Graphical user interface for fly ash solidification automatic control system for electronic equipment
CN309050714SActive Publication Date: 2025-01-03JIANGSU TIANYING ENVIRONMENTAL PROTECTION ENERGY COMPLETE EQUIP CO LTD +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202430330175.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Designs(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2039-05-31
Smart Images

Figure 000001_ABST
Abstract
1. Name of the product of this design: Graphical user interface of fly ash solidification automatic control system for electronic equipment. 2. Purpose of the product of this design: an electronic device. 3. The key design point of this design product lies in the displayed graphical user interface content. 4. The picture or photo that best illustrates the key points of the design: main view. 5. Purpose of the graphical user interface: The graphical user interface of this design product is used for the industrial computer configuration interface for real-time monitoring and control of the fly ash solidification production line, including: full-process monitoring interface diagram, solution preparation interface diagram, metering and stirring interface diagram, ash silo heating interface diagram, dust removal system interface diagram, weighing calibration interface diagram, alarm setting interface diagram, etc. 6. Description of the changing state of the graphical user interface: The graphical user interface for full-process monitoring is the main interface of the product, which includes functions such as date and time, fault alarm prompt bar, and full-process monitoring display of the fly ash solidification process. Click F2 Solution Preparation below to jump to the interface change state diagram 1; Interface change state diagram 1 is the solution preparation interface, including the selection of manual and automatic control mode, chelating agent automatic preparation process control and display, and display of each tank liquid level. Click F3 Metering and Stirring below to jump to the interface change state diagram 2; Interface change state diagram 2 is the metering and stirring interface, including the total control Click F4 ash bin heating below to jump to the interface change state diagram 3; Interface change state diagram 3 is the ash bin heating interface, including ash bin temperature display, ash bin heater remote and operation status display, ash bin heating automatic enable button, etc. Click F5 dust removal system below to jump to the interface change state diagram 4; Interface change state diagram 4 is the dust removal system interface, which is the pulse dust removal control interface of the fly ash bin and cement bin, including the dust removal system start and stop control buttons of the two bins, pulse Click F6 weighing calibration below to jump to the interface change state diagram 5; Interface change state diagram 5 is the weighing calibration interface, including the single weighing sensor measurement display, zeroing function button, integrated correction value display and other functions of the three metering tanks: fly ash metering tank, cement metering tank and chelating agent solution metering tank. Click F8 alarm setting below to jump to the interface change state diagram 6; Interface change state diagram 6 is the alarm setting interface, which is the upper and lower limit alarm value setting for each detection value, including the upper and lower limits of the ash silo wall temperature, and the upper limit setting of the liquid level of the solution preparation tank and the storage tank. , setting the weighing upper limits of the three metering tanks and other functions. Click the report icon below to jump to the interface change status diagram 7; Interface change status diagram 7 is the data report interface, which is the data report interface of the main sensors, including communication status display, date and time, and fault alarm prompt bar. It is mainly for preparation of liquid level, storage liquid level, fly ash bin wall temperature, fly ash weighing and other display functions. Click the alarm icon below to jump to the interface change status diagram 8; Interface change status diagram 8 alarm interface, which is the display interface of system alarms and faults, including fault alarm date, fault alarm time, and other functions.
Need to check novelty before this filing date? Find Prior Art
