Novel scaffold wall connecting piece
By using the pre-embedded sleeve and detachable long bolt design of the new scaffolding wall tie, the problems of high material consumption and leakage hazards of traditional wall ties are solved, achieving the effects of saving materials and safe construction.
Patent Information
- Application Number
- CN202520474853.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-18
- Publication Date
- 2026-02-06
- Estimated Expiration
- 2035-03-18
AI Technical Summary
Existing pre-embedded steel pipe wall ties consume a lot of materials, affect construction safety, and pose a risk of leakage after use.
A new type of scaffolding wall tie is adopted, which uses hollow pre-embedded sleeves and detachable long bolts. The pre-embedded sleeves are embedded in the main structure and fixed to the scaffolding steel pipes through the connecting mechanism. After use, the bolt holes can be disassembled and sealed.
Reduce material consumption, avoid impact on construction, lower the risk of leakage, achieve reusability, and improve construction safety.
Smart Images

Figure CN223880737U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of building construction, specifically relates to a novel scaffold wall connecting piece. BACKGROUND
[0002] In building construction, a large number of scaffolds are usually set up as construction operation platforms or safety protection. In order to maintain the safety and stability of the scaffold, a wall connecting piece is needed to rigidly connect the scaffold with the main structure. However, in the construction site, a novel wall connecting piece with simple structure, convenient manufacturing, material saving and convenient use is rarely seen. The traditional embedded steel pipe type wall connecting piece (such as Figure 5 Red line).
[0003] The embedded steel pipe type wall connecting piece needs to embed a certain length of steel pipe, which consumes a lot of materials.
[0004] The embedded steel pipe protrudes from the main structure, affecting the construction of other procedures, and there is a safety hazard of tripping construction personnel.
[0005] After the embedded steel pipe type wall connecting piece is used, the protruding steel pipe needs to be cut off, and the steel pipe hole needs to be plugged, which has leakage risks and large steel pipe loss. INVENTION CONTENTS
[0006] The purpose of the utility model is to solve the problems in the above background art, and a novel scaffold wall connecting piece is provided.
[0007] The purpose of the utility model can be achieved through the following technical solutions:
[0008] A novel scaffold wall connecting piece comprises:
[0009] An embedded assembly comprises a hollow embedded sleeve and a fixing unit, the embedded sleeve is cast in the main structure, and a connecting interface is embedded at the end of the embedded sleeve;
[0010] An anchoring unit comprises a detachable long bolt, one end of the long bolt is threadedly connected with the connecting interface of the embedded sleeve, and the other end of the long bolt is exposed to the main structure;
[0011] A connecting mechanism has a first connecting part and a second connecting part, the first connecting part is hinged to the exposed end of the long bolt, and the second connecting part is provided with an adjustable clamping structure for fixing and connecting the scaffold steel pipe.
[0012] As a further scheme of the utility model, the inner cavity of the embedded sleeve is provided with a radial limiting structure for restricting the axial displacement of the connecting interface.
[0013] As a further scheme of the utility model, the second connecting part of the connecting mechanism comprises an openable and closable clamping assembly, and the locking of the steel pipe is realized through a fastening unit.
[0014] As a further scheme of the utility model: the fixed unit is one of screw, buckle or adhesive structure, which is used for temporarily fixing the pre-buried sleeve on the surface of the formwork.
[0015] As a further scheme of the utility model: the connecting interface is a threaded fitting pre-buried in the end of the sleeve, which is matched with the nut or threaded segment of the long bolt.
[0016] As a further scheme of the utility model: the pre-buried sleeve is made of plastic material, and the end thereof is provided with a sealing cover plate or a closed layer to prevent the concrete slurry from seeping in.
[0017] As a further scheme of the utility model: the exposed end of the long bolt is provided with an anti-loosening structure, and the anti-loosening structure comprises a spring washer or double nuts.
[0018] As a further scheme of the utility model: the clamping assembly of the connecting mechanism comprises a hinged upper cover body and a lower cover body, and the opening and closing adjustment is realized through a rotating shaft.
[0019] As a further scheme of the utility model: one end of the steel pipe connected with the connecting mechanism is provided with anti-slip lines or clamping grooves to enhance the friction force with the clamping structure.
[0020] As a further scheme of the utility model: the axis of the pre-buried sleeve is perpendicular to the surface of the main body structure or forms a preset inclination angle to adapt to different construction scenes.
[0021] The utility model has the advantages of:
[0022] The utility model only needs the pre-buried sleeve, and the consumption of materials is small.
[0023] The utility model is embedded in the inside of the main body structure, has no influence on other process constructions, and is convenient to construct.
[0024] After the utility model is used, the long bolt only needs to be screwed out, the bolt hole is plugged, the long bolt can be used repeatedly, the consumption of materials is small, the bolt hole is small, the main body structure is not contacted with the internal steel bars, the main body structure is not damaged, and there is no leakage risk. BRIEF DESCRIPTION OF DRAWINGS
[0025] The utility model will be further described below in combination with the drawings.
[0026] Figure 1 It is a structural schematic view of the utility model;
[0027] Figure 2 It is a structural schematic view of the long bolt of the utility model;
[0028] Figure 3 And 4 It is a structural schematic view of the connecting mechanism in the utility model;
[0029] Figure 5 is a schematic diagram of the prior art.
[0030] In the figure: 1, main structure; 2, pre-buried sleeve; 3, long bolt; 4, fixing unit; 5, connecting mechanism; 6, steel pipe; 32, nut; 51, upper cover body; 52, lower cover body; 53, rotating shaft; 54, fastening unit; 511, first perforation; 512, second perforation. DETAILED DESCRIPTION
[0031] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.
[0032] Embodiment one, please refer to Figures 1-4 The utility model discloses a novel scaffold wall connecting piece, which comprises:
[0033] The pre-buried assembly comprises a hollow pre-buried sleeve 2 and a fixing unit 4. The pre-buried sleeve 2 is cast in the main structure 1, and a connecting interface is pre-buried at the end of the pre-buried sleeve 2.
[0034] The anchoring unit comprises a detachable long bolt 3. One end of the long bolt 3 is threadedly connected with the connecting interface of the pre-buried sleeve 2, and the other end of the long bolt 3 is exposed to the main structure 1.
[0035] The connecting mechanism 5 has a first connecting part and a second connecting part. The first connecting part is hingedly connected with the exposed end of the long bolt 3. The second connecting part is provided with an adjustable clamping structure for fixing and connecting the scaffold steel pipe 6.
[0036] Embodiment two, please refer to Figures 1-4 The utility model discloses a novel scaffold wall connecting piece, which comprises:
[0037] The pre-buried assembly comprises a hollow pre-buried sleeve 2 and a fixing unit 4. The pre-buried sleeve 2 is cast in the main structure 1, and a connecting interface is pre-buried at the end of the pre-buried sleeve 2. The inner cavity of the pre-buried sleeve 2 is provided with a radial limiting structure for restricting the axial displacement of the connecting interface. The connecting interface is a threaded adapter pre-buried at the end of the sleeve, which is matched with the nut 32 or the threaded segment of the long bolt 3.
[0038] The fixing unit 4 is one of a screw, a buckle or a gluing structure, which is used for temporarily fixing the pre-buried sleeve 2 on the surface of a formwork.
[0039] Anchoring unit, comprising a detachable long bolt 3, one end of which is threadedly connected with the connecting interface of the embedded sleeve 2, and the other end of which is exposed to the main structure 1;
[0040] Connecting mechanism 5, having a first connecting part and a second connecting part, the first connecting part is hinged with the exposed end of the long bolt 3, and the second connecting part is provided with an adjustable clamping structure for fixing the scaffold steel pipe 6, the second connecting part of the connecting mechanism 5 comprises an openable clamping assembly, and the locking of the steel pipe 6 is realized through the fastening unit 54.
[0041] Embodiment three, please refer to Figures 1-4 The utility model discloses a novel scaffold wall connecting piece, which comprises:
[0042] The embedded assembly comprises a hollow embedded sleeve 2 and a fixing unit 4, the embedded sleeve 2 is cast in the main structure 1, and a connecting interface is embedded at the end of the embedded sleeve 2; the inner cavity of the embedded sleeve 2 is provided with a radial limiting structure for restricting the axial displacement of the connecting interface, and the connecting interface is a threaded adapter embedded at the end of the sleeve and matched with the nut 32 or the threaded section of the long bolt 3.
[0043] The embedded sleeve 2 is made of plastic material, and a sealing cover plate or a sealing layer is arranged at the end of the embedded sleeve 2 to prevent concrete slurry from seeping in.
[0044] The fixing unit 4 is one of a screw, a buckle or a gluing structure, and is used for temporarily fixing the embedded sleeve 2 to the surface of a formwork.
[0045] Anchoring unit, comprising a detachable long bolt 3, one end of which is threadedly connected with the connecting interface of the embedded sleeve 2, and the other end of which is exposed to the main structure 1;
[0046] The exposed end of the long bolt 3 is provided with an anti-loosening structure, and the anti-loosening structure comprises a spring washer or a double nut.
[0047] Connecting mechanism 5, having a first connecting part and a second connecting part, the first connecting part is hinged with the exposed end of the long bolt 3, and the second connecting part is provided with an adjustable clamping structure for fixing the scaffold steel pipe 6, the second connecting part of the connecting mechanism 5 comprises an openable clamping assembly, and the locking of the steel pipe 6 is realized through the fastening unit 54.
[0048] The clamping assembly of the connecting mechanism 5 comprises a hinged upper cover body 51 and a lower cover body 52, and the opening and closing adjustment is realized through a rotating shaft 53.
[0049] The end of the steel pipe 6 connected with the connecting mechanism 5 is provided with anti-skid lines or clamping grooves, so that the friction force with the clamping structure is enhanced.
[0050] The axis of the pre-embedded sleeve 2 is perpendicular to the surface of the main structure 1 or has a preset inclination to adapt to different construction scenes.
[0051] The fixing unit 4 serves to fix the pre-embedded sleeve 2. The end of the pre-embedded sleeve 2 adhering to the formwork is provided with four small holes, and the fixing unit 4 passes through the small holes and is nailed to the formwork surface. The fixing unit 4 is tightened by using an electric screwdriver to fix the pre-embedded sleeve 2 on the formwork surface.
[0052] The pre-embedded sleeve 2 is made of plastic material and has a hollow structure, through which a long bolt 3 passes. The end of the pre-embedded sleeve 2 is embedded in a nut 32 matched with the long bolt 3. The inner diameter of the pre-embedded sleeve 2 at the nut 32 is larger than that at the bolt body, forming a stepped inner surface. The end surface of the nut 32 is attached to the stepped surface, and the nut 32 cannot be displaced in the pre-embedded sleeve 2 under the constraint of the stress in the main structure 1. A small cover plate can be provided on the end surface of the pre-embedded sleeve 2 on the side of the nut 32 according to the application situation. After embedding the nut 32, the small cover plate is closed to seal the end surface, or transparent adhesive tape is wound to seal the end surface to prevent the nut 32 from being contaminated. After the end surface of the pre-embedded sleeve 2 close to the formwork is sealed by winding the transparent adhesive tape, the pre-embedded sleeve 2 is fixed to the formwork surface by the fixing unit 4 to prevent the cement mortar from entering the cavity of the pre-embedded sleeve 2. When installing the wall connecting piece, the long bolt 3 only needs to break through the transparent adhesive tape.
[0053] The length of the long bolt 3 is not less than 30 cm. The length of the long bolt 3 embedded in the main structure 1 is not less than 10 cm, that is, the embedding depth of the nut 32 is not less than 10 cm. The exposed length of the long bolt 3 is not less than 20 cm. The connecting mechanism 5 occupies 5-10 cm of the exposed length of the long bolt 3. The exposed length of the steel pipe 6 after passing through the second perforation 512 of the connecting mechanism 5 is not less than 10 cm and is abutted against the main structure 1, ensuring the overall rigidity and stability of the wall connecting piece.
[0054] The first perforation 511 of the connecting mechanism 5 is passed through by the long bolt 3, and the connecting mechanism 5 is hinged with the long bolt 3, so that the connecting mechanism 5 can rotate around the axis of the long bolt 3. The upper cover body 51 and the lower cover body 52 of the connecting mechanism 5 are hinged through the hinge shaft 53. The rotation of the upper cover body 51 and the lower cover body 52 around the hinge shaft 53 can realize the size of the second perforation 512. The second perforation 512 of the connecting mechanism 5 is passed through by the steel pipe 6. During construction, the upper cover body 51 and the lower cover body 52 are rotated and separated around the hinge shaft 53 to make the second perforation 512 larger, facilitating the passage of the steel pipe 6. After passing through the steel pipe 6, the upper cover body 51 and the lower cover body 52 are pinched and tightly attached to the surface of the steel pipe 6, and the fastening unit 54 is tightened to fix the steel pipe 6 and the connecting mechanism 5.
[0055] During construction, according to the construction needs, before the structural member is bound and the formwork is reinforced, the embedded sleeve 2 is fixed on the inner side of the formwork according to the setting requirements of the construction scheme, and the end face of the embedded sleeve 2 is tightly attached to the formwork. The main structure 1 is poured with concrete, and the embedded sleeve 2 is firmly embedded in the concrete. After the concrete strength reaches a certain requirement, the installation of the wall connecting piece can be carried out.
[0056] The above describes one embodiment of the present application in detail, but the content is only a preferred embodiment of the present application, and cannot be considered as limiting the scope of the present application. Any equivalent changes and improvements made according to the scope of the present application should still belong to the scope of the claims of the present application.
Claims
1. A novel scaffold wall connector, characterized in that, The utility model relates to a kind of pre-embedded components, including hollow pre-embedded sleeve (2) and fixed unit (4), the pre-embedded sleeve (2) is cast in main structure (1), and its end is embedded with connecting interface; Anchor unit includes detachable long bolt (3), one end of the long bolt (3) is threadedly connected with the connecting interface of pre-embedded sleeve (2), and the other end is exposed to main structure (1); Connecting mechanism (5) has first connecting part and second connecting part, the exposed end of long bolt (3) is hinged with the first connecting part, and the second connecting part is provided with adjustable clamping structure for fixing connecting scaffold steel pipe (6). The inner cavity of the pre-embedded sleeve (2) is provided with radial limiting structure for constraining the axial displacement of the connecting interface.
2. A novel wall connector for scaffolding according to claim 1, characterized in that, The second connecting part of the connecting mechanism (5) includes openable clamping assembly, and the steel pipe (6) is locked by fastening unit (54).
3. A novel wall connector for scaffolding as claimed in claim 1, wherein, The fixed unit (4) is one of screw, buckle or adhesive structure, for temporarily fixing the pre-embedded sleeve (2) on the formwork surface.
4. A novel wall connector for scaffolding as claimed in claim 1, wherein, The connecting interface is a threaded fitting embedded in the end of the sleeve, matched with the screw cap (32) or threaded segment of long bolt (3).
5. A novel wall connector for scaffolding as claimed in claim 1, wherein, The pre-embedded sleeve (2) is made of plastic material, and the end is provided with sealing cover plate or closed layer.
6. A novel wall connector for scaffolding according to claim 1, characterized in that, The exposed end of the long bolt (3) is provided with anti-loosening structure, and the anti-loosening structure includes spring washer or double nut.
7. A novel wall connector for scaffolding as claimed in claim 1, wherein, The clamping assembly of the connecting mechanism (5) includes hinged upper cover body (51) and lower cover body (52), and is adjusted by hinge shaft (53) to open and close.
8. A novel wall connector for scaffolding as claimed in claim 1, wherein, The end of the steel pipe (6) connected with the connecting mechanism (5) is provided with anti-skid pattern or clamping groove.
9. A novel wall connector for scaffolding as claimed in claim 1, wherein, The axis of the pre-embedded sleeve (2) is perpendicular to the surface of the main structure (1) or has a preset inclination.
10. A novel wall connector for scaffolding according to claim 1, characterized in that,