Slurry treatment equipment for construction site
By introducing components such as preheating air ducts, electric telescopic rods, and cleaning rods into the mud treatment equipment at construction sites, the problem of mud adhesion to the inner wall of the drying box was solved, improving mud drying efficiency and cleaning convenience.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-08
- Publication Date
- 2026-03-20
AI Technical Summary
In existing construction site mud treatment equipment, dried mud easily adheres to the inner wall of the drying box, resulting in incomplete cleaning and affecting the subsequent treatment effect.
A device comprising a drying chamber, a mixing chamber, a mud pump, a hot air blower, and a cleaning water pipe was designed. Through components such as a preheating air duct, an electric telescopic rod, and a cleaning rod, the device achieves preliminary heating, drying, and automatic cleaning of the mud, preventing mud adhesion.
It improves the efficiency of mud drying, simplifies the cleaning process of the drying box, ensures that no mud adheres to the inner wall, facilitates personnel operation, and improves cleaning efficiency.
Smart Images

Figure CN224015481U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of mud treatment technology, specifically to a mud treatment device for construction sites. Background Technology
[0002] A construction site is a location where a construction project is under development and civil engineering is being carried out. Its area is often enclosed by fences, wire mesh, or walls to restrict the entry and exit of personnel, materials, machinery, and vehicles. In pile foundation construction, mud is generated by the drilling tools during the drilling process. Since mud can be recycled and reused, mud treatment devices are placed on construction sites to treat the mud.
[0003] The application with application number 202220419942.3 proposes a method of pumping mud into the interior of a preliminary treatment unit using a slurry pump for mixing and preliminary drying. During the mixing process, the mud comes into contact with the side wall of the mixing tank, and the internal moisture evaporates, thus achieving the purpose of preliminary drying. The mud after preliminary drying enters the interior of the drying tank, where it is further dried under the action of a hot air blower. The final dried solid particles are easy to collect and uniformly process, which is more environmentally friendly.
[0004] While the aforementioned applications meet users' needs to a certain extent, certain shortcomings still exist during use. Specifically, when cleaning the inside of the drying chamber, although water flushing is used, the dried mud tends to adhere to the inner wall, leading to incomplete cleaning and affecting subsequent mud treatment. Therefore, this invention designs a mud treatment device for construction sites to solve the above problems. Utility Model Content
[0005] This utility model provides a mud treatment device for construction sites, which can effectively solve the problems mentioned in the background art.
[0006] To achieve the above objectives, this utility model provides the following technical solution: a mud treatment device for construction sites, comprising a drying box, a mixing box fixedly installed on the top of the drying box, a mud pump fixedly installed at one end of the mixing box, a feed pipe fixedly connected to the discharge end of the mud pump, one end of the feed pipe being inside the mixing box, a hot air blower fixedly installed at one end of the drying box, a cleaning water pipe fixedly installed at one end of the drying box, a moving rod slidably connected to one end of the drying box, a cleaning rod installed at one end of the moving rod by screws, and a connecting plate installed in the middle of the cleaning rod by screws.
[0007] Preferably, a preheating air duct is fixedly connected to the outside of the feed pipe, and a circulating air duct is fixedly installed on the top of the preheating air duct, which is fixedly connected to one end of the top of the drying box.
[0008] Preferably, an electric telescopic rod is installed at one end of the interior of the drying chamber by screws, a sealing plate is installed at one end of the electric telescopic rod by screws, and a mud pump switch is provided at one end of the interior of the drying chamber.
[0009] Preferably, the sealing plate corresponds to the discharge port at the bottom of the mixing tank, and a placement groove is provided inside the drying tank at the position corresponding to the sealing plate.
[0010] Preferably, the input terminal of the mud pump switch is electrically connected to the output terminal of an external power supply, and the output terminal of the mud pump switch is electrically connected to the input terminal of the mud pump.
[0011] Preferably, the connecting plate and the cleaning water pipe are positioned corresponding to each other, and the outer side of the cleaning rod is in contact with the inner wall of the drying chamber.
[0012] Preferably, the mixing tank is equipped with a heating rod and a stirring rack.
[0013] Compared with the prior art, the beneficial effects of this utility model are as follows: This utility model has a scientific and reasonable structure and is safe and convenient to use. It can preheat the mud inside the feed pipe so that the mud has a certain temperature when it enters the mixing box, which can reduce the mud drying time, improve the mud drying efficiency, and thus improve the mud treatment efficiency. It also facilitates the cleaning of the inner wall of the drying box, avoiding the problem of dried mud sticking to the inner wall of the drying box, which would make it inconvenient for personnel to clean. This improves the effectiveness and efficiency of personnel cleaning the inner wall of the drying box. At the same time, it is easy to close and open the bottom of the mixing box to achieve the drying of sludge, and the mud pump can be automatically shut off when it is opened. Attached Figure Description
[0014] The accompanying drawings are provided to further understand the present invention and form part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation thereof.
[0015] In the attached diagram:
[0016] Figure 1 This is a schematic diagram of the structure of this utility model;
[0017] Figure 2 This is a schematic diagram of the cleaning water pipe installation structure of this utility model;
[0018] Figure 3 This is a schematic diagram of the connecting plate installation structure of this utility model;
[0019] Figure 4 This is the utility model Figure 3 Enlarged structural diagram of region A in the middle;
[0020] The following are the labels in the diagram: 1. Drying box; 2. Mixing box; 3. Mud pump; 4. Feed pipe; 5. Hot air blower; 6. Cleaning water pipe; 7. Circulating air duct; 8. Preheating air duct; 9. Electric telescopic rod; 10. Enclosure plate; 11. Mud pump switch; 12. Moving rod; 13. Cleaning rod; 14. Connecting plate. Detailed Implementation
[0021] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.
[0022] Example: Figure 1-4 As shown, this utility model provides a technical solution: a mud treatment device for construction sites, including a drying box 1, a mixing box 2 fixedly installed on the top of the drying box 1, a heating rod and a mixing rack inside the mixing box 2 for mixing mud, a mud pump 3 fixedly installed at one end of the mixing box 2, a feed pipe 4 fixedly connected to the discharge end of the mud pump 3, one end of the feed pipe 4 being inside the mixing box 2, a hot air blower 5 fixedly installed at one end inside the drying box 1, a cleaning water pipe 6 fixedly installed at one end inside the drying box 1, a preheating air pipe 8 fixedly connected to the outside of the feed pipe 4, a circulating air pipe 7 fixedly installed on the top of the preheating air pipe 8, and the circulating air pipe 7 fixedly connected to one end of the top of the drying box 1;
[0023] An electric telescopic rod 9 is installed at one end of the interior of the drying oven 1 by screws. A sealing plate 10 is installed at the other end of the electric telescopic rod 9 by screws. The sealing plate 10 corresponds to the discharge port at the bottom of the mixing box 2. A placement groove is provided inside the drying oven 1 at the position corresponding to the sealing plate 10 to facilitate sealing the discharge port of the mixing box 2 and to facilitate the storage of the sealing plate 10. A mud pump switch 11 is provided at one end of the interior of the drying oven 1. The input terminal of the mud pump switch 11 is electrically connected to the output terminal of an external power supply. The output terminal of the mud pump switch 11 is electrically connected to the input terminal of the mud pump 3 to facilitate the operation of the mud pump 3.
[0024] A movable rod 12 is slidably connected to one end of the drying oven 1. A cleaning rod 13 is installed at one end of the movable rod 12 by screws. A connecting plate 14 is installed in the middle of the cleaning rod 13 by screws. The connecting plate 14 corresponds to the position of the cleaning water pipe 6. The outer side of the cleaning rod 13 is in contact with the inner wall of the drying oven 1, which facilitates the movement of the cleaning rod 13 to clean the inner wall of the drying oven 1.
[0025] Personnel use mud pump 3 to pump mud into mixing tank 2 for mixing and initial heating and drying. After initial drying, the electric telescopic rod 9 is activated, moving the sealing plate 10 to open the bottom of mixing tank 2, allowing the initially dried mud to enter drying tank 1. As the sealing plate 10 contacts the mud pump switch 11, the mud pump 3 is shut off. After the mud is discharged into drying tank 1, the electric telescopic rod 9 is activated again to close the bottom of mixing tank 2. Then, the hot air fan 5 is turned on to dry the mud inside drying tank 1. During the drying process, hot air passes through the circulating air duct 7 and then enters the preheating air duct 8 to initially heat the mud inside the feed pipe 4, so that when the mud enters mixing tank 2... Having a certain temperature can reduce the drying time of the mud and improve the efficiency of mud drying, thereby improving the efficiency of mud treatment. After the mud is dried, the personnel will open the drying box 1 and process the dried mud. During the process, the personnel will use an external water pump to introduce water into the drying box 1 through the cleaning water pipe 6. At this time, the water flow impacts the connecting plate 14, pushing the connecting plate 14 to move, which in turn drives the cleaning rod 13 to move. Then, the personnel will pull the moving rod 12 to drive the cleaning rod 13 to clean the inner wall of the drying box 1, so as to avoid the dried mud from sticking to the inner wall of the drying box 1, which would cause inconvenience to the personnel in cleaning. This improves the effect and efficiency of personnel cleaning the inner wall of the drying box 1.
[0026] Finally, it should be noted that the above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A mud treatment device for construction sites, comprising a drying box (1), characterized in that: A mixing tank (2) is fixedly installed on the top of the drying box (1). A mud pump (3) is fixedly installed at one end of the mixing tank (2). A feed pipe (4) is fixedly connected to the discharge end of the mud pump (3). One end of the feed pipe (4) is inside the mixing tank (2). A hot air blower (5) is fixedly installed at one end of the drying box (1). A cleaning water pipe (6) is fixedly installed at one end of the drying box (1). A moving rod (12) is slidably connected to one end of the drying box (1). A cleaning rod (13) is installed at one end of the moving rod (12) by screws. A connecting plate (14) is installed in the middle of the cleaning rod (13) by screws.
2. The mud treatment equipment for construction sites according to claim 1, characterized in that, The feed pipe (4) is fixedly connected to a preheating air pipe (8) on the outside. A circulating air pipe (7) is fixedly installed on the top of the preheating air pipe (8). The circulating air pipe (7) is fixedly connected to one end of the top of the drying box (1).
3. The mud treatment equipment for construction sites according to claim 1, characterized in that, An electric telescopic rod (9) is installed inside the drying box (1) by screws at one end, and a sealing plate (10) is installed at the other end of the electric telescopic rod (9) by screws. A mud pump switch (11) is provided inside the drying box (1) at one end.
4. The mud treatment equipment for construction sites according to claim 3, characterized in that, The sealing plate (10) corresponds to the bottom outlet of the mixing box (2), and a placement groove is provided inside the drying box (1) at the position corresponding to the sealing plate (10).
5. A mud treatment device for construction sites according to claim 3, characterized in that, The input terminal of the mud pump switch (11) is electrically connected to the output terminal of the external power supply, and the output terminal of the mud pump switch (11) is electrically connected to the input terminal of the mud pump (3).
6. The mud treatment equipment for construction sites according to claim 1, characterized in that, The connecting plate (14) and the cleaning water pipe (6) are positioned to correspond to each other, and the outer side of the cleaning rod (13) is in contact with the inner wall of the drying box (1).
7. A mud treatment device for construction sites according to claim 1, characterized in that, The mixing tank (2) is equipped with a heating rod and a stirring rack.
Citation Information
Patent Citations
Environment-friendly slurry treatment equipment for building construction
CN217516831U