Finished support pipe heald bearing integrated joint

By pre-assembling multiple pipes onto a support assembly to form an integrated section unit, multiple pipes can be hoisted at once, solving the problems of low construction efficiency, high labor intensity, and high safety risks in existing technologies, thereby improving construction efficiency and reducing costs.

CN224245598UActive Publication Date: 2026-05-15SHANGHAI FUSHIDE CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANGHAI FUSHIDE CONSTR TECH CO LTD
Filing Date
2025-07-01
Publication Date
2026-05-15

AI Technical Summary

Technical Problem

The lack of a systematic solution for integrated hoisting and precise positioning of multiple pipelines in existing technologies leads to low construction efficiency, high labor intensity, high cost and high safety risks, especially in narrow spaces or complex environments where it is difficult to achieve efficient installation of multiple pipelines.

Method used

The prefabricated support pipe assembly is used to support the integrated section. Multiple pipes are pre-assembled on the support assembly to form an integrated section unit, which is then lifted in one go by a lifting platform vehicle, reducing the repetitive operation of installing each pipe one by one.

Benefits of technology

It significantly improves pipeline laying efficiency, reduces labor intensity and labor costs, and enhances construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224245598U_ABST
    Figure CN224245598U_ABST
Patent Text Reader

Abstract

The utility model discloses a finished support pipe heald bearing integrated joint, and belongs to the technical field of support equipment. The finished product support pipe heald bearing integration joint comprises a support assembly, the support assembly comprises three sets of vertical rods, three sets of transverse rods and four connecting rods, each set of vertical rods comprises two vertical rods, each set of transverse rods comprises three transverse rods, each set of transverse rods is fixedly connected between two corresponding vertical rods, each connecting rod is fixedly connected between two corresponding vertical rods, and the support assembly is fixedly connected with the support assembly. The finished product support pipe heald bears an integrated joint, a plurality of pipelines are placed on a plurality of cross rods of the support assembly, then the support assembly is lifted through the lifting platform car, then the lifting platform car starts to move and drives each pulley to slide in the I-shaped groove, and the pipelines are assembled on the support assembly in advance to form an integrated joint unit. The multiple pipelines are hoisted at a time, repeated operation of one-by-one installation is reduced, the laying efficiency is remarkably improved, and the labor intensity and the labor cost are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of support equipment technology, and more specifically, to a prefabricated support tube assembly load-bearing integrated section. Background Technology

[0002] In the field of pipeline construction, traditional installation methods typically employ a piece-by-piece laying and individual fixing approach. This decentralized construction method is not only inefficient but also suffers from high labor intensity and poor coordination. As modern engineering construction moves towards large-scale and high-efficiency operations, optimizing pipeline installation processes, reducing repetitive operations, and improving overall construction efficiency have become pressing technical challenges for the industry. Although some existing support structures are used to assist pipeline installation, a systematic solution capable of integrated hoisting and precise positioning of multiple pipelines is still lacking, making it difficult to meet the high standards of construction speed and quality required for large-scale projects.

[0003] Specifically, in traditional construction processes, workers must use hoisting equipment to move pipes one by one and manually adjust and fix them in pre-set positions. The installation of each pipe requires repeated positioning, alignment, and fixing steps, which is not only time-consuming and labor-intensive but also prone to cumulative errors due to repeated operations. Especially in confined spaces or complex environments, controlling the spacing and coordinating multiple pipes becomes even more difficult, further increasing construction difficulty and costs. Furthermore, frequent hoisting operations at height also bring high safety risks. Therefore, there is an urgent need for an integrated solution that can pre-assemble multiple pipes into modular units, enabling one-time hoisting and rapid positioning, to significantly improve construction efficiency and reduce overall costs. Utility Model Content

[0004] 1. Technical problems to be solved

[0005] To address the problems existing in the prior art, the purpose of this utility model is to provide a pre-assembled support pipe assembly unit. This unit forms an integrated section by pre-assembling multiple pipes onto a support assembly, allowing for the simultaneous hoisting of multiple pipes. This reduces repetitive installation operations, significantly improves laying efficiency, and lowers labor intensity and labor costs.

[0006] 2. Technical Solution

[0007] To solve the above problems, the present invention adopts the following technical solution:

[0008] A prefabricated support tube assembly includes: a support component, the support component comprising three sets of vertical rods, three sets of horizontal rods, and four connecting rods. Each set of vertical rods has two members, each set of horizontal rods has three members, each set of three horizontal rods is fixedly connected to two corresponding vertical rods, each connecting rod is fixedly connected to two corresponding vertical rods, and each vertical rod has a U-shaped frame plate fixedly connected to its upper end. Two pulleys are rotatably connected to the inner walls of both sides of the U-shaped frame plate.

[0009] As a preferred embodiment of this utility model, a plurality of pipe clamps are fixedly installed on the top of each crossbar.

[0010] As a preferred embodiment of this utility model, each of the vertical rods is provided with multiple elliptical mounting holes.

[0011] As a preferred embodiment of this utility model, each of the crossbars is provided with multiple elliptical mounting holes.

[0012] As a preferred embodiment of this utility model, each of the pulleys is made of stainless steel.

[0013] As a preferred embodiment of this utility model, each of the U-shaped square frame plates is made of stainless steel.

[0014] 3. Beneficial effects

[0015] Compared with the prior art, this utility model provides a prefabricated support tube assembly with the following advantages:

[0016] This finished support pipe assembly is used in practical applications. Multiple pipes are placed on the crossbars of the support assembly, and then the support assembly is lifted by a lifting platform until each U-shaped frame plate corresponds to the I-shaped groove. The lifting platform then moves, causing each pulley to slide in the I-shaped groove, installing the pipes in the corresponding positions. By repeating the above steps, multiple support assemblies and pipes can be assembled together to complete the laying of batch pipes. By pre-assembling multiple pipes on the support assembly to form an integrated section unit, multiple pipes can be hoisted at one time, reducing the repetitive operation of installing one pipe at a time, significantly improving laying efficiency, and reducing labor intensity and labor costs. Attached Figure Description

[0017] Figure 1 This is a perspective view of the present utility model;

[0018] Figure 2 For the present utility model Figure 1 Enlarged view of point A in the middle;

[0019] Figure 3 This is a side view of the present invention;

[0020] Figure 4 For the present utility model Figure 3 Enlarged view of section B in the middle.

[0021] Explanation of the labels in the diagram:

[0022] 1. Support assembly; 101. Vertical bar; 102. Horizontal bar; 103. Connecting rod; 2. Pipe clamp; 3. U-shaped square frame plate; 4. Pulley. Detailed Implementation

[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present utility model, not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model without creative effort are within the scope of protection of the present utility model.

[0024] Example

[0025] Please see Figures 1-4 A prefabricated support tube assembly includes: a support component 1, which includes three sets of vertical rods 101, three sets of horizontal rods 102, and four connecting rods 103. Each set of vertical rods 101 has two members, and each set of horizontal rods 102 has three members. Each set of three horizontal rods 102 is fixedly connected between two corresponding vertical rods 101, and each connecting rod 103 is fixedly connected between two corresponding vertical rods 101. Each vertical rod 101 has a U-shaped square frame plate 3 fixedly connected to its upper end, and two pulleys 4 are rotatably connected to the inner walls of both sides of the U-shaped square frame plate 3.

[0026] In a specific embodiment of this utility model, components such as smoke exhaust ducts, power cable trays, integrated low-voltage cable trays, fire water pipes, domestic water supply pipes, sewage pipes, vent pipes, chilled water pipes, and high-pressure fine water mist pipes can be placed on multiple crossbars 102. The I-shaped grooves are pre-installed on the upper side of the installation area. In actual use, multiple pipes are placed on multiple crossbars 102 of the support assembly 1, and then the support assembly 1 is lifted up by a lifting platform until each U-shaped square plate 3 corresponds to the I-shaped groove. Then the lifting platform starts to move, driving each pulley 4 to slide in the I-shaped groove, installing the pipes in the corresponding positions. Repeating the above steps, multiple support assemblies 1 and pipes can be assembled together to complete the laying of batch pipes. By pre-assembling multiple pipes on the support assembly 1 to form an integrated section unit, multiple pipes can be hoisted at one time, reducing the repetitive operation of installing one pipe at a time, significantly improving laying efficiency, and reducing labor intensity and labor costs.

[0027] Specifically, multiple pipe clamps 2 are fixedly installed on the top of each crossbar 102.

[0028] In this embodiment, the number and size of the pipe clamps 2 are not fixed. They are selected and installed on the crossbar 102 according to the actual situation. The pipe clamps 2 are used to fasten the pipes such as fire water pipes, domestic water supply pipes, sewage pipes and smoke exhaust pipes, so that the pipes will not roll when the crossbar 102 supports the pipes.

[0029] Specifically, each vertical rod 101 has multiple elliptical mounting holes.

[0030] In this embodiment, the elliptical mounting hole of the vertical rod 101 is used to connect with the horizontal rod 102. By selecting a suitable elliptical mounting hole, the spacing between two adjacent horizontal rods 102 can be designed.

[0031] Specifically, each crossbar 102 has multiple elliptical mounting holes.

[0032] In this embodiment, the elliptical mounting hole located in the middle part of the crossbar 102 is mainly used to install pipe clamps 2 of various sizes.

[0033] Specifically, each pulley 4 is made of stainless steel.

[0034] In this embodiment, the pulley 4 has high wear resistance and is not easily corroded.

[0035] Specifically, each U-shaped square panel 3 is made of stainless steel.

[0036] In this embodiment, the U-shaped frame plate 3 is not prone to rust, so that the pulley 4 inside each U-shaped frame plate 3 can always maintain normal rotation.

[0037] Working principle: In actual use, multiple pipes are placed on multiple crossbars 102 of the support assembly 1. Then, the support assembly 1 is lifted by a lifting platform until each U-shaped square plate 3 corresponds to the I-shaped groove. Then, the lifting platform starts to move, driving each pulley 4 to slide in the I-shaped groove, installing the pipes in the corresponding positions. Repeating the above steps can assemble multiple support assemblies 1 and pipes into integrated sections, completing the laying of batch pipes. By pre-assembling multiple pipes on the support assembly 1 to form integrated section units, multiple pipes can be hoisted at one time, reducing the repetitive operation of installing one pipe at a time, significantly improving laying efficiency, and reducing labor intensity and labor costs.

[0038] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model based on the technical solution and its improved concept should be covered within the protection scope of the present utility model.

Claims

1. A prefabricated support tube assembly for load bearing, characterized in that, include: The support assembly (1) includes three sets of vertical rods (101), three sets of horizontal rods (102) and four connecting rods (103). Each set of vertical rods (101) has two members, each set of horizontal rods (102) has three members, each set of three horizontal rods (102) is fixedly connected between two corresponding vertical rods (101), and each connecting rod (103) is fixedly connected between two corresponding vertical rods (101). Each vertical rod (101) has a U-shaped square frame plate (3) fixedly connected to its upper end. The inner walls of both sides of the U-shaped square frame plate (3) are rotatably connected to two pulleys (4).

2. The prefabricated support tube assembly according to claim 1, characterized in that: Each of the crossbars (102) has a number of pipe clamps (2) fixedly installed at its top.

3. The prefabricated support tube assembly according to claim 1, characterized in that: Each of the vertical rods (101) has multiple elliptical mounting holes.

4. The prefabricated support tube assembly according to claim 1, characterized in that: Each of the crossbars (102) has multiple elliptical mounting holes.

5. The prefabricated support tube assembly bearing integrated section according to claim 1, characterized in that: Each of the pulleys (4) is made of stainless steel.

6. The prefabricated support tube assembly according to claim 1, characterized in that: Each of the U-shaped square panels (3) is made of stainless steel.