Construction slope protection device for water supply and drainage
By designing a foldable construction slope protection device, and utilizing storage and fastening structures, the problem of existing devices being unable to be folded and stored has been solved, achieving both rapid transportation and stable storage.
Patent Information
- Application Number
- CN202520007183.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-03
- Publication Date
- 2025-12-23
- Estimated Expiration
- 2035-01-03
AI Technical Summary
Existing slope protection devices cannot be folded during installation and storage, resulting in large space occupation and difficulty in quick transportation.
A device comprising a first protective net, a second protective net, and a third protective net was designed. By setting up a storage structure and a fastening structure, the protective net can be folded and stored, and fixed by a pin, a magnetic plate, and a locking bolt.
The protective netting can be folded and stored, reducing the space occupied by the device, improving the efficiency of transportation and storage, and ensuring the stability after storage through a fastening structure.
Smart Images

Figure CN223706512U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of slope protection, in particular to a construction slope protection device for water supply and drainage. BACKGROUND
[0002] The construction slope protection device in the drainage engineering is usually used to ensure the stability of the construction site slope, avoids the slope collapse or landslide, and is particularly important in the excavation and construction process. These protection measures are usually selected according to different soil quality, slope angle, surrounding environment and other factors.
[0003] The existing patent with the publication number CN119121979A proposes a construction slope protection device for municipal water supply and drainage, which sets up a vertical protection mechanism, a connecting mechanism and a horizontal protection mechanism on the slope body, and the vertical protection mechanism is movably connected with the horizontal protection mechanism through the connecting mechanism. When it rains, the rainwater is guided by the horizontal protection mechanism and flows into the vertical protection mechanism, and then is discharged through the vertical protection mechanism, effectively reducing the amount of rainwater flowing on the surface of the slope body and reducing the impact force of rainwater scouring the surface of the slope body, thereby slowing down the soil loss.
[0004] However, the device cannot be folded and stored when it is laid and the protection device is stored, and occupies a large space when it is moved, so it cannot be quickly transported. UTILITY MODEL CONTENT
[0005] The utility model aims to provide a construction slope protection device for water supply and drainage to solve the problem that the existing device cannot be folded and stored when it is laid and the protection device is stored, and occupies a large space when it is moved, so it cannot be quickly transported.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a construction slope protection device for water supply and drainage, comprising a first protection net, a second protection net is arranged on one side of the first protection net, a third protection net is arranged on one side of the second protection net, a storage structure is arranged between the first protection net and the second protection net, a first fixed rod is fixedly arranged on one side of the first protection net, a connecting piece is rotatably arranged on the outer wall of the first fixed rod, the lower end of the connecting piece is fixedly connected with one side of the upper end of the second protection net, a second fixed rod is fixedly arranged on one side of the second protection net, the third protection net is sleeved on the outer wall of the second fixed rod, a reserved hole is arranged in the first protection net, the second protection net and the third protection net, and a bolt is arranged in the reserved hole.
[0007] Preferably, a fixed structure is arranged on one side of the first protection net, the fixed structure comprises an L plate fixedly arranged on one side of the first protection net, a locking bolt is threadedly arranged in the L plate, and a locking hole is formed in one side of the second protection net.
[0008] Preferably, a magnetic suction plate is fixedly installed on one side of the upper end of the third protective net.
[0009] Preferably, a pull ring is fixedly provided at the upper end of the pin.
[0010] Preferably, one end of the locking bolt is fixedly provided with an anti-slip handle.
[0011] Preferably, a rectangular groove is provided on one side of the upper end of the third protective net, and the magnetic suction plate is located inside the magnetic suction groove.
[0012] Compared with the prior art, the beneficial effects of this utility model are:
[0013] 1) By setting up a storage structure, the three sets of protective nets can be folded and stored in the later stage, which reduces the overall placement space of the device and speeds up the transportation and storage efficiency of the device.
[0014] 2) By setting up a fastening structure, the output end of the locking screw is sent into the locking hole by rotating the locking bolt, and then the two protective nets after folding are fixed to ensure quick fixation after storage. Attached Figure Description
[0015] Figure 1 This is a three-dimensional structural diagram of a construction slope protection device for water supply and drainage according to an embodiment of the present utility model;
[0016] Figure 2 for Figure 1 Enlarged structural diagram at point A;
[0017] Figure 3 for Figure 1 Enlarged structural diagram at point B;
[0018] Figure 4 This is a schematic diagram of the structure of the third protective net after it has been flipped over.
[0019] Figure 5 This is a schematic diagram of the folding structure in an embodiment of the present utility model;
[0020] Figure 6 for Figure 5 Enlarged structural diagram at point C;
[0021] Figure 7 for Figure 4 A magnified structural diagram at point D.
[0022] In the figure: 1, the first protective net; 2, the second protective net; 3, the third protective net; 4, the storage structure; 5, the first fixed rod; 6, the connecting piece; 7, the second fixed rod; 8, the reserved hole; 9, the bolt; 10, the fixed structure; 11, the L plate; 12, the locking bolt; 13, the locking hole; 14, the magnetic plate. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0024] Embodiment one
[0025] In combination Figures 1-7 , a construction slope protection device for water supply and drainage, including first protective net 1, first protective net 1 one side is provided with the second protective net 2, the second protective net 2 one side is provided with the third protective net 3, first protective net 1 with the second protective net 2 between being provided with storage structure 4, first protective net 1 one side is fixedly provided with the first fixed rod 5, the first fixed rod 5 outer wall is rotatably provided with the connecting piece 6, the lower end of connecting piece 6 with the upper end one side of second protective net 2 is fixedly connected, the second protective net 2 one side is fixedly provided with the second fixed rod 7, the third protective net 3 is set in the outer wall of second fixed rod 7, first protective net 1, second protective net 2 and third protective net 3 inside are all provided with reserved hole 8, the reserved hole 8 inside is provided with bolt 9.
[0026] Referring to Figure 3 , Figure 5 and Figure 7 , further get, the upper end one side of third protective net 3 is fixedly provided with the magnetic plate 14, the upper end of bolt 9 is fixedly provided with the pull ring, the one end of locking bolt 12 is fixedly provided with the anti-skid handle, the upper end one side of third protective net 3 is provided with rectangular groove, and the magnetic plate 14 is located in the magnetic slot.
[0027] Specifically, the magnetic plate 14 is used to attract and fix the third protective net 3 and the second protective net 2 after the third protective net 3 is turned over, and the rectangular groove is used to set the magnetic plate 14.
[0028] Embodiment two
[0029] Referring to Figure 6And on the basis of embodiment one, further get, one side of the first protective net 1 is provided with fixed structure 10, fixed structure 10 includes the L plate 11 of the first protective net 1 one side fixed setting, the inside screw of L plate 11 is provided with locking bolt 12, one side of the second protective net 2 is provided with locking hole 13.
[0030] Specifically, L plate 11 is used to thread locking bolt 12, locking bolt 12 enters the inside of locking hole 13, can realize the fixed of second protective net 2, guarantee the stable of whole folding.
[0031] In actual operation process, when the water pipe construction is needed at the lower end of the slope, the first protective net 1, the second protective net 2 and the third protective net 3 are laid on the slope, and are fixed by the bolt 9, to avoid the large amount of slope silt rolling down during construction work;
[0032] When it is needed to be stored, the bolt 9 is removed, the third protective net 3 is turned over, the magnetic plate 14 on the upper end of the third protective net 3 is adsorbed on the upper end of the second protective net 2, then the second protective net 2 is turned over, the second protective net 2 is covered on the upper end of the first protective net 1, the locking bolt 12 is rotated, so that the locking bolt 12 enters the inside of the locking hole 13, the fixed of the second protective net 2 is realized, and space can be saved during carrying later.
[0033] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and spirits of the utility model, the scope of the utility model is defined by the appended claims and their equivalents.
Claims
1. A construction slope protection device for water supply and drainage, comprising a first protective net (1), characterized in that: A second protective net (2) is provided on one side of the first protective net (1), and a third protective net (3) is provided on one side of the second protective net (2). A storage structure (4) is provided between the first protective net (1) and the second protective net (2). A first fixing rod (5) is fixedly provided on one side of the first protective net (1). A connector (6) is rotatably provided on the outer wall of the first fixing rod (5). The lower end of the connector (6) is fixedly connected to the upper end of the second protective net (2). A second fixing rod (7) is fixedly provided on one side of the second protective net (2). The third protective net (3) is sleeved on the outer wall of the second fixing rod (7). A reserved hole (8) is provided inside the first protective net (1), the second protective net (2) and the third protective net (3). A pin (9) is provided inside the reserved hole (8).
2. The construction slope protection device for water supply and drainage according to claim 1, characterized in that: A fixing structure (10) is provided on one side of the first protective net (1). The fixing structure (10) includes an L plate (11) fixedly installed on one side of the first protective net (1). The L plate (11) has a locking bolt (12) on its internal thread. A locking hole (13) is opened on one side of the second protective net (2).
3. The construction slope protection device for water supply and drainage according to claim 1, characterized in that: A magnetic suction plate (14) is fixedly installed on one side of the upper end of the third protective net (3).
4. A construction slope protection device for water supply and drainage according to claim 3, characterized in that: A pull ring is fixedly provided at the upper end of the pin (9).
5. A construction slope protection device for water supply and drainage according to claim 2, characterized in that: One end of the locking bolt (12) is fixedly provided with an anti-slip handle.
6. A construction slope protection device for water supply and drainage according to claim 1, characterized in that: A rectangular groove is provided on one side of the upper end of the third protective net (3), and the magnetic suction plate (14) is located inside the magnetic suction groove.
Citation Information
Patent Citations
Construction slope protection device for municipal water supply and drainage
CN119121979A