Building engineering construction gap filling equipment

By designing a construction joint filling device, and utilizing a combination of clamping plates and clamping plate membranes, the problems of equipment transportation and joint adjustment were solved, enabling flexible and adaptable filling of joints and ensuring construction quality and waterproofing effect.

CN224032108UActive Publication Date: 2026-03-24SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-04-18
Publication Date
2026-03-24

AI Technical Summary

Technical Problem

Existing technologies for sealing construction joints in building projects present challenges such as difficulties in equipment transportation, significant variations in joint size, and difficulty in adjustment, resulting in incomplete filling and potential water leakage.

Method used

A construction joint filling device for building engineering has been designed, including a caulking head, a clamping membrane, a clamping plate, and a caulking head connector. The clamping plate cooperates with the joint, and the combination of the clamping membrane and the caulking head connector enables flexible and adaptive filling of the joint. By utilizing the tongue and groove joint of the clamping plate and the cooperation of the clamping membrane, it can adapt to different joint shapes and sizes.

Benefits of technology

It improves construction quality, ensures that gaps are filled tightly, meets waterproofing requirements, and is easy to carry and install, with strong adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224032108U_ABST
    Figure CN224032108U_ABST
Patent Text Reader

Abstract

The utility model discloses building engineering construction gap filling equipment which comprises a gluing head, a clamping plate film, a clamping plate, a gluing gun and a gluing head connecting piece, the clamping plate is used for being arranged on a gap in a clamping mode, and the glue outlet end of the gluing gun is fixed to the clamping plate. One end of the gluing head connecting piece penetrates through the clamping plate to be communicated with the glue outlet end of the gluing gun, and the other end of the gluing head connecting piece penetrates through the multiple layers of clamping plate films to be connected with the gluing head. The utility model has the advantages that gaps with various widths can be effectively covered by using the clamping plates with the rabbets, and the clamping plates with different specifications are adapted to a larger gap range, so that the gaps can be fully filled with colloid materials, and the requirements of waterproof engineering are met; the clamping plate and the gluing head connecting piece are convenient to carry and install and high in flexibility.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of gap gluing, especially a building engineering construction gap filling equipment. BACKGROUND

[0002] The gluing of the gap in construction, especially the gap gluing of the door and window engineering, is relatively high in quality requirement due to waterproofness. In order to avoid the defect of insufficient gluing amount, workers usually illegally glue more in the gap and then cut off the expansion with a blade, which leads to the problem of non-dense filling of the gap and causes window frame leakage. This construction difficulty needs to be solved.

[0003] Another disclosed invention patent "Gluing device for decoration" (application publication number CN 119352737A) mentions a matched mobile trolley, a hydraulic extrusion mechanism, an angle adjusting mechanism, etc., which has the advantage of ensuring uniformity of gluing. However, the above-mentioned auxiliary construction method has the disadvantages of great difficulty in equipment transportation and great difficulty in adjusting the gap, which urgently needs to propose a low-cost and convenient construction solution.

[0004] In view of the difficulties of the traditional manual gluing gun and the gluing device in the above-mentioned patent, a building engineering construction gap filling equipment is proposed. SUMMARY

[0005] The utility model aims at the deficiency of prior art, and provides a building engineering construction gap filling equipment, which is composed of a gluing head, a clamping plate film, a clamping plate, a gluing gun and a gluing head connecting piece. The glue outlet end of the gluing gun is fixed on the clamping plate, one end of the gluing head connecting piece penetrates through the clamping plate and communicates with the glue outlet end of the gluing gun, and the other end penetrates through several layers of the clamping plate film and connects with the gluing head. The clamping plate is clamped on the gap, which has the advantages of full mobility, great adaptability and improved construction quality.

[0006] The utility model is achieved by the following technical solutions:

[0007] A building engineering construction gap filling equipment includes a gluing head, a clamping plate film, a clamping plate, a gluing gun and a gluing head connecting piece. The clamping plate is used for clamping on the gap. The glue outlet end of the gluing gun is fixed on the clamping plate. One end of the gluing head connecting piece penetrates through the clamping plate and communicates with the glue outlet end of the gluing gun, and the other end penetrates through several layers of the clamping plate film and connects with the gluing head.

[0008] One side or both sides of the bottom of the clamping plate are provided with tongue and groove. The size and shape of the bottom of the clamping plate are matched with the size and shape of the gap, respectively.

[0009] The size and shape of the clamping plate film are matched with the size and shape of the gap, respectively.

[0010] The card board and the card board film are spaced apart.

[0011] The card board film is provided with a pull strip.

[0012] The connecting mode between the glue head connector and the card board is a bayonet connection or a threaded connection.

[0013] The advantages of the present application are that the card board with a groove can effectively cover gaps of various widths, and through card boards of different specifications, a larger gap range can be adapted, and the gap can be fully filled with a rubber material, thereby meeting the requirements of waterproof engineering; the card board and the glue head connector are convenient to carry, easy to install, and have high flexibility. BRIEF DESCRIPTION OF DRAWINGS

[0014] Fig. 1 The figure is a structural schematic view of the building engineering construction gap filling device of the present application;

[0015] Fig. 2 The figure is a working schematic view of the building engineering construction gap filling device of the present application;

[0016] Fig. 3 The figure is a construction method flow chart of the building engineering construction gap filling device of the present application;

[0017] As shown in the figure, the marks respectively represent: Figs. 1-3 A glue head 1, a card board film 2, a card board 3, a glue gun 4, a glue head connector 5, a door and window frame 6, a gap 7.

[0018] DETAILED DESCRIPTION The features of the present application and other related features are further described in detail below by embodiments with reference to the accompanying drawings, so as to facilitate the understanding of the same by the same industry technical personnel:

[0019] Embodiment: As shown in the figure, the present embodiment relates to a building engineering construction gap filling device, which mainly comprises a glue head 1, a card board film 2, a card board 3, a glue gun 4 and a glue head connector 5. In the present embodiment, the card board 3 is clamped on the gap 7 of the door and window frame 6. Of course, the card board 3 can also be clamped on the gap 7 of other building structures. One side of the bottom of the card board 3 is provided with a groove, that is, the card board 3 respectively comprises a top structure and a bottom structure. The width of the bottom structure is smaller than that of the top structure. The size and shape of the bottom structure are respectively matched with the size and shape of the gap 7, so that the card board 3 is clamped on the gap 7. The size and shape of the card board film 2 are respectively matched with the size and shape of the gap 7, which is used to block the filling rubber material and keep the rubber material uniform and flat.

[0020] Figs. 1-2

[0021] ​​The glue outlet end of the glue gun 4 is fixed on the clamping plate 3, one end of the glue gun connecting piece 5 passes through the clamping plate 3 and communicates with the glue outlet end of the glue gun 4, and the other end passes through the clamping plate film 2 and is connected with the glue gun head 1. In the embodiment, a gap is left between the clamping plate 3 and the clamping plate film 2, and the thickness of the glue material filled in the gap 7 is controlled by adjusting the gap between the clamping plate 3 and the clamping plate film 2. The connection between the glue gun connecting piece 5 and the clamping plate 3 is bayonet connection or screw connection, which is convenient to disassemble. The clamping plate film 2 is provided with a pull strip. Since the glue material filled in the gap 7 will be adhered to the bottommost clamping plate film 2, after the glue filling is completed, the bottommost clamping plate film 2 is pulled off through the pull strip.

[0022] As Figs. 1-3 shown, the embodiment also has the following construction method:

[0023] 1. Construction preparation.

[0024] 2. Fill the glue material in the glue gun 4.

[0025] 3. Fix the glue gun 4 with the clamping plate 3, and connect the glue gun connecting piece 5 with the clamping plate 3.

[0026] 4. Install the clamping plate film 2 on the glue gun connecting piece 5.

[0027] 5. Clamp the clamping plate 3 on the gap 7 of the door and window frame 6, and perform the glue filling operation.

[0028] 6. Tear off the bottommost clamping plate film 2.

[0029] 7. Repeat steps 5-6 until the glue filling of the gap 7 of the door and window frame 6 is completed.

[0030] 8. After the construction is completed, clean the site.

[0031] The beneficial technical effects of the embodiment are that the clamping plate with the tongue and groove can effectively cover gaps of various widths, and different specifications of the clamping plate can adapt to a larger gap range, so that the gap can be fully filled with glue material, thereby meeting the requirements of waterproof engineering; the clamping plate and the glue gun connecting piece are convenient to carry, easy to install, and high in flexibility.

[0032] Although the above embodiment has been described in detail with reference to the drawings, those skilled in the art can recognize that various improvements and changes can be made to the utility model without departing from the scope defined by the claims, and therefore, detailed description is not given here.

Claims

1. A construction engineering construction joint filling apparatus, characterized by: It comprises a glue head, a card board film, a card board, a glue gun and a glue head connecting piece, the card board is used for clamping on the gap, the glue outlet of the glue gun is fixed on the card board, one end of the glue head connecting piece is communicated with the glue outlet of the glue gun through the card board, and the other end is connected with the glue head through the card board film.

2. A construction joint filling apparatus as claimed in claim 1, wherein: One side or both sides of the bottom of the card board are provided with tongue and groove, the size and shape of the bottom of the card board are matched with the size and shape of the gap respectively.

3. A construction joint filling apparatus as claimed in claim 1, wherein: The size and shape of the card board film are matched with the size and shape of the gap respectively.

4. A construction joint filling apparatus as claimed in claim 1, wherein: There is a gap between the card board and the card board film.

5. A construction joint filling apparatus as claimed in claim 1, wherein: The card board film is provided with a pull strip.

6. A construction joint filling apparatus as claimed in claim 1, wherein: The connection between the glue head connecting piece and the card board is bayonet connection or screw connection.

Citation Information

Patent Citations

  • Gluing device for decoration

    CN119352737A