined to form a groove structure with an opening facing inward for accommodating the barrel rim and the cover rim.
[0019] Further, the outer periphery of the rod of the bolt is sleeved with a spring, and the upper and lower ends of the spring are respectively abutted with the head of the bolt and the first connecting piece.
[0020] Further, the end of the first connecting piece away from the second connecting piece is provided with a first connecting hole and a second connecting hole, the lower end of the spring is arranged in the first connecting hole, and the bolt is movably inserted into the second connecting hole.
[0021] Further, the end of the first connecting piece close to the second connecting piece is provided with a third connecting hole, and the stud is threadedly connected in the third connecting hole.
[0022] Further, the outer sides of the first connecting piece, the second connecting piece and the third connecting piece are provided with reinforcing ribs.
[0023] The beneficial effects of the present application are as follows:
[0024] (1) The connection and fixation between the barrel body and the cover body are more convenient and reliable.
[0025] (2) When sealing is needed, the connecting buckle is rotated around the bolt, the barrel rim and the cover rim are clamped into the groove structure of the connecting buckle, and the upper stud is screwed downward to press downward, so that the tight sealing between the cover body and the barrel body is realized, and the sealing effect is reliable.
[0026] (3) When opening is needed, the upper stud is unscrewed in reverse, the lower end thereof is separated from the cover body, then the connecting buckle is rotated around the bolt in reverse, the barrel rim and the cover rim are separated from the groove structure of the connecting buckle, and the separation of the cover body and the barrel body is realized.
[0027] (4) During disassembly, the connecting buckle is always connected to the cover body through the bolt and cannot be separated from the cover body, so that the operation is facilitated and the connecting buckle is not easy to lose.
[0028] (5) The spring can ensure that the connecting buckle can rotate around the bolt, and maintain a gap between the lower end of the connecting buckle and the cover rim for accommodating the barrel rim, so that the quick alignment and installation are facilitated. BRIEF DESCRIPTION OF DRAWINGS
[0029] The present application will be further described below in combination with the drawings and embodiments.
[0030] Figure 1 is a structural schematic view of the present application;
[0031] Figure 2 is a structural schematic view of the buckling mechanism;
[0032] Figure 3 This is a cross-sectional view of the fastening mechanism;
[0033] Figure 4 This is a cross-sectional view of the connecting buckle.
[0034] In the picture:
[0035] 1. Barrel body, 2. Lid, 3. Fastening mechanism;
[0036] 11. Rim of the bucket;
[0037] 21. Lid rim;
[0038] 31. Connecting buckle; 32. Stud; 33. Spring; 34. Bolt;
[0039] 311. First connector, 312. Second connector, 313. Third connector, 314. First connecting hole, 315. Second connecting hole, 316. Third connecting hole. Detailed Implementation
[0040] The present invention will be further described in detail below with reference to the accompanying drawings.
[0041] like Figure 1 , 2 As shown, the specific structure of the air content measuring instrument for concrete pipe foundations includes a barrel 1 and a cover 2. The structure of the cover 2 and the installed pressure gauge, valves, etc., are all existing technologies. A barrel rim 11 is provided at the upper end of the barrel 1, and a cover rim 21 is provided at the lower end of the cover 2. A fastening mechanism 3 is used to fix the cover 2 to the barrel 1, thereby sealing the barrel 1. The connection and fixation between the barrel 1 and the cover 2 is simpler and more reliable.
[0042] like Figure 3 , 4 As shown, the specific structure of the fastening mechanism 3 includes a connecting buckle 31, which has a groove for accommodating the barrel rim 11 and the cover rim 21. A stud 32 is threadedly connected to the upper end of the connecting buckle 31, and the lower end of the stud 32 can press against the upper end face of the cover rim 21. A bolt 34 is fixedly disposed on the upper end of the cover rim 21, and the connecting buckle 31 is movably sleeved on the bolt 34. The connecting buckle 31 can rotate around the bolt 34 and can also move along the axial direction of the bolt 34. During disassembly and assembly, the connecting buckle 31 is always connected to the cover 2 by the bolt 34 and will not detach from the cover 2, making it easy to operate and not easy to lose. A spring 33 is sleeved on the outer periphery of the shank of the bolt 34, and the upper and lower ends of the spring 33 abut against the head of the bolt 34 and the first connecting member 311, respectively. The spring 33 can ensure that the connecting buckle 31 can rotate around the bolt 34 and maintain a gap between the lower end of the connecting buckle 31 and the cover rim 21 for accommodating the barrel rim 11, which facilitates quick alignment and installation with the barrel 1.
[0043] When the barrel 1 and the cover 2 need to be sealed, the connecting buckle 31 is rotated clockwise around the bolt 34, the barrel along 11 and the cover along 21 are clamped into the groove structure of the connecting buckle 31, and the upper bolt 32 is screwed downward to press downward, so that the cover 2 and the barrel 1 are tightly sealed, and the sealing effect is reliable. When opening is needed, the upper bolt 32 is screwed in the opposite direction, the lower end of the bolt 32 is separated from the cover 2, and then the connecting buckle 31 is rotated counterclockwise around the bolt 34, so that the barrel along 11 and the cover along 21 are separated from the groove structure of the connecting buckle 31, and the cover 2 and the barrel 1 are separated.
[0044] The specific structure of the connecting buckle 31 includes a first connecting piece 311, a second connecting piece 312 and a third connecting piece 313 which are integrally formed. The outer sides of the first connecting piece 311, the second connecting piece 312 and the third connecting piece 313 are provided with reinforcing ribs, so as to further ensure the strength of the three. The first connecting piece 311 is arranged at the upper end of the cover along 21 in the horizontal direction and is movably sleeved on the bolt 34. The second connecting piece 312 is arranged at the lower end of the first connecting piece 311 in the vertical direction. The third connecting piece 313 is arranged at the lower end of the second connecting piece 312 in the horizontal direction. The first connecting piece 311 and the third connecting piece 313 are located on the same side of the second connecting piece 312. The first connecting piece 311, the second connecting piece 312 and the third connecting piece 313 are combined into a groove structure with an opening inward for accommodating the barrel along 11 and the cover along 21.
[0045] The end of the first connecting piece 311 away from the second connecting piece 312 is provided with a first connecting hole 314 and a second connecting hole 315, and the first connecting hole 314 and the second connecting hole 315 form a stepped hole. The lower end of the spring 33 is arranged in the first connecting hole 314, and the bolt 34 is movably inserted into the second connecting hole 315. The end of the first connecting piece 311 close to the second connecting piece 312 is provided with a third connecting hole 316, and the bolt 32 is threadedly connected in the third connecting hole 316.
[0046] Based on the above ideal embodiments of the present application, through the above description, relevant personnel can make various changes and modifications without deviating from the technical idea of the present application. The technical scope of the present application is not limited to the contents in the specification, and must be determined according to the scope of claims.
Claims
1. A concrete pipe foundation air content meter, characterized by, The utility model relates to a concrete pipe foundation air content tester, including: Barrel body (1) is seted up with the barrel edge (11); Cover body (2) is seted up with the cover edge (21); The buckle mechanism (3) is used for fixing the cover body (2) on the barrel body (1); The buckle mechanism (3) includes: Connecting buckle (31) is seted up with the recess for accommodating the barrel edge (11) and cover edge (21); Stud (32) is screwed on the upper end of connecting buckle (31), and the lower end of stud (32) can be pressed on the upper end surface of cover edge (21); Bolt (34) is fixedly arranged on the upper end of cover edge (21), and connecting buckle (31) is movably sleeved on bolt (34).
2. The concrete pipe foundation air content tester according to claim 1, wherein: The connecting buckle (31) includes a first connecting piece (311), a second connecting piece (312), and a third connecting piece (313); The first connecting piece (311) is movably sleeved on the bolt (34) and arranged on the upper end of the cover edge (21) in the horizontal direction; The second connecting piece (312) is arranged on the lower end of the first connecting piece (311) in the vertical direction; The third connecting piece (313) is arranged on the lower end of the second connecting piece (312) in the horizontal direction; The first connecting piece (311), the second connecting piece (312), and the third connecting piece (313) are combined to form a recess structure with an opening facing inward for accommodating the barrel edge (11) and the cover edge (21).
3. The concrete pipe foundation air content tester according to claim 2, wherein: The outer periphery of the shank of the bolt (34) is sleeved with a spring (33), and the upper and lower ends of the spring (33) respectively abut against the head of the bolt (34) and the first connecting piece (311).
4. The concrete pipe foundation air content tester according to claim 3, wherein: The end of the first connecting piece (311) away from the second connecting piece (312) is provided with a first connecting hole (314) and a second connecting hole (315), the lower end of the spring (33) is arranged in the first connecting hole (314), and the bolt (34) is movably inserted into the second connecting hole (315).
5. The concrete pipe foundation air content tester according to claim 3, wherein: The end of the first connecting piece (311) close to the second connecting piece (312) is provided with a third connecting hole (316), and the stud (32) is screwed into the third connecting hole (316).
6. The concrete pipe foundation air content tester according to claim 2, wherein: The outer sides of the first connecting piece (311), the second connecting piece (312), and the third connecting piece (313) are provided with reinforcing ribs.