An aerated wastewater heavy metal treatment reactor

By integrating mixing, reaction, and precipitation within a single tank, an aerated wastewater heavy metal treatment reactor has been developed, solving the problems of large footprint and high energy consumption in traditional processes and achieving highly efficient wastewater heavy metal treatment.

CN224981398UActive Publication Date: 2026-11-17JIANGXI MINYUAN ENVIRONMENTAL PROTECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522596540.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-06
Publication Date
2026-11-17
Estimated Expiration
2035-12-06

AI Technical Summary

Technical Problem

Traditional heavy metal wastewater treatment processes involve a large system footprint, complex pipeline connections, high infrastructure investment, and increased energy consumption due to the multi-unit series layout. Furthermore, the excessively long process makes management difficult.

Method used

Design an aerated wastewater heavy metal treatment reactor that highly integrates mixing, reaction and sedimentation units into a single tank. It utilizes the same aeration system to achieve mixing and mass transfer, and achieves solid-liquid separation through the connecting frame at the top of the tank and the internal sedimentation inclined tube.

Benefits of technology

The system configuration is simplified, significantly reducing the floor space required. It enables a continuous process from reaction to sedimentation, improving treatment efficiency and ensuring the quality of the effluent.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224981398U_ABST
    Figure CN224981398U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of wastewater heavy metal treatment technology, and in particular to an aerated wastewater heavy metal treatment reactor. It includes a tank, controller, inlet pipe, sludge discharge valve, blower, and main air pipe. The controller is installed on the lower front side of the tank, the inlet pipe is connected to the lower right side of the tank, the sludge discharge valve is fixedly installed at the bottom of the tank, and the blower is fixedly installed on the left side of the tank. The main air pipe is located at the outlet of the blower and is situated inside the tank. Branch air pipes are connected to both the front and rear sides of the middle section of the main air pipe. This utility model highly integrates mixing, reaction, and sedimentation units into a single tank and utilizes the same aeration system to achieve mixing and mass transfer. This eliminates the need for the mixing tank, reaction tank, and sedimentation tank arranged in series in traditional processes, achieving a simplified system configuration and significantly reducing the floor space required.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of wastewater heavy metal treatment technology, and in particular to an aerated wastewater heavy metal treatment reactor. Background Technology

[0002] Aeration is a process of forcibly introducing air into a liquid to increase the dissolved oxygen content of the water and to promote mixing and mass transfer by utilizing the agitation effect of rising bubbles. In the field of industrial wastewater treatment, especially for wastewater containing heavy metal ions, physicochemical methods are used to convert dissolved toxic heavy metals into stable, insoluble precipitates, thereby achieving effective separation and removal from the aqueous phase. In this process, aeration not only provides the necessary oxygen for certain oxidation reactions, but more importantly, the turbulence and stirring effects it generates create ideal conditions for the rapid and uniform mixing of subsequently added chemical agents with the wastewater, making it a key step in ensuring sufficient reaction and improving treatment efficiency.

[0003] However, in traditional processing flows, achieving multiple unit operations such as mixing, reaction, flocculation, and sedimentation usually relies on a series of structures and equipment connected in series, such as independently set up mixing tanks, reaction tanks, and sedimentation tanks. This multi-stage layout not only results in a large system footprint, complex pipeline connections, and high infrastructure investment, but also may lead to increased energy consumption and inconvenient operation and management due to the excessively long process.

[0004] Therefore, there is an urgent need for an aerated wastewater heavy metal treatment reactor. Utility Model Content

[0005] In order to overcome the shortcomings of traditional heavy metal wastewater treatment processes, such as system redundancy and large footprint caused by multi-unit series layout, this utility model provides an aerated wastewater heavy metal treatment reactor.

[0006] The technical implementation scheme of this utility model is as follows: an aerated wastewater heavy metal treatment reactor includes a tank, a controller, an inlet pipe, a sludge discharge valve, a blower, a main air pipe, branch air pipes, aeration heads, a connecting frame, a sedimentation inclined tube, an effluent weir, and an effluent pipe. The controller is fixedly installed on the lower front side of the tank, the inlet pipe is fixedly connected to the lower right side of the tank, the sludge discharge valve is fixedly installed at the bottom of the tank, the blower is fixedly installed on the left side of the tank, the main air pipe is located at the air outlet of the blower and is located inside the tank, and branch air pipes are fixedly connected to both the front and rear sides of the middle of the main air pipe. Aeration heads are fixedly installed on both sides of the main air pipe and on the branch air pipes. A connecting frame is fixedly connected to the top of the tank, a sedimentation inclined tube is fixedly installed inside the connecting frame, an effluent weir is fixedly installed on the connecting frame, and an effluent pipe is fixedly connected to the front side of the effluent weir. The controller is electrically connected to the sludge discharge valve and the blower.

[0007] More preferably, it also includes an observation window, which is located in the middle of the tank.

[0008] More preferably, it also includes a medicine container and a dispensing pipe. The medicine container is fixedly installed on the upper right side of the container body, and the dispensing pipe is fixedly connected to the left side of the medicine container, with the dispensing pipe extending into the container body.

[0009] More preferably, the can is equipped with graduation lines.

[0010] More preferably, it also includes a top cover, with the top of the outlet weir hinged to the top of the weir.

[0011] More preferably, the top cover has a handle.

[0012] Compared with the prior art, the present invention has the following advantages: 1. The present invention integrates mixing, reaction and sedimentation units into a single tank and uses the same aeration system to achieve mixing and mass transfer, eliminating the need for mixing tanks, reaction tanks and sedimentation tanks set in series in the traditional process, thus achieving the effect of simplifying the system configuration and significantly reducing the floor space.

[0013] 2. This utility model, by setting a connecting frame and an internal sedimentation inclined tube at the top of the tank, enables efficient solid-liquid separation of the flocculated mud-water mixture after the reaction is completed. The clarified water is discharged through the effluent weir and effluent pipe, achieving the effect of continuously completing the entire process from reaction to sedimentation in a compact device, ensuring the quality of the effluent and improving the overall treatment efficiency. Attached Figure Description

[0014] Figure 1 This is a three-dimensional structural diagram of the present invention.

[0015] Figure 2 This is a partial sectional view of the blower, main air pipe, and branch air pipe components of this utility model.

[0016] Figure 3 This is a three-dimensional structural diagram of the connecting frame, sedimentation inclined tube, and effluent weir of this utility model.

[0017] Figure 4 This is a three-dimensional structural diagram of the components of this utility model, including the bronchus, aeration head, and tank.

[0018] The components in the attached diagram are labeled as follows: 1. Tank body, 10. Controller, 11. Inlet pipe, 12. Sludge discharge valve, 13. Blower, 14. Main air pipe, 15. Branch air pipe, 16. Aeration head, 17. Observation window, 2. Chemical tank, 21. Liquid outlet pipe, 3. Connecting frame, 31. Sedimentation inclined tube, 32. Water outlet weir, 33. Water outlet pipe, 34. Top cover. Detailed Implementation

[0019] Example: An aerated wastewater heavy metal treatment reactor, such as... Figures 1-4 As shown, the system includes a tank 1, a controller 10, an inlet pipe 11, a sludge discharge valve 12, a blower 13, a main air pipe 14, a branch air pipe 15, an aeration head 16, a connecting frame 3, a sedimentation inclined pipe 31, an outlet weir 32, and an outlet pipe 33. The controller 10 is fixedly installed on the lower front side of the tank 1, the inlet pipe 11 is fixedly connected to the lower right side of the tank 1, the sludge discharge valve 12 is fixedly installed at the bottom of the tank 1, and the blower 13 is fixedly installed on the left side of the tank 1. The main air pipe 13 is located at the outlet of the blower 13. Pipe 14, the main air pipe 14 is located inside the tank body 1, and branch air pipes 15 are fixedly connected to the front and rear sides of the middle of the main air pipe 14. Aeration heads 16 are fixedly installed on the left and right sides of the main air pipe 14 and on the branch air pipes 15. A connecting frame 3 is fixedly connected to the top of the tank body 1. A sedimentation inclined pipe 31 is fixedly installed inside the connecting frame 3. A water outlet weir 32 is fixedly installed on the connecting frame 3. A water outlet pipe 33 is fixedly connected to the front side of the water outlet weir 32. The controller 10 is electrically connected to the sludge discharge valve 12 and the blower 13.

[0020] like Figure 1 As shown, it also includes an observation window 17. The observation window 17 is located in the middle of the tank body 1, which makes it convenient for the operator to observe the sewage treatment situation.

[0021] like Figure 2 and Figure 4 As shown, it also includes a medicine container 2 and a dispensing pipe 21. The medicine container 2 is fixedly installed on the upper right side of the container body 1, and the dispensing pipe 21 is fixedly connected to the left side of the medicine container 2. The dispensing pipe 21 passes into the container body 1. The container body 1 is provided with scale lines to facilitate the operator to input the precise dosage of medicine.

[0022] like Figure 1 As shown, it also includes a top cover 34, which is hinged to the top of the water outlet weir 32. The top cover 34 is equipped with a handle for easy operation.

[0023] When using this device for wastewater treatment, the wastewater to be treated is first connected to the inlet pipe 11. Then, the blower 13 is turned on via the controller 10 to deliver compressed air to the main air pipe 14. The main air pipe 14 evenly distributes the air to each branch pipe 15, and finally, a large number of microbubbles are released from the aeration head 16. These bubbles rise rapidly at the bottom of the tank 1, providing sufficient dissolved oxygen to the water and creating strong turbulence and stirring. At the same time, the wastewater containing heavy metals to be treated is continuously injected into the bottom of the tank 1 through the inlet pipe 11, where it is thoroughly mixed with the rising bubble flow. After uniform mixing, the operator adds a specific chemical agent to the reagent tank 2. Under the influence of gravity, the agent enters the interior of the tank 1 through the outlet pipe 21. In the turbulent environment created by the aeration head 16, the agent rapidly diffuses throughout the reaction zone, reacting chemically with the heavy metal ions in the wastewater to generate precipitates such as insoluble hydroxides or sulfides. After the chemical reaction is complete, the wastewater mixture containing a large amount of heavy metal precipitates slowly rises in tank 1. The mixture first flows through connecting frame 3. When the water flows through sedimentation inclined tube 31, the heavy flocs and precipitate particles slide down the wall of sedimentation inclined tube 31 under the action of gravity and accumulate at the bottom of tank 1 below. The clarified supernatant continues to rise and eventually overflows the effluent weir 32 installed on connecting frame 3. The clarified water is discharged through effluent pipe 33, completing the purification process. After one treatment cycle is completed, the operator first turns off the blower 13. After the system stops aeration, the sludge discharge valve 12 is opened to discharge the precipitate accumulated at the bottom of tank 1. After the sludge discharge is completed, the sludge discharge valve 12 is closed.

Claims

1. An aerated wastewater heavy metal treatment reactor, characterized in that, The system includes a tank (1), a controller (10), an inlet pipe (11), a sludge discharge valve (12), a blower (13), a main air pipe (14), a branch air pipe (15), an aeration head (16), a connecting frame (3), a sedimentation inclined pipe (31), an outlet weir (32), and an outlet pipe (33). The controller (10) is installed on the lower front side of the tank (1), the inlet pipe (11) is connected to the lower right side of the tank (1), the sludge discharge valve (12) is installed at the bottom of the tank (1), and the blower (13) is installed on the left side of the tank (1). The outlet of the blower (13) is equipped with a... There is a main air pipe (14), which is located inside the tank (1). The main air pipe (14) is connected to branch air pipes (15) on both sides of the middle of the main air pipe (14). Aeration heads (16) are installed on both sides of the main air pipe (14) and on the branch air pipes (15). A connecting frame (3) is connected to the top of the tank (1). A sedimentation inclined pipe (31) is installed inside the connecting frame (3). A water outlet weir (32) is installed on the connecting frame (3). A water outlet pipe (33) is connected to the front side of the water outlet weir (32). The controller (10) is electrically connected to the sludge discharge valve (12) and the blower (13).

2. An aerated wastewater heavy metal treatment reactor according to claim 1, characterized in that, It also includes an observation window (17), which is located in the middle of the tank body (1).

3. An aerated wastewater heavy metal treatment reactor according to claim 2, characterized in that, It also includes a medicine tank (2) and a liquid outlet pipe (21). The medicine tank (2) is installed on the upper right side of the tank body (1), and the liquid outlet pipe (21) is connected to the left side of the medicine tank (2). The liquid outlet pipe (21) is inserted into the tank body (1).

4. An aerated wastewater heavy metal treatment reactor according to claim 3, characterized in that, The tank (1) has scale lines.

5. An aerated wastewater heavy metal treatment reactor according to claim 4, characterized in that, It also includes a top cover (34), and the top of the outlet weir (32) is hinged to the top of the top cover (34).

6. An aerated wastewater heavy metal treatment reactor according to claim 5, characterized in that, A handle is provided on the top cover (34).