Production line for precast box girders
The precast box girder production line optimizes station arrangement and uses a carrier car system to enhance automation and efficiency, addressing high construction costs and low production efficiency in traditional methods.
Patent Information
- Application Number
- DE202024104543
- Authority / Receiving Office
- DE · DE
- Patent Type
- Utility models
- Current Assignee / Owner
- Priority Date
- 2023-08-15
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2034-08-31
AI Technical Summary
Traditional precast box beam production methods suffer from high construction costs, low automation, low production efficiency, and inefficient steam curing, with multiple processes occurring simultaneously at each station, leading to prolonged construction times and high fuel consumption.
A precast box girder production line that optimizes station arrangement by integrating formwork assembly and casting, incorporating a carrier car system for decentralized station transfers, and utilizing a combined system of bottom and side forms to streamline processes such as formwork installation, concrete pouring, and reinforcement cage insertion.
Significantly improves production efficiency by reducing workflow time, enhancing automation, and decreasing construction costs, while minimizing the need for on-site labor and fuel consumption.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[0001] The invention relates to the technical field of prefabrication of box girders, in particular a production line for prefabricated box girders.
[0002] In the construction of highway and railway bridges in China, the box girder is one of the most important structural members. The earliest construction method was cast-in-place concrete, which is associated with long construction periods, significant traffic impacts, high overall energy consumption, large numbers of on-site construction workers, and high labor intensity. Over time, the concept of the prefabricated bridge structure emerged. This concept involves prefabricated box girders in a standardized central prefabrication facility and manufactured simultaneously with the bridge substructure. These girders are transported to the designated site by girder trucks and assembled by the bridge builders. This type of prefabricated bridge structure has proven highly efficient.With the development of construction techniques and technologies, centralized prefabrication of box girders in girder manufacturing plants has become widespread and has gradually evolved from traditional prefabrication on fixed platforms to assembly line production.
[0003] The traditional precast box girder is prefabricated by the fixed table method, that is, from the reinforcement cage into the formwork, formwork, pouring to the completion of prestressing, everything is carried out in one table. At present, this prefabrication technology is mature, but the shortcomings are obvious, the main problems are as follows: high construction cost, low automation level of machinery and equipment, low production efficiency, low efficiency of steam curing, and a number of stations at the same time, which requires the concrete to be transported in tank trucks from the mixing station to the pouring site, low efficiency, and large fuel consumption.
[0004] In the currently developed production method, the production line is divided into the bottom formwork entry station, the closing and pouring station, the inner formwork entry and exit station, the maintenance prestressing station, the steam treatment station and the prestressing station, to a certain extent, there is also the problem of insufficient production efficiency, that is,In order to save space in the precast plant, it is still necessary to carry out a series of processes simultaneously in one station, especially in the formwork pouring station, where the placing of the bottom formwork, closing and grinding of the side formwork, applying the coating agent, placing the reinforcement cage, placing the inner formwork, closing the end formwork, installing the embedded parts, and pouring and final setting of the concrete must be carried out. When the strength of the box girder reaches the strength of dismantling the girder formwork, and the dismantling of the formwork is completed before entering the next station, this process takes up too much time in the production line, so that the capacity advantage of the production line is not fully utilized. Therefore, it is necessary to further rationalize the arrangement of workstations to improve the productivity of the box girder production line.
[0005] This invention shows a precast box girder production line that appropriately optimizes the arrangement of the stations of the production line and contributes to significantly improving the production efficiency of the precast box girder production line.
[0006] To achieve the above-mentioned purpose, the invention offers the following technical solutions: A precast box girder production line comprising a box girder production line unit, the box girder production line unit comprising a formwork assembly and pouring station, an inner formwork entry and exit station, a maintenance prestressing station, a steam treatment station, a prestressing and reinforcement cage insertion station arranged sequentially, an inner formwork escape table being provided on the outside of the inner formwork entry and exit station; wherein the formwork assembly and pouring station is used to complete the installation of the inner and end forms, as well as the pouring and final setting of the concrete and the removal of the end forms in a combined system of bottom and side forms with installed reinforcement cages; wherein the inner formwork entry and exit stations serve to interact with the inner formwork exit and entrance and provide space for the combined bottom and side formwork system to return to the formwork assembly and pouring stations; wherein the maintenance prestressing station serves to condition the box girder transferred from the formwork assembly and casting station with steam for the prestressing force of the box girder, to prestress the strand bundles for bundling and prestressing and to remove the inner formwork from the formwork; wherein the steam treatment station serves to steam cure the box girder transferred from the maintenance prestressing station to achieve prestress strength; the prestressing and reinforcement cage insertion station serves to carry out the prestressing of the box girder transferred from the steam treatment station and, after demoulding and transfer of the box girder, to complete the installation of the reinforcement cage into the combined system of base and side moulds; The inner formwork escape table is used to temporarily store and avoid the inner formwork of the box girder.
[0007] Preferably, an end formwork deflection table is provided at an end of the formwork assembly and pouring station remote from the inner formwork entry and exit station; wherein an end formwork deflection table is also provided at an end of the inner formwork deflection table proximate the formwork assembly and pouring station.
[0008] Preferably, a concrete mixing plant is provided on the outside of the formwork assembly and pouring station, wherein a feed track is provided between the concrete mixing plant and the formwork assembly and pouring station. Preferably, a carrier carriage traverse zone is also provided in front of the prestressing and reinforcement cage insertion station; further comprising a circulation line unit provided on one side of the box girder production line unit or between two of the box girder production line units and extending from the carrier carriage traverse zone to the inner formwork entry and exit station to provide a space for transferring the movement of the carrier carriage and the transfer of the combined system of bottom and side forms from the prestressing and reinforcement cage insertion station back to the inner formwork entry and exit station.
[0009] Preferably, the transfer of the combined system of bottom and side formwork between the formwork assembly and pouring station, the inner formwork entry and exit station, the maintenance prestressing station, the steam treatment station and the prestressing and reinforcement cage insertion station is carried out by means of a carrier carriage;
[0010] wherein the formwork assembly and pouring station, the maintenance prestressing station, the steam treatment station and the prestressing and reinforcement cage insertion station are provided with at least two strip footings to support the combined bottom and side formwork system after the carrier carriage has moved the combined bottom and side formwork system into place. Preferably, the transfer of the combined system of bottom and side formwork between the formwork assembly and pouring station, the inner formwork entry and exit station, the maintenance prestressing station, the steam treatment station, the prestressing and reinforcement cage insertion station, the carrier carriage traverse zone and the circulation line unit is carried out by means of a carrier carriage;
[0011] wherein the formwork assembly and pouring station, the maintenance prestressing station, the steam treatment station and the prestressing and reinforcement cage insertion station are provided with at least two strip footings to support the combined bottom and side formwork system after the carrier carriage has moved the combined bottom and side formwork system into place.
[0012] More preferably, the carrier carriage comprises a carrier carriage frame, carrier carriage rollers and carrier carriage jacks, the carrier carriage frame being adapted to the length of the combined system of bottom and side formwork, a plurality of carrier carriage rollers being rolled and connected thereunder, and a plurality of rows of carrier carriage jacks being provided at intervals thereabove.
[0013] More preferably, each row of carrier jacks is provided with at least three carrier jacks, one of the carrier jacks being provided on the central axis of the carrier truck frame and the other two being symmetrical with respect to the central axis of the carrier truck frame.
[0014] Preferably, the combined bottom and side formwork system comprises a bottom formwork, a side formwork, and a longitudinal connecting element for the bottom formwork, wherein a downwardly projecting longitudinal connecting plate for the bottom formwork is provided on both sides of the bottom formwork, and wherein the longitudinal connecting plate for the bottom formwork is spaced apart from one another with a plurality of longitudinal connecting holes for the bottom formwork; wherein a downwardly projecting longitudinal connecting plate for the side formwork is provided on a lower side edge of the side formwork, wherein the longitudinal connecting plate for the side formwork is spaced apart with a plurality of longitudinal connecting holes for the side formwork;wherein the longitudinal connecting element for the bottom form passes through the longitudinal connecting holes for the bottom form and the longitudinal connecting holes for the side form and is fastened such that the side form is fastened on both sides of the bottom form, wherein the longitudinal connecting element for the bottom form comprises a combination of a screw and a nut;
[0015] wherein the bottom formwork comprises a bottom formwork panel, wherein bottom formwork support beams are attached at intervals below the bottom formwork panel, wherein the bottom formwork support beams extend along the length of the bottom formwork panel and have a length corresponding to the length of the bottom formwork panel; wherein the side formwork comprises a side formwork panel, wherein side formwork support beams are attached at intervals to the outer sides of the side formwork panel, wherein the side formwork support beams extend along the length of the side formwork panel and have a length corresponding to the length of the side formwork panel.
[0016] Preferably, a formwork support system is provided below and on the outside of the combined system of bottom and side formwork, wherein a liftable hydraulic support system is provided at the bottom of the formwork support system.
[0017] The precast box girder production line described above has the following advantages: 1) The invention has reasonably optimized the arrangement of workstations and completed the insertion process of cages in the prestressing and reinforcement cage insertion station, so as to reduce the workflow of the formwork assembly and pouring station, reduce the occupancy time of the formwork assembly and pouring station, and improve the prefabrication efficiency of the entire production line. 2) By using carrier trucks for the transfer of box girder prefabrication stations, the efficiency of station transfer is higher; and the carrier trucks move in the prefabrication yard, the process distribution is more decentralized, and the time difference between the operation of each station is smaller, thus fully releasing the capacity of the production line. 3) The bottom and side formworks are integrated, the bottom and side formworks are not separated during the whole prefabrication process, so there is no need to close and release the side formworks during the prefabrication process, which simplifies the prefabrication process of the box girder, reduces the operation process of the formwork installation and the pouring station, and then reduces the occupancy time of the closing and pouring station, which greatly improves the efficiency of the prefabrication of the box girder. 4) By using this box girder prefabrication production line, the efficiency of box girder prefabrication is improved, so that the construction time of construction workers is shortened to a certain extent and the cost of box girder prefabrication is effectively reduced. Fig. 1 Schematic diagram of the structure of the box girder production line and the circulation line unit of the invention; Fig. 2 Schematic representation of the main view of the carrier carriage; Fig. 3 Schematic representation of the structure of the top view of Fig. 2; Fig. 4 Schematic representation of the structure in the left view of Fig. 2 (excluding the carrier car control room); Fig. 5 Schematic representation of the structure of the longitudinal connection of the bottom and side formwork in the combined system of bottom and side formwork; Fig. 6 Schematic representation of the structure of the cross connection of the bottom and side formwork in the combined system of bottom and side formwork; Fig. 7 Structural representation of the arrangement of the formwork support system, the bar foundation, the support carriage and the combined system of bottom and side formwork. Fig. 8 Schematic representation of the structure of the left view of Fig. 7.
[0018] In the description of the invention, it should be noted that the orientation or positional relationship indicated by the terms "top", "bottom", etc. is based on the orientation or positional relationship shown in the accompanying drawings or on the orientation or positional relationship in which the inventive product is conventionally arranged in use; this is intended only to facilitate and simplify the description of the invention and is not an indication or inference that the device or element mentioned must have a particular orientation or be constructed and operated in a particular orientation, and is therefore not to be understood as a limitation of the invention.
[0019] As in Fig. 1, a precast box girder production line comprises a box girder production line unit 1. The box girder production line unit 1 comprises a formwork assembly and pouring station 101, an inner formwork entry and exit station 104, a maintenance prestressing station 105, a steam treatment station 106, and a prestressing and reinforcement cage insertion station 107, which are arranged one after the other, with an inner formwork removal table 103 provided on the outside of the inner formwork entry and exit station 104. Here, the formwork assembly and pouring station 101 is used to complete the installation of the inner and end forms and some pre-assembled parts, as well as the pouring and final setting of the concrete and the removal of the end forms in a combined system of bottom and side forms with installed reinforcement cages.The installation of some of the pre-assembled parts includes the installation of pre-assembled parts such as ventilation holes, drainage holes, lifting holes, and the like. The inner formwork entry and exit station 104 serves to cooperate with the exit and entrance of the inner formwork and to create a space for the combined system of bottom and side formwork to return to the formwork assembly and pouring stations 101; the inner formwork transfer table 103 serves to temporarily store and transfer the inner formwork of the box girder 4; in particular, at the entry into the formwork, the inner formwork carries out the entry of the inner formwork from the inner formwork entry and exit station 104 to the formwork assembly and pouring station 101, and at the exit of the formwork, the exit of the inner formwork from the maintenance pre-stressing station 105 to the inner formwork entry and exit station 104, and the inner formwork transfer table 103 is provided,When the box girder 4 is transferred from the formwork assembly and casting station 101 to the maintenance prestressing station 105, the inner formwork entry and exit station 104 waits for the next girder piece to be produced in the formwork so that the inner formwork can temporarily move into the inner formwork transfer table 103. After the transfer of the box girder 4 to the maintenance prestressing station 105 is completed, the inner formwork is transferred back to the inner formwork entry and exit station 104 and waits for the mold to be poured. The transfer of the inner formwork can be carried out using an inner mold transfer car. The maintenance prestressing station 105 serves to condition the box girder 4 transferred from the formwork assembly and casting station 101 with steam for the prestressing force of the box girder 4.Prestress the strand bundles for bundling and prestressing and remove the inner formwork from the formwork; the steam treatment station 106 serves to steam-cure the box girder 4 transferred from the maintenance prestressing station 105 to achieve prestress strength; the maintenance prestressing station 105 and the steam treatment station 106 perform closed steam curing, which contributes to improving the efficiency of heat utilization. The use of steam curing can significantly shorten the curing time, shorten the prefabrication process time, and improve the efficiency of prefabrication. In the maintenance prestressing station 105, the time for occupying the inner molds can be reduced to improve the efficiency of using the inner molds and reduce the utilization cost of the workpieces. The prestressing and reinforcement cage insertion station 107 serves toto carry out the prestressing of the box girder 4 transferred from the steam treatment station 106 and, after demoulding and transferring the box girder 4, to complete the installation of the reinforcement cage into the combined system of bottom and side forms; after tensioning the finished box girder 4, the girder is lifted out of the box girder production line unit 1 using the girder lifting system, whereby the production of the finished box girder 4 is completed once and the prefabrication of the next box girder 4 begins at this time, that is, in the combined system of bottom and side formwork, which has been transported from the formwork assembly and pouring station 101 to the prestressing and reinforcement cage insertion station 107, the formwork is ground and cleaned, the mold release agent is applied, the bearing plates, fall protection girders Prestressed parts are installed,Then, the reinforcement cage is installed. In the present embodiment, the integrated construction of the bottom formwork 6 and the side formwork 5 is maintained, forming a combined system of bottom formwork and side formwork, thereby reducing the time required to dismantle the side forms. Furthermore, the steps for installing the reinforcement cage, which is completed at the prestressing and reinforcement cage insertion station 107, are rationally adjusted to reduce the operating sequences of the formwork assembly and pouring station 101 and to decrease the occupancy time of the formwork assembly and pouring station 101. This significantly improves the efficiency of prefabrication of the box girder.
[0020] Preferably, an end formwork transfer table 102 is provided at one end of the formwork assembly and pouring station 101 remote from the inner formwork entry and exit station 104; and an end formwork transfer table 102 is also provided at one end of the inner formwork transfer table 103 near the formwork assembly and pouring station 101. Each set of box girder forms is provided with two sets of end forms, one set each at the front and rear ends, and the end forms are placed in the end formwork transfer table 102 before installation. The end forms at one end of the inner formwork transfer table 103 are then transported to the front end of the formwork assembly and pouring station 101 for installation. The transfer of the end forms can be carried out using the end formwork assembly base. As shown in Fig. 1, a production line unit for box girders 1 is shown on the left and right sides of the circulating line unit 2 in the feed direction of the box girder 4, wherein the production line unit for box girders 1 on the right side is shown with end forms shifted to the front end of the formwork assembly and pouring station 101, and the production line unit for box girders 1 on the left side is shown with end forms still located in the inner formwork escape tables 103 at the near-formwork end of the formwork assembly and pouring station 101. Furthermore, in the right-hand illustration of the production line for box girders 1, the transfer carriage for the inner formwork is located in the inner formwork entry and exit station 104, where the installation of the inner formwork is completed, and then the end formwork is moved to the front end of the formwork assembly and pouring station 101.In the illustration of the production line for box girder 1 on the left, the inner formwork transfer carriage is housed in the inner formwork transfer table 103.
[0021] Preferably, a concrete mixing plant 110 is provided on the outside of the formwork assembly and pouring station 101, wherein a feed line 109 is provided between the concrete mixing plant 110 and the formwork assembly and pouring station 101; the concrete mixing plant 10 can transport the mixed concrete via the feed line 9 directly to the formwork assembly and pouring station 101 for casting the box girder, thereby reducing repeated transfers of concrete mixer trucks and lowering construction costs.
[0022] Preferably, a carrier carriage traverse zone 108 is also provided upstream of the prestressing and reinforcement cage insertion station 107; further comprising a circulation line unit 2 provided on one side of the box girder production line unit 1 or between two of the box girder production line units 1 and extending from the carrier carriage traverse zone 108 to the inner formwork entry and exit station 104 to provide a space for transmitting the movement of the carrier carriage 3 and the transfer of the combined system of bottom and side formwork from the prestressing and reinforcement cage insertion station 107 back to the inner formwork entry and exit station 104; in particular, the carrier carriage 3 first moves the combined system of bottom and side formwork and the reinforcement cage to the carrier carriage traverse zone 108 and then travels to the circulation line unit 2, as indicated by the arrows in Fig. 1, and the carrier carriage 3 moves the combined system of bottom and side formwork and the reinforcement cage through the space of the circulating line unit 2 to the side of the inner formwork entry and exit station 104 and then returns to the inner formwork entry and exit station 104, and finally through the inner formwork entry and exit station 104 back to the formwork assembly and pouring station 101. Since the circulating line unit 2 takes a shorter period of time, a circulating line unit 2 may also be provided between the two box girder production line units 1 to use the space more efficiently.
[0023] Preferably, the transfer of the combined system of bottom and side formwork between the formwork assembly and pouring station 101, the inner formwork entry and exit station 104, the maintenance prestressing station 105, the steam treatment station 106 and the prestressing and reinforcement cage insertion station 107 is carried out by means of a carrier carriage;The carrier carriage 3 carries the combined system of bottom and side formwork and transports it between the various stations to achieve the prefabrication of the box girder 4 in the production line. If the circulation line unit 2 is provided, the transfer of the combined system of bottom and side formwork between the formwork assembly and pouring station 101, the inner formwork entry and exit station 104, the maintenance prestressing station 105, the steam treatment station 106, the prestressing and reinforcement cage insertion station 107, the carrier carriage truss zone 108, and the circulation line unit 2 is carried out by means of a carrier carriage 3;The formwork assembly and pouring station 101, the maintenance prestressing station 105, the steam treatment station 106, and the prestressing and reinforcement cage insertion station 107 are provided with at least two strip foundations to support the combined bottom and side formwork system after the carrier car 3 places the combined bottom and side formwork system in place. The strip foundation 8 is cast in concrete, and the concrete support ensures that the box girder 4 does not sag and subside during the prefabrication process, making the structure safer.
[0024] Even more preferably, this embodiment provides a structure of a carrier carriage 3 which, in conjunction with the Fig. 2 to 4, the carrier trolley 3 comprises a carrier trolley frame 303, a carrier trolley roller 304 and a carrier jack 302, the carrier trolley frame 303 being adapted to the length of the combined bottom form and side form system for holding and transferring the combined bottom form and side form system, a plurality of carrier trolley rollers 304 being rollingly connected below the carrier trolley frame 303 and a plurality of rows of carrier jacks 302 being provided at intervals above, when the carrier trolley 3 is needed to transfer the combined bottom form and side form system, the carrier jacks 302 are jacked up to raise the combined bottom form and side form system so that they are no longer supported by the beam foundation 8, and then the carrier trolley 3 is moved to transfer the combined bottom form and side form system to the appropriate;After the transfer, the carrier jack 302 retracts so that the combined system of bottom and side formwork is supported by the beam foundation 8. A control room of the carrier carriage 301 is provided at the front or rear end of the carrier carriage frame 303, which can separately control the carrier carriage rollers 304 at the front and rear to realize the front or rear diagonal displacement of the carrier carriage as well as the overall displacement.
[0025] To ensure the stability and strength of the beam during the transfer of the combined bottom and side formwork system, at least three beam jacks 302 are preferably provided in each row of beam jacks 302, with one of the beam jacks 302 being provided on the center axis of the beam carriage frame 303 and the other two being symmetrical to the center axis of the beam carriage frame 303. At least one row of beam jacks 302 is provided at the front, center, and rear of the beam frame 303 to ensure balanced support.
[0026] Preferably, this embodiment also provides a combined system of bottom and side formwork, which comprises a bottom formwork 6, a side formwork 5 and a longitudinal connecting element for the bottom formwork, as in Fig. 5; wherein a downwardly projecting longitudinal connection plate for the bottom formwork 603 is provided on both sides of the bottom formwork 6, and wherein the longitudinal connection plate for the bottom formwork 603 is provided along the longitudinal direction and is spaced with a plurality of longitudinal connection holes for the bottom formwork; wherein a downwardly projecting longitudinal connection plate for the side formwork 503 is provided on a lower side edge of the side formwork 5, wherein the longitudinal connection plate of the side formwork 503 is also provided in the longitudinal direction with a plurality of spaced-apart longitudinal connection holes for the side formwork; wherein the longitudinal connection plate for the side form 503 and the longitudinal connection plate for the bottom form 603 are both in the Fig. 5 are arranged from front to back. The longitudinal connecting elements for the bottom formwork pass through the longitudinal connecting holes for the bottom formwork and the longitudinal connecting holes for the side formwork and are fixed so that the side forms 5 are fixed on both sides of the bottom formwork 6; of course, the longitudinal connecting plate 503 for the side formwork and the longitudinal connecting plate 603 for the bottom formwork fit together so that the side formwork 5 and the bottom formwork 6 can be stably connected to each other, and for the longitudinal connecting element for the bottom formwork, that is, a combination of bolts and nuts commonly used in the art, the bolts are passed through the longitudinal connecting holes for the bottom formwork and the longitudinal connecting holes for the side formwork, and the other end can be screwed tight with a nut.This combined system of bottom and side formwork is firmly connected to each other throughout the prefabrication of the box girder 4, and the longitudinal connecting elements of the bottom formwork are only removed to separate the bottom formwork 6 from the side formwork 5 when they need to be transported or replaced.
[0027] In addition, a stop formwork 504 is mounted above the outer side of the side formwork 5 in order to fix the shape of the outer side of the flange plate on the box girder 4; this is state of the art and will not be described in detail here.
[0028] Preferably, the structure of the floor formwork 6 and the side formworks 5 is optimized, since the floor formwork 6 and the side formworks 5 must support the box girder 4 for transport in order to prevent deformation of the box girder 4. The floor formwork 6 comprises a floor formwork panel 601, wherein the floor formwork panel 601 is of conventional structure, with floor formwork support longitudinal beams 602 fixed at intervals below the floor formwork panel 601, wherein the floor formwork support longitudinal beams 602 extend along the longitudinal direction of the floor formwork panel 601 and have a length corresponding to the length of the floor formwork panel 601, and wherein the floor formwork support longitudinal beams 602 are arranged parallel to one another, preferably at equal intervals;The side formwork 5 comprises a side formwork panel 501, to the outer sides of which side formwork longitudinal beams 502 are attached at intervals, wherein the side formwork longitudinal beams 502 extend in the longitudinal direction of the side formwork panel 501 and have a length corresponding to the length of the side formwork panel 501, and wherein the side formwork longitudinal beams 502 are also arranged parallel to each other. The bottom formwork support beams 602 and the side formwork support beams 502 can ensure the strength of the combined system of bottom and side forms and better ensure that the box girder is free from cracks, deformations, and other quality problems during pouring and transfer. Preferably, this embodiment provides a material for the bottom formwork support beam 602 and the side formwork support beam 502, wherein the bottom formwork support beam 602 is made of an H-beam;the bottom formwork 6 is subjected to a large load and the use of an H-beam better ensures the support strength; the side formwork support beam 502 comprises a first side formwork support beam 502a and a second side formwork support beam 502b, wherein the first side formwork support beam 502a is fixed to the center of the web of the side formwork panel 501 and to the center of the upper flange plate of the side formwork panel 501;A second side formwork support beam 502b is fixed at intervals on both sides. The first side formwork support beam 502a is made of H-beam, and the second side formwork support beam 502b is made of channel steel. The H-beam is fixed to reinforce the side forms 5 at the position where the loads they bear are greater, and the channel steel can be used to reinforce the side forms 5 at other positions. The bottom formwork support beam 602 and the side formwork support beam 502 are connected to the bottom formwork panel 601 and the side formwork panel 501 by welding, respectively.
[0029] In addition, due to the great length of the box girder and to facilitate transport and storage, the bottom formwork 6 comprises several bottom formwork segments connected to each other along the length (i.e. in the longitudinal direction), as shown in Fig. 6, a downwardly projecting cross-connecting plate for the bottom formwork 204 is provided on the front and back of the lower mold part; the cross-connecting plates for the bottom formwork 204 are arranged in the transverse direction, ie in the Fig. 6, and the bottom formwork cross-connection plates 204 of adjacent bottom form segments are fastened and secured to one another by the cross-connection elements, thus forming the bottom formwork 6. To facilitate assembly, the bottom formwork 6 can be divided into a plurality of equally long bottom form segments so that the connection sequence can be carried out without restrictions; likewise, the side formwork 5 comprises a plurality of side form segments connected to one another along a longitudinal direction, wherein the side formwork segments are provided with downwardly projecting side formwork cross-connection plates 105 at the front and rear sides of the side formwork segments; the side formwork cross-connection plates 105 of adjacent side form segments are connected to one another and secured by the side formwork cross-connection elements to form the side formwork 5.The bottom formwork cross-connecting elements are selected from a combination of bolts and nuts commonly used in engineering. The bottom formwork cross-connecting plate 204 is provided with bottom formwork cross-connecting holes 205 at intervals. The bolts pass through the bottom formwork cross-connecting holes 205 of the two parts of the bottom formwork cross-connecting plates 204, and the other end can be tightened with nuts to achieve the connection of the bottom formwork 6 in the front and rear directions; the same applies to the front and rear directions of the side formwork 5. The side formwork cross-connecting plate 105 is interspersed with side formwork cross-connecting holes 106, also with bolts and nuts for connecting the side formwork segments.Preferably, the bottom formwork segments and the side formwork segments are of equal length in the longitudinal direction to facilitate the establishment of the connection between the combination of bottom and side formwork segments in the longitudinal direction after the connection of each bottom formwork segment to the side formwork segment in the transverse direction has been completed.
[0030] Preferably, a formwork support system 7 is provided below and on the outside of the combined system of bottom and side formwork, wherein a liftable hydraulic support system is provided at the bottom of the formwork support system 7. The formwork support system 7 forms a support for the combined system of bottom and side formwork, and the hydraulic support system, together with the strip foundation 9, forms a support for the box girder 4, the formwork, and the formwork support system 7 during construction work. In conjunction with the Fig. 7 to 8, this embodiment shows the structure of one of the formwork support systems 7, wherein the formwork support system 7 comprises a formwork support cross member 709, a support structure for the back rib 702, a formwork support cross member adjustment unit 713, a support structure for the side formwork, and a hydraulic support mechanism for the side formwork 714; the formwork support cross members 709 are releasably attached at transverse intervals below the bottom formwork 6 and extend outwardly, in this embodiment perpendicular to the bottom formwork support longitudinal members 602, in particular, the formwork support cross members 709 are arranged transversely and spaced longitudinally (i.e., lengthwise) below the bottom formwork 6 to form a support for the bottom formwork 6,The structural self-weight of the extended overhanging part of the combined bottom and side formwork system on the carrier carriage 3 is borne during work transfer; the support structure for the back rib 702 is spaced outside the side formwork 5 in the transverse direction, conforms to the shape of the side formwork 5, and provides support for the side formwork 5 in the upward and downward directions. It is fixed at one end to the top of the formwork support cross member 709, which is vertically connected to the side formwork beam longitudinal members 502. The connection can be made by welding, and the distance between the support structure for the back rib 702 and the distance of the formwork support cross member 709 are matched. The formwork support cross member adjustment unit 713 is fixed below the formwork support cross member 709 and is located below the location,at which the support structure for the back rib 702 is connected to the formwork support crossbeam 709, and includes a lifting element for adjusting the height of the formwork support crossbeam; the side formwork support structure is supported on the outside and below the support structure for the back rib 702, and the lower part includes a bottom crossbeam 712 connected to the formwork support crossbeam adjustment unit and supporting the outer end of the formwork support crossbeam 709; provided below the outer end of the bottom crossbeam 712 is a side formwork hydraulic support mechanism 714, with which the stroke of the formwork support crossbeam can be adjusted. The side formwork support structure forms a support for the side formwork 5, and the formwork support crossbeam adjustment unit 713 and the side formwork hydraulic support mechanism 714 together form a support for the bottom formwork 6 and the side formwork support structure.which form a hydraulic lifting and lowering support system for the formwork support system 7, and both lift or lower simultaneously, adjusting the lifting and lowering of the inner and outer sides of the bottom formwork 6 and the side formwork support structure. When the combined bottom and side formwork system is positioned, the formwork support crossbeam adjustment unit 713 and the side formwork hydraulic support mechanism 714 are lifted and supported on the ground foundation. A strip foundation 8 is established in connection with each construction site to transfer the box girder 4 and the formwork's dead weight load, as well as the load of the construction work, to the ground foundation. The support of the formwork support system 7 prevents the deformation and destruction of some areas of the formwork structure caused by the partial overhang of the structure.and the internal structure of the prefabricated box girder 4 does not conform to the phenomenon, so as to ensure the quality of the construction and the quality of the product. From , Fig. 7 shows that two sets of formwork support systems 7 are present, one set for each of the side formworks 5, symmetrical with respect to the longitudinal center axis of the bottom formwork 6.
[0031] Preferably, the side formwork support structure comprises a plurality of first vertical beams 710, second vertical beams 708, third vertical beams 711, upper cross beams 705, lower cross beams 712, and a reinforcement connection unit, wherein one end of the upper cross beam 705 is fixed to the upper part of the support structure for the back rib 702 arranged on the outer side of the web portion of the side formwork 5, and the other end is connected to the first vertical beam 710; the upper end of the first vertical beam 710 is connected to the lower outer end of the support structure for the back rib 702 arranged on the outer side of the upper flange plate portion of the side formwork 5, and the lower end is connected to the upper outer end of the bottom cross beam 712;The upper end of the second vertical beam 708 is connected to the lower part of the middle part of the upper cross beam 705, and the lower end is connected to the upper part of the outer end of the formwork support cross beam 709. During work relocation, the formwork support cross beam adjustment unit 713 and the side formwork hydraulic support mechanism 714 are not supported on the ground, and the structural dead weight of the extended overhanging part of the combined system of bottom and side forms on the support carriage 3 is transferred to the formwork support cross beam 709, ensuring support; The first vertical beam 710 supports the outer end of the side formwork 5, and the second vertical beam 708 supports the part of the side formwork 5 near the web, so that the side formwork 5 ensures a stable mass of the part of the upper flange plate of the box girder 4.The upper end of the third vertical beam 711 is connected to the underside of the outer end of the formwork support crossbeam, and the lower end is connected to the upper part of the floor crossbeam 712 and is located below the second vertical beam 708. The third vertical beam 711 allows the formwork support crossbeam 709 to be connected to the rest of the side formwork support structure to be integrated; the inner end of the floor crossbeam 712 is connected to the fixed part of the lifting link, that is, the floor crossbeam 712 does not hinder the movement of the formwork support crossbeam adjustment unit 713 when it is jacked up or retracted;A first vertical beam 710, a second vertical beam 708, a third vertical beam 711, an upper cross beam 705, a bottom cross beam 712, and a formwork support cross beam 709 form a transverse formwork support structure unit, and the transverse formwork support structure units are arranged at equal intervals to prevent structural damage caused by excessive local loads; A connecting longitudinal beam of the beam 715 is connected to the connection of the plurality of first vertical beams 710 to the upper cross beams 705 and the bottom cross beams 712, respectively, to which the lateral formwork beams can be connected in the entire longitudinal direction of the formwork as a whole;A reinforcement connection unit is detachably attached between the back rib support structure 702 and the second vertical beam 708, between the first vertical beam 710 and the second vertical beam 708, between adjacent first vertical beams 710, between adjacent upper cross beams 705, and between adjacent bottom cross beams 712. The reinforcement connection unit improves the integrity of the side mold support structure and the stability of the support. The connections between the various components of the side mold support structure can be bolted. In the present embodiment, a more specific structure of reinforcement connection units is provided, which can be used in conjunction with; Fig. 7, wherein a third reinforcement connection unit 706 in the form of an X-connecting rod structure is provided between adjacent first vertical beams 710, wherein the upper end is provided at the connection between the first vertical beam 710 and the upper connecting longitudinal beam 715 and the lower end is provided at the connection between the first vertical beam 710 and the lower connecting longitudinal beam of the beam 715, thereby forming a scissor-like structure, and the third reinforcement connection unit 706 can be made of angle steel. In connection with Fig. 7, a second reinforcement connecting unit 704, also of X-connecting rod design, is also provided between adjacent upper cross members 705; in the figure, the connecting rod of the second reinforcement connecting unit 704 can be seen, but there is no schematic plan view to see the X-shaped structure. Each rod end was inserted into the upper cross member 705 and the first vertical member 710, and diagonally opposite the second vertical member 708 (next to the other side of the mold supporting the structural unit of the second vertical member 708) of the connection, the material can be referred to the third reinforcement connecting unit 706; between the adjacent lower cross members 712, a fifth reinforcement connecting unit 716 is also provided.wherein each end of each rod is provided at the connection between the lower cross member 712 and the diagonally opposite second vertical member 708 (the second vertical member 708 of the adjacent side formwork support structure unit on the other side), wherein the material refers to the second reinforcement connection unit 704. The reinforcement connection unit between the support structure for the back rib 702 and the second vertical member 708, i.e., the first reinforcement connection unit 701, is a diagonally connected support rod, one end of which is connected to the connection position of the support structure for the back rib 702 and the formwork support cross member 709, and the other end of which is connected to the connection position of the second vertical member 708 and the upper cross member 705, and may be made of angle steel,wherein the setting of a corresponding connecting piece to form a screw connection; the reinforcing connection unit between the first vertical beam 710 and the second vertical beam 708 forms a triangular reinforcing structure with the second vertical beam 708, i.e., the fourth reinforcing connection unit 707 shown in the figure, wherein the apex of the triangular reinforcing structure lies on the first vertical beam 710, so that the load of the side formwork is distributed evenly above the ground foundation via the first vertical beam 710 and the formwork cross beam 709.
[0032] More preferably, vertical beams 703 are connected at intervals between the support structure for the back rib 702 and the upper cross beams 705 located on the outside of the upper flange plate portion of the side form 5 to form more load transfer points on the outside of the side form 5 and to prevent the product quality of the box girder 4 from being affected by local deformation of the upper flange plate portion of the box girder 4 due to local deformation of the side form 5.
[0033] In addition, a working platform may be provided on the outside of the outer surface of the side formwork 5 on the top side of the support structure for the back rib 702, and further, a working ladder 9 may be provided in the formwork support system 7 so that it is possible to climb onto the working platform from the ground.
[0034] Preferably, the lifting element of the formwork support cross member adjustment unit 713 and the side formwork hydraulic support mechanism 714 are hydraulic jacks, which are easy to operate and control and are preferred for the lifting structure.
[0035] Combined with Fig.7, the transfer of the carrier carriage 3, which carries the combined system of bottom and side formwork, between the various stations is shown as follows: during the prefabrication of the box girder 4, the carrier carriage 3 carries the combined system of bottom and side formwork and the formwork support system 7 for transfer between the various stations. Once the transfer has taken place, the carrier jack 302 above the carrier carriage 3 retracts so that the combined system of bottom and side formwork and the formwork support system 7 falls to the position of the bar foundation 8 at the station. At this moment, the hydraulic support system on the underside of the formwork support system 7 is also lifted downwards to form a support for the formwork support system 7.and the box girder 4 and the dead weight of the formwork as well as the load of the construction work are transferred to the ground foundation via the strip foundation 8 and the hydraulic support system. When the operation of one station is completed and it is necessary to transport the combined system of bottom and side formwork and the formwork support system 7 to the next station, the hydraulic support system is retracted and the girder jacks 302 are jacked up so that the combined system of bottom and side formwork is detached from the strip foundation 8 and the combined system of bottom and side formwork and the formwork support system 7 can be transported by the girder truck 3. List of reference symbols 1 production line unit for box girders 101 Formwork assembly and pouring station 102 End formwork avoidance table 103 Internal formwork escape table 104 Internal formwork entry and exit station 105 Maintenance tensioning station 106 Steam treatment station 107 Prestressing and reinforcement cage insertion station 108 Carrier carriage traverse zone 109 Feed track 110 concrete mixing plant 2 Circulation line unit 3 carrier wagons 301 Carrier car control room 302 Carrier Jack 303 Carrier frame 304 Carrier trolley roller 4 box girders 5 side formwork 501 side formwork panel 502 Side formwork support beams 502a first side formwork support longitudinal beam 502b second side formwork support longitudinal beam 503 Longitudinal connecting plate for the side formwork 504 Stop formwork 6 Floor formwork 601 floor formwork panel 602 Floor formwork support beams 603 Longitudinal connecting plate for the floor formwork 7 Formwork support system 701 first reinforcement connection unit 702 Support structure for the back rib 703 Vertical support 704 second reinforcement connection unit 705 upper cross member 706 third reinforcement connection unit 707 fourth reinforcement connection unit 708 second vertical beam 709 formwork support cross member 710 first vertical beam 711 third vertical beam 712 floor cross member 713 Adjustment unit for the formwork support mechanism 714 Hydraulic support mechanism for side formwork 715 Connecting longitudinal beam of the beam 716 fifth reinforcement connection unit 8 strip foundation 9 work managers
Claims
[1] Production line for precast box girders, characterized by that it comprises a production line unit for box girders (1), the production line unit for box girders (1) comprising a formwork assembly and casting station, an inner formwork entry and exit station, a maintenance prestressing station (105), a steam treatment station (106), a prestressing and reinforcement cage insertion station, which are arranged one after the other, an inner formwork escape table (103) being provided on the outside of the inner formwork entry and exit station; wherein the formwork assembly and pouring station is used to complete the installation of the inner and end forms, as well as the pouring and final setting of the concrete and the removal of the end forms in a combined system of bottom and side forms with installed reinforcement cages; wherein the inner formwork entry and exit stations serve to interact with the inner formwork exit and entrance and provide space for the combined bottom and side formwork system to return to the formwork assembly and pouring stations; wherein the maintenance prestressing station (105) serves to condition the box girder (4) transferred from the formwork assembly and casting station with steam for the prestressing force of the box girder, to prestress the strand bundles for bundling and prestressing and to remove the inner formwork from the formwork; wherein the steam treatment station serves to steam cure the box girder transferred from the maintenance prestressing station (105) in order to achieve prestress strength; wherein the prestressing and reinforcement cage insertion station serves to carry out the prestressing of the box girder transferred from the steam treatment station (106) and, after demoulding and transfer of the box girder, to complete the installation of the reinforcement cage into the combined system of bottom and side moulds; wherein the inner formwork avoidance table (103) serves to temporarily store and avoid the inner formwork of the box girder. [2] Production line for prefabricated box girders according to claim 1, characterized by that an end formwork deflection table (102) is provided at one end of the formwork assembly and pouring station remote from the inner formwork entry and exit station; wherein an end formwork deflection table (102) is also provided at one end of the inner formwork deflection table near the formwork assembly and pouring station. [3] Production line for precast box girders according to claim 1 or 2, wherein a concrete mixing plant (110) is provided on the outside of the formwork assembly and pouring station, wherein a feed line (109) is provided between the concrete mixing plant (110) and the formwork assembly and pouring station. [4] A precast box girder production line according to any one of claims 1 to 3, wherein a carriage (3) traverse zone is also provided before the prestressing and reinforcement cage insertion station; further comprising a circulation line unit (2) provided on one side of the box girder production line unit (1) or between two of the box girder production line units (4) and extending from the carriage (3) traverse zone to the inner formwork entry and exit station to provide a space for transmitting the movement of the carriage and the transfer of the combined system of bottom and side forms from the prestressing and reinforcement cage insertion station back to the inner formwork entry and exit station. [5] A precast box girder production line according to any one of the preceding claims, wherein the transfer of the combined system of bottom and side formwork between the formwork assembly and pouring station, the inner formwork entry and exit station, the maintenance prestressing station (105), the steam treatment station (106), and the prestressing and reinforcement cage insertion station is carried out by means of a carrier carriage; wherein the formwork assembly and pouring station, the maintenance prestressing station (105), the steam treatment station (106), and the prestressing and reinforcement cage insertion station are provided with at least two strip foundations to support the combined system of bottom and side formwork (5) after the carrier carriage (3) has brought the combined system of bottom and side formwork (5) into place. [6] A precast box girder production line according to claim 4 or 5, wherein the transfer of the combined system of bottom and side formwork between the formwork assembly and pouring station, the inner formwork entry and exit station, the maintenance prestressing station (105), the steam treatment station (106), the prestressing and reinforcement cage insertion station, the carrier carriage truss zone, and the circulation line unit (2) is carried out by means of a carrier carriage; wherein the formwork assembly and pouring station, the maintenance prestressing station (105), the steam treatment station (106), and the prestressing and reinforcement cage insertion station are provided with at least two strip foundations to support the combined system of bottom and side formwork (5) after the carrier carriage (3) has brought the combined system of bottom and side formwork (5) into place. [7] Production line for prefabricated box girders according to claim 5 or 6, wherein the carrier carriage (3) comprises a carrier carriage frame (303), carrier carriage rollers and carrier carriage jacks (302), wherein the carrier carriage frame (303) is adapted to the length of the combined system of bottom and side formwork (5), several carrier carriage rollers are rolled and connected underneath and several rows of carrier carriage jacks are provided at intervals above. [8] A precast box girder production line according to claim 7, wherein each row of girder jacks is provided with at least three girder jacks, one of the girder jacks being provided on the central axis of the girder frame and the other two being symmetrical with respect to the central axis of the girder frame. [9] Production line for precast box girders according to one of the preceding claims, wherein the combined system of bottom and side formwork (5) comprises a bottom formwork (6), a side formwork (5) and a A longitudinal connecting element for the floor formwork (6), wherein a downwardly projecting longitudinal connecting plate for the floor formwork (603) is provided on both sides of the floor formwork (6), and wherein the longitudinal connecting plate for the floor formwork (603) is spaced apart from one another with a plurality of longitudinal connecting holes for the floor formwork (6); wherein a downwardly projecting longitudinal connecting plate for the side formwork (503) is provided on a lower side edge of the side formwork (5), wherein the longitudinal connecting plate for the side formwork (503) is spaced apart from one another with a plurality of longitudinal connecting holes for the side formwork (5);wherein the longitudinal connecting element for the floor form passes through the longitudinal connecting holes for the floor formwork (6) and the longitudinal connecting holes for the side formwork (5) and is fastened such that the side formwork (5) is fastened on both sides of the floor formwork (6), wherein the longitudinal connecting element for the floor formwork (6) comprises a combination of a screw and a nut; wherein the bottom formwork (6) comprises a bottom formwork panel (601), wherein bottom formwork support longitudinal beams (602) are fastened at intervals below the bottom formwork panel (601), wherein the bottom formwork support longitudinal beams (602) extend along the length of the bottom formwork panel (601) and have a length corresponding to the length of the bottom formwork panel (601); wherein the side formwork (5) comprises a side formwork panel (501), wherein side formwork support longitudinal beams (502) are fastened at intervals to the outer sides of the side formwork panel (501), wherein the side formwork support longitudinal beams (502) extend along the length of the side formwork panel (501) and have a length corresponding to the length of the side formwork panel (501). [10] A precast box girder production line according to any one of claims 1 to 9, wherein a formwork support system (7) is provided below and on the outside of the combined system of bottom and side forms, and wherein a liftable hydraulic support system is provided at the bottom of the formwork support system.
Citation Information
Cited By
Production method of high-speed railway box girder prefabrication production line
CN116604691A
Production method of high-speed railway box girder prefabrication production line
CN116604691B