Tower crane driver channel device capable of being synchronously lifted along with climbing frame
By using a foldable structure and modular design for the tower crane operator's access device, combined with an electric hoist and a fixed pulley system, the synchronous lifting of the tower crane operator's access and the climbing frame is achieved. This solves the problems of long time consumption, high cost, and high safety risks associated with traditional tower crane operator's access devices, thereby improving construction efficiency and reducing safety risks.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-19
- Publication Date
- 2026-04-10
AI Technical Summary
Traditional tower crane operator access channels require repeated disassembly and assembly, which is time-consuming, affects the construction period, increases labor costs, and poses risks associated with working at heights.
The tower crane operator's access device adopts a foldable structure and modular design, combined with an electric hoist and a fixed pulley system, to achieve synchronous lifting of the tower crane operator's access and the climbing frame. The electric hoist drives the wire rope to rotate and reset the movable access platform.
This enabled the simultaneous lifting of the tower crane operator's access and the climbing scaffold, reducing assembly and disassembly time, lowering labor costs and safety risks, and improving construction efficiency.
Smart Images

Figure CN224105437U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of climbing frame, especially a tower crane driver passageway device that can be lifted synchronously with climbing frame. BACKGROUND
[0002] In the construction of high-rise buildings, the tower crane as a hoisting machinery equipment is one of the indispensable equipment, in the construction process with the increase of building height, the tower crane height increases, the tower crane driver operation climbs up and down, time-consuming and laborious, and there is a risk of falling from a great height. The traditional tower crane driver passageway usually leaves a hole in the middle part of the building climbing frame, adopts frame pipe, fastener to set up the driver passageway, to facilitate the tower crane driver to go up and down. The problem of this kind of way is that manual driver passageway not only takes a long time, and cannot be lifted synchronously with climbing frame, needs to be repeatedly set up and removed, not only affects the construction period, increases the labor cost, and increases the safety risk of high-altitude operation, the industry needs a breakthrough solution. SUMMARY
[0003] (I) Technical problem to be solved
[0004] The utility model solves the technical problem that: a tower crane driver passageway device that can be lifted synchronously with climbing frame innovatively adopts folding structure, modular design, realizes the synchronous lifting of tower crane driver passageway and climbing frame, solves the problem that the traditional tower crane driver passageway needs to be repeatedly disassembled, time-consuming, delays the construction period, high labor cost, and big high-altitude operation risk, improves the construction efficiency, reduces the labor cost and safety risk.
[0005] (II) Technical scheme
[0006] The utility model provides a tower crane driver passageway device can synchronous promotion with climbing frame, include: fixed passageway mechanism, movable passageway mechanism, power mechanism, the fixed passageway mechanism is by passageway platform A, guardrail cross bar, inclined pull rod, guardrail vertical rod, T plate, connecting sleeve A is composed, passageway platform A, guardrail cross bar, the both outer sides of guardrail vertical rod are equipped with even distribution round hole, and the guardrail vertical rod is installed on the both outer sides of passageway platform A even distribution round hole through even distribution round hole, screw bolt, and the guardrail cross bar is installed in the outside of guardrail vertical rod through even distribution round hole, and the inclined pull rod is equipped with one in left and right, and the bottom of inclined pull rod is fixed through bolt connection with the both sides of passageway platform A front end, and the top of inclined pull rod is fixedly connected with climbing frame body, and T plate is connected fixedly with passageway platform A and guardrail and climbing frame body through bolt, and connecting sleeve A is welded and fixed on the upside of passageway platform A front end, is used for installing movable passageway mechanism, the movable passageway mechanism is by passageway platform B, guardrail cross bar, guardrail vertical rod, T plate, connecting sleeve B and pin shaft composition, and the both outer sides of passageway platform B are equipped with even distribution round hole, and the guardrail vertical rod is installed on the both outer sides of passageway platform B through even distribution round hole, and the guardrail cross bar is installed in the inside of guardrail vertical rod through even distribution round hole, and T plate is connected fixedly with passageway platform B and guardrail vertical rod through bolt, and connecting sleeve B is welded and fixed on the upside of passageway platform B rear end, and is hinged with passageway platform A through pin shaft, the power mechanism is by electric hoist, trolley pulley, steel wire rope composition, and electric hoist is hung on climbing frame main frame body through the mode of hanging upside down, and trolley pulley is fixed on the upper portion of climbing frame main frame body through bolt, and one end of steel wire rope is hung on electric hoist hook, and the other end is fixed on the front end of passageway platform B through trolley pulley.
[0007] Preferably, the passageway platform A and the passageway platform B of the fixed passageway mechanism and the movable passageway mechanism adopt a square tube welded frame with a material Q235, a specification of 50mm*50mm*3mm, a φ12mm hole on the outer side, and a spacing of 100mm.
[0008] Preferably, the guardrail vertical rod and the guardrail cross bar are made of a square tube with a size of 30mm*30mm*2mm, a φ12mm hole on the outer side, and a spacing of 100mm.
[0009] Preferably, the connecting sleeve A and the connecting sleeve B are made of a seamless tube with a diameter of φ25mm and a wall thickness of 5mm.
[0010] Preferably, the inclined pull rod is made of a steel tube with a material Q235, a diameter of φ48mm, and a wall thickness of 3.5mm, and the both ends are flattened and punched with a φ17mm hole.
[0011] Preferably, the electric hoist is a 1.5t continuous operation electric hoist.
[0012] Preferably, the fixed pulley is a double- groove pulley, which is matched with two steel wires.
[0013] Preferably, the steel wire is two, with a diameter of φ11mm, one end of which is hung on the electric hoist hook, and the other end of which is fixed on the front end of the passage platform B on both sides through the fixed pulley, and is fixed by using a steel wire rope clamp. Advantages
[0014] The tower crane driver passage device with the folding structure and the modular design can realize synchronous lifting of a tower crane driver passage and a climbing frame, solve the problems of the traditional tower crane driver passage, such as repeated disassembly and assembly, long time consumption, delayed construction period, high labor cost and high risk of high-altitude operation, improve construction efficiency, and reduce labor cost and safety risk. BRIEF DESCRIPTION OF DRAWINGS
[0015] Figure 1 is a front view of the tower crane driver passage device capable of being synchronously lifted with a climbing frame according to an embodiment of the utility model;
[0016] Figure 2 is a front view and a top view of the connection of the passage platform A and the passage platform B according to an embodiment of the utility model;
[0017] Figure 3 is a front view and a left view of the T-shaped plate according to an embodiment of the utility model. DETAILED DESCRIPTION
[0018] The specific embodiments of the utility model are further described in detail in combination with the drawings and the embodiments. The following embodiments are used to illustrate the utility model, but are not used to limit the scope of the utility model.
[0019] Figure 1 is a front view of the tower crane driver passage device capable of being synchronously lifted with a climbing frame according to an embodiment of the utility model, which comprises a passage platform A1, a protective rail cross rod 2, a cable-stayed rod 3, a protective rail vertical rod 5, a T-shaped plate 6, a connecting sleeve A10, a passage platform B4, an electric hoist 9, a fixed pulley 8 and a steel wire 7;
[0020] Figure 2 is a front view and a top view of the connection of the passage platform A and the passage platform B according to an embodiment of the utility model, which comprises a passage platform A1, a passage platform B4, a connecting sleeve A10, a connecting sleeve B11 and a pin shaft 12.
[0021] Figure 3 is a front view and a left view of the T-shaped plate according to an embodiment of the utility model.
[0022] The specific working principle is as follows:
[0023] The application discloses a tower crane driver passage device which can be synchronously lifted with a climbing frame. When being installed, a fixed passage mechanism and a movable passage mechanism are hingedly connected through a pin shaft, guardrail vertical rods are installed on both sides of a passage platform A and a passage platform B, a T-shaped plate is used as a positioning connecting piece and is installed between the passage platforms and the guardrail vertical rods. Then, guardrail cross rods are installed, the T-shaped plate is used as a positioning connecting piece and is installed between the guardrail vertical rods and the guardrail cross rods, and is simultaneously used for connection with a climbing frame body. The guardrail cross rod of the passage platform A is installed on the outer side of the guardrail vertical rod, and the guardrail cross rod of the passage platform B is installed on the inner side of the guardrail vertical rod, so that the guardrail cross rod does not interfere when the movable passage mechanism rotates upwards. After the above assembly is completed, the passage platform A and the guardrail of the fixed passage mechanism are fixedly connected with the T-shaped plate and the climbing frame body through bolts. Two inclined pull rods are fixed at two ends of the passage platform A through bolts respectively, and are fixed on the climbing frame body in parallel correspondence through bolts at the other ends. A power mechanism is installed on the climbing frame body below the passage platform, a double-groove fixed pulley is installed on the climbing frame body above the passage platform, two steel wires are hung at two ends of a hook of an electric hoist, and the other ends of the two steel wires pass through the double-groove fixed pulley and are hung at two ends of the passage platform B. Before the climbing frame climbs, the electric hoist is started, the steel wires are tightened, the movable passage mechanism is rotated upwards and is separated from a tower crane standard section, a safety distance of not less than 500 mm is kept, and climbing frame climbing operation can be performed. After the climbing frame climbing operation is completed, the electric hoist is reversed to loosen the steel wires, the movable passage mechanism is reset under the action of gravity, falls above a horizontal support of the tower crane standard section and is overlapped on the horizontal support, and a tower crane driver can go up and down the tower crane from the driver passage. The above steps can be repeated to realize synchronous lifting of the tower crane driver passage and the climbing frame and application, and repeated disassembly and assembly are not needed.
[0024] The above embodiments are only used for describing the application, and are not used for limiting the application. Those skilled in the art can make various changes and modifications without departing from the spirit and scope of the application. All equivalent technical solutions belong to the scope of the application, and the patent protection scope of the application is defined by the claims.
Claims
1. A tower crane cabs device that can be hoisted in synchronization with a climbing frame, characterized in that, It includes: fixed channel mechanism, movable channel mechanism, power mechanism; the fixed channel mechanism is composed of channel platform A (1), guardrail cross rod (2), inclined pull rod (3), guardrail vertical rod (5), T-shaped plate (6), connecting sleeve A (10), the two outer sides of channel platform A (1), guardrail cross rod (2), guardrail vertical rod (5) are provided with uniformly distributed round holes, the guardrail vertical rod (5) is installed on the two outer sides of channel platform A (1) by being provided with uniformly distributed round holes and bolts, the guardrail cross rod (2) is installed on the outer side of the guardrail vertical rod (5) by being provided with uniformly distributed round holes, the inclined pull rod (3) is provided with one on the left and right, the bottom is fixed by bolt connection with the two sides of the front end of channel platform A (1), the top is fixedly connected with the climbing frame body, the T-shaped plate (6) is fixedly connected with the climbing frame body by bolts, the connecting sleeve A (10) is welded and fixed on the upper side of the front end of channel platform A (1) and is used for installing movable channel mechanism; the movable channel mechanism is composed of channel platform B (4), guardrail cross rod (2), guardrail vertical rod (5), T-shaped plate (6), connecting sleeve B (11) and pin shaft (12), the two outer sides of channel platform B (4) are provided with uniformly distributed round holes, the guardrail vertical rod (5) is installed on the two outer sides of channel platform B (4) by being provided with uniformly distributed round holes and bolts, the guardrail cross rod (2) is installed on the inner side of the guardrail vertical rod (5) by being provided with uniformly distributed round holes, the T-shaped plate (6) is fixedly connected with the guardrail vertical rod (5) by bolts, the connecting sleeve B (11) is welded and fixed on the upper side of the rear end of channel platform B (4) and is hinged with channel platform A (1) through the pin shaft (12); the power mechanism is composed of electric hoist (9), fixed pulley (8) and steel wire rope (7), the electric hoist (9) is hung on the climbing frame main body in an inverted manner, the fixed pulley (8) is fixed on the upper part of the climbing frame main body by bolts, one end of the steel wire rope (7) is hung on the electric hoist hook, and the other end is fixed on the front end of channel platform B (4) through the fixed pulley (8).
2. A tower crane cabs device that can be raised in synchronization with the climbing frame according to claim 1, characterized in that, The channel platform A (1) and the channel platform B (4) of the fixed channel mechanism and the movable channel mechanism adopt Q235 steel, the specification is 50mm*50mm*3mm, the outer side is provided with a square tube welded frame with a diameter of φ12mm and a spacing of 100mm, and a steel mesh sheet is welded on the square tube welded frame as a walkway plate.
3. A tower crane cabs device that can be raised in synchronization with the climbing frame as claimed in claim 1, characterized in that, The guardrail vertical rod (5) and the guardrail cross rod (2) are made of 30mm*30mm*2mm square tubes, and the outer side is provided with a diameter of φ12mm and a spacing of 100mm.
4. The tower crane cabs device that can promote with the climbing frame synchronization as claimed in claim 1 is characterized in that, The connecting sleeve A (10) and the connecting sleeve B (11) are made of a seamless pipe with a diameter of φ25mm and a wall thickness of 5mm.
5. A tower crane cabs device that can be raised in synchronization with the climbing frame as claimed in claim 1, characterized in that, The inclined pull rod (3) is made of Q235 steel pipe with a diameter of φ48mm and a wall thickness of 3.5mm, and the two side ends are flattened and punched with a diameter of φ17mm.
6. A tower crane cabs device that can be raised in synchronization with the climbing frame as claimed in claim 1, characterized in that, The electric hoist (9) is a 1.5t continuous working electric hoist.
7. A tower crane cabs device that can be raised in synchronization with the climbing frame as claimed in claim 1, characterized in that, The fixed pulley (8) is a double-rope groove pulley used with two steel wire ropes (7).
8. A tower crane cabs device that can be raised in synchronization with the climbing frame as claimed in claim 1, characterized in that, The steel wire rope (7) is two, diameter φ11mm, one end of all hanging in the electric hoist (9) hook, the other end through the fixed pulley (8) is fixed in the channel platform B (4) front end two sides, all use steel wire rope rope card fixed.