A dual-function cast-in-place pile for the reconstruction of existing tunnels with two layers
By adopting an integrated design of cast-in-place piles and capping beams in existing tunnels, a dual function of integrated load-bearing and support is formed, solving the problems of a large number of piles and the lack of coordination of independent pile forces, and realizing efficient, safe construction and structural stability of the double-layer renovation of existing tunnels.
Patent Information
- Application Number
- CN202522749642.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-25
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-25
AI Technical Summary
In existing technologies for the reconstruction of double-layer tunnels, the large number of piles leads to complicated construction procedures, which can easily cause conflicts between procedures, increase the risk of surrounding rock collapse, and result in insufficient overall lateral stiffness due to the lack of a coordinated force-bearing mechanism between independent piles, making it unsuitable for the stress characteristics of double-layer tunnels.
The tunnel employs cast-in-place piles spaced longitudinally along the tunnel. These piles are integrally cast with the capping beam, forming a lateral protective barrier and a transverse rigid load-bearing beam, integrating load-bearing and support functions. The top of the cast-in-place piles is anchored to the upper tunnel slab, forming a closed-loop force structure of "pile-beam-upper structure".
Simplify construction procedures, reduce the number of piles, improve overall lateral stiffness, ensure that the upper and lower structures are linked to bear the load, reduce the risk of surrounding rock collapse, and improve construction efficiency and structural stability.
Smart Images

Figure CN224982909U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of tunnel construction technology, specifically a dual-function cast-in-place pile for the double-layer reconstruction of existing tunnels. Background Technology
[0002] In urban transportation upgrade and renovation projects, the need to expand and upgrade existing tunnels into double-layer tunnels is becoming increasingly urgent. Such projects are strictly limited by the boundaries of urban built-up areas, resulting in extremely narrow construction space inside the tunnels. Moreover, most tunnels need to pass through areas of weak surrounding rock, which has poor stability and complex load transfer paths, posing many challenges to the renovation and construction.
[0003] In traditional reconstruction schemes, the structural self-weight of the upper tunnel and the vertical load of the arch surrounding rock need to be borne by specially installed load-bearing piles, while the lateral pressure from the weak surrounding rock faced during the excavation of the lower tunnel needs to be resisted by separate support piles, forming a separate pile structure of "load-bearing piles + support piles". This design has significant drawbacks: First, the large number of piles leads to complicated construction procedures, which can easily cause overlapping and conflicting procedures within the limited space of the existing tunnel, significantly extending the construction period; Second, the continuous construction of multiple sets of piles will cause repeated disturbances to the already unstable weak surrounding rock, significantly increasing the risk of surrounding rock collapse; Third, the lack of an effective coordinated force-bearing mechanism between independent piles results in insufficient overall lateral stiffness, making it difficult to adapt to the stress characteristics of the interconnected upper and lower structures of the double-layer tunnel.
[0004] In existing technologies, although there are application scenarios of combined cast-in-place piles and capping beams (such as temporary support for tunnel entry), none of them have achieved the core design of "integrating the dual functions of load bearing and support in the same pile body". Furthermore, they have not optimized the structural synergy for the special spatial conditions and stress requirements of existing double-layer tunnel renovation, and cannot solve the problems of low construction efficiency, high safety risks, and unreasonable stress caused by separate pile bodies. Utility Model Content
[0005] The purpose of this utility model is to provide a dual-function cast-in-place pile for the double-layer reconstruction of existing tunnels, so as to solve the technical problems mentioned in the background art.
[0006] To achieve the above objectives, the technical solution provided by this utility model is as follows: A dual-function cast-in-place pile for the reconstruction of an existing tunnel with two layers includes cast-in-place piles arranged at intervals along the longitudinal direction of the tunnel. The cast-in-place piles are distributed on both sides of the tunnel and are attached to the excavation outline of the lower tunnel to form a lateral protective barrier. A capping beam is connected to the top of the cast-in-place pile on the same side, and the cast-in-place pile and the capping beam are integrally cast. The capping beam is connected to the middle plate of the upper tunnel, and the capping beam completely wraps and connects the top of the cast-in-place pile on the same side to form a transverse rigid load-bearing beam.
[0007] Preferably, the top of the cast-in-place pile is provided with a steel bar connector that is anchored to the upper tunnel slab and secondary lining structure.
[0008] Preferably, the main reinforcement bar at the top of the cast-in-place pile extends out of the pile body and into the casting area of the capping beam, and the main reinforcement bar at the top of the cast-in-place pile is tied and fixed to the main reinforcement bar of the capping beam.
[0009] Preferably, the main reinforcement bar at the top of the cast-in-place pile extends 35Dcm beyond the pile body.
[0010] Preferably, the crown beam has a pre-embedded steel bar in the middle section for connection with the middle slab of the upper tunnel.
[0011] Preferably, the diameter of the cast-in-place pile is 800-1200 mm.
[0012] Preferably, the pile bottom is embedded in stable rock strata for no less than 2m.
[0013] Compared with the prior art, the beneficial effects of this utility model are as follows: 1. This utility model directly forms a lateral protection barrier by arranging cast-in-place piles at intervals along the longitudinal direction of the tunnel on both sides of the tunnel and fitting them with the outline of the lower tunnel excavation. This barrier can resist the lateral pressure and deformation of the surrounding rock during the lower excavation in advance, eliminating the need for additional support piles. Furthermore, it breaks through the limitation of the traditional single function of piles by integrating the upper load-bearing and lower support functions into the same cast-in-place pile, saving the construction of independent support piles or load-bearing piles. This simplifies the structural system and reduces the number of piles to be constructed within the limited space of the existing tunnel. 2. In this utility model, the top of the same-side cast-in-place pile is integrally cast with the capping beam, and the capping beam completely wraps around the pile top to form a transverse rigid load-bearing beam, integrating the scattered single piles into a group pile force system, which significantly improves the overall lateral stiffness. 3. The cap beam of this utility model is connected to the middle plate of the upper tunnel, forming a closed loop of force of "pile-beam-upper structure", which ensures that the upper and lower structures are linked to bear force, effectively adapts to the force requirements of double-layer tunnels, and avoids the problem of load transfer breakpoints caused by poor connection between independent piles and structure. Attached Figure Description
[0014] To more clearly illustrate the technical solutions of the embodiments of this utility model, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0015] Figure 1 This is a schematic diagram of the structure of the cast-in-place pile of this utility model applied in a tunnel.
[0016] The attached diagram lists the components represented by each number as follows: 1. Cast-in-place piles; 2. Crown beam; 3. Lower tunnel; 4. Upper tunnel; 5. Intermediate slab; 6. Secondary lining structure. Detailed Implementation
[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present utility model.
[0018] like Figure 1 As shown: Embodiment 1 of this utility model is as follows: A dual-function cast-in-place pile for the reconstruction of existing tunnels includes cast-in-place piles 1 arranged at intervals along the longitudinal direction of the tunnel. The cast-in-place piles 1 are distributed on both sides of the tunnel and fit with the excavation outline of the lower tunnel 3 to form a lateral protective barrier. The top of the cast-in-place piles 1 on the same side is connected to a capping beam 2, and the cast-in-place piles 1 and capping beam 2 are integrally cast. The capping beam 2 is connected to the middle plate 5 of the upper tunnel 4, and the capping beam 2 completely wraps and connects the top of the cast-in-place piles 1 on the same side to form a transverse rigid load-bearing beam.
[0019] Specifically, the top of the cast-in-place pile 1 is equipped with a steel rebar connector that is anchored to the middle plate 5 and secondary lining structure 6 of the upper tunnel 4.
[0020] As can be seen from the above description, the steel bar connector installed at the top of the cast-in-place pile achieves a reliable anchoring connection with the upper tunnel slab and secondary lining structure, ensuring that the self-weight of the upper tunnel structure and the vertical load transmitted by the arch surrounding rock can be directly and efficiently transferred to the cast-in-place pile. This avoids load transfer failure or structural settlement caused by loose connection, ensures the load-bearing stability of the upper tunnel, simplifies the connection process between the pile and the upper structure, and improves construction efficiency.
[0021] Specifically, the main reinforcement bar at the top of the cast-in-place pile 1 extends out of the pile body and into the casting area of the capping beam 2, and the main reinforcement bar at the top of the cast-in-place pile 1 is tied and fixed to the main reinforcement bar of the capping beam 2.
[0022] As can be seen from the above description, the main reinforcement bars at the top of the cast-in-place pile extend out and are tied and fixed to the main reinforcement bars of the capping beam, forming a mechanical interlocking connection between the pile body and the capping beam. Combined with the integrated casting process, this ensures that the two deform together and are stressed synchronously, avoiding stress concentration or poor load transfer at the pile-beam connection. This connection method enhances the integrity of the pile-beam composite structure, makes the synergistic stress effect of the pile group more significant, and further improves the structure's resistance to lateral displacement and bearing reliability.
[0023] Specifically, the main reinforcement bar at the top of the cast-in-place pile 1 extends 35 cm beyond the pile body.
[0024] As can be seen from the above description, it not only ensures the effective binding length of the main reinforcement and the main reinforcement of the cap beam to meet the connection strength requirements, but also avoids construction interference caused by excessive extension of the main reinforcement or unreliable connection risk caused by excessive extension. It provides accurate construction parameter basis for the integrated molding of pile and beam, and ensures the stability and consistency of structural connection quality.
[0025] Specifically, the middle part of the crown beam 2 has a pre-embedded steel bar that connects to the middle plate 5 of the upper tunnel 4.
[0026] As can be seen from the above description, the reliability of the connection with the upper tunnel slab has been further enhanced, making the cast-in-place pile-cap beam-slab form a more stable stress closed loop; the pre-embedded steel bars are pre-set, avoiding damage to the cap beam structure caused by drilling and planting steel bars later, while simplifying the construction process, ensuring the connection accuracy between the upper structure and the cap beam, effectively dispersing the upper load, reducing local stress concentration in the structure, and ensuring the structural stability during long-term operation.
[0027] Specifically, the diameter of the cast-in-place pile 1 is 800-1200mm.
[0028] As can be seen from the above description, this size range is determined based on the precise calculation of the upper layer's load-bearing requirements and the lower layer's support strength. It can meet the bearing requirements of the upper tunnel structure's self-weight and the vertical load of the surrounding rock, and provide sufficient lateral stiffness to resist the lateral pressure of the lower surrounding rock. This avoids the problems of excessive construction space occupation and material waste caused by excessively large pile diameters, or the risk of insufficient strength caused by excessively small pile diameters, and is suitable for the narrow construction space conditions of existing tunnels.
[0029] Specifically, the bottom of the cast-in-place pile 1 should be embedded in stable rock strata for no less than 2m.
[0030] As can be seen from the above description, it can ensure that the cast-in-place piles obtain a reliable bearing foundation, effectively disperse vertical loads, and avoid excessive settlement or instability of the pile body. At the same time, the pile body that penetrates into stable rock layers can resist greater lateral thrust, further improving the support effect. It is especially suitable for areas with weak surrounding rock, reducing the risk of pile body instability caused by deformation of the surrounding rock, and ensuring the safety and stability of the structure during the construction period and long-term operation period.
[0031] The specific construction process and force principle of the above-mentioned cast-in-place piles are as follows: 1) Within the existing tunnel, at the boundary between the upper and lower tunnel levels, cast-in-place piles (800-1200mm in diameter) are laid longitudinally at intervals along the tunnel. The pile bottoms are embedded at least 3m into stable rock strata to ensure load-bearing stability. Low-clearance pile driving equipment is used during the construction of cast-in-place pile 1, and a "skip-pile" technique is implemented (constructing piles at 1-2 intervals) to reduce concentrated disturbance to the weak surrounding rock caused by continuous pile driving, adapting to the narrow working space of the existing tunnel. Simultaneously, the pre-embedded reinforcing bars in the capping beam are precisely connected to the upper tunnel slab, forming an integrated load-bearing system of "cast-in-place piles - capping beam - upper tunnel structure," ensuring uninterrupted load transfer. Vertical load path: upper tunnel structure → middle slab → capping beam → cast-in-place piles → stable rock strata; Lateral load path: Lateral pressure of lower surrounding rock → cast-in-place piles → capping beam → group piles working together to resist; Ultimately, the deformation of the weak surrounding rock was controlled within 3mm, and the long-term structural settlement met the specifications, satisfying the safety, efficiency, and economic needs of the existing tunnel double-layer renovation.
[0032] The cast-in-place pile 1 after construction has a dual function: The upper part serves as a load-bearing pile: it is anchored to the upper tunnel slab and secondary lining through the steel bar connector at the top, directly bearing the self-weight of the upper tunnel structure and the vertical load transmitted by the arch surrounding rock, and transferring the load along the pile body to the stable rock layer to avoid settlement of the upper structure. The lower part serves as a support pile: the pile body conforms to the outline of the lower tunnel excavation, forming a lateral support barrier in advance before the lower tunnel is excavated, and using the rigidity of the pile body to resist the lateral pressure and deformation of the weak surrounding rock, thus limiting the displacement of the surrounding rock.
[0033] 2) Coordinated load-bearing: After the cast-in-place piles on both sides reach their design strength, a reinforced concrete capping beam (600mm × 800mm cross-section) is poured on top of the piles. The main reinforcement bars at the top of the cast-in-place piles extend 35D and are tied and fixed to the main reinforcement bars of the capping beam before being cast integrally. The capping beam completely encloses and connects the cast-in-place piles scattered on the same side, forming a transverse rigid load-bearing beam, transforming the originally independently load-bearing single piles into a group pile coordinated load-bearing system. When the surrounding rock generates lateral thrust, the lateral pressure borne by a single cast-in-place pile is transmitted to all cast-in-place piles on the same side through the capping beam, thereby dispersing and dissipating the lateral pressure and significantly improving the overall lateral stiffness. The upper vertical load is transferred to the capping beam through the middle plate, and then evenly distributed to each cast-in-place pile by the capping beam, so as to avoid local damage caused by excessive stress on a single pile.
[0034] In this utility model, unless otherwise explicitly specified and limited, the terms "installation", "setting", "connection", "fixing", "screw connection", etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal connection of two components or the interaction between two components. Unless otherwise explicitly limited, those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0035] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that modifications may be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A double-function cast-in-place pile for reconstruction of an existing tunnel double-deck, characterized by: The tunnel includes cast-in-place piles (1) spaced along the longitudinal direction of the tunnel. The cast-in-place piles (1) are distributed on both sides of the tunnel and fit into the excavation outline of the lower tunnel (3) to form a lateral protective barrier. The top of the cast-in-place piles (1) on the same side is connected to a capping beam (2), and the cast-in-place piles (1) and the capping beam (2) are integrally cast. The capping beam (2) is connected to the middle plate (5) of the upper tunnel (4), and the capping beam (2) completely wraps and connects the top of the cast-in-place piles (1) on the same side to form a transverse rigid load-bearing beam.
2. The dual-function cast-in-place pile for reconstruction of an existing tunnel according to claim 1, characterized in that: The top of the cast-in-place pile (1) is provided with a steel bar connector that is anchored to the middle plate (5) of the upper tunnel (4) and the secondary lining structure (6).
3. The dual-function cast-in-place pile for reconstruction of an existing tunnel according to claim 1, characterized in that: The main reinforcement bar at the top of the cast-in-place pile (1) extends out of the pile body and into the casting area of the capping beam (2), and the main reinforcement bar at the top of the cast-in-place pile (1) is tied and fixed to the main reinforcement bar of the capping beam (2).
4. A dual-function cast-in-place pile for the double-layer reconstruction of existing tunnels according to claim 3, characterized in that: The main reinforcement bar at the top of the cast-in-place pile (1) extends 35Dcm beyond the pile body.
5. A dual-function cast-in-place pile for the double-layer reconstruction of existing tunnels according to claim 1, characterized in that: The crown beam (2) has a pre-embedded steel bar in the middle that is connected to the middle plate (5) of the upper tunnel (4).
6. A dual-function cast-in-place pile for the double-layer reconstruction of existing tunnels according to claim 1, characterized in that: The diameter of the cast-in-place pile (1) is 800-1200mm.
7. A dual-function cast-in-place pile for the double-layer reconstruction of existing tunnels according to claim 1, characterized in that: The bottom of the cast-in-place pile (1) is embedded in a stable rock layer for no less than 2m.