A green and energy-saving building decorative ceiling device
By using an open trapezoidal rigid frame and mechanical clamping mechanism in the ceiling decoration, combined with epoxy resin bonding, the problem of drilling damaging the steel reinforcement protective layer is solved, achieving green and energy-saving construction and improving the load-bearing capacity and construction efficiency of the ceiling device.
Patent Information
- Application Number
- CN202522654247.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-15
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-15
AI Technical Summary
In current construction of decorative ceilings, drilling holes to form the suspension holes damages the reinforcing bars and the protective layer of the steel, affecting the durability and fire safety of the building structure. It also causes environmental pollution and material waste during construction.
The system employs an open-top trapezoidal rigid frame, movable pressure plates, load-bearing pressure rods, and a mechanical clamping mechanism. Through a dual fixing method of epoxy resin bonding and mechanical clamping, drilling is avoided, enhancing the load-bearing capacity and stability of the hangers and achieving green and energy-saving construction.
It effectively protects the steel reinforcement protective layer of reinforced concrete floor slabs, improves construction efficiency and material utilization, improves the working environment, and enhances the overall load-bearing capacity and rigid connection stability of ceiling devices.
Smart Images

Figure CN224982430U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building decoration construction technology, and in particular to a green and energy-saving building decoration ceiling device. Background Technology
[0002] In the field of building structure and decoration construction, suspended ceilings generally require drilling holes in the bottom surface of reinforced concrete floor slabs to form suspension holes. Expansion bolts are then used to fix and install suspension rods or reverse support rods. When drilling these holes, because the floor slab reinforcement is at the bottom, the drilling may hit or touch the bottom reinforcement, or get very close to it, directly exposing the reinforcement or damaging the concrete cover, causing it to crack. According to structural design principles and the structural requirements of reinforced concrete materials, both reinforcing bars and steel must have a concrete cover within the concrete. This ensures that the outermost edge of the reinforcing bars or steel is covered with a certain thickness of concrete from the outermost edge to the concrete surface. This guarantees that the steel and concrete form a unified structure, providing the steel with sufficient bond strength and meeting mechanical calculation requirements. It also prevents the steel from rusting due to atmospheric oxygen and water corrosion caused by cracks in the concrete surface, which would affect the durability and stability of the concrete structure. In the event of a fire, a sufficient concrete cover thickness prevents the steel in the structure from being damaged by high temperatures, thus avoiding collapse. The integrity of the reinforcing steel and the thickness of the concrete cover is crucial to the mechanical properties, quality, durability, and safety of reinforced concrete and prestressed reinforced concrete structures. Therefore, in many civil engineering projects, the owner commissions a third party to inspect the steel cover to control the quality of the reinforced concrete structure. However, the destructive drilling used in current ceiling installations for suspended rods can damage the reinforcing steel and its cover, exposing the steel bars and affecting the building's durability and fire safety. As an important part of interior decoration, suspended ceilings have several drawbacks. Existing construction techniques and processes involve destructive drilling to create the hanging rod holes, which damages the protective layer of the reinforcing steel in the reinforced concrete slab. This damage can easily cause corrosion of the steel reinforcement, leading to rust expansion and further peeling of the protective layer, affecting the structural lifespan and fire safety. Furthermore, when encountering steel, drilling must be done nearby, potentially causing the hanging rod to tilt and resulting in inaccurate positioning between the rod and the joists. Drilling also generates dust and debris, negatively impacting the health of construction workers, slowing down construction progress, and requiring reinstallation of hanging rods when changing ceiling styles. These practices are also environmentally unfriendly, increase material consumption, and are not energy-efficient. Utility Model Content
[0003] This utility model aims to provide a green and energy-saving building decoration ceiling device that can effectively solve the above-mentioned problems. It solves the problem of damage to the reinforcing bars and steel protective layer caused by destructive drilling under the reinforced concrete floor slab in current building decoration ceilings. This avoids the corrosion of the reinforcing bars in the reinforced concrete floor slab structure, which can lead to the expansion force of rust and further peeling off the protective layer, affecting the durability and fire safety of the building structure. At the same time, it solves the problems of material reuse and construction environment, implements green and energy-saving construction, and improves construction efficiency and standardized operation.
[0004] This utility model provides a green and energy-saving building decorative ceiling device, including: An open trapezoidal rigid frame is fixedly connected to a reinforced concrete beam structure. The open trapezoidal rigid frame is composed of an upper horizontal brace, a first outer horizontal brace, a second outer horizontal brace, an outer vertical diagonal brace, a first lower horizontal brace, an upper longitudinal brace, a lower longitudinal brace, a second lower horizontal brace, diagonal braces, vertical horizontal braces, and fixed vertical braces welded or rigidly connected. The upper longitudinal brace has a longitudinal connecting groove along its length, and the fixed vertical brace has a vertical brace tightening groove for connecting one end of the perforated connecting tightening rod.
[0005] The movable pressure plate is slidably engaged in the longitudinal groove of the upper longitudinal connection via a sliding block, and its top surface is bonded to the side of the reinforced concrete beam structure by the epoxy resin. Mechanical clamping mechanism: includes a perforated clamping rod with one end connected to the vertical rod clamping groove on the fixed vertical rod, and the other end abutting against the pressure plate clamping circular groove on the movable pressure plate; The bearing and preload mechanism includes a bearing rod and a rod connecting bolt for extending it and allowing the bearing rod to extend and retract by rotation, which is connected to the moving pressure plate of the other end beam where the rod presses against a circular groove. Fixed hanger: A fixed hanger is screwed into the hanger bearing arc-shaped slider nut and connected to the bearing pressure rod; Pressure bar connecting bolt: By rotating it in the opposite direction, a preload is applied between the bearing pressure bar and the pressure bar abutting circular groove on the movable pressure plate. This makes the bearing pressure bar a fully compressible member and further tightens it against the movable pressure plate.
[0006] Preferably, the movable pressure plates are arranged in at least two rows laterally, with each row having at least one pressure plate tightening circular groove at the top and bottom. The inner and outer sides of the pressure plate tightening circular groove are both circular, with threads on the outer side for connection with the fastening concave nut. The two inner holes of the fastening concave nut are both threaded. The thread of the smaller inner hole is used to connect with the tightening rod with the hole, and the thread of the larger inner hole is used to connect with the pressure rod tightening circular groove, the pressure plate tightening circular groove, the vertical rod tightening groove, and the bearing pressure rod. A pressure rod tightening circular groove is provided in the middle of the outer side of the movable pressure plate, with threads arranged on the outer side. There is a rubber stop on the upper inner side, and a slider is provided at the lower part corresponding to the longitudinal connecting groove of the upper longitudinal connection to accommodate beams of different widths. The movable pressure plate is fixedly connected to the rubber plate.
[0007] Preferably, the rubber sheet is fixed to the movable pressure plate by a rubber stop and the inner side of the movable pressure plate.
[0008] Preferably, the bearing pressure rod has a through-slit along its length, and the connecting end of the bearing pressure rod and the pressure rod abutting the circular groove on the movable pressure plate is provided with internal and external threads on the inside and outside. The bearing arc-shaped slider nut of the hanger is provided with a protrusion, which slides in the through-slit of the pressure rod and can slide in the through-slit of the pressure rod. The lower fastening nut on the fixed hanger is used to restrict the movement of the fixed hanger along the through-slit of the pressure rod.
[0009] Preferably, the fixed hanger is a continuous threaded rod, on which a lower hanger fastening nut, a hanger bearing arc-shaped slider nut, and an upper hanger fastening nut are screwed in sequentially from bottom to top. The lower hanger fastening nut on the fixed hanger is used to restrict the movement of the fixed hanger along the continuous joint of the pressure rod after the fixed hanger is in place.
[0010] Preferably, the movable pressure plate has a circular groove for tightening the pressure rod at the middle of the outer side of the reinforced concrete beam structure. The bearing pressure rod is connected to the end of the circular groove for tightening the pressure rod on the movable pressure plate by an internal thread. The end of the bearing pressure rod is connected to the tightening rod with a hole by a connecting rod with a hole. The rod is then connected to the circular groove for tightening the pressure rod and the bearing pressure rod by two fastening concave nuts. The pressure rod connecting bolts are used to connect the bearing pressure rods to each other and apply preload.
[0011] Preferably, the outer circumferential surface of the perforated connecting tightening rod is threaded, and the inner small and inner large circumferential surfaces of the fastening concave nut are threaded. The outer circumferential surface thread of the perforated connecting tightening rod engages with the inner small circumferential surface thread of the fastening concave nut. The thread on the inner large circumferential surface of the connecting fastening concave nut engages with the threads on the outer circumferential surface of the pressure rod tightening circular groove, the movable pressure plate tightening circular groove, the bearing pressure rod connecting with the pressure rod tightening circular groove connection end, and the vertical rod tightening groove.
[0012] Preferably, the end of the perforated connecting top tightening rod away from the fixed vertical rod is provided with a rotating hole. The function of the rotating hole is to facilitate the rotation of the perforated connecting top tightening rod. The shape and size of the rotating hole are adapted to the insertion of the steel rod.
[0013] Preferably, the movable pressure plate has a circular groove for pressing against the outer side of the reinforced concrete beam structure. The circular groove for pressing against the pressure plate is circular and distributed on the surface of the movable pressure plate.
[0014] Preferably, when the floor slab or beam is subjected to vibration load, two springs and two nuts can be screwed into the perforated connecting clamping rod to tighten the two limiting concave nuts respectively.
[0015] Preferably, the top-opening trapezoidal rigid frame and the movable pressure plate are made of aluminum alloy or high-strength lightweight materials.
[0016] This utility model has the following beneficial effects: 1. In this utility model, by setting the device of this application, the destructive drilling and forming of hanging holes under the reinforced concrete floor slab during building decoration and ceiling construction is avoided, which would damage the reinforcing bars and steel protective layer. This eliminates the problem of corrosion of the reinforcing bars in the reinforced concrete floor slab structure, the generation of corrosion expansion force, which would further cause the protective layer to crack and peel off, affecting the durability and fire safety of the building structure. At the same time, it ensures the reuse of the materials of the device of this application, the construction working environment is thoroughly improved, green and energy-saving construction is effectively implemented, and construction efficiency and standardized operation are also improved.
[0017] 2. In this utility model, by setting a movable pressure plate and adopting a dual fixing method that combines epoxy resin bonding with mechanical tightening of a hole-connected top clamping rod, the problem of drilling holes in the reinforced concrete beam structure for the installation of hangers in the prior art is solved, which damages the main structure of the building and affects its durability and safety. It achieves the technical effect of high-reliability fixing without damaging the beam structure, which is in line with the construction concept of green and energy-saving buildings.
[0018] 3. In this utility model, by setting a bearing pressure bar and applying preload by rotating the pressure bar connecting bolt in the opposite direction, the bearing pressure bar becomes a fully pressure-bearing component. This preload can further tighten the moving pressure plate, solving the problems of limited bearing capacity, insufficient connection rigidity, and easy loosening of existing fixed devices. This achieves the technical effect of greatly improving the overall bearing capacity and rigid connection stability of the device.
[0019] 4. In this utility model, by increasing the rigidity of the hanger rod, the anti-support system in the ceiling structure can be replaced, further saving ceiling materials, reducing project investment, and saving costs. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the three-dimensional structure of the central beam of a green and energy-saving building decorative ceiling device proposed in this utility model; Figure 2 This is a schematic diagram of the three-dimensional structure of the edge beam of a green and energy-saving building decorative ceiling device proposed in this utility model; Figure 3 This is a schematic diagram of the movable pressure plate part of a green and energy-saving building decorative ceiling device proposed in this utility model; Figure 4 This is a schematic diagram of the load-bearing pressure bar structure of a green and energy-saving building decorative ceiling device proposed in this utility model.
[0021] Figure 5 This is a schematic diagram of a perforated connecting and tightening rod structure for a green and energy-saving building decorative ceiling device proposed in this utility model.
[0022] Legend: 1. Epoxy resin; 2. Rubber sheet; 3. Moving pressure plate; 301. Pressure rod tightening circular groove; 302. Pressure plate tightening circular groove; 303. Sliding block; 304. Rubber stop block; 4. Fastening concave nut; 5. Connecting tightening rod with hole; 501. Rotating hole; 6. Upper horizontal brace; 7. First outer horizontal brace; 8. Second outer horizontal brace; 9. Outer vertical diagonal bar; 10. First lower horizontal brace; 11. Upper longitudinal brace; 1101. Longitudinal brace sliding bar. 12. Groove; 13. Lower longitudinal bracing; 14. Second lower transverse bracing; 15. Diagonal bracing; 16. Vertical bar transverse bracing; 17. Bearing compression bar; 18. Compression bar continuous joint; 19. Upper fastening nut on the hanger; 20. Bearing arc-shaped slider nut on the hanger; 11. Protrusion; 22. Lower fastening nut on the hanger; 23. Fixed hanger; 24. Fixed vertical bar; 25. Vertical bar tightening groove; 26. Compression bar connecting bolt; 27. Reinforced concrete beam structure. Detailed Implementation
[0023] To make the objectives, technical solutions, and advantages of this utility model clearer, the technical solutions in the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. All other embodiments obtained by those skilled in the art based on the embodiments of this utility model without creative effort are within the scope of protection of this utility model. Example
[0024] Please refer to Figures 1 to 5This utility model provides a green and energy-saving building decorative ceiling device, which aims to solve the problems of existing ceiling rod fixing methods that rely on drilling holes in the reinforced concrete floor slab structure, resulting in local damage to the main reinforced concrete structure, and the lack of reliability and load-bearing capacity mechanism caused by the aging of the plastic of the expansion bolts connecting the rod device to the reinforced concrete slab.
[0025] This green and energy-saving building decorative ceiling device consists of an even number of upper-opening trapezoidal rigid frames connected by horizontal joints to form a rigid whole. The friction generated by the clamps and the bonding force of the epoxy resin 1 provide the load-bearing capacity. It is used to fix and connect to the reinforced concrete beam structure 23. It includes an upper-opening trapezoidal steel frame, a movable pressure plate 3, a load-bearing pressure bar 16, a fixed hanging bar 20, epoxy resin 1, a perforated connecting top tightening bar 5, a fastening concave nut 4, and a pressure bar connecting bolt 22. The top-opening trapezoidal rigid frame serves as the rigid support skeleton of the device. It is a rigid structure welded together from the upper horizontal bracing 6, the first outer horizontal bracing 7, the second outer horizontal bracing 8, the outer vertical diagonal bracing 9, the first lower horizontal bracing 10, the upper longitudinal bracing 11, the lower longitudinal bracing 12, the second lower horizontal bracing 13, the diagonal bracing 14, the vertical horizontal bracing 15, and the fixed vertical bracing 21. The upper longitudinal link 11 has a longitudinal link groove 1101 along its length direction. The movable pressure plate 3 is slidably engaged in the longitudinal link groove 1101 of the upper longitudinal link 11 through the sliding block 303, realizing the connection between the movable pressure plate 3 and the upper open trapezoidal rigid frame, making it suitable for beams of different widths and facilitating the clamping operation to form pressure. This solution uses a double fixing method to fix the device to the reinforced concrete beam structure 23. The first fixing is chemical bonding, and the top surface of the movable pressure plate 3 is bonded to the side of the reinforced concrete beam structure 23 with epoxy resin 1. The second layer of fixation is mechanical clamping. The fixed vertical rod 21 is provided with a vertical rod clamping groove 2101. One end of the clamping rod 5 with a hole is connected to the vertical rod clamping groove 2101. The fastening concave nut 4 is screwed onto the clamping rod 5 with a hole. The other end of the clamping rod 5 with a hole abuts against the groove of the pressure plate clamping circular groove 302 on the movable pressure plate 3. Through the tightening action of the clamping rod 5 with a hole, the movable pressure plate 3 is mechanically clamped to the side of the reinforced concrete beam structure 23. The bearing pressure rod 16 is extended by the pressure rod connecting bolt 22 and is telescopically connected to the movable pressure plate 3. The pressure rod is pressed into the groove of the circular groove 301. The fixed hanger 20 is connected to the bearing pressure rod 16 by the hanger bearing arc-shaped slider nut 18. The reverse rotation of the pressure rod connecting bolt 22 is used to apply preload between the bearing pressure rod 16 and the movable pressure plate 3, so that the bearing pressure rod 16 forms a fully compressible component and further tightens the movable pressure plate 3, thereby enhancing the overall bearing capacity and connection stability of the device.
[0026] To solve the above-mentioned technical problems, the core of the technical solution of this embodiment is that the green and energy-saving building decorative ceiling device also includes a rubber plate 2, a rubber block 304, a sliding block 303, a pressure rod tightening circular groove 301, a pressure plate tightening circular groove 302, a lower fastening nut 19 for the hanger, a hanger bearing arc-shaped slider nut 18, a protrusion 1801, and an upper fastening nut 17 for the hanger. Furthermore, these components form a specific structural fit and connection relationship with the aforementioned movable pressure plate 3, bearing pressure rod 16, fixed hanger 20, etc. The core structure will be explained in detail below: A rubber plate 2 is provided between the contact surface of the movable pressure plate 3 and the reinforced concrete beam structure 23. The rubber plate 2 is fixed to the movable pressure plate 3 by a rubber stop 304 and the inner side of the movable pressure plate 3. It is used to provide cushioning during fixed connection and to enhance the bonding force between the movable pressure plate 3 and the reinforced concrete beam structure 23. The rubber plate 2 should comply with the material specifications of the current "GB / T 20688.4-2023 Rubber Bearings Part 4: Ordinary Rubber Bearings". Through the epoxy resin 1 and the rubber plate 2, the contact between the movable pressure plate 3 and the side of the reinforced concrete beam structure 23 is made closer and the stress is evenly distributed, and sufficient adhesive shear strength and friction are ensured. The movable pressure plate 3 has a pressure rod tightening circular groove 301 in the middle of the side away from the reinforced concrete beam structure 23. After the bearing pressure rod 16 is connected and extended by the pressure rod connecting bolt 22, the end is screwed into the pressure rod tightening circular groove 301 on the movable pressure plate 3 by screwing in the tightening rod with hole 5. Rotating the pressure rod connecting bolt 22 and the tightening rod with hole 5 makes the bearing pressure rod 16 tighten into the pressure rod tightening circular groove 301 on the movable pressure plate 3. And it is securely connected to the bearing pressure rod 16 and the pressure rod tightening circular groove 301 by two fastening concave nuts 4 respectively. This is equivalent to applying a preload to the bearing pressure rod 16. This embedded fit applies a preload to the bearing pressure rod 16, ensuring that the bearing pressure rod 16 can increase the bearing capacity under stress, stably transmit the preload to the movable pressure plate 3, and prevent lateral displacement. The movable pressure plate 3 is provided with a circular groove 302 for pressing the plate on the side close to the reinforced concrete beam structure 23. The circular groove 302 is circular in shape and distributed on the surface of the movable pressure plate 3. The number and number of rows are determined by calculation based on the load borne by a single load-bearing pressure bar 16. This further enhances the bonding strength between the movable pressure plate 3 and the epoxy resin 1 and the reinforced concrete beam structure 23, ensuring the bonding and pressing effect. The load-bearing pressure rod 16 has a through-length groove 1601 along its length. The fixed hanger 20 is provided with a hanger bearing arc-shaped slider nut 18. The hanger bearing arc-shaped slider nut 18 is provided with a protrusion 1801. The protrusion 1801 is slidably engaged in the through-length groove 1601. This sliding engagement structure allows the fixed hanger 20 to be precisely adjusted in the horizontal position along the length of the load-bearing pressure rod 16, which greatly facilitates on-site installation and calibration. The fixed rod 20 is screwed with a lower rod fastening nut 19, a rod bearing arc-shaped slider nut 18, and a rod upper fastening nut 17 in sequence from bottom to top. The lower rod fastening nut 19 is used to restrict the axial movement of the fixed rod 20 after it is in place, so as to ensure the stable fixation of the rod in the installation position.
[0027] Based on the above embodiments, the present invention may further include the following preferred technical solutions: In a preferred embodiment, to achieve a tightening fit between the perforated connecting clamping rod 5 and the fastening concave nut 4, the outer circumferential surface of the perforated connecting clamping rod 5 is threaded, and the inner small and inner large circumferential surfaces of the fastening concave nut 4 are threaded. The thread on the outer circumferential surface of the perforated connecting clamping rod 5 and the thread on the inner small circumferential surface of the connecting fastening concave nut 4 are screwed together. The thread on the inner large circumferential surface of the connecting fastening concave nut 4 is screwed together with the threads on the outer circumferential surface of the pressure rod tightening circular groove 301, the pressure plate tightening circular groove 302, the bearing pressure rod 16 and the connection end of the pressure rod tightening circular groove 301, and the vertical rod tightening groove 2101. By rotating the fastening concave nut 4, the bearing pressure rod 16 and the pressure rod tightening circular groove 301 are subjected to a tightening force, and the bearing pressure rod 16 generates a preload. As another preferred embodiment, in order to facilitate the application and adjustment of the tightening force, a rotating hole 501 is provided at the end of the tightening rod 5 with the hole away from the fixed vertical rod 21. The shape and size of the rotating hole 501 are adapted to the insertion of the steel rod, so that the operator can rotate the tightening rod 5 with the hole.
[0028] Working principle: During installation, first grind and clean the area to be installed on the side of the reinforced concrete beam structure 23, apply epoxy resin 1 evenly, and then lift the prefabricated upper open trapezoidal rigid frame into place, so that the moving pressure plate 3 slides in the longitudinal groove 1101 of the upper longitudinal connection 11 through the sliding block 303 on it, and aligns with the installation edge line. Next, the operator can insert a steel rod into the rotating hole 501 of the perforated connecting top clamping rod 5, rotate the perforated connecting top clamping rod 5, and move the end away from the fixed vertical rod 21 forward to abut against and push the movable pressure plate 3, so that the movable pressure plate 3 squeezes the epoxy resin 1 through the rubber plate 2 and forms pressure on the side of the reinforced concrete beam structure 23. After the rubber plate 2 on the movable pressure plate 3 is squeezed, it fits tightly against the side of the reinforced concrete beam structure 23, and at the same time, the epoxy resin 1 is evenly distributed. At this time, tighten the fastening concave nut 4 to lock it. After the epoxy resin 1 is cured, it forms a chemical bond, which together with the mechanical tightening force applied by the perforated connecting top clamping rod 5 forms the first double fixation of the reinforced concrete beam structure 23. During installation, the fixed hanger 20 is sequentially inserted into the lower fastening nut 19, the bearing arc-shaped slider nut 18, and the upper fastening nut 17. The protrusion 1801 on the bearing arc-shaped slider nut 18 is aligned with the pressure bar through-slit 1601 of the bearing pressure bar 16 and slid in. After moving to the designed position, the lower fastening nut 19 is tightened to achieve horizontal positioning of the fixed hanger 20 on the bearing pressure bar 16. Finally, the crucial pre-stress is applied by screwing the end of the bearing rod 16 into the perforated connecting clamping rod 5, aligning the other end of the perforated connecting clamping rod 5 with the groove of the rod clamping circular groove 301 on the moving pressure plate 3, and screwing in the rod connecting bolt 22 to extend the bearing rod 16 and rigidly connect the two. Then, by rotating the rod connecting bolt 22 in the opposite direction, the bearing rod 16 is in a state of compression between the grooves of the rod clamping circular groove 301 on the moving pressure plates 3 of the adjacent beams, forming a fully compressed force-bearing component. This pre-stress is transmitted to the moving pressure plate 3 through the bearing rod 16, making it press more tightly against the side of the reinforced concrete beam structure 23, forming a second layer of reinforcement and fixation, which greatly improves the overall load-bearing capacity and stability of the device. Through this double fixation and fully compressed force-bearing structure, this utility model solves the problems of unstable fixing of the hanger, low load-bearing capacity, local damage to the original reinforced concrete structure, and protection of the steel reinforcement protective layer without damaging the beam structure.
[0029] Furthermore, the implementation steps of this utility model are as follows: Step 1: Calculate the load-bearing weight of the architectural ceiling decoration design drawings and structure; Step 2: Optimize the longitudinal and transverse arrangement of the ceiling fixing rods 20 according to the architectural ceiling decoration design drawings and the load weight of the ceiling, and determine the spacing of the load-bearing pressure rods 16; Step 3: According to the spacing of the load-bearing compression members 16, take the short side between two adjacent beams to calculate the load borne by each load-bearing compression member 16, thereby determining the area of the movable pressure plate 3 and the number of pressure plates pressing against the circular grooves 302 according to the middle beam and the side beam, and arranging the number of rows and the number of each row. At the same time, determine the number of frames of the upper open trapezoidal rigid frame and the size of each member of the rigid frame, the segment length of the load-bearing compression members 16, and send them to a specialized manufacturer for production; Step 4: Based on the spacing of the bearing pressure bar 16 and the area of the movable pressure plate 3, make preliminary layout on the middle beam and the side beam to roughly determine the position of the movable pressure plate 3. For the middle beam and side beam with partition walls, remove them appropriately according to the requirements of installing the upper open trapezoidal steel frame. Then, manually grind the area where the movable pressure plate 3 is installed with a grinding wheel to remove the carbonized layer on the concrete surface of the beam. Clean, remove dust and wipe the surface with a damp cotton cloth to ensure that the surface is clean and free of dust. Step 5: Based on the installation position of the load-bearing pressure bar 16, accurately lay out the installation position of the movable pressure plate 3, and pop out the installation edge line of the movable pressure plate 3 on the side of the reinforced concrete beam structure 23. Step 6: Verify the top-opening trapezoidal steel frame produced by the professional manufacturer, and number it according to the installation position and order. At the same time, after tightening the hole-connecting top-tightening rod 5 to the bottom of the groove in the vertical rod top-tightening groove 2101, screw two fastening concave nuts 4 in the opposite direction on the hole-connecting top-tightening rod 5 respectively. Step 7: Purchase epoxy resin 1 according to the technical specifications of GB / T 44543-2024 "Epoxy Adhesive for Precast Concrete Segment Assembly". Prepare epoxy resin 1 according to the instructions at an ambient temperature of 5-40 degrees Celsius. After stirring evenly, apply it evenly to the side of the reinforced concrete beam structure 23 within the installation edge line of the movable pressure plate 3. The coating thickness should be controlled between 1-2 mm. Step 8: Insert the sliding block 303 of the combined plate, which is fixed to the rubber plate 2 on the movable pressure plate 3, into the longitudinal sliding groove 1101. Manually lift the top-opening trapezoidal rigid frame and align it with the installation edge line of the movable pressure plate 3 marked on the side of the reinforced concrete beam structure 23. Then, insert the steel rod into the rotating hole 501 of the perforated connecting top tightening rod 5. Rotate the steel rod so that the perforated connecting top tightening rod 5 pushes into the pressure plate tightening circular groove 302 on the movable pressure plate 3, pushing the movable pressure plate 3 and the rubber plate 2 to fit tightly against the beam and generate pressure. When rotating the steel rod, each perforated connecting top tightening rod 5 should be rotated evenly. After reaching the specified torque, screw the two fastening concave nuts 4 on the perforated connecting top tightening rod 5 into the pressure plate tightening circular groove 302 and the vertical rod tightening groove 2101 respectively, so that the movable pressure plate 3 and the fixed vertical rod 21 are firmly connected and prevented from loosening. The rubber sheet 2 is bonded to the movable pressure plate 3 using the epoxy adhesive. Before bonding, the bonding surface of the movable pressure plate 3 is roughened by sandblasting, degreased, and cleaned, and the surface is kept dry. Epoxy resin 1 is prepared according to the epoxy adhesive instructions at an ambient temperature of 5-40 degrees Celsius. After stirring evenly, it is evenly applied to the bonding surface of the movable pressure plate 3 and the inner side of the rubber block 304, with the coating thickness controlled between 1-2 mm. The rubber sheet 2 is then bonded to the evenly applied epoxy resin, and pressure is evenly applied to the entire surface of the rubber sheet 2. The epoxy resin is allowed to cure for at least 24 hours.
[0030] Step 9: Next, according to the number of fixed hangers 20 installed on each section of the bearing pressure rod 16, tighten the lower fastening nut 19, the bearing arc-shaped slider nut 18, and the upper fastening nut 17 on one end of the fixed hanger 20. At the same time, rotate the upper fastening nut 17 to press it tightly against the bearing arc-shaped slider nut 18. Then, align the protrusion 1801 of the bearing arc-shaped slider nut with the pressure rod through-slit 1601 and slide it into the bearing pressure rod 16. Position the fixed hanger 20 according to its position and tighten the lower fastening nut 19 to fix the fixed hanger 20. Step 10: After screwing the pressure rod connecting bolt 22 into the extended bearing pressure rod 16, tighten the hole-connected top-tightening rod 5 at the connection end with the pressure rod tightening circular groove 301. At the same time, screw two fastening concave nuts 4 in the opposite direction on the hole-connected top-tightening rod 5. Insert a steel rod into the rotating hole 501 and rotate the steel rod so that the hole-connected top-tightening rod 5 pushes into the bottom of the pressure rod tightening circular groove 301 on the movable pressure plate 3. Step 11: Insert a steel bar into the longitudinal joint 1601 of the pressure bar, rotate the bearing pressure bar 16 to make the fixed hanger 20 vertical downward, insert steel bars into the longitudinal joint 1601 of the pressure bar at both ends of the pressure bar connecting bolt 22 and stabilize them, rotate the pressure bar connecting bolt 22 in the opposite direction to make the bearing pressure bar 16 partially unscrewed from the pressure bar connecting bolt 22, further tightening the movable pressure plate 3, and at the same time making the bearing pressure bar 16 form a fully compressed component, increasing the bearing capacity and the lateral pressure of the movable pressure plate 3 on the reinforced concrete beam structure 23; Step 12: Tighten the two fastening concave nuts 4 on the perforated connecting clamping rod 5 that connects the bearing pressure rod 16 and the clamping circular groove 301 to the bearing pressure rod 16 and the clamping circular groove 301 respectively, so that the moving pressure plate 3 and the bearing pressure rod 16 are effectively connected and the load is transferred. Step 13: Accurately calibrate the position of the fixed hanger 20 and restore the removed partition wall; Step 14: After the installation of the fixed hanger 20 is completed, install the main keel and secondary keel on the fixed hanger 20 according to the construction design drawings, and then carry out the subsequent construction procedures of the ceiling.
[0031] The above description is merely a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this utility model should be included within the protection scope of this utility model. Therefore, the protection scope of this utility model should be determined by the protection scope of the claims.
Claims
1. A green and energy-saving building decorative ceiling device, characterized in that, include: The upper-opening trapezoidal rigid frame is composed of an upper horizontal brace (6), a first outer horizontal brace (7), a second outer horizontal brace (8), an outer vertical diagonal bar (9), a first lower horizontal brace (10), an upper longitudinal brace (11), a lower longitudinal brace (12), a second lower horizontal brace (13), a diagonal brace (14), a vertical bar horizontal brace (15), and a fixed vertical bar (21) welded together. The upper longitudinal brace (11) is provided with a longitudinal brace groove (1101) for sliding connection, and the fixed vertical bar (21) is provided with a vertical bar tightening groove (2101). A tightening rod with a hole is connected in the vertical bar tightening groove (2101). The movable pressure plate (3) is slidably fitted in the longitudinal groove (1101) of the upper longitudinal joint (11) by means of the sliding block (303), and its top surface is bonded to the side of the reinforced concrete beam structure (23) by epoxy resin (1). Mechanical clamping mechanism: includes a perforated connecting clamping rod (5) with one end connected to the vertical rod clamping groove (2101) on the fixed vertical rod (21), and the other end abutting against the pressure plate clamping circular groove (302) on the movable pressure plate (3). Bearing and prestressing mechanism: includes a bearing pressure bar (16) and a pressure bar connecting bolt (22) for extending it and allowing the bearing pressure bar (16) to extend and retract by rotation, and connected to the pressure bar pressing a circular groove (301) on the movable pressure plate (3) of the other end beam. Fixed hanger (20): A hanger is screwed into the hanger bearing arc-shaped slider nut (18) and connected to the bearing pressure rod (16); Pressure bar connecting bolt (22): Pre-pressure is applied between the bearing pressure bar (16) and the pressure bar abutting circular groove (301) on the movable pressure plate (3) by rotating in the opposite direction.
2. The green and energy-saving building decorative ceiling device according to claim 1, characterized in that, The movable pressure plate (3) is distributed in at least two rows in the horizontal direction. Each row is provided with at least one pressure plate tightening circular groove (302) at the top and bottom. The pressure plate tightening circular groove (302) is circular inside and out, and has threads on the outside for connection with the fastening concave nut (4). The two inner holes of the fastening concave nut (4) are both made with threads. The thread of the small inner hole is used to connect with the tightening rod (5) with holes, and the thread of the large inner hole is used to connect with the pressure rod tightening circular groove (301), the pressure plate tightening circular groove (302), the vertical rod tightening groove (2101), and the bearing pressure rod (16). The pressure rod tightening circular groove (301) is provided in the middle of the outer side of the movable pressure plate (3), and the threads are arranged on the outer side. There is a rubber stop (304) at the top and a sliding block (303) is provided at the bottom corresponding to the longitudinal connecting groove (1101) of the upper longitudinal connecting (11) to adapt to beams of different widths. The movable pressure plate (3) is fixedly connected to the rubber plate (2).
3. The green and energy-saving building decorative ceiling device according to claim 2, characterized in that, The rubber plate (2) is fixed to the movable pressure plate (3) by the rubber stop (304) and the inner side of the movable pressure plate (3).
4. The green and energy-saving building decorative ceiling device according to claim 1, characterized in that, The bearing pressure rod (16) has a through-slit (1601) along its length. The connecting end of the bearing pressure rod (16) and the pressure rod on the movable pressure plate (3) with the pressure rod pressing the circular groove (301) is provided with internal and external threads. The hanging rod bearing arc-shaped slider nut (18) is provided with a protrusion (1801). The protrusion (1801) can slide in the through-slit (1601) of the pressure rod.
5. The green and energy-saving building decorative ceiling device according to claim 4, characterized in that, The fixed hanger (20) is a continuous threaded rod, on which the lower fastening nut (19), the arc-shaped slider nut (18), and the upper fastening nut (17) of the fixed hanger (20) are screwed in sequentially from bottom to top. The lower fastening nut (19) of the fixed hanger (20) is used to restrict the movement of the fixed hanger (20) along the continuous joint (1601) of the pressure rod after the fixed hanger (20) is in place.
6. The green and energy-saving building decorative ceiling device according to claim 1, characterized in that, The movable pressure plate (3) is provided with a pressure rod tightening circular groove (301) at the middle of the outer side of the reinforced concrete beam structure (23). The bearing pressure rod (16) is connected to the inner side of the connection end of the pressure rod tightening circular groove (301) on the movable pressure plate (3) by an internal thread. The end of the bearing pressure rod (16) is connected to the tightening rod (5) with a hole by a connection rod (5). The rod is then connected to the pressure rod tightening circular groove (301) and the bearing pressure rod (16) by two fastening concave nuts (4). The pressure rod connecting bolt (22) is used to connect the bearing pressure rods (16) to each other and apply preload.
7. The green and energy-saving building decorative ceiling device according to claim 1, characterized in that, The mechanical tightening mechanism also includes a fastening concave nut (4). The outer circumferential surface of the tightening rod (5) with holes is threaded. The inner small and inner large circumferential surfaces of the fastening concave nut (4) are threaded. The outer circumferential surface thread of the tightening rod (5) with holes is screwed into the inner small circumferential surface thread of the fastening concave nut (4). The inner large circumferential surface thread of the fastening concave nut (4) is screwed into the outer circumferential surface thread of the pressure rod tightening circular groove (301), the pressure plate tightening circular groove (302), the bearing pressure rod (16) and the pressure rod tightening circular groove (301) connection end, and the vertical rod tightening groove (2101) are screwed into the outer circumferential surface thread. The end of the tightening rod (5) with holes away from the fixed vertical rod (21) is provided with a rotating hole (501).
8. The green and energy-saving building decorative ceiling device according to claim 1, characterized in that, The movable pressure plate (3) is provided with a circular groove (302) for pressing the plate against the outer side of the reinforced concrete beam structure (23).