Prestressed bent cap construction platform

By using limiting blocks and limiting grooves, the problem of unstable bolt tightening during the splicing of prestressed cap beam construction platforms was solved, achieving stable connection of the work platform and improving construction safety.

CN224314054UActive Publication Date: 2026-06-02ZHEJIANG JICHUAN TRANSPORTATION TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ZHEJIANG JICHUAN TRANSPORTATION TECH CO LTD
Filing Date
2025-07-15
Publication Date
2026-06-02

AI Technical Summary

Technical Problem

When assembling existing prestressed cap beam construction platforms, excessive force on bolt tightening can easily lead to thread stripping, resulting in loose connections and potential safety hazards.

Method used

The system employs a limit block and limit groove structure. The end-to-end connection of the worktable is achieved by the limit block being inserted into the limit groove, and it is fixed with plug-in columns and hinge rods to ensure stable splicing.

Benefits of technology

It improves the splicing stability of the workbench, avoids thread stripping, and enhances construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224314054U_ABST
    Figure CN224314054U_ABST
Patent Text Reader

Abstract

The utility model discloses a prestressed bent cap construction platform relates to construction platform technical field, including workbench and install multiple support legs on workbench, the opposite two side walls of workbench are seted up with multiple jacks, seted up with two limit grooves on workbench, the opposite limit groove of workbench is connected with the limit block of each limit groove with sliding with the adaptation, the utility model provides a prestressed bent cap construction platform, its through with the limit block carding into the limit groove with adaptation, make two workbench opposite two side walls head -tail connection, and then realize the splicing to workbench.