Multifunctional constructional engineering feeding tool

By designing a multifunctional construction engineering material handling tool with support components, lifting components, and baffle components, the problems of existing tools being limited in function, inefficient, and lacking in safety performance have been solved, achieving efficient and safe material handling.

CN224200284UActive Publication Date: 2026-05-05SHANDONG DEJIAN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANDONG DEJIAN GRP CO LTD
Filing Date
2025-05-15
Publication Date
2026-05-05

AI Technical Summary

Technical Problem

Existing construction material handling tools are limited in function, inefficient, and lack sufficient safety features. They cannot meet the handling needs of different materials and cannot adjust the size of the materials.

Method used

A multifunctional material handling tool for construction engineering has been designed, comprising a support assembly, a lifting assembly, and a baffle assembly. The support assembly is connected by slides and slots, the lifting assembly adjusts the height, and the baffle assembly prevents materials from slipping, thus adapting to the handling needs of different materials.

Benefits of technology

It improves material loading efficiency, can be adjusted according to material size to meet the handling needs of different materials, and enhances safety performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224200284U_ABST
    Figure CN224200284U_ABST
Patent Text Reader

Abstract

The utility model discloses a multifunctional constructional engineering feeding tool which comprises a support assembly, a lifting assembly and a baffle assembly, the support assembly comprises a first support and a second support, the first support comprises two first supporting legs and two third supporting legs, the two first supporting legs are connected with the two third supporting legs through two first sliding grooves respectively, and the second supporting legs are connected with the two third supporting legs through two second sliding grooves respectively. The second support comprises two second supporting legs, a first inserting groove is formed in the bottom of the second support, the first inserting groove is connected with the first sliding groove in a matched and inserted mode, the lifting assembly comprises two first lifting supports and two second lifting supports, and the bottoms of the two first lifting supports are connected with the two first supporting legs and the two second supporting legs in a sliding mode respectively. The two second lifting supports are slidably mounted at the tops of the two third supporting legs correspondingly. The baffle assembly comprises two first baffles, two second baffles and two third baffles. The feeding device is high in feeding efficiency, capable of being adjusted according to the size of materials, capable of meeting the carrying requirements of different materials and good in safety performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of construction engineering equipment technology, and in particular to a multifunctional construction engineering material loading tool. Background Technology

[0002] During construction, material handling tools are required. However, existing material handling tools generally have the following problems: 1. Limited functionality: Traditional material handling tools can only handle material handling and cannot meet the needs of handling various materials; 2. Low material handling efficiency; 3. Material slippage during the handling process, resulting in insufficient safety performance; 4. Inability to adjust according to the size of the material. Utility Model Content

[0003] The purpose of this utility model is to provide a multifunctional material loading tool for construction engineering, which has high loading efficiency, can be adjusted according to the size of the material, can adapt to the handling needs of different materials, and has good safety performance.

[0004] To achieve the above and other related objectives, this utility model provides a multifunctional construction engineering material loading tool, comprising: a support assembly, a lifting assembly, and a baffle assembly. The support assembly includes a first support and a second support. The first support includes two first legs and two third legs. The bottoms of the two first legs are fixedly connected to both ends of a first crossbeam. The two first legs are respectively connected to the two third legs through two first sliding grooves. The third legs pass through the first sliding grooves and are fixedly connected to the sidewalls of the first sliding grooves. The second support includes two second legs. The bottoms of the two second legs are fixedly connected to both ends of a second crossbeam. Each of the bottoms of the two second supports facing the third legs is provided with a first slot. The two first slots are respectively engaged with the two first sliding grooves. A plurality of first insert rods are inserted between the two first sliding grooves and the two first slots. The tops of the plurality of first insert rods are... A base plate is installed; the lifting assembly includes two first lifting brackets and two second lifting brackets. The bottoms of the two first lifting brackets are slidably connected to the two first legs and the two second legs, respectively. The two first lifting brackets are fixedly connected to the two first legs and the two second legs through two first locking structures, respectively. Two lifting lugs are fixedly installed on the top of each first lifting bracket. The two second lifting brackets are slidably installed on the tops of the two third legs, respectively. The second lifting brackets are fixedly connected to the third legs through a second locking structure. The baffle assembly includes two first baffles, two second baffles, and two third baffles. The two first baffles are detachably installed to the two first legs and the two second legs, respectively. The second baffles are detachably installed between adjacent first legs and third legs, and the third baffles are detachably installed between adjacent second legs and third legs.

[0005] In one example of the multifunctional construction engineering material loading tool of this utility model, the surfaces of the two first legs arranged opposite each other are provided with second sliding grooves, the two ends of the first crossbeam are respectively fixedly connected to the bottom of the two second sliding grooves, and the bottom of the first lifting bracket is respectively slidably connected to the two second sliding grooves.

[0006] In one example of the multifunctional building material loading tool of this utility model, the surfaces of the two second legs arranged opposite each other are provided with third sliding grooves, the two ends of the second crossbeam are respectively fixedly connected to the bottom of the two third sliding grooves, and the bottom of the other first lifting bracket is respectively slidably connected to the two third sliding grooves.

[0007] In one example of the multifunctional construction engineering material loading tool of this utility model, the first lifting bracket includes two first insert plates and a third crossbeam. The two ends of the third crossbeam are respectively fixedly connected to the top ends of the two first insert plates. The top of the third crossbeam is provided with two lifting lugs. The two first insert plates are respectively slidably installed in the two second slide grooves or the two third slide grooves.

[0008] In one example of the multifunctional building construction material feeding tool of this utility model, the first locking structure includes a second insert rod, and a first insertion hole is provided on the two opposing surfaces of the first legs and the two opposing surfaces of the second legs respectively. The first insert plate includes a vertically arranged first side plate and a second side plate, and a plurality of second insertion holes are provided on the two first side plates. The first insertion hole and the second insertion hole cooperate with each other, and the second insert rod is inserted into the first insertion hole and the second insertion hole respectively.

[0009] In one example of the multifunctional building construction material loading tool of this utility model, the third leg includes a vertically arranged third side plate and a fourth side plate. The third side plate passes through the first slide groove, and the fourth side plate is fixedly connected to the side wall of the first slide groove.

[0010] In an example of a multifunctional construction material loading tool of this utility model, the second lifting support includes a fifth side plate and a sixth side plate arranged vertically. The fifth side plate and the sixth side plate are slidably connected to the third side plate and the fourth side plate, respectively. The top of the third side plate is provided with two third insertion holes, and the fifth side plate is provided with a plurality of fourth insertion holes. The first support leg is provided with four fifth insertion holes that cooperate with the two third insertion holes, and the second support leg is provided with four sixth insertion holes that cooperate with the two third insertion holes. The second side plate is provided with a seventh insertion hole that cooperates with the plurality of fourth insertion holes. The second locking structure includes two third insertion rods, which are respectively inserted into the third insertion hole, the fourth insertion hole, the fifth insertion hole, the sixth insertion hole, and the seventh insertion hole.

[0011] In one example of the multifunctional building engineering material feeding tool of this utility model, the first slide is provided with a plurality of eighth insertion holes, the first slot is provided with a plurality of ninth insertion holes, the eighth insertion holes cooperate with the ninth insertion holes, and the first insertion rod is respectively engaged with the eighth insertion hole and the ninth insertion hole.

[0012] In one example of the multifunctional building construction material loading tool of this utility model, a first support plate is fixedly installed on the side wall adjacent to the two first sliding grooves at both ends of the first crossbeam, and a second support plate is fixedly installed on the side wall adjacent to the two first slots at both ends of the second crossbeam. The first support plate and the second support plate cooperate to install the base plate.

[0013] In one example of the multifunctional building construction material loading tool of this utility model, the base plate is provided with second slots on both sides that cooperate with the two third legs.

[0014] In one example of the multifunctional building material feeding tool of this utility model, two third slots are provided on the outer wall of the two first legs away from the first slide, and one first baffle is inserted into the two third slots. Two fourth slots are provided on the outer wall of the two second legs away from the first slots, and another first baffle is inserted into the two fourth slots.

[0015] In one example of the multifunctional building engineering material feeding tool of this utility model, two first wing plates are provided on the outer wall of the two first legs facing the first chute, a second wing plate is provided on the third side plate away from the fifth side plate, and two third wing plates are provided on the outer wall of the two second legs facing the first slot.

[0016] This utility model relates to a multifunctional construction engineering material loading tool. A support assembly serves as the supporting structure, wherein a first and second support are connected via a first sliding groove and a first slot, and fixed by several first insert rods. A base plate is mounted on the top of each first insert rod, and the base plate can bear materials. The distance between the first and second support is adjustable to accommodate materials of different lengths. A lifting assembly is installed on top of the support assembly. A first lifting bracket is adjustablely mounted on top of the first and second support, and a second lifting bracket is adjustablely mounted on top of a third support leg, thereby adjusting the overall height of the loading tool to accommodate different materials. The lifting lugs on the top of the first lifting bracket facilitate loading. A baffle assembly can seal the support assembly, enabling it to bear powdery or granular materials and preventing material slippage during loading, thus improving its safety performance. This utility model offers high loading efficiency, can be adjusted according to material size, adapts to the handling needs of different materials, and has excellent safety performance. Attached Figure Description

[0017] Figure 1 This is a three-dimensional structural diagram of an embodiment of the multifunctional building construction material feeding tool of this utility model;

[0018] Figure 2 This is a schematic diagram of the structure of the baffle removal assembly in one embodiment of the multifunctional building construction material feeding tool of this utility model;

[0019] Figure 3 This is a schematic diagram of the support assembly and lifting assembly in one embodiment of the multifunctional building construction material loading tool of this utility model.

[0020] Component designation:

[0021] 100 Bracket assembly; 110 First bracket; 111 First leg; 112 Third leg; 113 First crossbeam; 114 First slide rail; 115 First socket; 117 Fifth socket; 118 Eighth socket; 120 Second bracket; 121 Second leg; 122 Second crossbeam; 123 First slot; 124 Sixth socket; 125 Ninth socket; 126 Fourth slot; 130 First insert rod; 140 Base plate; 150 First wing plate; 160 Second wing plate; 170 Third wing plate; 180 First support plate; 200 Lifting assembly; 210 First lifting bracket; 211 First insert plate; 212 Third crossbeam; 213 Lifting lug; 214 Second insertion hole; 215 Seventh insertion hole; 220 Second lifting bracket; 221 Fourth insertion hole; 230 First locking structure; 231 Second insertion rod; 240 Second locking structure; 241 Third insertion rod; 300 Baffle assembly; 310 First baffle; 320 Second baffle; 330 Third baffle. Detailed Implementation

[0022] The following specific examples illustrate the implementation of this utility model. Those skilled in the art can easily understand other advantages and effects of this utility model from the content disclosed in this specification. This utility model can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of this utility model. It should be noted that, in the absence of conflict, the following embodiments and features in the embodiments can be combined with each other. It should also be understood that the terminology used in the embodiments of this utility model is for describing specific implementation schemes and not for limiting the scope of protection of this utility model. Test methods in the following embodiments that do not specify specific conditions are generally performed under conventional conditions or according to the conditions recommended by the respective manufacturers.

[0023] When numerical ranges are given in the embodiments, it should be understood that, unless otherwise specified in this invention, both endpoints of each numerical range and any value between the two endpoints may be selected. Unless otherwise defined, all technical and scientific terms used in this invention, as well as the prior art known to those skilled in the art and the description of this invention, may be implemented using any prior art methods, equipment, and materials similar to or equivalent to those in the embodiments of this invention.

[0024] Please see Figures 1 to 3This utility model provides a multifunctional material loading tool for construction engineering, comprising: a support assembly 100, a lifting assembly 200, and a baffle assembly 300. The support assembly 100 includes a first support 110 and a second support 120. The first support 110 includes two first legs 111 and two third legs 112. The bottoms of the two first legs 111 are fixedly connected to both ends of a first crossbeam 113. The two first legs 111 are respectively connected to the two third legs 112 through two first sliding grooves 114. The third legs 112 pass through the first sliding grooves 114 and... The second bracket 120 is fixedly connected to the side wall of the first slide 114. The second bracket 120 includes two second legs 121. The bottom of the two second legs 121 is fixedly connected to both ends of the second crossbeam 122. The bottom of the two second brackets 120 facing the third leg 112 is provided with a first slot 123. The two first slots 123 are respectively engaged with the two first slides 114. A plurality of first insert rods 130 are inserted between the two first slides 114 and the two first slots 123. The top of the plurality of first insert rods 130 is equipped with a base plate 140. The lifting assembly 200 includes two first lifting brackets 210 and two second lifting brackets 220. The bottoms of the two first lifting brackets 210 are slidably connected to the two first legs 111 and the two second legs 121, respectively. The two first lifting brackets 210 are fixedly connected to the two first legs 111 and the two second legs 121, respectively, through two first locking structures 230. Two lifting lugs 213 are fixedly installed on the top of each first lifting bracket 210. The two second lifting brackets 220 are slidably installed on the tops of the two third legs 112, and the second lifting brackets 220 are fixedly connected to the third legs 112 through a second locking structure 240. The baffle assembly 300 includes two first baffles 310, two second baffles 320, and two third baffles 330. The two first baffles 310 are detachably connected to the two first legs 111 and the two second legs 121, respectively. The second baffles 320 are detachably installed between adjacent first legs 111 and third legs 112. The third baffles 330 are detachably installed between adjacent second legs 121 and third legs 112.

[0025] This invention utilizes a support assembly 100 as a supporting structure. A first support 110 and a second support 120 are connected via a first sliding groove 114 and a first slot 123, and fixed by a plurality of first insert rods 130. A base plate 140 is mounted on the top of the first insert rods 130, and the base plate 140 can bear materials. The spacing between the first support 110 and the second support 120 is adjustable to accommodate materials of different lengths. A lifting assembly 200 is installed on top of the support assembly 100. A first lifting support 210 is adjustablely installed on top of the first support 110 and the second support 120, and a second lifting support 220 is adjustablely installed on top of the third support leg 112, thereby adjusting the overall height of the feeding tool to accommodate different materials. The lifting lug 213 on the top of the first lifting support 210 facilitates feeding. A baffle assembly 300 can seal the support assembly 100, enabling it to bear powdery or granular materials and preventing material slippage during the feeding process, thus improving its safety performance.

[0026] Please see Figure 2 and Figure 3 In one example of the multifunctional construction material loading tool of this utility model, the surfaces of the two first support legs 111 arranged opposite each other are provided with second sliding grooves. The two ends of the first crossbeam 113 are respectively fixedly connected to the bottom of the two second sliding grooves. The bottom of one first lifting bracket 210 is respectively slidably connected to the two second sliding grooves. The surfaces of the two second support legs 121 arranged opposite each other are provided with third sliding grooves. The two ends of the second crossbeam 122 are respectively fixedly connected to the bottom of the two third sliding grooves. The bottom of another first lifting bracket 210 is respectively slidably connected to the two third sliding grooves. The first lifting bracket 210 includes two first insert plates 211 and a third crossbeam 212. The two ends of the third crossbeam 212 are respectively fixedly connected to the top ends of the two first insert plates 211. The top of the third crossbeam 212 is provided with two lifting lugs 213. The two first insert plates 211 are respectively slidably installed in the two second sliding grooves or the two third sliding grooves.

[0027] Please see Figure 2 and Figure 3 In an example of the multifunctional building construction material feeding tool of this utility model, the first locking structure 230 includes a second insert rod 231. A first insertion hole 115 is provided on the surfaces of the two first legs 111 facing away from each other and on the surfaces of the two second legs 121 facing away from each other. The first insert plate 211 includes a first side plate and a second side plate arranged vertically. A plurality of second insertion holes 214 are provided on the two first side plates. The first insertion hole 115 cooperates with the second insertion hole 214. The second insert rod 231 is inserted into the first insertion hole 115 and the second insertion hole 214 respectively.

[0028] Please see Figure 2 and Figure 3 In one example of the multifunctional building construction material loading tool of this utility model, the third support leg 112 includes a third side plate and a fourth side plate arranged vertically. The third side plate passes through the first slide groove 114, and the fourth side plate is fixedly connected to the side wall of the first slide groove 114. The second lifting bracket 220 includes a fifth side plate and a sixth side plate arranged vertically. The fifth side plate and the sixth side plate are slidably connected to the third side plate and the fourth side plate, respectively. The top of the third side plate is provided with two third insertion holes. The fifth side plate is provided with a plurality of fourth insertion holes 221. The first support leg 111 is provided with four fifth insertion holes 117 that cooperate with the two third insertion holes. The second support leg 121 is provided with four sixth insertion holes 124 that cooperate with the two third insertion holes. The second side plate is provided with a seventh insertion hole 215 that cooperates with the plurality of fourth insertion holes 221. The second locking structure 240 includes two third insertion rods 241. The third insertion rods 241 are respectively engaged with the third insertion hole, the fourth insertion hole 221, the fifth insertion hole 117, the sixth insertion hole 124 and the seventh insertion hole 215.

[0029] Please see Figure 3 In an example of a multifunctional construction engineering material loading tool of this utility model, the first slide 114 is provided with a plurality of eighth insertion holes 118, and the first slot 123 is provided with a plurality of ninth insertion holes 125. The eighth insertion holes 118 and the ninth insertion holes 125 cooperate with each other, and the first insertion rod 130 is respectively inserted into the eighth insertion holes 118 and the ninth insertion holes 125. First support plates 180 are fixedly installed on the side walls adjacent to the two first slides 114 at both ends of the first crossbeam 113, and second support plates are fixedly installed on the side walls adjacent to the two first slots 123 at both ends of the second crossbeam 122. The first support plates 180 cooperate with the second support plates for mounting the base plate 140. The base plate 140 has second slots on both sides that cooperate with the two third support legs 112.

[0030] Please see Figure 3In one example of the multifunctional construction engineering material feeding tool of this utility model, two first legs 111 have two mating third slots on their outer walls on the side away from the first slide 114, and one first baffle 310 is inserted into the two third slots. Two second legs 121 have two mating fourth slots 126 on their outer walls on the side away from the first slot 123, and another first baffle 310 is inserted into the two fourth slots 126. Two first wing plates 150 are provided on the outer walls of the two first legs 111 facing the first slide 114, and a second wing plate 160 is provided on the side of the third wing plate away from the fifth wing plate. Two third wing plates 170 are provided on the outer walls of the two second legs 121 facing the first slot 123. The first wing plates 150, second wing plates 160, and third wing plates 170 are used to install the baffle assembly 300.

[0031] The above embodiments are merely illustrative of the principles and effects of this utility model and are not intended to limit the scope of this utility model. Any person skilled in the art can modify or alter the above embodiments without departing from the spirit and scope of this utility model. Therefore, all equivalent modifications or alterations made by those skilled in the art without departing from the spirit and technical concept disclosed in this utility model should still be covered by the claims of this utility model.

Claims

1. A multifunctional material loading tool for construction projects, characterized in that, include: A support assembly includes a first support and a second support. The first support includes two first legs and two third legs. The bottoms of the two first legs are fixedly connected to both ends of a first crossbeam. The two first legs are respectively connected to the two third legs through two first sliding grooves. The third legs pass through the first sliding grooves and are fixedly connected to the sidewalls of the first sliding grooves. The second support includes two second legs. The bottoms of the two second legs are fixedly connected to both ends of a second crossbeam. The bottom of each of the two second supports facing the third legs is provided with a first slot. The two first slots are respectively engaged with the two first sliding grooves. A plurality of first insert rods are passed between the two first sliding grooves and the two first slots. A base plate is installed on the top of the plurality of first insert rods. A lifting assembly includes two first lifting brackets and two second lifting brackets. The bottoms of the two first lifting brackets are slidably connected to the two first legs and the two second legs, respectively. The two first lifting brackets are fixedly connected to the two first legs and the two second legs, respectively, through two first locking structures. Two lifting lugs are fixedly installed on the top of each first lifting bracket. The two second lifting brackets are slidably installed on the tops of the two third legs, respectively, and the second lifting brackets are fixedly connected to the third legs through a second locking structure. A baffle assembly includes two first baffles, two second baffles, and two third baffles. The two first baffles are detachably connected to the two first legs and the two second legs, respectively. The second baffles are detachably installed between adjacent first legs and third legs. The third baffles are detachably installed between adjacent second legs and third legs.

2. The multifunctional construction material loading tool as described in claim 1, characterized in that, The two first legs are provided with second sliding grooves on their opposite surfaces. The two ends of the first crossbeam are fixedly connected to the bottom of the two second sliding grooves respectively, and the bottom of the first lifting bracket is slidably connected to the two second sliding grooves respectively.

3. The multifunctional construction material loading tool as described in claim 2, characterized in that, The two second legs are provided with third sliding grooves on their opposite surfaces. The two ends of the second crossbeam are fixedly connected to the bottom of the two third sliding grooves respectively, and the bottom of the other first lifting bracket is slidably connected to the two third sliding grooves respectively.

4. The multifunctional construction material loading tool as described in claim 3, characterized in that, The first lifting bracket includes two first insert plates and a third crossbeam. The two ends of the third crossbeam are fixedly connected to the top ends of the two first insert plates respectively. The top of the third crossbeam is provided with two lifting lugs. The two first insert plates are slidably installed in the two second slide grooves or the two third slide grooves respectively.

5. The multifunctional construction material loading tool as described in claim 4, characterized in that, The first locking structure includes a second insert rod. A first insertion hole is provided on the two opposing surfaces of the first legs and the two opposing surfaces of the second legs. The first insert plate includes a vertically arranged first side plate and a second side plate. A plurality of second insertion holes are provided on the two first side plates. The first insertion holes cooperate with the second insertion holes. The second insert rod is inserted into the first insertion hole and the second insertion hole respectively.

6. The multifunctional construction material loading tool as described in claim 5, characterized in that, The third leg includes a vertically arranged third side plate and a fourth side plate. The third side plate passes through the first slide groove, and the fourth side plate is fixedly connected to the side wall of the first slide groove. The second lifting bracket includes a vertically arranged fifth side plate and a sixth side plate. The fifth side plate and the sixth side plate are slidably connected to the third side plate and the fourth side plate, respectively. The top of the third side plate is provided with two third insertion holes, and the fifth side plate is provided with several fourth insertion holes. The first leg is provided with four fifth insertion holes that mate with the two third insertion holes, and the second leg is provided with four sixth insertion holes that mate with the two third insertion holes. The second side plate is provided with a seventh insertion hole that mates with several fourth insertion holes. The second locking structure includes two third insertion rods, which are respectively inserted into the third insertion hole, the fourth insertion hole, the fifth insertion hole, the sixth insertion hole, and the seventh insertion hole.

7. The multifunctional construction material loading tool as described in claim 1, characterized in that, The first slide groove is provided with a plurality of eighth insertion holes, and the first slot is provided with a plurality of ninth insertion holes. The eighth insertion holes and the ninth insertion holes cooperate with each other, and the first insertion rod is respectively connected to the eighth insertion hole and the ninth insertion hole.

8. The multifunctional construction material loading tool as described in claim 1, characterized in that, A first support plate is fixedly installed on the side wall adjacent to the two first sliding grooves at both ends of the first crossbeam, and a second support plate is fixedly installed on the side wall adjacent to the two first slots at both ends of the second crossbeam. The first support plate and the second support plate cooperate to install the base plate. The base plate has a second slot on both sides that cooperates with the two third legs.

9. The multifunctional construction material loading tool as described in claim 8, characterized in that, Two first legs are provided with two mating third slots on the outer wall of the side away from the first slide groove, and one first baffle is inserted into the two third slots. Two second legs are provided with two mating fourth slots on the outer wall of the side away from the first slot, and another first baffle is inserted into the two fourth slots.

10. The multifunctional construction material loading tool as described in claim 6, characterized in that, Two first wing plates are provided on the outer wall of the two first legs facing the first slide groove, and a second wing plate is provided on the third side plate away from the fifth side plate. Two third wing plates are provided on the outer wall of the two second legs facing the first slot.