A pre-embedded sleeve structure for installing scaffold wall ties
By using a conical insert and cap structure design, the embedded sleeve is stably fixed with bolts and connecting caps, which solves the problem of traditional embedded sleeves being difficult to remove, simplifies the construction process, reduces labor intensity and construction period, and protects the concrete wall.
Patent Information
- Application Number
- CN202522684374.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-18
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-18
AI Technical Summary
Traditional pre-embedded sleeves are firmly bonded to concrete, making them difficult to remove completely. This leads to complicated construction procedures, extended construction periods, increased labor intensity, and easy damage to the wall structure.
The design employs a conical insert and cap structure, and uses bolts and connecting caps to achieve stable fixation between the embedded sleeve and the casting template. During disassembly and assembly, the connecting cap can be unscrewed to separate the sleeve and the concrete wall, simplifying the construction process and avoiding damage to the concrete wall.
It simplifies the construction process, reduces the labor intensity of operators, shortens the construction period, and avoids damage to the concrete walls.
Smart Images

Figure CN224955262U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building auxiliary structure technology, specifically to a pre-embedded sleeve structure for installing scaffolding wall ties. Background Technology
[0002] In construction engineering, a reliable connection between scaffolding and concrete walls is crucial. The installation of wall ties generally relies on sleeve structures embedded in the wall. Traditionally, these sleeves are typically steel or PVC pipes directly cast into the concrete. During the later stages of construction, when installing scaffolding steel pipes, the pipes are inserted into the embedded sleeves and secured with fasteners. When dismantling the scaffolding, it's necessary to separate the scaffolding from the embedded sleeves. However, the sleeves are often firmly bonded to the concrete, making complete removal difficult. This usually requires gas cutting or chiseling to remove the sleeves from the wall, a cumbersome process that takes a long time, increases the labor intensity of workers, and can easily damage the wall structure.
[0003] While existing technologies may already offer solutions to the aforementioned problems, this case aims to provide an alternative or replacement technical solution. Utility Model Content
[0004] To solve the problems mentioned in the background art, the present invention is achieved through the following technical solution: a pre-embedded sleeve structure for installing scaffold wall ties, comprising a casting template and a concrete wall, wherein an insert is inserted into the casting template and the concrete wall;
[0005] The insert has a conical structure. One end of the insert is coaxially provided with a columnar neck. A cap is fixedly fitted on the columnar neck. The cap passes through the casting template. The insert is embedded in the concrete wall. A connecting cap is inserted into the inner wall of the cap.
[0006] The connecting cover includes a sleeve, which is threadedly inserted into the inner wall of the cap. A plug is fixedly installed at one end of the sleeve, and the plug is movably fitted against the side wall of the casting template.
[0007] Preferably, a bolt is movably inserted into the plug, with one end of the bolt inserted into the side wall of the casting template.
[0008] Preferably, a hexagonal plug head is installed at the center of the plug.
[0009] Preferably, the diameter of one end of the insert is the same as the outer diameter of the cap.
[0010] Preferably, the thickness of the casting template is the same as the axial dimension of the cap.
[0011] Preferably, a scaffolding steel pipe is also movably inserted into the inner wall of the cap.
[0012] Beneficial effects
[0013] This utility model provides a pre-embedded sleeve structure for installing scaffold wall ties. Compared with the prior art, it has the following advantages: The device is fixed to the casting template with bolts, ensuring the stability of the pre-embedded device. By removing the bolts and unscrewing the connecting cap to separate it from the sleeve, and then disassembling and reassembling the casting template, the scaffold steel pipe can be inserted into the sleeve when installing the scaffold steel pipe, achieving the initial connection and fixation between the scaffold steel pipe and the concrete wall. The operation is simple. The scaffold steel pipe and the sleeve can be welded together. When disassembling and reassembling the scaffold steel pipe, the sleeve and the insert are peeled off from the concrete wall. The insert has low adhesion to the concrete, making it easy to peel off from the concrete wall and avoiding damage to the concrete wall. This simplifies the construction process, reduces the labor intensity of operators, and shortens the construction period. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the overall three-dimensional structure of the pre-embedded sleeve structure for installing scaffold wall ties according to this utility model.
[0015] Figure 2 This is an exploded three-dimensional structural diagram of a pre-embedded sleeve structure for installing scaffolding wall ties according to the present invention.
[0016] Figure 3 This is a three-dimensional structural diagram of the embedded sleeve structure for the installation of scaffold wall ties according to this utility model, in conjunction with the pouring template.
[0017] Figure 4 This is a side sectional view of the pre-embedded sleeve structure for installing scaffold wall ties according to the present invention, in conjunction with the pouring template and concrete wall.
[0018] Figure 5 This is a three-dimensional structural diagram of the scaffold steel pipe installation state of the pre-embedded sleeve structure for installing scaffold wall ties according to the present invention.
[0019] In the diagram: 1. Casting formwork, 2. Concrete wall, 3. Embedded part, 4. Column neck, 5. Cap, 6. Sleeve, 7. Plug, 8. Bolt, 9. Hexagonal bolt head, 10. Scaffolding steel pipe. Detailed Implementation
[0020] Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.
[0021] Example: Please refer to Figure 1-5To address the problems of traditional embedded sleeves, which are typically made of steel or PVC pipes directly cast into concrete, and the subsequent installation of scaffolding steel pipes during the later stages of construction, inserting the scaffolding steel pipes into the embedded sleeves and securing them with fasteners, and the need to separate the scaffolding from the embedded sleeves during dismantling, which are often firmly bonded to the concrete and difficult to remove completely, requiring the use of gas cutting or chiseling to remove the embedded sleeves from the wall, resulting in cumbersome procedures, long construction periods, increased labor intensity for operators, and potential damage to the wall structure, a new technical solution has been designed. The detailed technical solution is as follows:
[0022] An embedded sleeve structure for installing scaffold wall ties includes a casting template 1 and a concrete wall 2, with an insert 3 inserted into the casting template 1 and the concrete wall 2.
[0023] Specifically, the insert 3 has a conical structure, and a columnar neck 4 is provided at one end of the insert 3 coaxially with the insert 3. A cap 5 is fixedly fitted on the columnar neck 4. The cap 5 passes through the casting template 1. The insert 3 is embedded in the concrete wall 2. A connecting cover is inserted on the inner wall of the cap 5.
[0024] It should be noted that the inlay 3 can be made of nylon or PVC material with a smooth surface, and the cap 5 can be made of metal material. The cap 5 can be fixed to the inlay 3 by adhesive.
[0025] Specifically, the connecting cover includes a sleeve 6, which is threadedly inserted into the inner wall of the cap 5. A plug 7 is fixedly installed at one end of the sleeve 6, and the plug 7 is movably fitted against the side wall of the casting template 1.
[0026] It should be noted that when the device is not installed on the casting template 1, the connecting cover is installed on the columnar neck 4 through the matching of the sleeve 6 and the cap 5. First, a hole with the same outer diameter as the cap 5 is made in the casting template 1, and the device is inserted into the hole. Preferably, and further, a bolt 8 is movably inserted into the plug 7. One end of the bolt 8 is inserted into the side wall of the casting template 1, and then the bolt 8 is inserted through the plug 7 and then inserted into the casting template 1, so that the position between the device and the casting template 1 is fixed to prevent concrete from solidifying. During the soil pouring process, the position of the device shifts. The length of the threaded part of the bolt 8 is smaller than the thickness of the pouring template 1 to prevent puncturing the pouring template 1. After the concrete wall 2 is poured, the insert 3 is embedded in the pouring template 1. When disassembling and assembling the pouring template 1, first remove the bolt 8, then rotate the plug 7. The plug 7 drives the sleeve 6 to rotate, so that the sleeve 6 is separated from the cap 5. Then disassemble the pouring template 1. The pouring template 1 is peeled off from the concrete wall 2 and the cap 5. At this time, the part of the cap 5 protrudes from the concrete wall.
[0027] As a preferred and further option, a scaffolding steel pipe 10 is also movably inserted into the inner wall of the cap 5;
[0028] It should be noted that when installing the scaffolding steel pipe 10, the scaffolding steel pipe 10 can be inserted into the cap 5 to achieve a preliminary connection and fixation between the scaffolding steel pipe 10 and the concrete wall 2. The operation is simple. The scaffolding steel pipe 10 and the cap 5 can be welded together. When disassembling the scaffolding steel pipe 10, the cap 5 and the insert 3 are peeled off from the concrete wall 2. Since the insert 3 has a conical structure and a smooth surface, the adhesion between the insert 3 and the concrete is small, making it easy to peel off from the concrete wall 2 and avoiding damage to the concrete wall 2. Compared with the traditional construction method of first disassembling the scaffolding wall ties and then disassembling the embedded pipe, this technical solution simplifies the construction process, reduces the labor intensity of the operators, and shortens the construction period.
[0029] As a preferred and further option, a hexagonal bolt head 9 is installed in the center of the plug 7, which makes it easy for the operator to use tools to rotate the plug 7. When rotating the plug 7 and installing the bolt 8, the operator can use an electric wrench.
[0030] Preferably, the diameter of one end of the inlay 3 is the same as the outer diameter of the cap 5, so that the outer wall surface formed by the inlay 3 and the cap 5 is smooth.
[0031] As a preferred and further option, the thickness of the casting template 1 is the same as the axial dimension of the cap 5, ensuring that only the insert 3 is embedded in the concrete wall 2, which facilitates subsequent peeling from the concrete wall 2.
[0032] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A pre-embedded sleeve structure for installing scaffold wall ties, comprising a casting formwork (1) and a concrete wall (2), characterized in that, The casting template (1) and the concrete wall (2) are fitted with inserts (3); The insert (3) is a conical structure. One end of the insert (3) is coaxially provided with a columnar neck (4). A cap (5) is fixedly fitted on the columnar neck (4). The cap (5) passes through the casting template (1). The insert (3) is embedded in the concrete wall (2). A connecting cover is inserted on the inner wall of the cap (5). The connecting cover includes a sleeve (6), which is threadedly inserted into the inner wall of the cap (5). A plug (7) is fixedly installed at one end of the sleeve (6), and the plug (7) is movably attached to the side wall of the casting template (1).
2. The embedded sleeve structure for installing scaffold wall ties according to claim 1, characterized in that, A bolt (8) is movably inserted into the cover (7), and one end of the bolt (8) is inserted into the side wall of the casting template (1).
3. The embedded sleeve structure for installing scaffold wall ties according to claim 1, characterized in that, A hexagonal bolt head (9) is installed at the center of the plug (7).
4. The embedded sleeve structure for installing scaffold wall ties according to claim 1, characterized in that, The diameter of one end of the insert (3) is the same as the outer diameter of the cap (5).
5. The embedded sleeve structure for installing scaffold wall ties according to claim 1, characterized in that, The thickness of the casting template (1) is the same as the axial dimension of the cap (5).
6. The embedded sleeve structure for installing scaffold wall ties according to claim 1, characterized in that, A scaffolding steel pipe (10) is also movably inserted into the inner wall of the cap (5).