Earthwork construction traffic safety protective fence
By using a combination of horizontal braces, diagonal braces, and connectors in the traffic safety guardrails used in earthwork construction, the problem of unstable steel pipe connections was solved, a stable connection of the guardrails was achieved, the collapse of bamboo planks was prevented, and the safety of the construction site was improved.
Patent Information
- Application Number
- CN202520254528.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-18
- Publication Date
- 2025-12-23
- Estimated Expiration
- 2035-02-18
AI Technical Summary
The existing traffic safety guardrails used in earthwork construction have unstable steel pipe connections during installation, and the bamboo planks are prone to collapse due to wind or accidental contact by people.
The system employs a combination structure consisting of a first horizontal brace, a second horizontal brace, a third horizontal brace, a diagonal brace, a connector, and a bamboo plank. Through the snap-fit connection of the fixed protrusion and the connecting groove, combined with the design of the connector and the limiting plate, a stable connection between the steel pipe and the bamboo plank is achieved.
The improved connection stability of the guardrail prevents the bamboo planks from collapsing due to wind or accidental contact, thus enhancing the safety of the construction site.
Smart Images

Figure CN223707307U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to earthwork construction safety protection technical field, concretely relates to a kind of earthwork construction traffic safety guardrail. BACKGROUND
[0002] Earthwork is the general term of earthwork and stone work, that is, earth and stone, and the unit of measurement is generally cubic meter. Earthwork engineering includes all earth (stone) excavation, filling, transportation, and drainage, dewatering and other aspects. When earthwork is under construction, a safety guardrail is usually installed around the construction site. The safety guardrail is usually composed of a bracket made of steel pipes and a bamboo jump plate arranged on the bracket. The existing earthwork construction traffic safety guardrail is usually installed by connecting the steel pipes in front and back with iron wires and leaning the bamboo jump plate against the surface of the steel pipes. This method causes the bamboo jump plate to collapse due to wind or accidental touch, and the connection between the steel pipes is not stable, which does not meet the current needs. SUMMARY
[0003] The utility model aims at solving the technical problem proposed above, provides a kind of earthwork construction traffic safety guardrail to improve the stability of guardrail connection, avoid bamboo jump plate to collapse due to wind or accidental touch.
[0004] To achieve the above purpose, the utility model employs the following technical scheme:
[0005] A kind of earthwork construction traffic safety guardrail, including first cross brace, second cross brace, third cross brace, several oblique braces, several plug-in components and at least one bamboo jump plate, the first cross brace, the second cross brace and the third cross brace are arranged in parallel, the third cross brace is located between the first cross brace and the second cross brace and is above the first cross brace and the second cross brace;The side of the first cross brace away from the second cross brace and the side of the third cross brace away from the second cross brace are both provided with a plurality of connecting grooves along the length direction;Several oblique braces are arranged in the length direction of the first cross brace, the opposite ends of the oblique brace are both provided with a fixing protrusion, and the two fixing protrusions are respectively inserted into the connecting grooves of the first cross brace and the third cross brace;Several plug-in components are arranged in the length direction of the first cross brace, the plug-in components are provided through the third cross brace and the second cross brace to connect the third cross brace and the second cross brace together;The bamboo jump plate is fixed to the side of the third cross brace and the second cross brace away from the first cross brace by a connecting piece.
[0006] Further, the first cross brace, the second cross brace, the third cross brace and the diagonal brace each comprise at least one steel pipe, the first cross brace, the second cross brace and the third cross brace are formed by at least two steel pipes connected in sequence, one end of the steel pipe is fixed with two first clamping ends, the other end of the steel pipe is fixed with two second clamping ends, a clamping groove is arranged between the two first clamping ends and the two second clamping ends, the first clamping end is slidably inserted into the clamping groove between the second clamping ends, and the second clamping end is slidably inserted into the clamping groove between the first clamping ends, so as to connect adjacent two steel pipes together; the connecting groove is concavely arranged on the outer side of the second clamping end, and the two ends of the steel pipe are provided with the fixed protrusions.
[0007] Further, two connecting grooves are concavely arranged on each second clamping end, the two connecting grooves are arranged in a circumferential direction of the steel pipe, and the fixed protrusion of the diagonal brace is clamped with one of the connecting grooves on the corresponding second clamping end.
[0008] Further, when the fixed protrusion of the diagonal brace is inserted into the connecting groove, the bottom surface of the fixed protrusion is attached to the outer side of the second clamping end, the top of the fixed protrusion at the top end of the diagonal brace is abutted with the first clamping end above the corresponding connecting groove, and the bottom of the fixed protrusion at the bottom end of the diagonal brace is abutted with the first clamping end below the corresponding connecting groove.
[0009] Further, the fixed protrusion of the diagonal brace and the corresponding second clamping end are further connected by a screw.
[0010] Further, the second cross brace and the third cross brace are each provided with a plurality of insertion holes arranged in a length direction, and the insertion piece is arranged to pass through the insertion holes of the second cross brace and the third cross brace.
[0011] Further, the insertion piece is fixed with two limiting plates arranged in a length direction, and the two limiting plates are respectively supported on the bottom sides of the third cross brace and the second cross brace.
[0012] Further, the limiting plate and the insertion piece are connected by a fixing bolt.
[0013] Further, the inner side of the bamboo jumping board facing the third cross brace is provided with two connecting protrusions, the two connecting protrusions are respectively attached to the fixed protrusions of the third cross brace and the second cross brace, and the connecting piece is a connecting bolt arranged to pass through the bamboo jumping board, the connecting protrusions, the fixed protrusions and be inserted into the steel pipe.
[0014] By adopting the above technical scheme, the present application has the following beneficial effects:
[0015] The first cross support, the third cross support and the inclined support are firmly connected together through the clamping and matching of the fixed protrusions at the two ends of the inclined support and the connecting grooves on the first cross support and the third cross support, thereby improving the stability of the connection of the protective fence; the bamboo jump plate is connected with the third cross support and the second inclined support through the connecting piece, thereby reinforcing the connection of the bamboo jump plate and avoiding the collapse of the bamboo jump plate due to wind force or accidental touch of people. BRIEF DESCRIPTION OF DRAWINGS
[0016] Figure 1 It is a structural schematic view of the earthwork construction traffic safety protective fence according to a preferred embodiment of the present application.
[0017] Figure 2 It is a structural schematic view of the earthwork construction traffic safety protective fence according to a preferred embodiment of the present application. Figure 1 It is a structural schematic view of the steel pipe in the earthwork construction traffic safety protective fence shown in the figure.
[0018] Figure 3 It is a sectional structural schematic view of the earthwork construction traffic safety protective fence according to a preferred embodiment of the present application. Figure 1
[0019] Figure 4 It is an enlarged view of the structure at I. Figure 1
[0020] Figure 5 It is an enlarged view of the structure at A. Figure 3
[0021] Figure 6 It is an enlarged view of the structure at B. Figure 3
[0022] In the drawings, 100, earthwork construction traffic safety protective fence; 10, first cross support; 20, second cross support; 30, third cross support; 40, inclined support; 50, connecting groove; 60, fixed protrusion; 70, steel pipe; 71, first clamping end; 72, second clamping end; 73, clamping groove; 74, insertion hole; 80, insertion piece; 82, limiting plate; 90, bamboo jump plate; 91, connecting protrusion; 92, connecting piece. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the present application.
[0024] It should be understood that when a component is referred to as being "on" another component, it can be directly on the other component or intervening components can also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component, or intervening components can be present. When a component is referred to as being "disposed" on another component, it can be directly disposed on the other component, or intervening components can be present. The terms "vertical", "horizontal", "left", "right", and similar terms as used herein are for purposes of description only.
[0025] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs. The terminology used in the description of the application herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the application. As used in this description, the term "and / or" includes any and all combinations of one or more of the associated listed items.
[0026] Referring to Figure 1 The application provides a soil and rock construction traffic safety fence 100, which comprises a first cross brace 10, a second cross brace 20, a third cross brace 30, a plurality of inclined braces 40, a plurality of plug-in parts 80 and at least one bamboo jumping plate 90. The first cross brace 10, the second cross brace 20 and the third cross brace 30 are arranged at intervals, the plurality of inclined braces 40 are connected to the sides of the first cross brace 10 and the third cross brace 30 away from the second cross brace 20, the plurality of plug-in parts 80 are connected to the second cross brace 20 and the third cross brace 30 to form a support structure of the soil and rock construction traffic safety fence 100, and the bamboo jumping plate 90 is fixed to the side of the second cross brace 20 and the third cross brace 30 away from the first cross brace 10.
[0027] The first cross brace 10, the second cross brace 20 and the third cross brace 30 are arranged in parallel at intervals, the third cross brace 30 is located between the first cross brace 10 and the second cross brace 20 and is above the first cross brace 10 and the second cross brace 20, so that the first cross brace 10, the second cross brace 20 and the third cross brace 30 form a triangular support structure, and the support is more stable. Referring to Figures 2 to 6 The side of the first cross brace 10 away from the second cross brace 20 and the side of the third cross brace 30 away from the second cross brace 20 are both provided with a plurality of connecting grooves 50 at intervals along the length direction. The plurality of inclined braces 40 are arranged at intervals along the length direction of the first cross brace 10, and the opposite ends of the inclined brace 40 are both provided with a fixing protrusion 60, and the two fixing protrusions 60 are respectively movably clamped into the connecting grooves 50 of the first cross brace 10 and the connecting grooves 50 of the third cross brace 30.
[0028] Specifically, the first cross brace 10, the second cross brace 20, the third cross brace 30 and the diagonal brace 40 each comprise at least one steel pipe 70. In the present embodiment, the first cross brace 10, the second cross brace 20 and the third cross brace 30 each comprise two steel pipes 70 connected in sequence, and the diagonal brace 40 comprises one steel pipe 70. One end of each steel pipe 70 is fixedly provided with two first clamping ends 71, and the other end of the steel pipe 70 is fixedly provided with two second clamping ends 72. A clamping groove 73 is arranged between the two first clamping ends 71 and the two second clamping ends 72. In the present embodiment, the first clamping end 71 and the second clamping end 72 are arranged staggered, so that the first clamping end 71 can be inserted into the clamping groove 73 between the two second clamping ends 72, and the second clamping end 72 can be inserted into the clamping groove 73 between the two first clamping ends 71, so as to connect two adjacent steel pipes 70 together. In the present embodiment, the outer side of the second clamping end 72 is concavely provided with the connecting groove 50. Specifically, two connecting grooves 50 are concavely provided on each second clamping end 72, and the two connecting grooves 50 are arranged in a circumferential direction of the steel pipe 70. The two ends of the steel pipe 70 are each provided with a fixing protrusion 60, and the fixing protrusion 60 of the diagonal brace 40 is clamped with one of the connecting grooves 50 on the corresponding second clamping end 72.
[0029] In the present embodiment, the diagonal brace 40 is arranged between two adjacent steel pipes 70 of the first cross brace 10. When the fixing protrusions 60 at the two ends of the diagonal brace 40 are inserted into the corresponding connecting grooves 50, the bottom surface of the fixing protrusion 60 is in contact with the outer side of the second clamping end 72. The top of the fixing protrusion 60 at the top end of the diagonal brace 40 is in contact with the first clamping end 71 above the corresponding connecting groove 50, the bottom of the fixing protrusion 60 at the bottom end of the diagonal brace 40 is in contact with the first clamping end 71 below the corresponding connecting groove 50, and the fixing protrusion 60 of the diagonal brace 40 is clamped between the two adjacent steel pipes 70, thereby realizing stable connection of the diagonal brace 40 with the first cross brace 10 and the third cross brace 30. In addition, in order to further improve the stability of the connection, the fixing protrusion 60 of the diagonal brace 40 and the corresponding second clamping end 72 can be connected by a screw (not shown in the figure).
[0030] A plurality of splicing pieces 80 are arranged along the length direction of the first cross support 10, and the splicing pieces 80 are arranged through the third cross support 30 and the second cross support 20 to connect the third cross support 30 and the second cross support 20 together. Specifically, the second cross support 20 and the third cross support 30 are both arranged with a plurality of splicing holes 74 along the length direction. In the embodiment, the splicing holes 74 are arranged at the substantially middle positions of each steel pipe 70, and the splicing piece 80 is arranged through the splicing hole 74 of the second cross support 20 and the splicing hole 74 of the third cross support 30. In the embodiment, the splicing piece 80 can be in the structure of a pipe or a rod. Two limiting plates 82 are arranged along the length direction of the splicing piece 80 and are fixed to the bottom side of the steel pipe 71 of the third cross support 30 and the second cross support 20, respectively. The arrangement of the limiting plate 82 can avoid the accidental movement of the second cross support 20 and the third cross support 30 along the length direction of the splicing piece 80 during use. In the embodiment, the limiting plate 82 is connected with the splicing piece 80 through a fixing bolt (not shown in the figure) to facilitate the disassembly and assembly of the splicing piece 80, the third cross support 30 and the second cross support 20.
[0031] The bamboo jump plate 90 is fixed to the side of the third cross support 30 and the second cross support 20 away from the first cross support 10 through the connecting piece 92. The bamboo jump plate 90 is a plate material made of bamboo as raw material, and is usually made of adult bamboo or Phyllostachys pubescens grown for more than two years. During the manufacturing process, the bamboo is split into bamboo pieces with a width of about 30 mm, and then the bamboo pieces are connected or woven together by iron wire or other materials to form a plate structure with certain strength and stability. The structure belongs to the prior art, and will not be described here to save space. In the embodiment, the connecting piece 92 is a connecting bolt. Specifically, the bamboo jump plate 90 is provided with two connecting protrusions 91 corresponding to the fixing protrusions 60 of the second cross support 20 and the third cross support 30. The two connecting protrusions 91 are arranged on the side of the bamboo jump plate 90 facing the second cross support 20 and the third cross support 30 and are respectively matched with the fixing protrusions 60 of the second cross support 20 and the third cross support 30. The connecting piece 92 can be a connecting bolt, which is arranged through the bamboo jump plate 90, the connecting protrusions 91 and the fixing protrusions 60 and is inserted into the steel pipe 70 of the second cross support 20 or the third cross support 30. The nut (not shown in the figure) of the connecting bolt is threadedly connected with the screw rod to clamp the bamboo jump plate 90 between the head of the nut and the screw rod, so as to connect the bamboo jump plate 90 with the second cross support 20 and the third cross support 30 together.
[0032] In other embodiments, the bottom end of the inclined support 40 or the bottom end of the splicing piece 80 is connected with a bottom plate (not shown in the figure) through a bolt. The bottom plate can increase the contact area between the bottom end of the inclined support 40 or the bottom end of the splicing piece 80 and the ground, further increase the friction, and prevent the accidental movement of the earthwork construction traffic safety guardrail 100 during use.
[0033] When the traffic safety fence 100 is installed, a plurality of steel pipes 70 are combined and installed in sequence along the transverse direction according to the size of the construction site, so that the first clamping end 71 is inserted into the clamping groove 73 between the two second clamping ends 72, and the second clamping end 72 is inserted into the clamping groove 73 between the two first clamping ends 71, to obtain the required length of the first cross brace 10, the second cross brace 20 and the third cross brace 30. Then a steel pipe 70 is installed obliquely on one side of the third cross brace 30 and located at the connection of the adjacent two steel pipes 70 to form the inclined brace 40, so that the fixing protrusion 60 at the top of the inclined brace 40 is clamped in the connecting groove 50 of the third cross brace 30. Then the first cross brace 10 is installed at the bottom end of the inclined brace 40, so that the fixing protrusion 60 at the bottom of the inclined brace 40 is clamped in the connecting groove 50 of the first cross brace 10, and the first cross brace 10 and the third cross brace 30 are located on the same side of the inclined brace 40. Then the insertion piece 80 is inserted into the insertion hole 74 of the third cross brace 30 and the second cross brace 20, and the third cross brace 30 and the second cross brace 20 are connected to each other through the insertion piece 80 to prevent the steel pipe 70 from falling down, and then the limiting plate 82 is installed on the insertion piece 80 to support the bottom of the steel pipe 70 of the third cross brace 30 and the second cross brace 20, preventing the steel pipe 70 from sliding along the length direction of the insertion piece 80. Finally, the bamboo jump plate 90 is installed on the side of the third cross brace 30 and the second cross brace 20 away from the first cross brace 10, so that the two connecting protrusions 91 of the bamboo jump plate 90 are respectively matched with the fixing protrusions 60 of the third cross brace 30 and the second cross brace 20, and the connection between the bamboo jump plate 90 and the third cross brace 30 and the second cross brace 20 is reinforced by the connecting piece 92 to prevent the bamboo jump plate 90 from collapsing due to wind or accidental touch.
[0034] When the steel pipe 70 is installed, the fixing protrusion 60 on the surface of the steel pipe 70 of the inclined brace 40 can be clamped into the connecting groove 50 of the first cross brace 10 and the third cross brace 30, and the fixing protrusions 60 at both ends of the inclined brace 40 can be respectively abutted with the first clamping end 71 above the third cross brace 30 and the first clamping end 71 below the first cross brace 10. At this time, the inclined brace 40 will be fixed outside the first cross brace 10 and the third cross brace 30 due to the limiting of the fixing protrusion 60 by the first clamping end 71, avoiding the inclined brace 40 from falling off, and the fixing protrusion 60 and the second clamping end 72 can be fixedly connected by screws to further enhance the stability of the oblique steel pipe 70.
[0035] It can be understood that the number of steel pipes 70 of the first cross brace 10, the second cross brace 20, the third cross brace 30 and the inclined brace 40 is not limited to the embodiment, and the number of steel pipes 70 can be selected according to the needs of the site.
[0036] The above description is directed to the detailed description of the preferred feasible embodiment of the present application, but the embodiment is not used to limit the patent application range of the present application, and any equivalent change or modification change completed under the technical spirit of the present application should belong to the patent range covered by the present application.
Claims
1. A traffic safety fence for earthwork construction, characterized by: The utility model provides a kind of bamboo jumping board, including first cross brace, second cross brace, third cross brace, several oblique braces, several insert pieces and at least one bamboo jumping board, the first cross brace, the second cross brace and the third cross brace are arranged in parallel interval, the third cross brace is located between the first cross brace and the second cross brace and is all above the first cross brace and the second cross brace;The side of the first cross brace away from the second cross brace and the side of the third cross brace away from the second cross brace are all arranged in length direction interval with several connecting grooves;Several oblique braces are arranged in length direction interval along the first cross brace, and the opposite ends of the oblique brace are provided with fixed protrusions, and two fixed protrusions are respectively inserted into the connecting groove of the first cross brace and the connecting groove of the third cross brace;Several insert pieces are arranged in length direction interval along the first cross brace, and the insert piece is provided with the insert hole of the second cross brace and the insert hole of the third cross brace to connect the third cross brace and the second cross brace;The bamboo jumping board is fixed to the side of the third cross brace and the second cross brace away from the first cross brace by connecting piece.
2. The earthwork traffic safety fence according to claim 1, wherein: The first cross brace, the second cross brace, the third cross brace and the oblique brace all include at least one steel pipe, the first cross brace, the second cross brace and the third cross brace are connected by at least two steel pipes connected in sequence, one end of the steel pipe is fixed with two first clamping ends, the other end of the steel pipe is fixed with two second clamping ends, the first clamping end is slidably inserted into the clamping groove between the second clamping end, and the second clamping end is slidably inserted into the clamping groove between the first clamping end to connect two adjacent steel pipes together, the connecting groove is recessed on the outer side of the second clamping end, and the two ends of the steel pipe are provided with the fixed protrusions.
3. The earthwork traffic safety fence according to claim 2, wherein: Two connecting grooves are recessed on each second clamping end, and the connecting grooves are arranged in circumferential direction interval, the fixed protrusion of the oblique brace is clamped with one of the connecting grooves on the corresponding second clamping end.
4. The earthwork traffic safety fence according to claim 3, wherein: When the fixed protrusion of the oblique brace is inserted into the connecting groove, the bottom surface of the fixed protrusion is attached to the outer side of the second clamping end, the top of the fixed protrusion at the top end of the oblique brace is abutted with the first clamping end above the corresponding connecting groove, and the bottom of the fixed protrusion at the bottom end of the oblique brace is abutted with the first clamping end below the corresponding connecting groove.
5. The earthwork traffic safety fence according to claim 2, wherein: The fixed protrusion of the oblique brace and the corresponding second clamping end are also connected by screws.
6. The earthwork traffic safety fence according to claim 2, wherein: The second cross brace and the third cross brace are both arranged in length direction interval with several insert holes, and the insert piece is provided with the insert hole of the second cross brace and the insert hole of the third cross brace.
7. The earthwork traffic safety fence according to claim 6, wherein: The insert piece is fixed with two limit plates in length direction interval, and the limit plates are respectively supported on the bottom side of the third cross brace and the second cross brace.
8. The earthwork traffic safety fence according to claim 7, wherein: The limit plate and the insert piece are connected by fixing bolts.
9. The earthwork traffic safety fence according to claim 2, wherein: The inner side of the bamboo jump board facing the third cross support is convex with two connecting protrusions, and the two connecting protrusions respectively match with the fixed protrusion of the third cross support and the fixed protrusion of the second cross support; the connecting piece is a connecting bolt, and the connecting piece is arranged through the bamboo jump board, the connecting protrusion, the fixed protrusion and inserted into the steel pipe.