Aerosol delivery device
By repeatedly piercing the surface of the molten alloy with a pneumatic slag-breaking steel rod device, the problem of slag not floating in the molten alloy is solved, improving the quality of alloy ingots and product quality. The device has a simple structure and high safety, and is suitable for alloy production.
Patent Information
- Application Number
- CN202522479531.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-23
- Publication Date
- 2026-11-03
- Estimated Expiration
- 2035-11-23
AI Technical Summary
After the reaction, the solidified slag on the surface of the alloy liquid did not completely float to the surface, affecting the quality of the alloy ingot and leading to a decline in product quality.
Design a pneumatic slag breaking steel rod device, including a platform vehicle, a slag breaking chamber, a slag breaking rod, a positioning sleeve, a cylinder, and a cylinder fixing frame. The slag breaking rod is driven by the cylinder to repeatedly pierce the surface of the alloy liquid, creating a channel for the slag to float upward. Combined with asbestos insulation and heat dissipation port design, safe and efficient operation is ensured.
It effectively improves the quality of alloy ingots, reduces inclusions, significantly improves product quality, has a simple structure that is easy to maintain, and is highly safe, making it suitable for alloy production.
Smart Images

Figure CN224927039U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to pneumatic slag breaking technology, and more particularly to a pneumatic slag breaking steel rod device. Background Technology
[0002] Currently, the aluminothermic reduction reaction method used in our alloy production results in a certain amount of slag in some alloy molten materials after the reaction. Although the density of the slag is less than that of the alloy molten material, as the top of the alloy molten material solidifies, some of the slag will remain in the alloy, affecting the quality of the alloy ingot and reducing product quality. Utility Model Content
[0003] The purpose of this invention is to address the problem of product quality degradation caused by the incomplete floating of solidified slag on the surface of the alloy liquid after reaction. This invention proposes a pneumatic slag-breaking steel rod device. The device is simple in composition, reasonable in structure, and convenient to operate. It can create holes on the surface of the alloy liquid to help the slag inside the alloy liquid float to the surface, effectively improving the quality of the alloy ingot.
[0004] It should be noted that, in this utility model, unless otherwise specified, the specific meaning of "comprising" in relation to composition and description includes both open-ended meanings such as "comprising," "including," etc., and closed-ended meanings such as "composed of," "consisting of," etc., and similar meanings.
[0005] To achieve the above objectives, the technical solution adopted by this utility model is as follows: a pneumatic slag-breaking steel rod device, comprising a platform cart, a slag-breaking chamber, a slag-breaking rod, a positioning sleeve, a cylinder, and a cylinder fixing frame. The slag-breaking chamber is provided with a chamber door, and the platform cart can enter and exit the slag-breaking chamber through the chamber door. The platform cart is used to place the crucible mold. A cylinder fixing frame is provided above the slag-breaking chamber, and the cylinder body of the cylinder is set inside the cylinder fixing frame. The slag-breaking rod is coaxially mounted on the piston rod of the cylinder. The positioning sleeve is welded to the center of the steel structure at the top of the slag-breaking chamber. The slag-breaking rod can pass through the positioning sleeve into the slag-breaking chamber and can penetrate deep into the crucible mold. The crucible mold contains alloy liquid that has not completely solidified after the reaction.
[0006] Furthermore, asbestos is installed on all four walls and the top of the slag-breaking chamber to insulate against heat.
[0007] Furthermore, the cylinder mounting bracket has two layers: the lower layer is used to mount the cylinder, and the upper layer is used to mount a hand chain hoist when repairing or replacing the cylinder.
[0008] Furthermore, a single-ear base is fixed to the tail of the cylinder body, and a double-ear base is fixed on the cylinder mounting bracket. The single-ear base and the double-ear base are connected by a pin to fix the cylinder to the cylinder mounting bracket.
[0009] Furthermore, the slag-breaking chisel includes a first internal threaded flange, a second internal threaded flange, an adapter rod, and a slag-breaking steel chisel connected in sequence, with the first internal threaded flange connected to the lower end of the cylinder piston rod.
[0010] Furthermore, the first and second internal threaded flanges are fixed by bolts; the length of the adapter rod should meet the following requirements: when the cylinder retracts, the lower part is inside the slag breaking chamber and above the crucible mold; when the cylinder extends, it can penetrate into the incompletely solidified alloy liquid inside the crucible mold; the lower end of the adapter rod is provided with an internal thread that mates with the external thread at the upper end of the slag breaking steel rod. During installation, the external thread of the slag breaking steel rod is screwed into the internal thread of the adapter rod and tightened in place.
[0011] Furthermore, the positioning sleeve includes a first inner threaded sleeve, a second inner threaded sleeve, an outer threaded extension tube, a ring, a first pressure cap, and a second pressure cap. The first inner threaded sleeve and the second inner threaded sleeve are respectively threadedly fitted at the upper and lower ends of the outer threaded extension tube. The outer side of the ring is welded to the roof steel structure of the slag crushing chamber, and the inner side is welded to the outer wall of the first inner threaded sleeve. The first pressure cap and the second pressure cap are respectively disposed on the inner walls of the first inner threaded sleeve and the second inner threaded sleeve.
[0012] Furthermore, a PTFE packing is provided in the gap between the first pressure cap and the inner wall of the first inner threaded sleeve, and a PTFE packing is provided in the gap between the second pressure cap and the inner wall of the second inner threaded sleeve, for positioning and dust prevention during slag breaking drill rod operation.
[0013] Furthermore, the top of the slag breaking chamber is also equipped with a heat dissipation vent, which is connected to a dust collector via a pipe to discharge the heat emitted during the solidification of the alloy liquid.
[0014] Furthermore, the floor of the slag breaking chamber is provided with a positioning structure, including but not limited to positioning buckles, for positioning and fixing the platform vehicle, thereby realizing the positioning of the crucible mold.
[0015] Furthermore, the pneumatic slag-breaking steel rod device also includes a control system (including but not limited to an electrical control program). Under the drive of the control system, the cylinder piston rod reciprocates to insert the slag-breaking steel rod into the alloy liquid in the crucible mold to a suitable depth, and repeatedly breaks the slag.
[0016] The working process of the pneumatic slag-breaking rod is as follows: A platform vehicle transports the reacted crucible mold to a designated position within the slag-breaking chamber, ensuring the slag-breaking rod is aligned with the center of the crucible mold. The slag-breaking chamber door is then closed, and the operator activates the slag-breaking rod switch, driving the cylinder to reciprocate. During this process, the rod at the tip continuously penetrates the surface of the molten alloy, causing the internal slag to float to the surface. This operation continues until the molten alloy solidifies, and until the rod can no longer penetrate the surface.
[0017] This utility model of pneumatic slag breaking steel rod device has the following advantages compared with the prior art:
[0018] 1) The pneumatic slag breaking steel rod device of this utility model has a simple and reasonable structure. The key components such as the slag breaking rod and positioning sleeve adopt a detachable modular design (such as flange connection and threaded connection), which is convenient for disassembly and replacement.
[0019] 2) The cylinder fixing frame of the pneumatic slag breaking steel rod device of this utility model is specially designed with a two-layer structure. The upper layer is specially used to fix the hand chain hoist during maintenance, which greatly facilitates the replacement and maintenance of the cylinder and reduces the intensity and difficulty of maintenance work.
[0020] 3) The pneumatic slag-breaking steel rod device of this utility model is suitable for slag breaking of alloy liquid that has not solidified after reaction. The device uses a pneumatically driven slag-breaking steel rod to repeatedly pierce the surface of the alloy liquid before it solidifies, effectively breaking the solidified shell and creating a channel for the internal slag material to float to the surface, thereby reducing slag inclusions in the alloy ingot and significantly improving the quality of the final product.
[0021] 4) The slag-breaking chamber of this utility model's pneumatic slag-breaking steel rod device is insulated with asbestos on all four walls and the top, ensuring the safety of outdoor equipment and personnel. The heat dissipation vents on the top can promptly discharge the heat and fumes emitted during the solidification of the alloy liquid, improving the working environment.
[0022] This utility model of pneumatic slag breaking steel rod has good application prospects and large-scale promotion potential in the field of alloy production. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of the pneumatic slag-breaking steel rod assembly.
[0024] Figure 2 This is a schematic diagram of the platform vehicle structure;
[0025] Figure 3 This is a schematic diagram of the crucible mold structure;
[0026] Figure 4 This is a schematic diagram of the slag breaking chamber structure;
[0027] Figure 5 This is a schematic diagram of the slag-breaking drill rod structure;
[0028] Figure 6 This is a schematic diagram of the positioning sleeve structure;
[0029] Figure 7 This is a schematic diagram of the cylinder structure;
[0030] Figure 8 This is a schematic diagram of the cylinder mounting bracket structure. Detailed Implementation
[0031] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.
[0032] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection, an electrical connection, or a connection that allows for mutual communication; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two elements or the interaction between two elements. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances. In the description of this application, "multiple" means two or more, unless otherwise expressly and specifically limited. Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, features defined with "first" and "second" may explicitly or implicitly include one or more features.
[0033] The following disclosure provides many different implementations or examples for carrying out different structures of this application. To simplify the disclosure of this application, the components and arrangements of specific examples are described below. Of course, these are merely examples and are not intended to limit this application.
[0034] Example 1
[0035] This embodiment discloses a novel pneumatic slag-breaking steel rod structure, such as Figure 1 As shown in Figure 8, the device includes a platform vehicle 1, a slag-breaking chamber 3, a slag-breaking rod 4, a positioning sleeve 5, a cylinder 6, and a cylinder fixing frame 7. The slag-breaking chamber 3 has a door on its side, and the four walls and top of the slag-breaking chamber are all fitted with asbestos to insulate against heat.
[0036] The platform cart 1 can enter and exit the slag-breaking chamber 3 through the chamber door. The platform cart 1 holds the crucible mold 2. A cylinder mounting bracket is fixed above the slag-breaking chamber 3. The cylinder 6 is housed within the cylinder mounting bracket 7, and the top of the cylinder body of the cylinder 6 is detachably fixed within the cylinder mounting bracket 7. The cylinder mounting bracket 7 has two layers: the lower layer is used to fix the cylinder 6, and the upper layer is used to install a hand-operated hoist for cylinder maintenance or replacement. In this embodiment, the cylinder mounting bracket is a square frame made of 10# square tubing, with an upper layer height of 800mm and a lower layer height of 3000mm. A single-ear base is fixed to the tail of the cylinder body, and a double-ear base is fixed to the cylinder mounting bracket. The single-ear base and the double-ear base are connected by a pin to fix the cylinder to the cylinder mounting bracket. In this embodiment, the cylinder model is QGB320x1200-CA, the single ear and pin are standard accessories for QGB320 diameter cylinders, and the double ear is made of 35mm thick iron plate.
[0037] The piston rod of the cylinder 6 is coaxially provided with a slag-breaking rod 4 at the bottom. The positioning sleeve 5 is welded to the center of the steel structure at the top of the slag-breaking chamber 3. The slag-breaking rod 4 can pass through the positioning sleeve 5 and enter the slag-breaking chamber 3, and can penetrate into the crucible mold 2. The crucible mold 2 contains alloy liquid that has not completely solidified after the reaction.
[0038] The slag-breaking rod comprises a first internal threaded flange, a second internal threaded flange, an adapter rod, and a slag-breaking steel rod connected in sequence. The first internal threaded flange is connected to the lower end of the cylinder piston rod. The first and second internal threaded flanges are fixed by bolts. The length of the adapter rod should meet the following requirements: when the cylinder retracts, the lower part is inside the slag-breaking chamber and above the crucible mold; when the cylinder extends, it can penetrate into the incompletely solidified alloy liquid inside the crucible mold. The lower end of the adapter rod is provided with an internal thread that mates with the external thread at the upper end of the slag-breaking steel rod. During installation, the external thread of the slag-breaking steel rod is screwed into the internal thread of the adapter rod and tightened in place. In this embodiment, the internal thread flange installed on the cylinder piston rod has a total height of 105 mm and a thickness of 25 mm. The thread is M48*2, and there are 6 18 mm diameter smooth holes for fixing bolts. The two flanges are fixed with M16 bolts. The adapter rod is made of 45# round steel with a diameter of 50 mm and a total length of 2440 mm. One end has an M48*2 external thread, and the other end has an M35*1.5 internal thread. The slag breaking steel rod is made of 45# round steel with a diameter of 50 mm and a total length of 1040 mm. One end has an M35*1.5 external thread with a thread length of 90 mm.
[0039] The positioning sleeve includes a first internal threaded sleeve, a second internal threaded sleeve, an external threaded extension tube, a ring, a first pressure cap, and a second pressure cap. The first and second internal threaded sleeves are threadedly fitted onto the upper and lower ends of the external threaded extension tube, respectively. The outer side of the ring is welded to the steel structure of the slag chamber roof, and the inner side is welded to the outer wall of the first internal threaded sleeve. The first and second pressure caps are respectively disposed on the inner walls of the first and second internal threaded sleeves. In this embodiment, the internal threaded sleeve has an outer diameter of 108mm, an inner diameter of 64mm, and a length of 160mm. It has an internal thread of M72*3 with a depth of 70mm on one side and an internal thread of M80*3 with a depth of 20mm on the other side. The external threaded extension tube has an outer diameter of 76mm, an inner diameter of 56mm, and a length of 560mm. It has external threads of M72*3 with a length of 70mm on both sides. The pressure cap has an inner diameter of 53mm, an external thread of M80*3 with a thickness of 20mm, and four holes with a diameter of 6mm and a depth of 8mm on it for knocking to remove and install the pressure cap.
[0040] A PTFE packing is installed in the gap between the first gland and the inner wall of the first internal threaded sleeve, and a PTFE packing is installed in the gap between the second gland and the inner wall of the second internal threaded sleeve, for positioning and dust prevention during slag breaking drill rod operations. In this embodiment, a PTFE packing with a 7mm*7mm square cross-section is used.
[0041] The top of the slag breaking chamber is also equipped with a heat dissipation vent to discharge the heat emitted during the solidification of the alloy liquid.
[0042] The slag breaking chamber floor is equipped with a positioning structure, including but not limited to positioning buckles, for positioning and fixing the platform vehicle, thereby realizing the positioning of the crucible mold.
[0043] The pneumatic slag-breaking steel rod device also includes a control system, such as an electrical control program. Under the drive of the control system, the cylinder piston rod reciprocates to insert the slag-breaking steel rod into the alloy liquid in the crucible mold to a suitable depth, and repeatedly breaks the slag.
[0044] This embodiment describes the principle of a novel pneumatic slag-breaking steel rod: During use, a platform vehicle transports the reacted crucible mold to a designated position within the slag-breaking chamber, positioning the slag-breaking rod at the center of the crucible mold. The slag-breaking chamber door is closed, and the operator operates the slag-breaking steel rod switch, causing the cylinder to reciprocate gradually. The slag-breaking steel rod at the head of the rod continuously penetrates the surface of the molten alloy, causing the slag material inside the alloy to float to the surface until the alloy solidifies to the point where the slag-breaking steel rod can no longer penetrate the surface.
[0045] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and are not intended to limit it. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model.
Claims
1. A pneumatic slag-breaking steel rod device, characterized in that, The system includes a platform cart (1), a slag-breaking chamber (3), a slag-breaking rod (4), a positioning sleeve (5), a cylinder (6), and a cylinder fixing frame (7). The slag-breaking chamber (3) is equipped with a door, and the platform cart (1) can enter and exit the slag-breaking chamber (3) through the door. The platform cart (1) is used to place the crucible mold (2). A cylinder fixing frame (7) is set above the slag-breaking chamber (3). The cylinder body of the cylinder (6) is set inside the cylinder fixing frame (7). The slag-breaking rod (4) is coaxially set on the piston rod of the cylinder (6). The positioning sleeve (5) is welded to the center of the steel structure at the top of the slag-breaking chamber (3). The slag-breaking rod (4) can pass through the positioning sleeve (5) into the slag-breaking chamber (3) and can penetrate deep into the crucible mold (2).
2. The pneumatic slag-breaking steel rod device according to claim 1, characterized in that, The walls and top of the slag breaking chamber are all fitted with asbestos.
3. The pneumatic slag-breaking steel rod device according to claim 1, characterized in that, The cylinder mounting bracket has two layers: the lower layer is used to mount the cylinder, and the upper layer is used to mount a hand chain hoist when repairing or replacing the cylinder.
4. The pneumatic slag-breaking steel rod device according to claim 1, characterized in that, A single-ear base is fixed to the tail of the cylinder body, and a double-ear base is fixed to the cylinder mounting bracket. The single-ear base and the double-ear base are connected by a pin.
5. The pneumatic slag-breaking steel rod device according to claim 1, characterized in that, The slag-breaking chisel includes a first internal threaded flange, a second internal threaded flange, a transition rod, and a slag-breaking steel chisel connected in sequence. The first internal threaded flange is connected to the lower end of the cylinder piston rod.
6. The pneumatic slag-breaking steel rod device according to claim 5, characterized in that, The first and second internal threaded flanges are fixed by bolts; the length of the adapter rod should meet the following requirements: when the cylinder retracts, the lower part is inside the slag breaking chamber and above the crucible mold; when the cylinder extends, it can penetrate into the incompletely solidified alloy liquid inside the crucible mold; the lower end of the adapter rod is provided with an internal thread that mates with the external thread at the upper end of the slag breaking steel rod.
7. The pneumatic slag-breaking steel rod device according to claim 1, characterized in that, The positioning sleeve includes a first inner threaded sleeve, a second inner threaded sleeve, an outer threaded extension tube, a ring, a first pressure cap, and a second pressure cap. The first inner threaded sleeve and the second inner threaded sleeve are respectively threadedly fitted at the upper and lower ends of the outer threaded extension tube. The outer side of the ring is welded to the steel structure of the roof of the slag breaking chamber, and the inner side is welded to the outer wall of the first inner threaded sleeve. The first pressure cap and the second pressure cap are respectively disposed on the inner walls of the first inner threaded sleeve and the second inner threaded sleeve.
8. The pneumatic slag-breaking steel rod device according to claim 7, characterized in that, A PTFE packing is provided in the gap between the first gland and the inner wall of the first inner threaded sleeve, and a PTFE packing is provided in the gap between the second gland and the inner wall of the second inner threaded sleeve.
9. The pneumatic slag-breaking steel rod device according to claim 1, characterized in that, The top of the slag crushing chamber is also equipped with a heat dissipation vent, which is connected to the dust collector via a pipe.
10. The pneumatic slag-breaking steel rod device according to claim 1, characterized in that... The floor of the slag breaking chamber is equipped with a positioning structure.
