An online cleaning system for leakage collection wells in underground powerhouses of hydropower stations
By installing leakage drainage pumps and sewage discharge units in the leakage collection wells of hydropower stations, combined with mobile devices and sedimentation tanks, online cleaning of the leakage collection wells can be achieved, solving safety risks and generator unit shutdown problems, and improving cleaning efficiency and safety.
Patent Information
- Application Number
- CN202522770967.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-26
AI Technical Summary
The existing methods for cleaning sludge from seepage collection wells in hydropower stations pose safety risks and result in losses due to generator unit downtime, and the sludge removal efficiency is low.
By combining a leakage drainage pump and a sewage discharge unit with a mobile device, online cleaning of water accumulated in the leakage collection well is achieved. The sludge and clean water are separated by a sedimentation tank, avoiding the need for personnel to enter the well for operation.
Ensure the safety of cleaning personnel, reduce generator downtime, improve cleaning efficiency, reduce the risk of sludge accumulation, and avoid loss of benefits.
Smart Images

Figure CN224982339U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of hydropower station leakage drainage technology, specifically to an online cleaning system for leakage collection wells in underground powerhouses of hydropower stations. Background Technology
[0002] The seepage drainage system is a crucial component of hydropower stations, used to remove seepage water from hydraulic structures and drainage from generating equipment. For high-head conventional hydropower stations or pumped-storage power stations, the power plant is often located underground to meet power generation requirements, making the seepage drainage system even more critical. A malfunction in the seepage drainage system can lead to insufficient drainage, causing flooding of the power plant. Seepage collection wells are located at the lowest point of the power plant and are used to collect seepage water from hydraulic structures and generating equipment. Since seepage water often contains various contaminants, these wells tend to accumulate silt over time. This silt and debris can affect the normal operation of the seepage drainage pumps, posing a safety hazard to the power station. Therefore, power stations regularly clean and desilt their collection wells. Currently, manual cleaning is commonly used. First, the power plant's generator units are shut down to reduce the amount of water flowing into the seepage collection well. Then, a temporary sewage pump is used to remove the sewage from the well, lowering the water level to a safe level. Workers then enter the well to use high-pressure water or air to blow away sludge and collect debris, which is then transported to the surface in sacks. While this method stops the generator units from draining water, water seepage continues to enter the collection well. Because workers are cleaning the well, they must constantly monitor the water level and activate the temporary sewage pump to remove any accumulated water, ensuring the water level does not affect the safety of those working underground. Although this cleaning method is simple, it poses certain risks to the safety of the workers. Furthermore, the generator units must be shut down during cleaning, impacting the power plant's efficiency. Currently, the wastewater containing sludge is often discharged to a high place outside the plant through drainage pipes. Since both sludge and water are discharged to a high place at the same time, the pumping power of the cleaning pump is often relatively large. Summary of the Invention
[0003] This application provides an online cleaning system for seepage collection wells in underground powerhouses of hydropower stations. This online cleaning system can ensure the safety of cleaning personnel and reduce generator downtime.
[0004] The online cleaning system for the seepage collection well of the underground powerhouse of the hydropower station provided in this application includes: a seepage collection well, the seepage collection well having a preset volume, a drainage gallery provided on one side of the seepage collection well, a drainage ditch provided on one side of the bottom of the drainage gallery, and the drainage ditch being connected to the seepage collection well; Multiple seepage drainage pumps are installed at a preset depth in the seepage collection well. The seepage drainage pumps are configured to discharge the accumulated water in the seepage collection well according to a preset water level. The accumulated water within the preset water level range generally has less silt.
[0005] The sewage discharge unit includes a sedimentation tank, a sewage pump, and a mobile device. The sedimentation tank is located within the drainage corridor. The sewage pump is positioned at a preset depth in the seepage collection well and is connected to the sedimentation tank via a sewage pipe. The drainage end of the sedimentation tank is connected to the drainage ditch of the drainage corridor via a drainage steel pipe. The mobile device is connected to the sewage pump and can drive the sewage pump to move within the seepage collection well.
[0006] In addition, the online cleaning system for seepage collection wells in underground powerhouses of hydropower stations provided in this application may also have the following additional technical features: In one optional embodiment, the number of sewage pumps is multiple, and the multiple sewage pumps are spaced apart in the seepage collection well. The sewage pipeline includes a main sewage pipe and multiple sewage branch pipes arranged in parallel. The main sewage pipe connects the sedimentation tank and the multiple sewage branch pipes. The sewage branch pipe includes a flexible hose and a connecting steel pipe. The connecting steel pipe is connected to the main sewage pipe. The flexible hose connects the connecting steel pipe and the sewage pump. The connecting steel pipe is equipped with a check valve and a gate valve.
[0007] In one alternative embodiment, the moving device includes a track, an electric hoist, and a chain guide. The track is disposed on the top inner wall of the seepage collection well, the electric hoist is slidably connected to the track, and the chain guide connects the sewage pump and the electric hoist. The moving device can drive the sewage pump to move within the seepage collection well, thereby expanding the scope of application of the sewage pump.
[0008] In one alternative embodiment, the mobile device further includes a control box and a control cable, the control cable electrically connecting the electric hoist and the control box, the control box being located on top of the leakage collection well and used to control the operating status of the electric hoist.
[0009] In one alternative embodiment, the drainage steel pipe includes a plurality of first steel pipes arranged in parallel, each first steel pipe being equipped with a drainage valve. The plurality of first steel pipes are arranged at intervals along the height direction of the sedimentation tank, so as to selectively discharge the upper layer of clear water according to the sludge depth and the upper layer of clear water depth in the sedimentation tank, and discharge it back into the collection well along the drainage ditch of the drainage corridor.
[0010] The beneficial effects of this application are as follows: The online cleaning system for the underground powerhouse's seepage collection wells in this hydropower station uses seepage drainage pumps to discharge accumulated water from the wells. Lower-level wastewater in the wells is pumped to a sedimentation tank, where it settles before the upper-level clean water is discharged back into the wells. Lower-level sludge is transported outside the plant manually or by other means. This cleaning process does not require personnel to enter the wells, ensuring the safety of cleaning personnel. Furthermore, the cleaning process does not require generator shutdown, allowing for simultaneous "online" cleaning while the generators are running, avoiding the loss of benefits caused by generator shutdowns. Cleaning can also be initiated when there is only a small amount of sludge accumulation in the wells, or can be performed periodically, thereby reducing the risk of sludge buildup.
[0011] It should be understood that the above general description and the following detailed description are merely exemplary and do not limit this application. Attached Figure Description
[0012] Figure 1 A schematic diagram of the elevation structure of the online cleaning system for the seepage collection wells in the underground powerhouse of a hydropower station. Figure 2 for Figure 1 A schematic diagram of the plan structure of the online cleaning system for the leakage collection well in the underground powerhouse of the Zhongshui Hydropower Station.
[0013] Reference numerals: 1. Leakage collection well; 2. Drainage gallery; 21. Drainage ditch; 3. Leakage drainage pump; 4. Sewage discharge unit; 40. Mobile device; 401. Rail; 402. Electric hoist; 403. Guide chain; 404. Control box; 405. Control cable; 405. Sedimentation tank; 41. Sewage pump; 42. Sewage main pipe; 43. Hose; 44. Connecting steel pipe; 45. Check valve; 46. Gate valve; 47. First steel pipe; 48. Drainage valve; 49.
[0014] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application. Detailed Implementation
[0015] To better understand the technical solution of this application, the embodiments of this application will be described in detail below with reference to the accompanying drawings.
[0016] It should be understood that the described embodiments are merely some embodiments of this application, and not all embodiments. All other technical solutions obtained by those skilled in the art based on the embodiments of this application without inventive effort are within the scope of protection of this application.
[0017] The terminology used in the embodiments of this application is for the purpose of describing particular embodiments only and is not intended to be limiting of this application. The singular forms “a,” “the,” and “the” used in the embodiments of this application and the appended claims are also intended to include the plural forms unless the context clearly indicates otherwise.
[0018] It should be understood that the term "and / or" used in this article is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this article generally indicates that the preceding and following related objects have an "or" relationship.
[0019] It should be noted that the directional terms such as "upper," "lower," "left," and "right" described in the embodiments of this application are used to describe the angles shown in the accompanying drawings and should not be construed as limiting the embodiments of this application. Furthermore, in the context, it should be understood that when it is mentioned that an element is connected "upper" or "lower" to another element, it can be directly connected to the other element "upper" or "lower," or indirectly connected to the other element "upper" or "lower" through an intermediate element.
[0020] like Figure 1-2 As shown in the figure, this application embodiment provides an online cleaning system for the leakage collection well of the underground powerhouse of a hydropower station. The online cleaning system for the leakage collection well of the underground powerhouse of a hydropower station mainly includes a leakage collection well 1, multiple leakage drainage pumps 3, and a sewage discharge unit 4. The leakage collection well 1 has a preset volume. A drainage corridor 2 is provided on one side of the leakage collection well 1, and a drainage ditch 21 is provided on the bottom side of the drainage corridor 2. The drainage ditch 21 is connected to the leakage collection well 1. The leakage drainage pump 3 is set at a preset depth of the leakage collection well 1 and is configured to discharge the accumulated water in the leakage collection well 1 according to a preset water level. The sewage discharge unit 4 includes a sedimentation tank 41, a sewage pump 42, and a moving device 40. The sedimentation tank 41 is located in the drainage corridor 2. The sewage pump 42 is set at a preset depth of the leakage collection well 1 and is connected to the sedimentation tank 41 through a sewage pipe. The drainage end of the sedimentation tank 41 is connected to the drainage ditch 21 through a drainage steel pipe. The moving device 40 is connected to the sewage pump 42 and can drive the sewage pump 42 to move within the leakage collection well 1.
[0021] In this embodiment, the online cleaning system for the seepage collection well in the underground powerhouse of the hydropower station uses a seepage drainage pump 3 to discharge the accumulated water in the seepage collection well 1. The lower layer of sewage in the seepage collection well 1 can be led to a sedimentation tank 41 by a sewage pump 42. After sedimentation in the sedimentation tank 41, the upper layer of clean water is discharged into the seepage collection well 1. The lower layer of sludge is transported outside the plant manually or by other means. This cleaning process does not require personnel to enter the seepage collection well 1, which can ensure the safety of the cleaning personnel. In addition, the generator unit does not need to be shut down during the cleaning process. The cleaning operation can be carried out synchronously "online" while the unit is running, avoiding the loss of benefits caused by the unit shutdown. The cleaning can also be started when there is a small amount of sludge in the seepage collection well 1, or the cleaning can be carried out periodically, thereby reducing the risk of sludge accumulation.
[0022] like Figure 1-2 As shown, in one specific embodiment, there are multiple sewage pumps 42, which are spaced apart within the seepage collection well 1. The sewage pipeline includes a main sewage pipe 43 and multiple sewage branch pipes arranged in parallel. The main sewage pipe 43 connects to the sedimentation tank 41 and the multiple sewage branch pipes. Each sewage branch pipe includes a flexible hose 44 and a connecting steel pipe 45. The connecting steel pipe 45 is connected to the main sewage pipe 43, and the flexible hose 44 connects the connecting steel pipe 45 and the sewage pumps 42. A check valve 46 and a gate valve 47 are installed on the connecting steel pipe 45. Specifically, the connecting steel pipe 45 can be a DN80 steel pipe, the main sewage pipe 43 can be a DN150 steel pipe, and the sewage pumps 42 are submersible pumps.
[0023] like Figure 1-2 As shown, in one specific embodiment, the mobile device 40 includes a track 401, an electric hoist 402, and a chain guide 403. The track 401 is disposed on the top inner wall of the seepage collection well 1. The electric hoist 402 is slidably connected to the track 401. The chain guide 403 connects the sewage pump 42 and the electric hoist 402. Furthermore, the mobile device 40 also includes a control box 404 and a control cable 405. The control cable 405 electrically connects the electric hoist 402 and the control box 404. The control box 404 is disposed on the top of the seepage collection well 1 and is used to control the working status of the electric hoist 402.
[0024] Specifically, the track 401 can be a closed ring. The track 401 is installed on the upper cover of the seepage collection well 1 and fixed to the bottom surface of the concrete cover above the well. Two electric hoists 402 are installed on the track 401, each connected to a sewage pump 42 via a guide chain 403. Depending on the cleaning status of the seepage collection well 1, power station personnel can stand above the cover of the seepage collection well 1 and operate the electric hoists 402 via the control box 404 and control cable 405. This allows the electric hoists 402 to move along the ring track 401, driving the sewage pump 42 via the guide chain 403, thus moving the sewage pump 42 within a certain range and expanding its usability. Furthermore, because the outlet of the sewage pump 42 is connected to the connecting steel pipe 45 via a flexible hose 44, and the hose 44 has a certain degree of flexibility, the hose 44 can move accordingly when the sewage pump 42 moves.
[0025] like Figure 1-2 As shown, in one specific embodiment, the drainage steel pipe includes multiple first steel pipes 48 arranged in parallel. Each first steel pipe 48 is equipped with a drainage valve 49. The multiple first steel pipes 48 are arranged at intervals along the height direction of the sedimentation tank 41 to selectively discharge the upper layer of clear water based on the depth of the sludge and the depth of the upper clear water in the sedimentation tank 41. Specifically, the retaining wall of the sedimentation tank 41 is equipped with three first steel pipes 48 of different heights and drainage valves 49. After the sludge-containing water in the sedimentation tank 41 has settled for a period of time, the drainage valves 49 of the corresponding heights are opened according to the depth of the sludge and the depth of the upper clear water in the sedimentation tank 41, discharging the upper clear water into the drainage ditches 21 on both sides of the drainage corridor 2, and then flowing back into the seepage collection well 1. The sludge retained in the lower layer of the sedimentation tank 41 is transported outside the factory manually or by other means.
[0026] like Figure 1 As shown, in one specific embodiment, the elevation from the bottom of the drainage corridor 2 to the bottom of the seepage collection well 1 is 13m, and the elevation from the top of the sedimentation tank 41 to the bottom of the seepage collection well 1 is 15m. More specifically, the sedimentation tank 41 is located in the drainage corridor 2, and its top elevation is EL.15m. Thus, the head of the sewage pump 42 is approximately the difference between the top elevation of the sedimentation tank 41 (EL.15m) and the bottom elevation of the collection well (EL.0.0m). Adding a pipeline loss of approximately 5m, the head of the sewage pump 42 is approximately 20m, which is relatively small. Furthermore, it should be noted that the rails 401, pipelines, and valves in all embodiments of this document are made of stainless steel to prevent corrosion; the motor of the electric hoist 402 is IP54 rated for easy operation in humid environments.
[0027] When the online cleaning system for the underground powerhouse seepage collection well of this hydropower station is in operation, the seepage collection well 1 collects seepage water from various parts of the underground powerhouse and seepage water from the operation of the generating units through the drainage corridor 2. The seepage drainage pump 3 periodically removes the accumulated water in the well according to the set water level. The sewage pump 42 is installed at the bottom of the seepage collection well 1, and the outlet of the sewage pump 42 is finally led to the sedimentation tank 41 above the well through the sewage pipe. When sewage discharge (cleaning) is required, the sewage pump 42 is started at the control box 404 above the seepage collection well 1, and the sludge and water at the bottom of the well are sent to the sedimentation tank 41 through the sewage pipe. After the sedimentation tank 41 is full, the sewage pump 42 is turned off, and the sewage discharge (cleaning) operation is stopped. After the turbid water containing sludge settles in the sedimentation tank 41 for a period of time, the sludge is located in the lower layer of the sedimentation tank 41, and the clear water is located in the upper layer of the sedimentation tank 41. At this point, open the drain valve 49 at the corresponding elevation on the retaining wall of sedimentation tank 41, allowing the clear water in the upper layer of sedimentation tank 41 to flow back into the collection well. The sludge retained in the lower layer of sedimentation tank 41 is transported outside the factory manually or by other means.
[0028] The above are merely preferred embodiments of this application and are not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. An online pollution collection system for a leakage collection well of a hydropower station underground powerhouse, characterized in that, include: A seepage collection well has a preset volume. A drainage gallery is provided on one side of the seepage collection well, and a drainage ditch is provided on one side of the bottom of the drainage gallery. The drainage ditch is connected to the seepage collection well. Multiple seepage drainage pumps are installed at a preset depth in the seepage collection well, and the seepage drainage pumps are configured to drain the accumulated water in the seepage collection well according to a preset water level. The sewage discharge unit includes a sedimentation tank, a sewage pump, and a mobile device. The sedimentation tank is located within the drainage corridor. The sewage pump is positioned at a preset depth in the seepage collection well and is connected to the sedimentation tank via a sewage pipe. The drainage end of the sedimentation tank is connected to the drainage ditch of the drainage corridor via a drainage steel pipe. The mobile device is connected to the sewage pump and can drive the sewage pump to move within the seepage collection well.
2. The on-line trash collecting system for leakage collecting well of underground powerhouse of hydropower station according to claim 1, characterized in that, The number of sewage pumps is multiple, and the multiple sewage pumps are spaced apart in the seepage collection well. The sewage pipeline includes a main sewage pipe and multiple sewage branch pipes arranged in parallel. The main sewage pipe connects the sedimentation tank and the multiple sewage branch pipes. The sewage branch pipe includes a flexible hose and a connecting steel pipe. The connecting steel pipe is connected to the main sewage pipe. The flexible hose connects the connecting steel pipe and the sewage pump. The connecting steel pipe is equipped with a check valve and a gate valve.
3. The on-line trash collecting system for leakage collecting well of underground powerhouse of hydropower station according to claim 1 or 2, characterized in that, The mobile device includes a track, an electric hoist, and a guide chain. The track is set on the top inner wall of the leakage collection well. The electric hoist is slidably connected to the track. The guide chain connects the sewage pump and the electric hoist.
4. The on-line trash collecting system for leakage collecting well of underground powerhouse of hydropower station according to claim 3, characterized in that, The mobile device also includes a control box and a control cable. The control cable electrically connects the electric hoist and the control box. The control box is located on top of the seepage collection well and is used to control the working status of the electric hoist.
5. The on-line trash collecting system for leakage collecting well of underground powerhouse of hydropower station according to claim 1 or 2 or 4, characterized in that, The drainage steel pipe of the sedimentation tank includes multiple first steel pipes arranged in parallel. Each first steel pipe is equipped with a drainage valve. The multiple first steel pipes are arranged at intervals along the height direction of the sedimentation tank to selectively discharge the upper layer of clear water according to the depth of sludge and the depth of the upper layer of clear water in the sedimentation tank.