A device for detecting the curing time of paste filling slurry

By designing a device for detecting the curing time of paste filling slurry, and using a combination of a geared motor, a probe, and a thrust gauge, the device accurately determines the curing time of downhole filling slurry, solving the problem of large errors in downhole filling projects and improving safety and efficiency.

CN224957771UActive Publication Date: 2026-11-10XUZHOU CUMT BACKFILL TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522683088.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-18
Publication Date
2026-11-10
Estimated Expiration
2035-12-18

AI Technical Summary

Technical Problem

In existing technologies, the determination of the curing time of large-volume paste filling slurry for downhole sealing has large errors, which affects the progress and safety of the filling project, especially the errors caused by surface sampling and testing and manual tamping methods.

Method used

A device for detecting the curing time of paste-filled slurry was designed. It uses a geared motor to drive a transmission screw and a probe. The probe directly contacts the downhole filling slurry for detection. Combined with a thrust gauge and a PLC controller, the device monitors the curing state of the filling slurry in real time, avoiding environmental differences and human error.

Benefits of technology

It enables accurate determination of the curing time of downhole filling slurry, avoiding the problem of filling collapse caused by misjudgment, and improving the safety and efficiency of filling projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224957771U_ABST
    Figure CN224957771U_ABST
Patent Text Reader

Abstract

This utility model discloses a device for detecting the curing time of paste-like filling slurry, including a carrier plate with a square opening on its upper surface. A mounting shell is fixedly installed on the upper surface of the carrier plate, and a sliding opening is provided on the front of the mounting shell. A bearing is fixedly embedded in the inner top wall of the mounting shell, and a geared motor is fixedly installed on the upper surface of the carrier plate. This device, through the arrangement of a probe, a second connecting rod, and a thrust gauge, can directly contact and detect large volumes of filling slurry downhole. Furthermore, the geared motor drives a transmission screw to rotate, which synchronously moves the transmission screw block, metal plate, switchable magnetic base, first connecting rod, positioning tube, and probe downwards. This allows the probe to pass through the square opening at a uniform speed and insert into the filling slurry below for detection, avoiding judgment errors caused by different forces and perception differences during human operation, and preventing the collapse of the filling material due to premature removal of the frame caused by misjudging that it is not yet cured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of coal mine backfilling, and in particular to a device for detecting the curing time of paste backfill slurry. Background Technology

[0002] Coal mine paste backfilling is a green mining method that processes coal gangue and other coal-based solid waste into a toothpaste-like slurry with no critical flow velocity and no need for dehydration. Under pump pressure or gravity, it is transported through pipelines to the coal mining face to fill the goaf in a timely manner, thereby controlling rock strata and surface subsidence, and relieving the burden of underground coal and the resource utilization of solid waste. In coal mines, paste backfilling behind fully mechanized mining supports usually uses crushed coal gangue as aggregate, cement, fly ash, etc. as cementing materials, and water is added to form a slurry with good flow properties. After being transported through pipelines to the backfilling area isolated by the fully mechanized mining hydraulic support, it solidifies. The solidification time of the paste backfilling slurry determines whether the underground fully mechanized mining backfilling face can be moved for coal mining, which directly affects the backfilling mining efficiency.

[0003] However, the current method for determining the curing time of large-volume paste-filled slurry in underground sealing typically involves sampling and testing slurry mixed on the surface, or manually tamping the slurry with steel bars or wooden sticks underground. Due to differences in the mix ratio, sampling volume, and ambient temperature of the slurry on the surface, the measured curing time of the slurry is completely inconsistent with the curing time of the large-volume filling body underground. In addition, judging the curing time by manually tamping the slurry underground results in large errors due to varying degrees of force. This often leads to problems such as the filling body collapsing after the frame is moved, or the filling slurry having high curing strength and difficulty in removing the tail beam after the frame is moved. These issues seriously endanger the safety of underground operators and affect the progress of the filling project. Therefore, we propose a device for detecting the curing time of paste-filled slurry to solve the above problems. Utility Model Content

[0004] The purpose of this invention is to provide a device for detecting the curing time of paste filling slurry, so as to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution:

[0006] A device for detecting the curing time of paste filling slurry includes a carrier plate with a square opening on its upper surface. A mounting shell is fixedly installed on the upper surface of the carrier plate. A sliding opening is provided on the front side of the mounting shell. A bearing is fixedly embedded in the inner top wall of the mounting shell. A geared motor is fixedly installed on the upper surface of the carrier plate. A transmission screw is fixedly installed at the output end of the geared motor. A transmission screw block is threadedly connected to the outer surface of the transmission screw. A metal plate is fixedly installed on the front side of the transmission screw block. A switchable magnetic base is magnetically connected to the front side of the metal plate. A first connecting rod is fixedly connected to the front side of the switchable magnetic base. A positioning tube is fixedly connected to the front end of the first connecting rod. A positioning screw opening is provided on the outer surface of the positioning tube. A fixing screw pin is threadedly connected inside the positioning screw opening. A probe is provided inside the positioning tube. The rear end of the fixing screw pin contacts the outer surface of the probe. A second connecting rod is fixedly installed at the top end of the probe. A thrust gauge is fixedly installed at the top end of the second connecting rod.

[0007] In a further embodiment, two sets of vent holes are provided on both the left and right sides of the mounting shell, and a protective net is fixedly connected to the inner wall of each set of vent holes.

[0008] In a further embodiment, auxiliary handles are fixedly connected to both the left and right sides of the carrier plate, and anti-slip textures are formed on the outer surfaces of both auxiliary handles.

[0009] In a further embodiment, a battery compartment is fixedly connected to the bottom surface of the carrier plate, and a placement seat is fixedly installed on the bottom surface of the battery compartment. Two mounting holes are opened on the upper surface of the placement seat.

[0010] In a further embodiment, a stabilizing upright plate is fixedly installed on the back of the carrier plate, and the front of the stabilizing upright plate is fixedly installed on the back of the mounting shell.

[0011] In a further embodiment, a PLC controller is fixedly mounted on the back of the mounting housing, and the inner wall of the sliding port is slidably connected to the outer surface of the transmission screw block.

[0012] In a further embodiment, the inner wall of the mounting housing is provided with a sliding groove, and the inner wall of the sliding groove is slidably connected to the outer surface of the transmission screw block.

[0013] Compared with the prior art, the beneficial effects of this utility model are:

[0014] This device, through the setup of a probe, a second connecting rod, and a thrust gauge, can directly contact and test large volumes of filling slurry downhole, replicating the actual downhole environment. This avoids the deviation in determining curing time caused by environmental differences and limited sampling volume in surface sampling tests. In addition, the geared motor drives the transmission screw to rotate, which in turn drives the transmission screw block, metal plate, switchable magnetic base, first connecting rod, positioning tube, and probe to move downwards synchronously. This allows the probe to pass through the square opening at a uniform speed and insert into the filling slurry below for testing, avoiding the discrimination errors caused by different forces and perception differences in human operation. It also prevents the collapse of the filling material due to premature removal of the frame caused by misjudging that it is not yet cured. Attached Figure Description

[0015] Figure 1 A front view schematic diagram of a device for detecting the curing time of paste filling slurry.

[0016] Figure 2 In the device for detecting the curing time of paste filling slurry Figure 1 Enlarged schematic diagram of the structure at point A in the middle.

[0017] Figure 3 A rear cross-sectional view of the housing installed in the device for detecting the curing time of paste filling slurry.

[0018] Figure 4 A bottom view schematic diagram of the device for detecting the curing time of paste filling slurry.

[0019] Figure 5 A top sectional view of the housing in the device for detecting the curing time of paste filling slurry.

[0020] In the diagram: 1. Carrier plate; 2. Square opening; 3. Mounting shell; 4. Slide opening; 5. Bearing; 6. Gear motor; 7. Transmission screw; 8. Transmission screw block; 9. Metal plate; 10. Switch-type magnetic base; 11. First connecting rod; 12. Positioning round tube; 13. Positioning screw hole; 14. Fixing screw pin; 15. Probe; 16. Second connecting rod; 17. Thrust gauge; 18. Vent hole; 19. Protective net; 20. Auxiliary handle; 21. Battery compartment; 22. Placement seat; 23. Mounting port; 24. Stable upright plate; 25. PLC controller; 26. Slide groove. Detailed Implementation

[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0022] Please see Figure 1-5 In this utility model, a device for detecting the curing time of paste filling slurry includes a carrier plate 1. A square opening 2 is formed on the upper surface of the carrier plate 1. A mounting shell 3 is fixedly installed on the upper surface of the carrier plate 1. A sliding opening 4 is formed on the front of the mounting shell 3. A bearing 5 is fixedly embedded in the inner top wall of the mounting shell 3. A reduction motor 6 is fixedly installed on the upper surface of the carrier plate 1. A transmission screw 7 is fixedly installed at the output end of the reduction motor 6. A transmission screw block 8 is threadedly connected to the outer surface of the transmission screw 7. A metal plate 9 is fixedly installed on the front of the transmission screw block 8. A switchable magnetic base 10 is magnetically connected to the front of the metal plate 9. A first connecting rod 11 is fixedly connected to the front of the switchable magnetic base 10. A positioning tube 12 is fixedly connected to the front end of the first connecting rod 11. A positioning screw opening 13 is formed on the outer surface of the positioning tube 12. A fixing screw pin 14 is threadedly connected inside the positioning screw opening 13. A probe 15 is provided inside the positioning tube 12. The fixing screw pin 14... The rear end of 4 contacts the outer surface of the probe 15. The top end of the probe 15 is fixedly installed with a second connecting rod 16, and the top end of the second connecting rod 16 is fixedly installed with a thrust gauge 17. Through the setup of the probe 15, the second connecting rod 16, and the thrust gauge 17, it can directly contact the large volume of filling slurry in the well for testing, restoring the actual environment in the well and avoiding the deviation in the determination of curing time caused by environmental differences and limited sampling volume in surface sampling tests. In addition, the geared motor 6 drives the transmission screw 7 to rotate, which can drive the transmission screw block 8, metal plate 9, switch-type magnetic base 10, first connecting rod 11, positioning round tube 12, and probe 15 to move downward synchronously. This allows the probe 15 to pass through the square opening 2 at a uniform speed and insert into the filling slurry below for testing, avoiding the discrimination error caused by different forces and perception differences in human operation, and preventing the problem of filling collapse caused by premature removal of the frame due to misjudgment of uncured filling.

[0023] The mounting shell 3 has two sets of ventilation holes 18 on both its left and right sides. Each set of ventilation holes 18 has a protective net 19 fixedly connected to its inner wall. The carrier plate 1 has auxiliary handles 20 fixedly connected to both its left and right sides. The outer surfaces of the two auxiliary handles 20 have anti-slip textures. The bottom surface of the carrier plate 1 has a battery compartment 21 fixedly connected to it. The bottom surface of the battery compartment 21 has a placement seat 22 fixedly installed. The upper surface of the placement seat 22 has two mounting holes 23. With the four sets of ventilation holes 18 and four sets of protective nets 19, ventilation and heat dissipation can be achieved, and external debris can be prevented from entering the mounting shell 3. The two auxiliary handles 20 can facilitate the operator to move the structure and increase the friction of the hands to avoid slipping during handling. The battery compartment 21 can store the power supply battery. The placement seat 22 and the two mounting holes 23 can fix the device in a designated position.

[0024] A stabilizing plate 24 is fixedly installed on the back of the carrier plate 1. The front of the stabilizing plate 24 is fixedly installed on the back of the mounting shell 3. A PLC controller 25 is fixedly installed on the back of the mounting shell 3. The inner wall of the sliding port 4 is slidably connected to the outer surface of the transmission screw block 8. A sliding groove 26 is provided on the inner wall of the mounting shell 3. The inner wall of the sliding groove 26 is slidably connected to the outer surface of the transmission screw block 8. The stabilizing plate 24 enhances the connection strength between the mounting shell 3 and the carrier plate 1. The PLC controller 25 can be used to control the device. The sliding groove 26 provides guidance for the up and down movement of the transmission screw block 8, preventing the transmission screw block 8 from shifting.

[0025] The working principle of this utility model is as follows:

[0026] First, using two auxiliary poles 20, the device is transported to the downhole filling operation area, and then fixed in the designated detection position through the two mounting ports 23. Next, according to the detection requirements of the filling slurry, the extension length of the probe 15 inside the positioning tube 12 is adjusted, and the fixing screw 14 is tightened to press the rear end of the fixing screw 14 against the outer surface of the probe 15, thus fixing the probe 15. Then, the reduction motor 6 is started to drive the transmission screw 7 to rotate, which drives the transmission screw block 8, metal plate 9, switchable magnetic base 10, first connecting rod 11, positioning tube 12, and probe 15 to move downwards synchronously, so that... The probe 15 passes through the square opening 2 at a constant speed and inserts into the filling slurry below. During the insertion of the probe 15 into the filling slurry, the filling slurry generates a counter-thrust force on the probe 15. This thrust is transmitted to the thrust gauge 17 through the second connecting rod 16. The thrust gauge 17 collects the thrust data in real time and feeds it back to the PLC controller 25. As the filling slurry gradually solidifies, its thrust resistance gradually increases. When the thrust value detected by the thrust gauge 17 reaches the preset threshold, the PLC controller 25 determines that the filling slurry has solidified and controls the reduction motor 6 to reverse, thereby driving the transmission screw block 8 and related detection components to reset upwards.

[0027] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0028] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.

Claims

1. A device for detecting the curing time of paste filling slurry, characterized in that: Includes a carrier plate (1), the upper surface of which has a square opening (2), a mounting shell (3) fixedly installed on the upper surface of the carrier plate (1), a sliding opening (4) on the front of the mounting shell (3), a bearing (5) fixedly embedded in the inner top wall of the mounting shell (3), a geared motor (6) fixedly installed on the upper surface of the carrier plate (1), a transmission screw (7) fixedly installed at the output end of the geared motor (6), a transmission screw block (8) threadedly connected to the outer surface of the transmission screw block (7), a metal plate (9) fixedly installed on the front of the transmission screw block (8), and a switchable magnetic base magnetically connected to the front of the metal plate (9). 10) The front of the switch-type magnetic base (10) is fixedly connected to a first connecting rod (11), and the front end of the first connecting rod (11) is fixedly connected to a positioning tube (12). The outer surface of the positioning tube (12) is provided with a positioning screw (13), and the internal thread of the positioning screw (13) is connected to a fixing screw (14). The inside of the positioning tube (12) is provided with a probe (15). The rear end of the fixing screw (14) is in contact with the outer surface of the probe (15). The top end of the probe (15) is fixedly installed with a second connecting rod (16), and the top end of the second connecting rod (16) is fixedly installed with a thrust gauge (17).

2. The device for detecting the curing time of paste filling slurry according to claim 1, characterized in that: The mounting shell (3) has two sets of ventilation holes (18) on its left and right sides, and a protective net (19) is fixedly connected to the inner wall of each set of ventilation holes (18).

3. The device for detecting the curing time of paste filling slurry according to claim 1, characterized in that: The carrier plate (1) is fixedly connected to the left and right sides with auxiliary handles (20), and the outer surfaces of the two auxiliary handles (20) are provided with anti-slip textures.

4. The device for detecting the curing time of paste filling slurry according to claim 1, characterized in that: The bottom surface of the carrier plate (1) is fixedly connected to the battery compartment (21), and the bottom surface of the battery compartment (21) is fixedly installed with a placement seat (22). The upper surface of the placement seat (22) has two mounting holes (23).

5. The device for detecting the curing time of paste filling slurry according to claim 1, characterized in that: A stabilizing plate (24) is fixedly installed on the back of the carrier plate (1), and the front of the stabilizing plate (24) is fixedly installed on the back of the mounting shell (3).

6. The device for detecting the curing time of paste filling slurry according to claim 1, characterized in that: A PLC controller (25) is fixedly installed on the back of the mounting housing (3), and the inner wall of the sliding port (4) is slidably connected to the outer surface of the transmission screw block (8).

7. The device for detecting the curing time of paste filling slurry according to claim 1, characterized in that: The inner wall of the mounting shell (3) is provided with a sliding groove (26), and the inner wall of the sliding groove (26) is slidably connected to the outer surface of the transmission screw block (8).